Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en

Bluestone Resources Inc.

Publié le 07 septembre 2017

Bluestone Announces Upgrade to Tier 1 Status

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Dollar | Guatemala |

Bluestone Announces Upgrade to Tier 1 Status

VANCOUVER, British Columbia, Sept. 07, 2017 (GLOBE NEWSWIRE) -- Bluestone Resources Inc. (TSX VENTURE:BSR) ("Bluestone" or the "Company") is pleased to announce that it has been approved for graduation to Tier 1 Issuer status from Tier 2 Issuer status by the TSX Venture Exchange (the "TSXV"), effective September 8, 2017.

Tier 1 is the TSXV's premier tier and is reserved for the TSXV's most advanced issuers with the most significant financial resources. Tier 1 Issuers benefit from decreased filing requirements and improved service standards.

Darren Klinck, President and CEO, stated: "We are pleased with the graduation to Tier 1 as it reflects another positive milestone and further demonstrates the quality of the Cerro Blanco Project and of our management team”.

About Bluestone Resources 

Bluestone Resources is a mineral exploration and development company that is focused on advancing its 100% owned Cerro Blanco gold and Mita geothermal projects located in Guatemala. The Cerro Blanco Project economics as disclosed in the Company's press release dated February 7, 2017 announcing the results of its Preliminary Economic Assessment (“PEA”) and updated mineral resource estimate for Cerro Blanco indicates a robust project with an expected nine-year mine life producing 952,000 ounces of gold and 3,141,000 ounces of silver. Initial capital expenditures estimated in the PEA to fund construction and commissioning is estimated at US$170.8 million with All-in sustaining cash costs (as defined per World Gold Council guidelines, less corporate general and administration costs) estimated to be US$490 per ounce of gold produced. The Company trades under the symbol “BSR” on the TSX Venture Exchange.

Cautionary Language

The PEA is preliminary in nature, it includes inferred mineral resources that are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as mineral reserves, and there is no certainty that the PEA will be realized. Mineral resources that are not mineral reserves do not have demonstrated economic viability.

The scientific and technical disclosure in this news release has been reviewed by John Robins, Executive Chairman of the Company, who is a Qualified Person as defined by National Instrument 43-101 - Standards of Disclosure for Mineral Projects.

Forward Looking Statements

This press release contains “forward-looking information” within the meaning of Canadian securities legislation and “forward-looking statements” within the meaning of the United States Private Securities Litigation Reform Act of 1995 (collectively, “forward-looking statements”).  All statements, other than statements of historical fact, that address activities, events or developments that Bluestone Resources Inc. (“Bluestone” or the “Company”) believes, expects or anticipates will or may occur in the future including, without limitation: statements about the Company’s plans for its mineral properties; Bluestone’s business strategy, plans and outlook; the future financial or operating performance of Bluestone; capital expenditures, corporate general and administration expenses and exploration and development expenses; expected working capital requirements; the future financial estimates of the Cerro Blanco Project economics, including estimates of capital costs of constructing mine facilities and bringing a mine into production and of sustaining capital costs, estimates of operating costs and total costs, net present value and economic returns; proposed production timelines and rates; funding availability; resource estimates; and future exploration and operating plans are forward-looking statements. These forward-looking statements reflect the current expectations or beliefs of the Company based on information currently available to Bluestone and often use words such as “expects”, “plans”, “anticipates”, “estimates”, “intends”, “may” or variations thereof or the negative of any of these terms.

All forward-looking statements are made based on the Company’s current beliefs as well as various assumptions made by them and information currently available to them.  Generally, these assumptions include, among others: the ability of Bluestone to carry on exploration and development activities; the price of gold, silver and other metals; there being no material variations in the current tax and regulatory environment; the exchange rates among the Canadian dollar, Guatemalan quetzal and the United States dollar remaining consistent with current levels; the presence of and continuity of metals at the Cerro Blanco Project at estimated grades; the availability of personnel, machinery and equipment at estimated prices and within estimated delivery times; metals sales prices and exchange rates assumed; appropriate discount rates applied to the cash flows in economic analyses; tax rates and royalty rates applicable to the proposed mining operation; the availability of acceptable financing; anticipated mining losses and dilution; success in realizing proposed operations; anticipated timelines for community consultations and the impact of those consultations on the regulatory approval process.

Forward-looking statements are subject to a number of risks and uncertainties that may cause the actual results of the Company to differ materially from those discussed in the forward-looking statements and, even if such actual results are realized or substantially realized, there can be no assurance that they will have the expected consequences to, or effects on, Bluestone. Factors that could cause actual results or events to differ materially from current expectations include, among other things: risks and uncertainties related to expected production rates, timing and amount of production and total costs of production; risks and uncertainties related to ability to obtain or maintain necessary licenses, permits, or surface rights; risks associated with technical difficulties in connection with mining development activities; risks and uncertainties related to the accuracy of mineral resource estimates and estimates of future production, future cash flow, total costs of production and diminishing quantities or grades of mineral resources; risks associated with geopolitical uncertainty and political and economic instability in Guatemala; risks and uncertainties related to interruptions in production; the possibility that future exploration, development or mining results will not be consistent with the Company’s expectations; uncertain political and economic environments and relationships with local communities; risks relating to variations in the mineral content within the mineral identified as mineral resources from that predicted; variations in rates of recovery and extraction; developments in world metals markets; risks related to fluctuations in currency exchange rates; as well as those factors discussed under “Risk Factors” in the Company’s Amended and Restated Annual Information Form.

Any forward-looking statement speaks only as of the date on which it was made, and except as may be required by applicable securities laws, Bluestone disclaims any intent or obligation to update any forward-looking statement, whether as a result of new information, future events or results or otherwise. Although Bluestone believes that the assumptions inherent in the forward-looking statements are reasonable, forward-looking statements are not guarantees of future performance and accordingly undue reliance should not be put on such statements due to their inherent uncertainty.  There can be no assurance that forward-looking statements will prove to be accurate, and actual results and future events could differ materially from those anticipated in such statements.


Lire la suite de l'article sur https:
Données et statistiques pour les pays mentionnés : Guatemala | Tous
Cours de l'or et de l'argent pour les pays mentionnés : Guatemala | Tous

Bluestone Resources Inc.

CODE : BSR.V
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs

Bluestone Resources Inc. est une société basée au Canada.

Bluestone Resources Inc. est cotée au Canada. Sa capitalisation boursière aujourd'hui est 9,6 millions CA$ (7,0 millions US$, 6,5 millions €).

La valeur de son action a atteint son plus haut niveau récent le 23 septembre 2011 à 8,00 CA$, et son plus bas niveau récent le 19 février 2016 à 0,05 CA$.

Bluestone Resources Inc. possède 21 310 000 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TSX-V (BSR.V)
0,450-1.10%
TSX-V
CA$ 0,450
07/05 11:40 -0,010
-1,1%
Cours préc. Ouverture
0,455 0,455
Bas haut
0,450 0,455
Année b/h Var. YTD
0,230 -  0,590 95,65%
52 sem. b/h var. 52 sem.
0,180 -  0,590 -18,18%
Volume var. 1 mois
33 280 -19,64%
24hGold TrendPower© : -15
Produit
Développe
Recherche
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
2024104,55%0,680,21
2023-48,84%0,650,18
2022-79,62%2,300,40
20217,11%2,181,29
202048,12%2,430,99
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,52 AU$+0,47%Trend Power :
OceanaGold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
12,14 US$+0,75%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,60 GBX+12,24%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,64 CA$+0,00%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
15,98 CA$+0,92%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+0,00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,20 AU$-4,76%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,87 CA$+0,00%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
50,90 US$+0,08%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+0,00%Trend Power :