Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en
Copper North Update of Thor Property
Published : January 26, 2015
( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Copper |

VANCOUVER, BRITISH COLUMBIA--(Marketwired - Jan. 26, 2015) - Copper North Mining Corp. ("Copper North" or the "Company") (News - Market indicators) is pleased to inform investors of progress on the Thor property in Northwest British Columbia. The Thor property covers 13,000 hectares and is located 15 km south of the Kemess South mine and mill facility. The property is underlain by Takla Group volcanic rocks intruded by Lower Jurassic granitic intrusions that host porphyry copper-gold deposits in the Kemess District.

Copper North completed 39 kilometres of induced polarization in the fall of 2014. The survey was focused on the covered area in Moose Valley, south of previous survey work that identified an anomaly on the most southerly survey line. Compilation of the geophysical survey information and geological and geochemical information from the historic exploration in the 1980's and 1990's, has identified two large targets for porphyry copper-gold mineralization. The Thor East target is located in the east part of the property in more mountainous terrain, and Thor West target is situated to the west in Moose Valley and is covered by extensive overburden (a map is available on the Company's web site www.coppernorthmining.com).

The Thor East target was the focus of previous exploration. A patchwork of soil and rock geochemical data and induced polarization survey data has defined an area of 4km by 2km underlain by granodiorite and Takla volcanic rocks that host copper-gold mineralization in shear zones and gossan areas, commonly associated with the margins of porphyry deposits. Six drill holes, totaling 629 metres, were completed in 1998, with most holes focused on shear structures in the Takla volcanic rocks. One shallow hole in the contact area of intrusive and volcanic rocks, intersected 60 metres of porphyry style mineralization grading 0.11% copper and 0.04 g/t gold. A detailed evaluation of the target area is planned for 2015, focused on the covered areas on the flanks of the ridge of volcanic strata.

The Thor West target is located to the southwest of the Thor East target in Moose Valley, flanking the access road to Kemess. This area has not seen previous exploration as the area is almost entirely covered by overburden, although outcrops exposed in creek areas have copper mineralization within Takla volcanic rocks. Airborne geophysical surveys conducted in 1997 defined a large area of high magnetic susceptibility that is interpreted as a large buried intrusion. Locally within the intrusion is an area of lower magnetic response suggestive of magnetite destruction that may be caused by alteration associated with a porphyry deposit. The recently completed induced polarization survey identifies an area of high chargeability that corresponds to the low magnetic area. The target area is approximately 3km by 2km.

The Thor West target may represent a deeper erosional level of a porphyry system as compared to the Thor East target that appears to represent a higher level in a porphyry system, situated on the east side of the Moose Valley fault structure. Wide spaced reconnaissance drilling is proposed for the Thor West target area.

The Thor property represents an attractive exploration opportunity for discovery of a porphyry copper-gold deposit near the Kemess mine and mill facility. Exploration by Aurico and others is identifying new porphyry deposits in this district as a new generation of exploration and discoveries unfolds.

Copper North is in early discussions with several groups with regards to potential joint venture opportunities to finance the next steps of exploration at the Thor property.

On behalf of the Board of Directors:

Dr. Harlan Meade, President, CEO and Director

About Copper North

Copper North is a Canadian mineral exploration and development company. Copper North's assets include the Carmacks Project located in the Yukon, the Redstone property located in the Northwest Territories, and the Thor property in British Columbia. Copper North trades on the TSX Venture Exchange under the symbol COL.

This news release includes certain forward-looking information or forward-looking statements for the purposes of applicable securities laws. These statements include, among others, statements with respect to the results from previous exploration activity; future exploration, development, engineering and permitting activities, and their timing; and potential joint venture financing. These statements address future events and conditions and, as such, involve known and unknown risks, uncertainties and other factors, which may cause the actual results, performance or achievements to differ materially from those anticipated in such statements. Important factors that could cause actual results to differ materially from the Company's expectations include, among others, the timing and success of future exploration and development activities; exploration and development risks; metallurgical process design; market prices; exploitation and exploration results; availability of capital and financing; general economic, market or business conditions; uninsured risks; regulatory changes; defects in title; availability of personnel; materials and equipment, unanticipated environmental impacts on operations and other exploration risks detailed herein and from time to time in the filings made by the Company with securities regulators. In making the forward-looking statements, the Company has applied several material assumptions including, but not limited to, the proposed exploration and development of the Thor property will proceed as planned; market fundamentals will result in sustained metals and mineral prices; and any additional financing needed will be available on reasonable terms. The Company expressly disclaims any intention or obligation to update or revise any forward-looking statements whether as a result of new information, future events or otherwise except as otherwise required by applicable securities legislation.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

NWM Mining Corp.

PRODUCTEUR
CODE : COL.V
ISIN : CA62946X1042
CUSIP : 197801103
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

MWN Mining est une société développant des projet miniers d'or basée au Canada.

MWN Mining détient divers projets d'exploration au Mexique.

Son principal projet en production est LLUVIA DE ORO au Mexique et ses principaux projets en exploration sont NORTH SONORA, CAMPAMENTO MEXICO et LLUVIA JOJOBA au Mexique.

MWN Mining est cotée au Canada et aux Etats-Unis D'Amerique. Sa capitalisation boursière aujourd'hui est 1,5 millions CA$ (1,2 millions US$, 973 367 €).

La valeur de son action a atteint son plus haut niveau récent le 07 juillet 2006 à 0,41 CA$, et son plus bas niveau récent le 01 avril 2020 à 0,01 CA$.

MWN Mining possède 30 110 000 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Rapports annuels de NWM Mining Corp.
Annual Report 2007
Financements de NWM Mining Corp.
19/03/2015Copper North Completes Private Placement
04/11/2013Copper North Extends Expiry Date of Warrants
30/10/2009NWM Mining Corporation Announces Closing of the Previously A...
01/10/2009Initial Closing and an Increase and Extension in Size of Pri...
04/09/2009Finalizes Terms for Non-Brokered Private Placement
28/07/2009NWM Press Release - NWM Mining Announces Non-Brokered Privat...
28/01/2009Announces Non-Brokered Private Placement
11/12/2008NWM Mining Press Release - NWM Announces First Draw on New C...
09/04/2008Announces Non-Brokered Private Placement
Attributions d'options de NWM Mining Corp.
02/10/2009NWM Mining Corporation Grants Stock Options
Nominations de NWM Mining Corp.
22/05/2013NWM Appoints Darren Koningen, P.Eng as President & COO
29/06/2012Mark Selby Joins NWM Board of Directors
13/05/2011NWM announces John Van De Beuken as COO
Projets de NWM Mining Corp.
31/01/2013NWM Reports 2012 Production Highlights
27/09/2012NWM Drills 1.03 g/t Au over 23.0 Metres from surface at Gold...
06/06/2012NWM Reports High Grade Results on Drilling at Gold Ridge
03/08/2011NWM Provides Lluvia-Jojoba Mine Update For July
07/07/2011NWM Provides Lluvia-Jojoba Mine Update & Announces New CFO
01/06/2011(Lluvia De Oro)NWM Provides Update on Gold Ridge Zone Exploration
26/05/2011(Lluvia Jojoba)Bi-weekly Update for Lluvia-Jojoba Project May 25, 2011
13/05/2011(La Jojoba)Lluvia de Oro / La Jojoba Project Up-date
28/04/2011(Lluvia De Oro)NWM provides Gold production and Lluvia de Oro mine update
27/04/2011(Lluvia De Oro)NWM provides update on new Gold Ridge discovery zone at Lluv...
08/04/2011(Lluvia Jojoba)NWM identifies another exploration target with high gold-cop...
31/03/2011(La Jojoba)NWM reports high-grade gold intercepts (3m of 11.15 g/t Au) ...
29/03/2011(La Jojoba)Bi-weekly Update for Lluvia-Jojoba Mine : 29, March, 2011
09/02/2011(Campamento Mexico)NWM Commences Exploration at Campamento
01/12/2010(Lluvia De Oro)NWM Drills 15 Meters of 1.082 g/t Au, 18.88 g/t Ag and 0.401...
21/07/2010(La Jojoba) Files Pre-Feasibility with Increase in Reserves
20/07/2010(Lluvia De Oro)Drills 2.155 g/t Au over 25.9 Meters at Lluvia de Oro (R10-0...
19/05/2010(La Jojoba)Lluvia de Oro & La Jojoba Mineral Resources and Reserves
17/09/2009(Lluvia De Oro)Lluvia de Oro Mine Update
08/08/2009(Lluvia De Oro)Lluvia de Oro Mine Update
24/07/2009(Lluvia De Oro)Lluvia de Oro Mine Update
05/03/2009(Lluvia De Oro)Assumes Financial and Operational Obligations at Lluvia-Jojo...
19/02/2009NI 43-101 Compliant Report for Sierra Pinta Gold Mine
14/11/2008(Lluvia De Oro)Lluvia de Oro Mine Update
04/06/2008(Lluvia De Oro)Lluvia de Oro Mine Update
07/05/2008(Lluvia De Oro)Lluvia de Oro Mine Update
26/02/2008(Lluvia De Oro)Lluvia-Jojoba Gold and Copper Mine Project Update
21/12/2007(Pii (pescarado Ii )) Files NI 43-101 Technical Report For PII, 2005-2007
02/10/2007(Lluvia De Oro)Columbia Metals Report - Lluvia de Oro Site - Bi-Weekly Upd...
Communiqués de Presse de NWM Mining Corp.
11/01/2016Copper North Announces Results of Phase 2 Drilling at Carmac...
26/10/2015Copper North Resumes Drilling of Carmacks Copper Mineralizat...
22/10/2015Copper North Clarifies Technical Disclosure
23/09/2015Copper North Expands Copper-Gold Mineralization at Carmacks ...
08/09/2015Copper North Announces Results From Drilling at Carmacks Pro...
04/08/2015Copper North Drilling Expands Copper Mineralization at Carma...
20/07/2015Copper North Commences Drilling at Carmacks Project, Yukon
02/07/2015Copper North Updates Improved Processing Plan for Carmacks P...
26/01/2015Expectations on Stimulus Fuel Hope for Copper Demand
21/01/2015Copper North Mining Corp.: Agitated Leach Process Provides O...
08/01/2015Copper North Grants Stock Options
05/01/2015Copper North Mining Corp.: Carmacks 2014 Exploration Project...
08/12/2014Copper North Clarifies Disclosure
25/11/2014Copper North Completes Warrant Incentive Program
17/11/2014Copper North Appoints Joseph Ringwald as Project Manager for...
14/10/2014Copper North Announces Joint Canada-China Feasibility Study ...
01/10/2014Copper North Commences Geophysical Survey on Thor Property i...
02/09/2014Copper North Progress at Carmacks Project, Yukon
27/08/2014Copper North Grants Stock Options
21/08/2014Copper North Exploration Success on Carmacks Project, Yukon
14/07/2014Copper North Files Carmacks Preliminary Economic Assessment
11/07/2014Copper North Completes Acquisition of Thor Property
02/07/2014Copper North Announces Agreement to Acquire Thor Property in...
23/06/2014Copper North Issues Shares to Repay Debt
17/06/2014Copper North Announces Loan Conversion
30/05/2014Copper North Announces Results of Preliminary Economic Asses...
25/04/2014Copper North Announces Closing of Private Placement
30/09/2013Copper North Executes Share Exchange Agreement
29/08/2013TORONTO =E2?? NWM Announces Start of Mining
28/06/2013NWM Announces Issuance of Bonus Shares
15/06/2013NWM Announces Debt Extension and Embarks on New Direction un...
08/05/2013Copper North Announces Loan Agreement and Deferred Salary Ag...
01/05/2013NWM reports a net income of $3,393,813 for 2012
04/04/2013(Lluvia De Oro)NWM Announces Drill Program to Increase Resources/Reserves a...
19/02/2013NWM Engages U.S. Business Development and Investor Relations...
19/02/2013Copper North Announces Results of 2012 Exploration Program, ...
17/01/2013Corporate Update January 17, 2013
16/10/2012Corporate Update October 17, 2012
21/09/2012NWM Successfully Negotiates Extension of Debt Facility to Ju...
31/08/2012NWM Loan Facility Update
23/08/2012NWM reports a profit of $1.8 million for Q2 2012
26/06/2012NWM and BioteQ Settle Lawsuit
19/06/2012NWM Signs Agreement to Purchase SART Plant Equipment
31/05/2012NWM reports a profit of $2.1 million for Q1 2012
26/04/2012NWM and BioteQ Settle Lawsuit
11/04/2012NWM produces 4,761 oz. Au in Q1.2012
07/02/2012NWM January Operational Update and Private Placement
17/01/2012NWM Provides Q4 2011 Update
30/11/2011Corporate Update November 18, 2011
30/09/2011Corporate Update September 23, 2011
12/09/2011Corporate Update September 9, 2011
29/08/2011NWM Q2 2011 Results and Lluvia-Jojoba Project Update
26/08/2011Corporate Update August 26, 2011
28/06/2011Greg McCoach Provides NWM Update
20/08/2010NWM Begins Mining at Lluvia de Oro & Draws on Standby Facili...
23/04/2010Receives Permits for Mining
05/01/2010NWM Mining Corporation Announces Share Issuance
15/12/2009First Phase Drill Program to Commence at Lluvia de Oro / La ...
08/12/2009NWM Settles Outstanding Tara Gold Resources Interest in Lluv...
10/08/2009New NWM Mining Corporation Presentation
24/06/2009Announces New Trading Symbol
10/03/2009Announces Share Issue
10/02/2009New Mining and Oil & Gas Research Website - StockResearchPor...
27/01/2009NWM Announces Convertible Debenture Restructuring
01/10/2008Lluvia de Oro Mine Update
17/09/2008Lluvia de Oro Mine Update
04/09/2008Lluvia de Oro Mine Update
20/08/2008Lluvia de Oro Mine Update
01/08/2008Press Release - NWM Pours First Gold at Lluvia-Jojoba Projec...
31/07/2008Lluvia de Oro Mine Update
25/07/2008Acorns to Mighty Oaks Initial Review - Published on Stockhou...
16/07/2008Lluvia de Oro Mine Update
02/07/2008Lluvia de Oro Mine Update
27/06/2008Columbia Announces Name Change
18/06/2008Lluvia de Oro Mine Update
05/06/2008 Profiled in The Market Traders' Commodity Supercycle Report
09/05/2008Hinde Gold Fund April 2008 Investor Letter
08/04/2008 Reports Option Payment at Lluvia de Oro
07/04/2008 Announces CDN $3M Financing Facility for Lluvia-Jojoba Gold
03/04/2008 Lluvia de Oro Mine Update
26/03/2008 Announces Addition To The Board of Directors
24/02/2008Lluvia de Oro Mine Update
16/01/2008Lluvia de Oro Mine Update
14/12/2007Lluvia de Oro Site - Bi-Weekly Update
12/12/2007Reports Option Payment at Lluvia de Oro
31/10/2007Lluvia de Oro Site - Bi-Weekly
30/10/2007Purchases Heavy Equipment for Lluvia de Oro Gold Mine
04/10/2007 Announces Transfer of Environmental & Mining Permits
18/09/2007Lluvia de Oro Site - Bi-Weekly Update - RESEND
01/09/2007(angl) Announces Investor Relations Engagement
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TSX-V (COL.V)OTHER OTC (NWMMF)
0,050+0.00%0,003+0.00%
TSX-V
CA$ 0,050
30/11 10:46 -
0%
Cours préc. Ouverture
0,050 0,055
Bas haut
0,050 0,055
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
- -  0,050 -%
Volume var. 1 mois
14 000 -%
24hGold TrendPower© : -28
Produit Gold
Développe
Recherche
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
2020100,00%0,070,01
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,82 AU$+1,69%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
11,22 US$+1,63%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,55 GBX+2,59%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,48 CA$-1,59%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
15,84 CA$-1,31%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+0,00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,19 AU$-7,32%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,85 CA$-2,63%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
51,83 US$+0,78%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,03 AU$+0,00%Trend Power :