Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en

Treasury Metals Inc.

Publié le 02 octobre 2017

Condemnation Drilling Highlights Near Surface Expansion Potential Along Strike to the North-East

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   9/11 | Canada | Change | Exploration | Mine | Mines | Report |

Oct 2, 2017 (7:00am EDT)

 

Treasury Metals Inc. - Condemnation Drilling Highlights Near Surface Expansion Potential Along Strike to the North-East

TSX: TML   OTCQX: TSRMF

TORONTO, Oct. 2, 2017 /CNW/ - Treasury Metals Inc. (TSX: TML) (OTCQX: TSRMF) ("Treasury" or the "Company") is pleased to announce results from its recently completed 4,360 metre condemnation and exploration drilling program at the Company's flagship Goliath Gold Project located in Northwestern Ontario. The condemnation program drilled several areas where future mining infrastructure will be situated, including milling and mining operations, and is encouraged by a number of new near surface intersections northeast of the proposed open pit.

The Company is also pleased to report a number of significant intersections in its active infill sampling program which is designed to assay previously drilled but un-sampled drill core in all zones, prioritizing intervals within and near the proposed open pit. Results include TL10-96 intersecting 11.37 g/t over an intersection length of 4.20 m including 34.80 g/t over 1.30 m within the D Zone and TL10-108 intersecting 31.38 g/t over 3.00 m including 93.40 g/t over 1.0 m in a HW Zone.

The first drill results from the Company's active infill drilling program are expected to be announced in October.

Condemnation Program:

Gold mineralization was intersected in several drill holes approximately 80 to 350 metres from the proposed open pit. Due to the proximity to the proposed open pit, these and future drilling results, may lead to an eastern expansion of the pit and/or underground operations ("East Resource Target").

There were a number of near surface highlights within the C Zone, located approximately 20-60 metres behind the Main Zone.

  • TL17-445 intersecting 2.26 g/t over an intersection length of 5.83 m with visible gold observed and 16.79 g/t over 2.00 m in the D Zone.

  • TL17-459 intersecting 2.84 g/t over 5.60 m including 13.80 g/t over 1.00 m and 4.00 m of 0.84 g/t in the same hole. 

  • TL17-458 intersecting 0.71 g/t over 8.00 m.

These new holes are located close to previously drilled holes TL12-268 which contained 3.53 g/t over 7.00 m and TL12-265 with 0.71 g/t over 8.50 m. In addition, these results within the C Zone are up dip of a potential developing, inferred high-grade shoot, which includes TL200 that intersected 4.78 g/t over 4.50 m and TL205 with 1.98 g/t over 4.50 m, where additional drill holes are planned in the second half of the current drilling program.

The Program also had encouraging results in the same area in the Main Zone (TL17-456, TL17-457) highlighted in the attached image and table (click here to enlarge image). 

2017 Condemnation and Exploration Program Drillhole Map (CNW Group/Treasury Metals Inc.)

Chris Stewart, President and Chief Executive Officer, commented: "After completion of the current infill drilling program in the Main Zone resource area, this East Resource Target will become an area of focus with plans to drill test down dip and along strike to further delineate this exciting target. The additional drilling in this zone has the potential to add near surface mineral resources which may potentially extend the mine life and/or increase production rates from the underground when compared to the proposed mining schedule in the 2017 PEA."

East Resource Target Intercepts:

Drill Hole

Section


From
(m)

To
(m)

*Intercept
(m)

Au (g/t)

Ag (g/t)

Comments

TL17423

528600E


30.00

33.40

3..40

0..72**

2..29

C Zone

TL17425

528650E


57.40

61.30

3..90

0..66**

3..29

C Zone

TL17445

528475E


43.17

49.00

5..83

2..26**

3..89

C1 Zone



Including

47.00

48.00

1..00

9..92**

3..60

Visible Gold




57.20

59.00

1..80

2..56**

5..38

C2 Zone




68.00

70.00

2..00

16.79**

1..90

D Zone



Including

69.00

70.00

1..00

33.30**

2..10


TL17455

528675E


63.00

68.00

5..00

0..79

2..02

Main Zone



Including

66.00

68.00

2..00

1..50

3..45


TL17456

528700E


132.00

139.00

7..00

0..94

5..81

Main Zone



Including

137.00

139.00

2..00

2..11

6..60


TL17457

528550E


58.00

60.00

2..00

3..21**

1..95

Main Zone



Including

59.00

60.00

1..00

6..09**

2..10


TL17458

528525E


100.00

108.00

8..00

0..71

2..83

C Zone



Including

102.00

104.00

2..00

1..71

5..20


TL17459

528450E


32.00

34.00

2..00

0..82

2..60

Main Zone




102.00

106.00

4..00

0..84

4..38

C1 Zone




122.00

127.60

5..60

2..84**

4..96

C2 Zone



Including

122.00

123.00

1..00

13.80**

19.90


Notes: The company has not used a Gold Equivalent (AuEq) for the contained silver for this release but would expect the recovery of silver to increase the overall contained AuEq by a small amount in future studies.

For duplicate samples, an average of the two gold assays are used to calculate the intersection grade; all grades un-cut, no-capping

Holes are generally drilled 320-330� Azimuth with inclinations ranging -45 to -60�

All assays are rounded to two decimal places

*Intervals do not indicate true widths

**Metallic Screen Fire Assay Results

Full Table of Assays will be provided on the company's website

As anticipated, a number of the condemnation results, where planned mine infrastructure will go, did not identify significant gold mineralization. These included holes TL17-431, TL-17432, TL17-433A and TL17-446 through TL17-454, all of which are situated within the proposed tailings storage facility. The tailings storage facility appears in the attached image above in purple.

Infill Sampling Program:

This program is designed to assay previously drilled but un-sampled drill core in all zones, prioritizing intervals within and near the proposed open pit. Core samples were assayed from 141 drill holes.  The goal of the program is to: 1) potentially increase gold ounces in the next resource estimate expected in first half of 2018; 2) extend existing gold mineralization; and, 3) uncover potential new zones.

The program is reporting a number of significant intersections including:

  • TL10-96 intersecting 11.37 g/t over an intersection length of 4.20 m including 34.80 g/t over 1.30 m within the D Zone. 
  • TL10-108 intersecting 31..38 g/t over 3.00 m including 93.40 g/t over 1.0 m in a HW Zone
  • TL11-171 intersecting 4.97 g/t over 4.43 m including 18.20 g/t over 1.00 m in the B Zone
  • TL11-209A intersecting 8..61 g/t over 4.00 m including 29.80 g/t over 1.00 m in a HW Zone. 

The next steps for the program will be to re-visit the portions of the geological model wherein these new results are located to better understand their impact and develop a follow-up program which may include additional infill core sampling and new drill holes.

Infill Sampling Program Intercepts:

Drill Hole

Section


From
(m)

To (m)

*Intercept
(m)

Au (g/t)

Ag (g/t)

Comments

TL0849

527600E


100.00

104.00

3..00

1..61**

15.97

E Zone

TL1096

527250E


206.80

211.00

4..20

11.37**

P

D Zone



Including

208.00

209.30

1..30

34.80**

P


TL10108

527475E


250.00

253.00

3..00

31.38**

21.63

HW Zone



Including

252.00

253.00

1..00

93.40**

64.10


TL11145

528500E


49.50

52.00

2..50

1..36**

9..90

BMS HW

TL11167

527275E


134.30

137.00

2..70

4..52**

5..18




Including

134.30

135.00

0..70

15.90**

11.70

HW Zone

TL11171

527225E


279.57

284.00

4..43

4..97**

1..16

B Zone



Including

283.00

284.00

1..00

18.20**

0..70


TL11209A

527075E


43.00

47.00

4..00

8..61**

0..99

HW Zone



Including

44.00

45.00

1..00

29.80**

2..20


TL12287

527275E


292.00

294.00

2..00

4..12**

2..09

HW Zone



Including

292.70

294.00

1..30

6..07**

2..40


TL13306

527850E


86.00

90.00

4..00

1..12**

1..65

C Zone

TL15387

527550E


143.00

145.00

2..00

3..70**

5..38

HW Zone

TL164-12RE

527625E


417.00

419.30

2..25

3..01**

N/A

B Zone

Notes: The company has not used a Gold Equivalent (AuEq) for the contained silver for this release but would expect the recovery of silver to increase the overall contained AuEq by a small amount in future studies.

For duplicate samples, an average of the two gold assays are used to calculate the intersection grade; all grades un-cut, no-capping

Holes are generally drilled 320-330� Azimuth with inclinations ranging -45 to -60�

All assays are rounded to two decimal places

*Intervals do not indicate true widths

**Metallic Screen Fire Assay Results

P � Assays Pending

Full Table of Assays will be provided on the company's website

Eastern Alternation Corridor:

Other encouraging results from the condemnation program are drill holes, approximately 1.5 km northeast of the proposed open pit and directly east of the tailing storage facility. TL17-439 intersected 1.08 g/t over 2.30 m and 0.49 g/t over 6.80 m, TL17-442 intersected 1.65 g/t over 3.00 m, and TL17-443 intersected 0.79 g/t over 3.18 m and 0.76 g/t over 4.00 m. These holes occurred over a strike length of approximately 100 metres with minimal past drilling. The previous drilling in the 2011 program found several envelopes of gold mineralization including TL11-225 which intersected 1.29 g/t over 3.65 m, and historical Teck hole TL271 encountered 17.36 g/t over 1.60 m and 1.20 g/t over 3.00 m.  Additional drilling in future programs will help delineate this mineralization and develop its potential.

All results from the program will be available for viewing in the Complete Assay Table on the Company's website.

Technical information in this press release has been reviewed and approved by Adam Larsen, P. Geo, who is the qualified person under the definitions established by National Instrument 43-101.

To view further details about the Goliath Gold Project, please visit the Company's website at www.treasurymetals.com.

Follow us on Twitter @TreasuryMetals

About Treasury Metals Inc.

Treasury Metals Inc. is a gold focused exploration and development company with assets in Canada and is listed on the Toronto Stock Exchange ("TSX") under the symbol "TML" and on the OTCQX� Best Market under the symbol TSRMF. Treasury Metals Inc.'s 100% owned Goliath Gold Project in northwestern Ontario is slated to become one of Canada's next producing gold mines. With first-rate infrastructure currently in place and gold mineralization extending to surface, Treasury Metals plans on the initial development of an open pit gold mine to feed a 2,500 per day processing plant with subsequent underground operations in the latter years of the mine life.

QA/QC Program:

The Company has implemented a quality assurance and quality control (QA/QC) program to ensure sampling and analysis of all exploration work is conducted in accordance with the CIM Exploration Best Practices Guidelines. The drill core is sawn in half with one-half of the core sample dispatched to Actlabs facility located in Dryden, Ontario. The other half of the core is retained for future assay verification and/or metallurgical testing. Other QA/QC procedures include the insertion of blanks and Canadian Reference Standards for every tenth sample in the sample stream. A quarter core duplicate is assayed every 20th sample. The laboratory has its own QA/QC protocols running standards and blanks with duplicate samples in each batch stream.  Additional checks are routinely run on anomalous values including gravimetric analysis and pulp metallic screen fire assays. Gold analysis is conducted by lead collection, fire assay with atomic absorption and/or gravimetric finish on a 50 gram sample. Check assays are conducted at a secondary ISO certified laboratory (in this case AGAT Laboratories located in Mississauga, Ontario).  Metallic screen fire assaying is now completed using a 2.0 kg sample and four 50 gm fire assays of the pass (-100 mesh) pulverized material.

Forward-looking Statements

This release includes certain statements that may be deemed to be "forward-looking statements". All statements in this release, other than statements of historical facts, that address events or developments that management of the Company expect, are forward-looking statements. Actual results or developments may differ materially from those in forward-looking statements. Treasury Metals disclaims any intention or obligation to update or revise any forward-looking statements, whether as a result of new information, future events or otherwise, save and except as may be required by applicable securities laws.

SOURCE Treasury Metals Inc.

For further information: Chris Stewart, President and CEO, T: 1..416.214.4654, cstewart@treasurymetals.com; Greg Ferron, Vice President, Corporate Development, T: 1.416.214.4654, greg@treasurymetals.com

 

To unsubscribe or change your settings click here:

Données et statistiques pour les pays mentionnés : Canada | Tous
Cours de l'or et de l'argent pour les pays mentionnés : Canada | Tous

Treasury Metals Inc.

EXPLORATEUR
CODE : TML.TO
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Treasury Metals est une société d’exploration minière de zinc et de plomb basée au Canada.

Ses principaux projets en exploration sont GOLIATH et LARA au Canada.

Treasury Metals est cotée au Canada. Sa capitalisation boursière aujourd'hui est 21,3 millions CA$ (15,6 millions US$, 14,5 millions €).

La valeur de son action a atteint son plus bas niveau récent le 20 février 2009 à 0,11 CA$, et son plus haut niveau récent le 14 août 2020 à 1,90 CA$.

Treasury Metals possède 103 970 000 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Financements de Treasury Metals Inc.
20/06/2016Closes US$4.4 Million Loan Transaction with Loinette Leasing...
18/05/2016Closing $4.0 Million Offering
05/05/2016Announces Exercise of Over-Allotment Option and Private Plac...
27/04/2016Announces Private Placement Financing
29/12/2015Completes Non-brokered Financing
30/09/2015Closes Final Tranche of Non-brokered Financing
24/09/2015Completes Non-brokered Financing
16/12/2014Closes Equity Financing
16/12/2014Closes Equity Financing
24/11/2014Closes RMB Resources' Second Tranche Financing
18/12/2013increases private placement financing
04/12/2013announces flow-through financing
01/05/2013Completes Final Tranche of Financing
26/04/2013Completes Non-brokered Financing
14/09/2012announces increase in previously announced financing to $5.0
06/12/2011Announces Closing of Private Placement
Rapports Financiers de Treasury Metals Inc.
24/06/2011Files Revised Unaudited Interim Financial Statements to Incl...
Projets de Treasury Metals Inc.
14/05/2013(Goliath)Provides Operational Update for its Goliath Gold Project
03/04/2013Reports Additional Near Surface Results - Includes 17 m @ 1....
18/03/2013Reports Additional Main and C Zone Results - Includes 13 met...
29/01/2013(Goliath)Drills 27 metres of 1.9 g/t Gold in Developing C Zone at Gol...
10/01/2013(Goliath)Recommences Drilling at Goliath Gold Project, Ontario
29/10/2012(Goliath)Commences Exploration Program at Goliath Gold Project
18/10/2012(Goliath)Completes Strategic Land Consolidation at Goliath Gold Depos...
15/10/2012Commences Drilling Program at Goldcliff Project, Ontario
17/09/2012(Goliath)Completes Advanced Staged Metallurgical Results - Goliath Go...
20/07/2012Receives Updated Preliminary Economic Assessment
25/01/2012(Goliath)Commences 2012 Exploration Program at Goliath Gold Project
18/01/2012Presents at Mineral Exploration Roundup
14/12/2011(Goliath)Announces New Management Positions to Further Advance Goliat...
20/07/2011(Goliath)Reports More Results from Developing Goliath Gold Project
07/06/2011(Goliath)Reports Exceptional 96% to 97% Gold Recoveries from Goliath ...
19/05/2011to Acquire Pico Machay Gold Project
27/04/2011(Goliath)Adds a Third Drilling Rig-Expands Program to 30,000 Metres a...
11/04/2011(Goliath)Continues to Consolidate Land Position at Goliath Gold Depos...
01/04/2011(Goliath)Defines High-Grade Gold Zone at Goliath-Intersects 23.22 g/t...
16/03/2011(Goliath)Intersects Additional High-Grade Gold Mineralization at the ...
23/02/2011(Goliath)Intersects High-Grade Gold Mineralization
31/01/2011(Goliath)Adds a Second Drill Rig to Its Goliath Gold Project
Communiqués de Presse de Treasury Metals Inc.
18/08/2016Treasury Metals Commences Drilling Campaign at Goliath Gold ...
11/07/2016Treasury Metals Provides Goliath Gold Project Update and Ann...
20/06/2016Treasury Metals Closes US$4.4 Million Loan Transaction with ...
08/06/2016Treasury Metals Announces Results of Annual Meeting of Share...
03/06/2016Treasury Metals Announces CEO Departure
18/05/2016Treasury Metals Closing $4.0 Million Offering
05/05/2016Treasury Metals Announces Exercise of Over-Allotment Option ...
27/04/2016Treasury Metals Announces Private Placement Financing
31/03/2016Treasury Metals Announces US$4.4 Million Loan Transaction wi...
23/01/2016Treasury Metals Files Supplement To Information Circular
29/12/2015Treasury Metals Completes Non-brokered Financing
13/10/2015Treasury Metals Announces Filing of NI 43-101 Resource Estim...
27/04/2015Treasury Metals Goliath Gold Project Moves to Public Comment...
15/04/2015Treasury Metals Intersects High Grade Gold and Silver Minera...
25/03/2015Treasury Metals Reports High-Grade Gold Results in New Zone ...
12/02/2015Treasury Metals Fast-Tracks Drilling with Additional Rig at ...
08/01/2015Treasury Metals Infill Drilling Program in Western Zone Conf...
16/12/2014Treasury Metals Closes Equity Financing
24/11/2014Treasury Metals Closes RMB Resources' Second Tranche Financi...
20/11/2014Treasury Metals Commences 2nd Phase of 2014 Drill Program
21/10/2014Treasury Metals Files Goliath Gold Project Environmental Imp...
05/08/2014Drilling Program Outlines Shallow High Grade Ounces Outside ...
05/08/2014Drilling Program Outlines Shallow High Grade Ounces Outside ...
05/08/2014Drilling Program Outlines Shallow High Grade Ounces Outside ...
05/08/2014Treasury Metals Drilling Program Outlines Shallow High Grade...
11/06/2014Treasury Metals Drilling Program Confirms New C Zone Continu...
22/05/2014Treasury Metals Announces Results of Voting at Annual Meetin...
05/05/2014Treasury Metals Delivers Solid Drill Results Across Goliath ...
08/04/2014(Goliath)Reports High-Grade Results on the Goliath Gold Project
08/04/2014Treasury Metals Reports High-Grade Results on the Goliath Go...
19/02/2014Closes RMB Resources $6 Million Financing
27/01/2014Engages Consultants to complete Environmental Impact Stateme...
20/12/2013Closes Equity Financing and Enters Into Facility Agreement W...
02/12/2013launches new website and corporate video
15/11/2013Announces Financing with RMB Resources Inc.
23/10/2013Provides Operational Update and Announces New Management Pos...
04/09/2013President and CEO interview - with download link
04/09/2013President and CEO interview
31/05/2013Announces Results of Voting At Annual Meeting of Shareholder...
28/05/2013Reminder–Treasury Metals–Annual Meeting of
22/05/2013Reports Near Surface Drilling Results
21/01/2013(Goliath)Receives Draft EIS For Goliath
11/12/2012(Goliath)Drills 5.2 Metres at 18.6 g/t Au at Goliath Gold Project
30/07/2012Recent Article in Northern Miner on Treasury Metals - Aquili...
21/03/2012Expands Development Team
06/02/2012to Host Investor Presentations in Europe
25/01/2012News Release
26/10/2011News Release
26/10/2011(Goliath)Reports Further High-Grade Gold Results on the Goliath Gold ...
26/09/2011News Release
26/09/2011-Pico Machay Gold Project Acquisition Update
31/08/2011News Release
30/08/2011News Release
26/08/2011News Release
26/08/2011Reports High-Grade Results at Depth in the Eastern Zone and ...
05/08/2011News Release
02/08/2011News Release
27/07/2011Completes Airborne Survey on Its Ontario Gold Properties
05/07/2011(Goliath)Reports High-Grade Results from Developing Western Target at...
07/06/2011Meeting Invitation
07/06/2011June 7
19/05/2011May 18
18/05/2011(Goliath)Reports High-Grade Results from Developing Gold Zone at the ...
11/05/2011May 11
11/04/2011April 11
20/03/2011March 16, 2011
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TORONTO (TML.TO)
0,205+2.50%
TORONTO
CA$ 0,205
24/04 16:59 -
2,5%
Cours préc. Ouverture
0,200 0,205
Bas haut
0,200 0,205
Année b/h Var. YTD
0,120 -  0,245 20,59%
52 sem. b/h var. 52 sem.
0,120 -  0,320 -31,67%
Volume var. 1 mois
51 645 28,13%
24hGold TrendPower© : -12
Produit
Développe
Recherche Copper - Gold - Lead - Silver - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
20242,50%
2023-37,50%0,390,20
2022-56,16%0,780,25
2021-45,93%1,460,65
2020357,63%1,900,15
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,75 AU$+0,52%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
10,92 US$-1,71%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,55 GBX+0,00%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$-8,33%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,38 CA$-3,64%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
15,32 CA$+0,46%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$-2,08%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,19 AU$+0,00%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,77 CA$-1,12%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
52,10 US$-0,89%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+0,00%Trend Power :