Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en

ECR Minerals Plc

Publié le 07 août 2012

(AIM=3AECR) =2D Sierra de las Minas Gold Project Progress Update

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Copper | G Mexico |
Email not displaying correctly? View it in your browser.

London: 7 August 2012 - ECR Minerals plc is pleased to provide the following update on activities at its 100% owned Sierra de las Minas gold project area in La Rioja Province, Argentina.

 

Highlights

- Underground sampling planned to begin at El Abra prospect in September using consultants with specific experience in mesothermal vein systems

 

- Permissions for bulk sampling at El Abra being sought; a successful bulk sampling programme could be expected to generate modest revenue

 

- Preliminary joint venture approach received in respect of Sierra de las Minas

 

Patrick Harford, Managing Director of ECR Minerals plc, comments:

 

�ECR remains busy on a number of fronts in Argentina. Most importantly, planning for the next phase of exploration at our El Abra gold prospect is well underway, and we are preparing for work at other prospects controlled by the Company such as Maestro Ag�ero.

 

The beauty of Sierra de las Minas is that it contains a host of known high grade gold deposits, and while these mostly appear to be of relatively small size, the area may prove very suitable for our proposed strategy of mining multiple deposits and either establishing a central processing plant or sending parcels of material for processing elsewhere.

 

We are also alert to possible new opportunities in La Rioja Province and in other parts of Argentina.�

 

Sierra de las Minas Gold Project Area

 

ECR�s Sierra de las Minas project area hosts numerous historical gold prospects, many of which have returned high grade gold assays from surface geochemical sampling by the Company and by previous explorers. The predominant style of mineralisation within the project area is steeply dipping mesothermal quartz veins.

 

Such veins frequently make attractive exploration targets given generally robust grades, simple metallurgy and often signi?cant strike and depth extension. It is typical for grades to change rapidly and mesothermal systems worldwide are characterized by a series of high grade plunging shoots which form along a controlling structure, whereby most of the gold endowment of the veins is hosted in a small percentage of the total vein volume.

 

ECR�s major focus at Sierra de las Minas to date has been the El Abra prospect, which was the site of small scale mining in the early 1900s when a series of vertical shafts were sunk to depths of 10-30m to enable the miners to drift along the veins.

 

During April and May 2012, ECR drilled 13 angled diamond drill holes for a total of 1,112m at the El Abra prospect. The best overall intersection of the programme was 3.9m downhole at 11.6 g/t gold including 0.2m at 109.1 g/t gold. Of 13 holes drilled three holes intersected very high grade gold mineralisation and four more holes intersected mineralisation grading in excess of 1 g/t gold. The remaining six holes did not intersect significant mineralisation but did intersect the host structures, reflecting complexity of vein morphology and structural control on grade distribution.

 

High grades including 80.78 g/t gold, 44.98 g/t gold and 39.74 g/t gold were returned by surface geochemical sampling at El Abra during 2011. Many samples of lower but potentially economic grade were also obtained.

 

The range of gold grades encountered by drilling and surface geochemical sampling also suggests a nugget effect that makes representative sampling a challenge.

 

Any economic mineralisation at El Abra will likely be hosted in only certain sections of the veins, and identifying any such sections is ECR�s objective. This is in keeping with the Company�s stated exploration strategy at Sierra de las Minas, which is to work up small, high grade gold targets that may be suitable for early advancement to production.

 

It appears based on work so far that the El Abra vein system has limited size potential, although further exploration is merited. However it is envisaged that any producing operation at Sierra de las Minas would combine feed from multiple prospects, either for processing at a plant constructed in the vicinity of the project area or for onward shipment to an existing facility.

 

ECR�s representatives in La Rioja Province have been approached by a South American group interested in holding preliminary joint venture discussions with regard to Sierra de las Minas. There can be no assurance that these discussions will progress beyond the initial stage but the Company is open to joint venture approaches, whether for exploration or in relation to any future mining and processing activities, and whether over all or part of the project area.

 

Next Steps at El Abra

 

- Bulk sampling

 

Application is being made to the provincial authorities in La Rioja for permission to undertake the removal from El Abra of bulk samples for test processing off site. This would allow confirmation of the metallurgical characteristics of the mineralisation as well as providing information on the continuity of grade in the target areas.

 

On the basis of laboratory scale testwork completed earlier this year the metallurgy of the surficial mineralisation at El Abra and other prospects at Sierra de las Minas is believed to be benign and high gold recoveries are believed to be achievable. Accordingly a successful bulk sampling programme may be expected to produce a modest level of revenue, depending on processing terms.

 

- Surface prospecting

 

Work at El Abra by ECR has so far focused on known veins, and it is now appropriate to undertake a prospect wide programme of detailed surface prospecting to determine if the known veins have strike extensions and if any undiscovered veins exist. Further systematic surface geochemical sampling may also be undertaken.

 

- Underground sampling

 

The presence of numerous historical shafts, adits and cross-cuts at El Abra provides a significant sampling opportunity without the cost of underground development.

 

Inspection of the existing vertical shafts indicates that several are ?ooded to within 10m of the surface. However, given that the shafts are relatively shallow, ECR plans to de-water the workings where necessary and sample the veins vertically down each shaft and horizontally along each drive in order to gain a better understanding of grade distribution and the structural control thereof, as well as vein architecture and continuity. The Company intends to complete this programme during September.

 

A less extensive programme of underground sampling had been planned for earlier in the year, but did not take place due to difficulties establishing safe access to the workings. The currently proposed programme will utilise specialist consultants in order to surmount the problems previously encountered.

 

Other Prospects at Sierra de las Minas

 

Away from El Abra, of the numerous other gold prospects within the Sierra de las Minas project area the Maestro Ag�ero prospect is considered the most promising. Maestro Ag�ero is characterised by a 200m long, steeply dipping quartz vein 1-2m wide, with sheeted quartz veins common in the hanging wall over intervals of 3-4m. There is thought to be potential for a small bulk mining target and ECR intends to conduct a systematic surface sampling programme to better assess the prospect.

 

In addition there are multiple prospects under the Company�s control that are yet to be subjected to first pass appraisal. Work to visit and appraise all such prospects is on-going.

 

About the Sierra de las Minas Project Area

ECR holds 100% of the exploration rights to the Sierra de las Minas project area and 100% of the exploitation rights to a number of prospects within it, including the El Abra prospect. Exploration rights for other prospects may be converted to exploitation rights by application to the government of La Rioja Province. The El Abra prospect is subject to a 2% net smelter return royalty from production. In the case of exploitation rights, commencement of mining activities would be subject to receipt of the necessary environmental permissions from the provincial government.

 

The project area is located approximately 800km north west of Buenos Aires and is the site of significant historical small scale gold mining. Access to the project area is possible via paved highways from the cities of Mendoza, San Juan and Cordoba. Local access is by paved and unpaved provincial routes.

About ECR Minerals plc

 

ECR is a mineral development company with 100% ownership of the Sierra de las Minas gold project in La Rioja Province, Argentina; a 21% fully diluted stake in THEMAC Resources Group Ltd (TSX-V: MAC), which is focused on the development of the Copper Flat copper-molybdenum-gold-silver porphyry deposit in New Mexico, USA to production; and stakes in West Wits Mining Ltd (ASX: WWI) and Paniai Gold Ltd (unquoted), both of which have interests in the Derewo River alluvial gold mining and exploration project in Papua, Indonesia.

 

 

For further information please contact:

ECR Minerals plc
Patrick Harford, Managing Director Tel: +44 (0)20 7929 1010
Stephen Clayson, Director & Chief Financial Officer
Email:info@ecrminerals.com
Daniel Stewart & Company plc
Paul Shackleton/Tessa Smith/David Hart Tel: +44 (0)20 7776 6550

 

The contents of this announcement have been reviewed by Richard Watts B.Eng. Mining, Fellow of the South African Institute of Mining & Metallurgy, a non-executive director of the Company with more than 40 years of experience in the mining industry.

 

Glossary

g/t: grams per tonne

hanging wall: the rocks on the upper side of an inclined mineral vein

km: kilometres

m: metre

t: tonnes



Copyright 2012 ECR Minerals plc. All rights reserved.






Sent to .com � why did I get this?
|
ECR Minerals � Peek House � 20 Eastcheap � London, England EC3M 1EB

EN DÉVELOPPEMENT
CODE :
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

ECR Minerals est une société développant des projet miniers de cuivre et d'or basée au Royaume-Uni.

ECR Minerals détient divers projets d'exploration en Papouasie-Nouvelle-Guinee.

Son principal projet en développement est MEEKATHARRA en Australie et ses principaux projets en exploration sont EL ABRA ARGENTINA et COPPER FLAT en Argentine et PANIAI GOLD en Papouasie-Nouvelle-Guinee.

ECR Minerals est cotée au Royaume-Uni et en Allemagne. Sa capitalisation boursière aujourd'hui est 307,2 millions GBX (358,9 millions US$, 315,6 millions €).

La valeur de son action a atteint son plus bas niveau récent le 09 mars 2007 à 0,36 GBX, et son plus haut niveau récent le 02 janvier 2015 à 8,19 GBX.

ECR Minerals possède 262 590 000 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Rapports annuels de
(AIM=3A ECR) =2D Annual Report & Accounts 2011
Financements de
06/09/2013AIM=3A ECR =2D Notice to Warrant Holders
18/02/2013AIM=3A ECR =2D Financing Update
20/08/2012(AIM=3A ECR) =2D =C2=A31.3 Million Financing Package
20/12/2011(Paniai Gold)=3A Increase in Paniai Gold Shareholding & Financing Update
Nominations de
25/05/2012(AIM=3A ECR) =2D Strategic Update & Appointment of Experienc...
13/04/2006appointment of nominated adviser and broker
Rapports Financiers de
28/06/2013AIM=3A ECR =2D Unaudited Interim Results and Update
Projets de
08/10/2013AIM=3A ECR =2D THEMAC Resources Update
12/09/2013AIM=3A ECR =2D THEMAC Resources Update
29/04/2013AIM=3A ECR =2D ECR Secures Right to Earn 50% Interest in Ito...
25/02/2013AIM=3A ECR =2D THEMAC Resources Update
07/08/2012(AIM=3AECR) =2D Sierra de las Minas Gold Project Progress U...
21/05/2012(AIM=3A ECR) =2D Argentina Drilling Report=2D 21 May 2012
09/05/2012(AIM=3A ECR) =2D Argentina Drilling Update =2D 9 May 2012
13/04/2012(AIM=3A ECR) =2D El Abra Gold Drilling Update =2D 13 April 2...
27/03/2012(AIM=3A ECR) =2D El Abra Drilling Commences =2D 27 March 201...
21/03/2012(AIM=3A ECR) =2D THEMAC Resources Update =2D 21 March 2012
04/01/2012=3A Argentina Project Update
12/12/2011=3A Argentina Gold Project Update
23/05/2011AIM:ECR - Invitation to Proactive Investors One2One Forum in...
25/05/2010NI43-101 Resource Estimate...
12/04/2010(Paniai Gold)Paniai Gold Update
18/02/2010(Copper Flat)Update
11/12/2009(Copper Flat)Copper Flat Update
17/08/2009(Copper Flat)Acquires Exclusive Option over New Mexico Copper Project
27/07/2009(Copper Flat)New Mexico Copper Project
Communiqués de Presse de
04/01/20164:56 pm Eclipse Resources announces Q4 operational update; c...
17/10/2013AIM=3AECR =2D Mining Maven Investor Evening =2D 23 October 2...
25/09/2013AIM=3A ECR =2D Exercise of Warrants
18/09/2013AIM=3AECR =2D Exercise of Warrants
30/08/2013AIM=3A ECR =2D Placement of Shares to Raise =C2=A3500=2C000
30/08/2013AIM=3A ECR =2D Update
16/08/2013AIM=3A ECR =2D Investor Queries
12/08/2013AIM=3A ECR =2D Grant of Options
05/08/2013AIM=3A ECR =2D Redemption of Convertible Loan Notes
30/07/2013AIM=3A ECR =2D Completion of Itogon Due Diligence & Amendmen...
19/07/2013AIM=3A ECR =2D Proposed Redemption of Convertible Loan Notes
15/07/2013=2D MiningMaven interview
05/07/2013AIM=3A ECR =2D Regional Investor Meetings
26/06/2013AIM=3AECR =2D Extension of Due Diligence Period
12/06/2013AIM=3AECR =2D Placing to raise =C2=A3450=2C000
22/05/2013AIM=3A ECR =2D Placing to Raise =C2=A3400=2C000
07/05/2013AIM=3A ECR =2D Mining Maven Interview
03/05/2013AIM=3A ECR =2D Proactive Investors Interview
23/04/2013AIM=3A ECR =2D MiningMaven Q&A
11/04/2013AIM=3A ECR =2D Master Investor 2013 =2D 27 April 2013
02/04/2013AIM=3A ECR =2D Result of General Meeting and Update
01/02/2013AIM=3A ECR =2D Board Changes
14/01/2013AIM=3A ECR =2D Result of General Meeting and Update
25/10/2012(AIM=3A ECR) =2D El Abra Gold Prospect Update
22/10/2012(AIM=3A ECR) =2D Update on Activities
18/09/2012(AIM=3A ECR) =2D Underground Sampling in Progress at El Abr...
31/08/2012(AIM=3A ECR) =2D ECR=E2??s Interest in THEMAC Resources Grou...
30/07/2012(AIM=3A ECR) =2D Mining Maven Q&A
20/07/2012(AIM=3A ECR) Stephen Clayson =2D Director Share Purchase
19/07/2012(AIM=3A ECR) =2D Director Share Purchase =2D 19 July 2012
27/06/2012(AIM=3A ECR) =2D Positive Drilling Update from THEMAC Resour...
08/06/2012New research on ECR Minerals plc (AIM=3A ECR) published by E...
25/05/2012Minesite.com article on ECR Minerals plc (AIM=3A ECR)
09/05/2012AIM=3AECR =2D Proactive Investors One2One Forum =2D 17 May 2...
08/05/2012(AIM=3A ECR) =2D Directorate Change =2D 8 May 2012
27/04/2012(AIM=3A ECR) =2D Restoration of Trading=2FDrilling Report =2...
20/04/2012CORRECTION =E2?? for plain text e=2Dmail programme users onl...
18/04/2012at Master Investor 2012
02/04/2012(AIM=3A ECR) =2D Result of AGM =2D 2 April 2012
27/03/2012(AIM=3A ECR) =2D Directorate Change & Strategy Update =2D 27...
20/01/2012(AIM=3A ECR) =2D FUNDRAISING =2D 20 January 2012
10/01/2012(AIM=3A ECR) =2D Video of MiningMaven.com presentation by Pa...
12/12/2011(AIM=3A ECR) =2D ECR Minerals Preparing to Drill=2DTest Sier...
14/07/2011Presentation Minesite Forum 12 July 2011
14/04/2011AIM:ECR
28/07/2010Silver Swan Resumes Drilling
30/06/2010Interim Results to 31 March 2010 & Update
15/06/2010Latest Announcement - Renewable Energy Partnership
09/04/2010Silver Swan Update
06/04/2010Transaction Update
15/03/2010Placing of 16,900,000 Million Ordinary Shares
16/03/2010Press Announcement
12/03/2010Release of Mercator Preliminary Results - Period Ended 30 Se...
02/03/2010Press Announcement
30/09/2009Sale of Interest in Silver Swan
31/07/2009Issue of shares
30/06/2009Holding in Company
30/06/2009Placing of Shares
29/06/2009Placing of 42.5 million ordinary shares at 2p per ordinary s...
22/06/2009Swan update
04/06/2009Reorganisation of Share Capital
29/05/2009Results of General Meeting
14/11/2008Corporate Update
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
AIM (ECR)
1,17+0.00%
GBX 1,17
28/06 17:02 -
0%
Cours préc. Ouverture
1,17 1,13
Bas haut
1,12 1,20
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
- -  1,17 -%
Volume var. 1 mois
956 224 -%
Produit
Développe Gold
Recherche Copper - Gold
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,75 AU$+0,52%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
10,92 US$-1,71%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,55 GBX+0,00%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$-8,33%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,38 CA$-3,64%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
15,32 CA$+0,46%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$-2,08%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,19 AU$+0,00%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,77 CA$-1,12%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
52,10 US$-0,89%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+0,00%Trend Power :