Chart usGOLD   Chart usSILVER  
 
Food for thought
A private central bank issuing the public currency is a greater menace to the liberty of the people than a standing army
Thomas Jefferson  
Search for :
LATEST NEWS  :
MINING STOCKS  :
Subscribe
Write Us
Add to Google
Search on Ebay :
PRECIOUS METALS (US $)
Gold 1208.90-6.80
Silver 17.03-0.44
Platinum 1299.00-3.50
Palladium 771.30-15.20
WORLD MARKETS
DOWJONES 1708413
NASDAQ 4504-2
NIKKEI 16174-137
ASX 529727
CAC 40 441658
DAX 947451
HUI 196-3
XAU 81-2
CURRENCIES (€)
AUS $ 1.4426
CAN $ 1.4140
US $ 1.2630
GBP (£) 0.7791
Sw Fr 1.2058
YEN 138.4850
CURRENCIES ($)
AUS $ 1.1423
CAN $ 1.1195
Euro 0.7918
GBP (£) 0.6169
Sw Fr 0.9547
YEN 109.6480
RATIOS & INDEXES
Gold / Silver70.99
Gold / Oil13.46
Dowjones / Gold14.13
COMMODITIES
Copper 3.04-0.02
WTI Oil 89.82-2.96
Nat. Gas 4.13-0.03
Market Indices
Metal Prices
RSS
Precious Metals
Graph Generator
Statistics by Country
Statistics by Metals
Advertise on 24hGold
Projects on Google Earth
Befesa Silvermet Joint Venture Arranges $49 Million Project Financing
Published : February 27, 2013
( 0 vote, 0/5 ) Print article
     
Tweet

TORONTO, ONTARIO--(Marketwire - Feb. 27, 2013) -

THIS NEWS RELEASE IS INTENDED FOR DISTRIBUTION IN CANADA ONLY AND IS NOT AUTHORIZED FOR DISTRIBUTION TO UNITED STATES NEWSWIRE SERVICES OR FOR DISSEMINATION IN THE UNITED STATES.

Silvermet Inc. ("Silvermet" or the "Company") (News - Market indicators) is pleased to announce that the European Bank for Reconstruction and Development ("EBRD"), has approved a project finance loan of US$49 million, which amount is equal to 70% of the estimated US$70 million cost for the new Adana zinc plant. Closing is subject to completion of documentation and is expected in early April. The project finance facility has a term of 9.5 years, with no repayments during the first twenty-four (24) month construction period.

Through its joint venture with Befesa Zinc, Silvermet will be constructing its first new Waelz kiln in Adana, Turkey. Permitting approval is expected over the next month and construction should begin in April. The Adana plant will have capacity to process 110,000 tonnes of electric arc furnace dust per annum which will result in the production of 40,000 tonnes of Waelz oxide per annum containing 60 million pounds of zinc, bringing the total zinc production of the joint venture to approximately 90 million pounds per annum. The Adana plant is expected to be commissioned by early 2015.

The joint venture partners will be contributing the remaining US$21 million required for the Adana plant (Silvermet's 49% share is US$10.3 million). Silvermet is presently evaluating various funding alternatives including using present cash on hand for part of this funding.

The Befesa Silvermet joint venture is also progressing with the permitting of a second new plant in Izmir, Turkey and construction is expected to begin on that plant later this year.

Stephen G. Roman, President and CEO commented, "The senior project financing facility announced today marks a significant corporate development milestone for Silvermet. Our new increased processing capacity coincides with announced zinc mine closures and an emerging consensus among zinc industry analysts forecasting a tightening of zinc concentrate supply in the coming years."

About Silvermet

Silvermet's principal business activity is the recycling of electric arc furnace dust ("EAFD"), a waste product created by steel mills, through a Waelz kiln to produce a zinc concentrate that is sold to smelters throughout the world. The Company owns a 49% interest in the operating company Befesa Silvermet Turkey ("BST"), which operates a Waelz kiln facility located in Iskenderun, Turkey.

Additional Information

Additional information can be accessed at the Company's website www.silvermet.ca or through the Company's public filings at www.sedar.com.

Caution concerning forward-looking statements: The information in this release may contain forward-looking information under applicable securities laws. This forward-looking information is subject to known and unknown risks, uncertainties and other factors that may cause actual results to differ materially from those implied by the forward-looking information. Factors that may cause actual results to vary include, but are not limited to, inaccurate assumptions concerning the exploration for and development of mineral deposits, political instability, currency fluctuations, unanticipated operational or technical difficulties, changes in laws or regulations, the risks of obtaining necessary licenses and permits, changes in general economic conditions or conditions in the financial markets and the inability to raised additional financing. Readers are cautioned not to place undue reliance on this forward-looking information. The Company does not assume the obligation to revise or update this forward-looking information after the date of this release or to revise such information to reflect the occurrence of future unanticipated events except as may be required under applicable securities laws. The TSX Venture Exchange does not accept responsibility for the adequacy or accuracy of this release.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Silvermet Inc.
Stephen G. Roman
Chairman, President & CEO
1 (416) 203-8336
info@silvermet.ca
or
Silvermet Inc.
Ian D. Atacan
Chief Financial Officer
1 (416) 203-8336
iatacan@silvermet.ca
or
Silvermet Inc.
8 King St. East, Suite 1700,
Toronto, ON, M5C 1B5, Canada
www.silvermet.ca
Data and Statistics for these countries : Canada | Turkey | All
Gold and Silver Prices for these countries : Canada | Turkey | All
Tweet

Silvermet Inc.

EXPLORATION STAGE
CODE : SYI.V
ISIN : CA8284251086
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Email Alert Add to Watchlist Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy
Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Annual reports of Silvermet Inc.
2009 Annual Report
2007 Annual report
Financings of Silvermet Inc.
6/24/2008FRAME MINING CORPORATION EXERCISES WARRANTS
Nominations of Silvermet Inc.
6/4/2008APPOINTS REIN LEHARI AS CHIEF FINANCIAL OFFICER
Financials of Silvermet Inc.
11/5/2012Reports 2012 Third Quarter Results and Provides an Update on...
Project news of Silvermet Inc.
4/10/2013Announces Record Production and Sales in 2012
1/10/2008(Muskox)REPORTS ON MUSKOX 2007 DRILL RESULTS AND LAKEFIELD MINERALOG...
Corporate news of Silvermet Inc.
5/29/2013Reports 2013 Q1 Results
3/11/2013to Extend Normal Course Issuer Bid
2/27/2013Befesa Silvermet Joint Venture Arranges $49 Million Project ...
6/27/2011Announces 2011 Q1 Results
5/4/2011Reports Significantly Improved Results for 2010
8/14/2008ANNOUNCES RETIREMENT OF THE CHAIRMAN
6/11/2008Announces Change to Board of Directors
6/5/2008RECEIVES SNC LAVALINS CAPITAL
2/29/2008Advancing to Production
Comment this article
You must be logged in to comment an article8000 characters max.
 
Sign in
User : Password : Login
Sign In Forgot password?
 
Latest comment posted for this article
Be the first to comment
Add your comment
TSX-V (SYI.V)OTHER OTC (SYIFF)
0.110+0.00%0.040-42.86%
TSX-V
CA$ 0.110
09/30 14:02 -
0%
Prev close Open
0.110 0.105
Low High
0.105 0.110
Year l/h YTD var.
0.050 -  0.130 57.14%
52 week l/h 52 week var.
0.040 -  0.130 57.14%
Volume 1 month var.
2,542,500 -15.38%
24hGold TrendPower© : 25
Produces
Develops
Explores for Chromium - Cobalt - Copper - Gold - Nickel - Palladium - Platinum
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
You must be logged in to use the porfolio and watchlists (free)
TOP NEWSRELEASES
Annual variation
DateVariationHighLow
2014120.00%0.080.05
2013-28.57%0.110.04
20120.00%0.110.07
2011-46.15%0.160.07
201062.50%0.180.08
 
5 years chart
 
3 months chart
 
3 months volume chart