Chart usGOLD   Chart usSILVER  
 
Food for thought
Liberty is the prevention of control by others
Lord Acton  
Search for :
LATEST NEWS  :
MINING STOCKS  :
Subscribe
Write Us
Add to Google
Search on Ebay :
PRECIOUS METALS (US $)
Gold 1294.60-0.06
Silver 19.630.01
Platinum 1404.50-4.50
Palladium 794.000.00
WORLD MARKETS
DOWJONES 16409-16
NASDAQ 40969
NIKKEI 1447961
ASX 544532
CAC 40 443226
DAX 941092
HUI 220-2
XAU 90-1
CURRENCIES (€)
AUS $ 1.4797
CAN $ 1.5203
US $ 1.3814
GBP (£) 0.8226
Sw Fr 1.2200
YEN 141.4310
CURRENCIES ($)
AUS $ 1.0716
CAN $ 1.1004
Euro 0.7239
GBP (£) 0.5955
Sw Fr 0.8832
YEN 102.3800
RATIOS & INDEXES
Gold / Silver65.95
Gold / Oil12.38
Dowjones / Gold12.67
COMMODITIES
Copper 3.040.02
WTI Oil 104.590.83
Nat. Gas 4.740.21
Market Indices
Metal Prices
RSS
Precious Metals
Graph Generator
Statistics by Country
Statistics by Metals
Advertise on 24hGold
Projects on Google Earth
Bombore FS and Resource Update Will Include +400,000m of Drilling
Published : February 04, 2013

Progress continues on the full Feasibility Study for a CIL plant

( 0 vote, 0/5 ) Print article
     
Tweet

OTTAWA, ONTARIO--(Marketwire - Feb. 4, 2013) - Orezone Gold Corporation (News - Market indicators) is pleased to announce additional positive results from an ongoing infill and expansion drill program at its wholly owned Bomboré Gold Project in Burkina Faso, West Africa. An additional 75,000 m of results have now been released since the August 2012 resource estimation.  The 100,000 m drill program continues to demonstrate the potential to upgrade and expand the resources, especially the softer near surface oxide resources.  The current resource is constrained within optimized open pit shells that span 11 km and includes 4.13 Moz of measured and indicated (125 Mt @ 1.03 g/t) and 1.03 Moz of inferred resources (35 Mt @ 1.00 g/t) with an average depth of drilling to only 120 meters.  The oxide portion of the resource occurs in the top 50 m and includes 1.76 Moz M&I and 0.26 Moz Inferred resources.  The Company has recently commissioned an interim/internal resource update using 63,500 m (771 holes) of the current program that will bring the total database to over 400,000 m (5,034 holes).  The update is expected to be completed in Q1 2013 and will be the basis for the reserves of the full Feasibility Study ("FS") to be released during the second half of 2013. 

"The additional drilling completed since the release of the 2012 Resource has been successful in infilling and expanding the known resources.  This is expected to have a positive impact on the Bomboré gold resource in terms of both size and the project economics," said Pascal Marquis, SVP Exploration for Orezone.

Results for this release include 9,509 m of reverse circulation (RC) drilling (170 holes) and 9,756 m of core (DD) drilling (73 holes) and are mostly from the northern area of the deposit.  The drilling in this location was designed to upgrade the largely inferred resources and test some new oxide targets.  Some of the holes were also part of a geotechnical drill program that was necessary to finalize the plant, tailings and infrastructure sites as part of the FS.

Feasibility Study Update:

Work continues on the FS with various trade-off studies to finalize the plant site location, optimal grinding circuit, water storage system, tailings design, geotechnical and environmental studies. All geotechnical drilling and work on the ground was completed prior to year end with the results and reports pending.  The Q1 resource update will include pit slopes derived from the geotechnical drilling and studies.  Although results from the 2012 detailed variability metallurgical tests should be released during Q1 2013, the Company continues to study both the soft and hard rock ores to further optimize the design of the grinding circuit so that the CIL plant can be built in two phases.  Preliminary results to date are positive and indicate that up to 60% of the near surface saprolite oxide resources (approximately 65% of the total oxide resource) does not require grinding and could report directly to the CIL leaching circuit.  This would allow for a small grinding circuit (ball mill) with lower power consumption. The Company's objective is to improve project returns by reducing both the initial capital expenditures and operating costs through the processing of only the softer surface ores for at least the first 5 to 6 years, with subsequent expansion of the grinding and leaching circuit funded from cash flows generated from the operation.  Results of the ongoing trade-off studies will be released as they are completed.

Table 1. Cumulative Results Excluded from the August 2012 Resource Reported to Date

Total Drilling to Date Grade g/t
Zone # of Holes Total m Uncut Cut(1)
KT - RC 23 1,172 1.28 1.23
CFU - RC 17 1,455 0.82 0.82
CFU - DD 16 2,517 2.69 1.08
Maga - RC 268 17,885 1.08 0.95
Maga - DD 60 12,874 1.36 1.10
P8P9 - RC 30 1,665 0.91 0.90
P8P9 - DD 43 8,320 1.01 0.98
P11 - RC 24 1,308 1.42 1.12
P11- DD 3 496 1.69 1.15
Siga E - RC 55 2,828 1.06 0.90
Siga E - DD 15 1,920 1.37 1.03
Siga W - RC 35 1,750 1.17 0.96
Siga W - DD 17 2,127 0.93 0.88
Siga S - RC 177 8,877 0.95 0.87
Siga S - DD 36 5,423 0.95 0.90
P16 - RC 12 607 1.03 1.03
P16 - DD 1 184 .91 .91
P17 N - RC 5 250 1.50 1.26
P17 S - DD 3 414 3.09 2.59
North - RC 338 22,177 1.07 0.96
North - DD 119 23,711 1.28 1.03
South - RC 291 14,763 1.01 0.90
South- DD 71 9,966 1.02 0.92
SE - RC 17 857 1.23 1.13
SE - DD 4 598 1.98 1.74
All - RC 646 37,797 1.05 0.94
All - DD 194 34,274 1.19 1.00
 
(1) Weighted average grade of individual assays, cut to 5 g/t. NSA: No Significant Assay.

Table 2. Breakdown of Drilling Meterage for this Release

Zone Core Drilling RC Drilling
# of holes Total m # of holes Total m
KT 0 0 16 822
Maga 15 3,010 93 6,618
CFU 16 2,517 4 293
P8P9 18 3,689    
P16 1 184 12 607
Geotechnical program 23 356 49 1,462
TOTAL 73 9,756 170 9,509

Table 3. Highlights of Diamond Drill Hole Results for this Release

      From To Length Uncut Grade(2) Cut Grade(3) Total
Zone Section Hole # (m) (m) (m) (g/t) (g/t) Assay(4)
CFU 3500 BBD0921 52.00 63.00 11.00 9.92 1.34  
CFU 3500 BBD0921 66.50 78.50 12.00 15.40 1.23  
CFU 2950 BBD0927 212.00 221.00 9.00 1.77 1.77  
CFU 2650 BBD0897 7.00 11.50 4.50 2.90 2.74  
CFU 2550 BBD0898 28.00 50.00 20.50 2.71 1.46  
CFU 2400 BBD0930 39.50 50.00 10.50 1.64 1.46  
Maga 4900 BBD0888 110.00 113.00 3.00 15.14 3.64  
Maga 4800 BBD0889 83.50 90.50 7.00 21.14 2.94  
Maga 3700 BBD0904 174.00 187.00 13.00 1.58 1.58  
Maga 3550 BBD0879 215.00 224.00 9.00 2.64 2.39  
Maga 3450 BBD0878 65.00 76.00 11.00 2.61 2.19  
Maga 3450 BBD0878 80.00 84.00 4.00 2.74 2.74  
Maga 3450 BBD0887 235.00 239.00 4.00 3.31 2.66  
Maga 3400 BBD0885 269.00 275.00 6.00 2.10 2.10  
Maga 2900 BBD0916 83.00 93.50 10.50 1.28 1.28  
Maga 2800 BBD0894 129.00 137.00 8.00 1.66 1.66  
P16 44200 BBD0971 85.00 95.00 10.00 1.26 1.26 Pending
P8P9 2100 BBD0933 111.00 120.00 9.00 3.91 2.81  
P8P9 1950 BBD0935 38.50 44.50 6.00 2.95 2.60  
P8P9 1950 BBD0935 71.50 82.00 10.50 1.67 1.66  
P8P9 1750 BBD0949 15.00 25.00 10.00 2.40 2.25 Pending
 
(2) Weighted average grade of uncut individual assays
(3) Weighted average grade of individual assays cut to 5 g/t
(4) Composite width and grade are preliminary where leach residue fire assay results are pending.

Table 4. Highlights of Reverse Circulation Results for this Release

      From To Length Uncut Grade(5) Cut Grade(6) Total
Zone Section Hole # (m) (m) (m) (g/t) (g/t) Assay(7)
KT 6750 BBC3839 8.00 12.00 4.00 3.71 3.10  
KT 6350 BBC3846 12.00 21.00 9.00 1.76 1.73  
KT 6300 BBC3847 42.00 50.00 8.00 2.44 2.27  
Maga 4950 BBC3857 6.00 13.00 7.00 1.55 1.55  
Maga 4950 BBC3876 26.00 37.00 11.00 3.01 1.82  
Maga 4850 BBC3859 47.00 56.00 9.00 4.86 2.02  
Maga 4850 BBC3862 18.00 32.00 14.00 1.69 1.69  
Maga 4850 BBC3878 28.00 39.00 11.00 1.59 1.59  
Maga 4800 BBC3690 53.00 64.00 11.00 2.05 2.05  
Maga 4800 BBC3880 22.00 29.00 7.00 3.16 2.04  
Maga 4750 BBC3868 21.00 28.00 7.00 1.47 1.47  
Maga 4200 BBC3824 19.00 25.00 6.00 8.96 2.20  
Maga 4150 BBC3717 5.00 20.00 15.00 0.78 0.78  
Maga 4100 BBC3829 50.00 64.00 14.00 1.36 1.36  
Maga 4050 BBC3723 8.00 13.00 5.00 2.14 2.14  
Maga 3950 BBC3738 13.00 21.00 8.00 1.33 1.33  
Maga 3650 BBC3743 45.00 51.00 6.00 3.65 2.44  
Maga 3050 BBC3771 33.00 42.00 9.00 1.26 1.26  
 
(5) Weighted average grade of uncut individual assays
(6) Weighted average grade of individual assays cut to 5 g/t
(7) Composite width and grade are preliminary where leach residue fire assay results are pending

The mineralized intervals are based on a lower cut-off grade of 0.5 g/t, a minimal width of 3 m and up to a maximum of two consecutive meters of dilution being included. The true width of the mineralization is approximately 85% of the drill length intervals in KT, CFU, Maga, P16, P17 and P8P9 areas, and 95% of the drill length intervals in the Siga area.

The half-core samples were collected by Orezone employees using a Diamond saw. The core samples were prepared by SGS Burkina Faso s.a.r.l. at the Bomboré site facility and then split by Orezone to 1 kg using Rotary Sample Dividers (RSDs). A 1 kg aliquot was analyzed for leachable gold at BIGS Global Burkina s.a.r.l in Ouagadougou, by bottle-roll cyanidation using a LeachWell™ catalyst.

The RC drilling samples were divided by Orezone employees using Rotary Sample Dividers (RSDs). A 2 kg split was prepared by SGS Burkina Faso s.a.r.l. at the Bomboré site facility and then split by Orezone to 1 kg using Rotary Sample Dividers (RSDs). A 1 kg aliquot was analyzed for leachable gold at BIGS Global Burkina s.a.r.l in Ouagadougou, by bottle-roll cyanidation using a LeachWell™ catalyst.

The leach residues from all samples with a leach grade in excess of 0.2 g/t were prepared by BIGS Global Burkina s.a.r.l. and then split by Orezone to 50 g using Rotary Sample Dividers (RSDs). A 50 g aliquot was analyzed by fire assay at SGS Burkina Faso s.a.r.l.

Orezone employs a rigorous Quality Control Program (QCP) including a minimum of 10% standards, blanks and duplicates. This program was executed under the supervision of Pascal Marquis, SVP Exploration for Orezone, who is a Qualified Person under National Instrument 43-101 and approved the technical information in this release. A complete table of results and the NI 43-101 Bomboré Resource Report that describes the Bomboré resource model can be found at www.orezone.com.

About Orezone Gold Corporation

Orezone is a Canadian company with a gold discovery track record of +12 Moz and recent mine development experience in Burkina Faso, West Africa.  The company owns a 100% interest in Bomboré which is situated 85 km east of the capital city, adjacent to an international highway. Mineral resources are constrained within optimized open pit shells that span 11 km, and include 4.13 Moz of measured and indicated (125 Mt @ 1.03 g/t) and 1.03 Moz of inferred resources (35 Mt @ 1.00 g/t) with an average depth of drilling to only 120 meters.  The Company is working to further expand the resources at Bomboré while it completes a FS for a phase one oxide-only CIL plant in 2H 2013 and becomes a mid-tier gold producer by 2015.

FORWARD-LOOKING STATEMENTS AND FORWARD-LOOKING INFORMATION: This news release contains certain "forward-looking statements" within the meaning of applicable Canadian securities laws. Forward-looking statements and forward-looking information are frequently characterized by words such as "plan," "expect," "project," "intend," "believe," "anticipate", "estimate" and other similar words, or statements that certain events or conditions "may" or "will" occur. Forward-looking statements in this release include statements regarding, among others; capital and operating cost estimates; gold production for the project; completion of a FS in 2H 2013;  completion of an internal resource update in Q1 2013; commencement of production at the Bomboré Project in 2015.

FORWARD-LOOKING STATEMENTS are based on certain assumptions, the opinions and estimates of management at the date the statements are made, and are subject to a variety of risks and uncertainties and other factors that could cause actual events or results to differ materially from those projected in the forward-looking statements. These factors include the inherent risks involved in the exploration and development of mineral properties, the uncertainties involved in interpreting drilling results and other geological data, fluctuating metal prices, the possibility of project cost overruns or unanticipated costs and expenses, the ability of contracted parties (including laboratories and drill companies to provide services as contracted); uncertainties relating to the availability and costs of financing needed in the future and other factors. The Company undertakes no obligation to update forward-looking statements if circumstances or management's estimates or opinions should change. The reader is cautioned not to place undue reliance on forward-looking statements. Comparisons between any resource model or estimates with the subsequent drill results are preliminary in nature and should not be relied upon as potential qualified changes to any future resource updates or estimates.

Readers are advised that National Instrument 43-101 of the Canadian Securities Administrators requires that each category of mineral reserves and mineral resources be reported separately. Readers should refer to the annual information form of Orezone for the year ended December 31, 2011 and other continuous disclosure documents filed by Orezone since January 1, 2012 available at www.sedar.com, for this detailed information, which is subject to the qualifications and notes set forth therein.



Orezone
Ron Little
CEO
(613) 241-3699 or Toll Free: (888) 673-0663
rlittle@orezone.com
or
Orezone
Pascal Marquis
SVP Exploration
(613) 241-3699 or Toll Free: (888) 673-0663
pmarquis@orezone.com
Data and Statistics for these countries : Burkina Faso | All
Gold and Silver Prices for these countries : Burkina Faso | All
Tweet

Orezone Gold Corp.

EXPLORATION STAGE
CODE : ORE.TO
ISIN : CA68616T1093
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Email Alert Add to Watchlist Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy
Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
In the News and Medias of Orezone Gold Corp.
8/28/2012Orezone tops 5 million ounces gold in Burkina Faso
2/17/2012Cluff outlines production fast-track for Orezone gold asset
5/27/2011Gold grades better than expected for Orezone at Bomboré
10/30/2010Resource boost bumps up buying at Orezone Gold
1/26/2010Orezone completes C$10m financing
1/6/2010Orezone announces C$10m equity financing
12/13/2008Iamgold agrees to take on Orezone for Essakane gold mine
Annual reports of Orezone Gold Corp.
2009 Annual Report
2008 Annual Report
Annual report 2006
Financings of Orezone Gold Corp.
11/13/2013Closes C$5M Non-Brokered Private Placement
10/30/2013Arranges C$5M Non-Brokered Private Placement
12/21/2010Completes C$54 Million Financing
6/23/2010Arranges C$5M Private Placement for Brighton Energy
1/2/2009 Closes Private Placement, Updates Timing of Transaction wit...
Financials of Orezone Gold Corp.
11/15/2008 Third Quarter Update
Project news of Orezone Gold Corp.
1/22/2014Announces Positive Preliminary Economic Assessment
3/27/2013(Bombore)Positive Progress Report for Bombore Feasibility Study and R...
11/13/2012(Bombore)Positive Drill Results Support Further Growth at Bombore
9/4/2012(Bombore)35,000 m of Positive Drill Results Support Further Growth at...
8/27/2012(Bombore)Bombore Gold Project Reaches World Class Size
2/22/2012(Bombore)Provides Positive Update on its Bombore Gold Project
2/3/2012(Sega)Sells Sega Project to Cluff Gold for $29.6M
1/10/2012(Bombore)Reports Continued Positive Results at Bombore Gold Project
11/28/2011Brighton Expands Niger Uranium Discovery to 14 km2 of Minera...
11/21/2011(Bombore)Reports Continued Positive Oxide Results at Bombore Gold Pro...
10/17/2011(Bombore)Positive Results Continue at Orezone's Bombore Gold Project
8/18/2011Orezone Confirms Heap Leach Potential of Sulphide Resources ...
8/18/2011(Sega)Confirms Heap Leach Potential of Sulphide Resources at Sega
8/8/2011Orezone Expands Bombor\303\251 Gold Project ...
8/8/2011(Bombore)Expands Bombore Gold Project Area 60% With New Permit
7/26/2011(Bombore)Reports Higher Gold Grades and Improved Continuity at Bombor...
6/21/2011(Bombore)Bombor=E9 Gold Project Has PositivePreliminary Economic Asse...
6/20/2011Orezone Bombor\303\251 Gold Project ...
4/11/2011(Sega)Confirms Positive Metallurgical Results for Sega Gold Deposi...
3/24/2011(Bombore)Positive Drill Results at Bombore Continue to Confirm Model
3/23/2011(Bombore)Positive Drill Results at Bombore Continue to Confirm Model
2/24/2011(Zeline 1 & Zeline 4)/Brighton Makes Significant New Uranium Discovery in Niger: ...
10/19/2010(Bombore)Bomboré Gold Project has Substantial Increase in Size and Gr...
7/6/2010(Bombore)Fourth Round of Positive Drill Results at Bombore
6/16/2010(Bombore)Positive Results Continue From Bombore Infill and Expansion ...
5/13/2010Additional PositiveInfill and Expansion Drilling Results at ...
3/25/2010(Bombore)Bombore Auger Drilling Results Indicate Possible 2.5km of Ex...
1/28/2010(Bombore)Commences $2 Million Drill Program at Bombore
1/5/2010(Sega)Increases Sega Project Gold Resources
12/8/2009(Bombore)Improves on Final Bombore Metallurgical Results
10/14/2009(Bombore)Confirms Bombore Gold Deposit is Amenable to Heap Leaching
7/29/2009(Bombore)Completes Drilling Below Surface Resources at Bombore
6/24/2009(Bombore)Orezone Confirms Mineralization at Bombore Below Surface Res...
4/24/2009(Bombore)Commences Deep Drilling and Metallurgical Testing at Bombore
11/10/2008(Bombore)Almost Triples Gold Resource at Bombore Project
6/30/2008(Essakane)2008 Technical report
3/4/2008(Bondi)Increases Bondi Project Resources
Corporate news of Orezone Gold Corp.
6/20/2013News Release
6/20/2013(Bombore)Shifts Focus of Bombore Study to Heap Leach Scenario
6/4/2013(Bondi)Positive Metallurgical and Drill Results from the Bondi Proj...
5/24/2013Results of Annual General Meeting
5/24/2013Results of Annual General Meeting
4/29/2013(Bombore)Increases and Upgrades the Bombore Gold Project Resource
2/25/2013(Bombore)Hits Higher Grades on New Targetsand Satellite Deposits at B...
2/4/2013(Bombore)Bombore FS and Resource Update Will Include +400,000m of Dri...
5/31/2012(Bombore)Bombore Drill Program Continues with Positive Results
5/23/2012(Sega)Completes the Sale of Sega to Cluff Gold for $26.5M
3/30/2012(Bombore)Completes 215,000 Drill Program at Bombore
2/7/2012to Consolidate Brighton Energy Corporation
12/7/2011Brighton Energy Makes Another Near-Surface Uranium Discovery...
10/17/2011..s Continue at Orezone's Bombor\303\251 Gold Project\n
9/12/2011(Bombore)Positive Results Continue at Bombore With Seven Drills Opera...
5/26/2011(Bombore)Reports Additional Positive Drill Results at Bombore Gold Pr...
5/16/2011.: Brighton Energy Discovers Additional Uranium Mineralizati...
4/6/2011Expands Board and Management Team
3/7/2011Burkina Faso is Ra
12/3/2010Announces C$46,875,000 Equity Financing
9/15/2010Brighton Energy Commences Uranium Exploration in Niger
2/17/2010Brighton Energy Limited Receives Niger Uranium Permit Approv...
7/8/2009Ron Little named Ernst & Young Entrepreneur of the Year Fina...
3/1/2009Orezone Presentation – PDAC 2009
2/25/2009IAMGOLD Completes Acquisition of Orezone
2/20/2009Obtains Final Court Approval for IAMGOLD Transaction
2/19/2009Shareholders Approve Arrangement with IAMGOLD
2/13/2009 Updates Status of Shareholder Vote
9/29/2005An emerging producer in Burkina Faso, West Africa
Comment this article
You must be logged in to comment an article8000 characters max.
 
Sign in
User : Password : Login
Sign In Forgot password?
 
Latest comment posted for this article
Be the first to comment
Add your comment
TORONTO (ORE.TO)
0.490-7.55%
TORONTO
CA$ 0.490
04/17 15:59 -0.040
-7.55%
Prev close Open
0.530 0.530
Low High
0.480 0.530
Year l/h YTD var.
0.490 -  0.710 -2.00%
52 week l/h 52 week var.
0.340 -  0.860 -44.32%
Volume 1 month var.
323,890 -24.62%
24hGold TrendPower© : -25
Produces
Develops
Explores for Copper - Gold - Molybdenum - Uranium
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
You must be logged in to use the porfolio and watchlists (free)
TOP NEWSRELEASES
Annual variation
DateVariationHighLow
2014-7.55%0.760.47
2013-66.46%1.950.32
2012-39.92%3.101.18
2011-33.25%5.262.15
2010358.14%4.250.66
 
5 years chart
 
3 months chart
 
3 months volume chart