Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en

Erdene Resource Development Corporation

Publié le 31 octobre 2017

Erdene Expands Bayan Khundii Mineralization with 43m of 1.8 g/t Gold East of Midfield, Including 1m of 45 g/t Gold, and 20m of 2.8 g/t Gold West of Striker, Including 1m of 51 g/t Gold

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Change | Copper | Precious Metals |

Erdene Expands Bayan Khundii Mineralization with 43m of 1.8 g/t Gold East of Midfield, Including 1m of 45 g/t Gold, and 20m of 2.8 g/t Gold West of Striker, Including 1m of 51 g/t Gold

HALIFAX, NOVA SCOTIA--(Marketwired - Oct 31, 2017) -

Note to editors: There are two maps associated with this press release.

Erdene Resource Development Corp. (ERD.TO) ("Erdene" or "Company") is pleased to provide an update on its gold exploration projects in southwest Mongolia, including additional assay results from the Company's 2017 drill program at its 100%-owned Bayan Khundii Gold Project ("Bayan Khundii").

"Today's results further demonstrate the growth potential at Bayan Khundii with holes west of Striker and east of Midfield providing the widest gold mineralized intersections in those areas to date, along with some of the very high grades observed in Striker and Midfield," said Peter Akerley, Erdene's President and CEO. "In addition to the Bayan Khundii drilling program and those at the neighboring Altan Nar project, surface exploration programs have been successfully generating new targets elsewhere within an area up to 8 kilometres north of Bayan Khundii and along the 6 kilometre long trend of gold prospects at Altan Nar. Over the next two months we will continue drilling at Bayan Khundii and Altan Nar, continuing to test the perimeters of the main mineralized areas and improving confidence in the ultra-high-grade zones at Bayan Khundii within which almost 20% of our holes have returned intersections of 30 to 300 g/t gold."

Summary of Results

Twenty holes (BKD-199 to BKD-218) and five-hole extensions (BKD-27, -29, -68, -85 and -176), totalling 4,355 metres, were drilled throughout the Bayan Khundii project area in mid Q3 and are included in this update. For reference see Table 1 and attached plan maps below.

Two plan maps have been attached for reference:

http://media3.marketwire.com/docs/Fig1_4128.jpg

http://media3.marketwire.com/docs/Fig2_4128.jpg

Highlights

Expansion East of Midfield Zone: While most of the drilling in Midfield has focused on pushing the northern limits of the gold mineralized zone towards the Northeast Zone, hole BKD-210, located 80 metres east of Midfield's eastern boundary, returned 43 metres of 1.8 g/t gold (BKD-210) and included gold values up to 44.8 g/t, establishing a new eastern extension to the Midfield Zone that justifies further follow-up drilling.

Multiple Mineralized Intersections West of Striker Zone: The area west of Striker continued to be a focus of the recent expansion drilling program with new holes returning the widest and highest-grade intersections to date in this area, justifying further follow-up drilling. Hole BKD-216, located along the western portion of the target area, 240 metres west of the Striker Zone, returned a 20 metre intersection of 2.8 g/t gold, including up to 50.5 g/t gold over 1 metre, and hole BKD-211, located 200 metres west of the Striker Zone, returned 63 metres of 1.1 g/t gold. In addition, three new holes and two extension holes (BKD-204, -205, -212; extensions BKD-68 and -176) were drilled in this area returning multiple zones of lower grade gold mineralization.

Striker Zone - Extensions at Depth Toward Midfield: Recent drilling in the northwest Striker area, where early, shallow holes had not intersected significant mineralization, returned an extension of mineralization below previous drilling with 58 metres of 1.2 g/t gold, including 16 metres of 2.8 g/t gold (BKD-30ext.) (see Sept 12, 2017 news release). Today's results include three additional hole extensions in this area; BKD-27, -29, and -85. Hole BKD-27ext. returned 55 metres of 1.2 g/t gold from 109 to 164 metres, followed by 20 metres of 0.74 g/t gold to 222 metres depth with the other two extension holes intersecting wide zones of highly anomalous gold, further confirming the extension of gold mineralization at depth between Striker and Midfield. These extended holes also continue to support the down-dip extension of mineralization from Midfield toward the west side of Striker.

Further Continuity in area North of Midfield Zone: Five holes were completed in this area and continue to support continuity of the gold mineralization in this zone discovered earlier in 2017, north of the Midfield Zone (BKD-199, -200, -209, -217, and -218). These holes were spaced at approximately 40 metre intervals and provided a number of wide gold mineralized intersections including hole BKD-199 which intersected a thick sequence of mineralized volcanics, returning 88 metres of 1.1 g/t gold at 74 metres depth. Hole BKD-217 also intersected a thick sequence of altered tuffs, with an 18 metre wide zone averaging 0.74 g/t gold. Hole BKD-218, drilled 80 metres northeast of BKD-217, intersected an 81 metre wide zone that returned 0.65 g/t gold and included a 20 metre zone that averaged 1.5 g/t gold. These results confirm continuity within this zone north of Midfield, extending it closer to the Northeast Zone.

Reconnaissance Drilling in Northeast Zone Demonstrates Continuity: A series of reconnaissance holes were drilled north and northeast of the main Bayan Khundii trend with one of these step-out holes, BKD-214, located 130 metres east of the Northeast Zone and 650 metres northeast of the Midfield Zone, returning an altered volcanic sequence with anomalous gold intersections, including 31 metres of 0.24 g/t gold at 48 metres depth. The result, although low-grade, is important as it provides evidence of continuity of the gold mineralizing fluids beyond the areas defined to date.

The following table includes drill result highlights of the holes discussed above.

Table 1. Bayan Khundii drill highlights

Drill Hole From (m) To (m) Interval (m) (1) Gold (g/t)
East of Midfield Zone
BKD-210 89 131.8 42.8 1.75
incl 105 118 13 4.89
incl 106 107 1 44.8
West of Striker Zone
BKD-204 70 87 17 0.89
incl 74 81 7 1.70
BKD-205 12 15 3 0.70
and 107 131 24 1.21
incl 120 127 7 3.59
incl 122 123 1 12.7
and 159 196 37 0.57
incl 183 195 12 1.34
BKD-211 100 163 63 1.09
incl 101 114 13 3.99
incl 101 102 1 17.9
and 106 107 1 12.2
BKD-216 29 50 21 0.48
and 153 173 20 2.83
incl 153 163 10 5.52
incl 156 157 1 50.5
BKD-68 ext. 128 130 2 20.5
North of Midfield Zone
BKD-199 74 162.3 88.3 1.08
incl 148 149 1 15.2
and 153 154 1 16.6
BKD-200 110.4 190 79.6 0.64
incl 110.4 136 25.6 1.18
and 210.7 223.5 12.8 0.47
BKD-209 136.5 153 16.5 0.62
BKD-217 179 197 18 0.74
incl 189 197 8 1.58
BKD-218 141 222 81 0.65
incl 202 222 20 1.46
Striker Zone Hole Extensions
BKD-27 ext. (2) 109 164 55 1.21
and 202 222.3 20.3 0.74
BKD-29 ext. 175 191 16 0.31
incl 175 181 6 0.51
BKD-85 ext. 148 170 22 0.34
and 177 213.4 36.4 0.47
incl 182 195 13 0.84
Northeast Zone
BKD-214 48 79 31 0.24
(1) Reported intervals are not true width. At this time, there is insufficient data with respect to the shape of the mineralized system to calculate true orientations in space. They represent drill intersection widths from holes drilled at a dip of -45 to -65 degrees and oriented to the north-northeast. The Bayan Khundii mineralization is interpreted to be moderately dipping (approximately 40 to 50 degrees to the southwest).
(2) Previously reported in 2016, 57m to 85m (end of hole), 28m of 0.51 g/t gold.

Going Forward - Q4-2017 Drill Program at Bayan Khundii

Since the beginning of the year, the Company has completed a total of 22,710 metres with 122 new drill holes and 10 extended drill holes at Bayan Khundii, and is expected to reach over 26,000 metres by year-end. Since the first drill hole in Q4-2015, the Company has drilled a total of 35,085 metres in 218 drill holes.

For the remainder of Q4, the Company's drilling program at Bayan Khundii will be focused on further defining boundaries and increasing confidence through a series of holes across the Bayan Khundii mineralized area including Striker, Midfield, and the areas north of Midfield and west of Striker. The Q4 drill program is expected to include an additional 4,000 metres, to be completed at Bayan Khundii and at the Company's Altan Nar gold-polymetallic project, 16 kilometres northwest. There will also be some additional reconnaissance drilling in target areas within both licences over the next two months. Those targets are still being defined as exploration results are continuing to be evaluated.

Ultra, High-Grade Areas

Bayan Khundii has a very significant high-grade component with over 20% of the 218 reported drill holes having one or more intersections of 30 g/t to 300 g/t gold. These 50+ intersections have an average grade of 78 g/t gold and their contribution to the eventual resource will be very significant. Therefore, ensuring these zones are well defined with sufficient data to provide accurate levels of influence and control for any proposed capping of these grades is of primary importance to the quality of the eventual resource estimate. Higher definition drilling of these ultra-high-grade zones has been recommended by an independent technical consultant and will be designed to assist in resource modeling.

Regional District Exploration Programs

In addition to drilling at Bayan Khundii, significant work has been completed in a series of projects within the larger developing district, including detailed geological mapping, soil geochemical sampling, rock chip geochemical sampling and geophysical programs over the entire Khundii license, north of the Bayan Khundii project. Final results are pending but several areas of intense alteration with associated anomalous gold in rock chip samples have been identified, including a zone along trend from Bayan Khundii, three kilometres to the northeast. It is anticipated that, the priority targets generated will be identified and drilled in Q4-2017 or early 2018.

2018 Resource Estimate

During Q1-2018 the Company's technical team will assess the 2017 program and determine what additional drilling may be required prior to an independent resource evaluation. Timing of the eventual resource studies for both Bayan Khundii and Altan Nar will be influenced by that determination, however it is anticipated that the studies will be completed between Q2 and Q3 2018.

Background on Bayan Khundii Gold Project

In Q2-2015, Erdene conducted an initial exploration program on the southern portion of the Company's 100%-owned Khundii exploration license in southwest Mongolia where an early rock-chip sampling program revealed multiple very high-grade surface quartz veins that returned up to 4,380 g/t gold. Since that time, drilling has revealed the presence of very high gold grades, with up to 306 g/t gold over 1-metre intervals, within broad mineralized zones, with up to 131 metres of 3.9 g/t gold, including 80 metres of 6.0 g/t gold. In addition to the drilling discussed above, the Company has completed a comprehensive exploration program at Bayan Khundii that has included: geological mapping; soil geochemical surveys; additional surface rock chip sampling; a ground magnetic survey; gradient array and dipole-dipole induced polarization surveys. In addition to this work, a series of detailed follow-up studies have also been completed, predominantly on drill core and minor surface outcrop, including: petrographic and mineralogical analyses; a fluid inclusion study; SEM gold composition analysis; Short-Wave Infra-Red Analysis (SWIR); structural analysis; and overall petrogenetic analysis. Detailed studies indicate the mineralized zones can be characterized as low-sulphidation, quartz-illite-adularia type mineralization that was presumably formed in an extensional environment.

In Q1-2016, the Company concluded preliminary metallurgical test work at Bayan Khundii, indicating that gravity concentration and cyanidation of the gravity tails yield very good overall gold recoveries for both high-grade and low-grade composites, yielding 99% gold recovery from the high-grade composite (24.9 g/t gold) and 92% gold recovery from the low-grade composite (0.7 g/t gold). Additional metallurgical work is underway with completion anticipated in Q3-2017.

The Bayan Khundii license has a 2% net smelter returns royalty ("NSR Royalty") in favour of Sandstorm Gold Ltd. with a buy-back option to reduce the NSR Royalty to 1%.

Qualified Person and Sample Protocol

Michael MacDonald, P.Geo. (Nova Scotia), Vice President Exploration for Erdene, is the Qualified Person as that term is defined in National Instrument 43-101 and has reviewed and approved the technical information contained in this news release. All samples have been assayed at SGS Laboratory in Ulaanbaatar, Mongolia. In addition to internal checks by SGS Laboratory, the Company incorporates a QA/QC sample protocol utilizing prepared standards and blanks.

Erdene's sampling protocol for drill core consisted of collection of samples over 1 metre or 2 metre intervals (depending on the lithology and style of mineralization) over the entire length of the drill hole, excluding minor post-mineral lithologies and un-mineralized granitoids. Sample intervals were based on meterage, not geological controls or mineralization. All drill core was cut in half with a diamond saw, with half of the core placed in sample bags and the remaining half securely retained in core boxes at Erdene's Bayan Khundii exploration camp. All samples were organized into batches of 30 samples including a commercially prepared standard, blank, and either a field duplicate, consisting of two 1/4 core intervals, or a laboratory duplicate. Sample batches were periodically shipped directly to SGS in Ulaanbaatar via Erdene's logistical contractor, Monrud Co. Ltd.

About Erdene

Erdene Resource Development Corp. is a Canada-based resource company focused on the acquisition, exploration, and development of base and precious metals in underexplored and highly prospective Mongolia. The Company has four exploration licenses and a mining license in southwest Mongolia. In addition to the Bayan Khundii and Altan Nar projects, other deposits and prospects within these licenses include: Khuvyn Khar - an early-stage, copper-silver porphyry project with multiple drill targets and significant copper intersections; Nomin Tal - a narrow, high grade copper-gold discovery; Zuun Mod - a large molybdenum-copper porphyry deposit; and Altan Arrow - an early-stage gold-silver project. In addition to the above properties, the Company has an Alliance with Teck Resources Limited on regional copper-gold exploration in the prospective Trans Altai region of southwest Mongolia. For further information on the Company, please visit www.erdene.com. Erdene has 145,963,086 issued and outstanding common shares and a fully diluted position of 156,592,160 common shares.

Forward-Looking Statements

Certain information regarding Erdene contained herein may constitute forward-looking statements within the meaning of applicable securities laws. Forward-looking statements may include estimates, plans, expectations, opinions, forecasts, projections, guidance or other statements that are not statements of fact. Although Erdene believes that the expectations reflected in such forward-looking statements are reasonable, it can give no assurance that such expectations will prove to have been correct. Erdene cautions that actual performance will be affected by many factors, most of which are beyond its control, and that future events and results may vary substantially from what Erdene currently foresees. Factors that could cause actual results to differ materially from those in forward-looking statements include market prices, exploitation and exploration results, continued availability of capital and financing and general economic, market or business conditions. The forward-looking statements are expressly qualified in their entirety by this cautionary statement. The information contained herein is stated as of the current date and is subject to change after that date. The Company does not assume the obligation to revise or update these forward-looking statements, except as may be required under applicable securities laws.

NO REGULATORY AUTHORITY HAS APPROVED OR DISAPPROVED THE CONTENTS OF THIS RELEASE

Lire la suite de l'article sur https:

Erdene Resource Development Corporation

EXPLORATEUR
CODE : ERD.TO
ISIN : CA29480N2068
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Erdene est une société d’exploration minière d'or et de cuivre basée au Canada.

Erdene détient divers projets d'exploration au Canada et en Mongolie.

Ses principaux projets en exploration sont DONKIN au Canada et DURVULJIN UUL, ERDENET et GALSHAR UUL en Mongolie.

Erdene est cotée au Canada et aux Etats-Unis D'Amerique. Sa capitalisation boursière aujourd'hui est 56,0 millions CA$ (44,8 millions US$, 39,2 millions €).

La valeur de son action a atteint son plus haut niveau récent le 06 juillet 2007 à 2,05 CA$, et son plus bas niveau récent le 01 novembre 2013 à 0,07 CA$.

Erdene possède 145 390 000 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Dans les médias de Erdene Resource Development Corporation
14/06/2018Erdene becomes first cross-listed firm on the Mongolian Stoc...
31/05/2018Mongolia listing boosts investors confidence in Erdene Resou...
10/05/2018Erdene soars as Altan Nar project in Mongolia proves larger ...
03/05/2018Mongolian Copper Corp considers international fight for Erde...
08/12/2017Mongolian Gov't can't nationalize Erdenet Copper Mine — cour...
Financements de Erdene Resource Development Corporation
23/04/2013Closes Private Placement
12/12/2012Announces Private Placement
06/12/2011Completes Private Placement Financing
28/11/2011Closes $1,715,000 Financing Pursuant to Private Placement Th...
20/06/2008Closes $18.6 Million Private Placement
02/06/2008Announces $15 Million Private Placement
Rapports Financiers de Erdene Resource Development Corporation
17/08/2009Reports 2009 Second Quarter Financial Results and Provides P...
19/05/2009Reports 2009 First Quarter Financial Results and Provides Pr...
15/05/2008Reports First Quarter Operating and Financial Results
Projets de Erdene Resource Development Corporation
18/11/2013Completes Trenching Program on the Altan Nar Gold-Silver Pro...
08/08/2012(Donkin)Finalizes Agreement to Separate Donkin Coal and Mongolian Mi...
26/07/2012(Donkin)Provides Donkin Export Coking Coal Project Update
03/07/2012Completes US$3.35 Million Sale of the Granite Hill Quarry Pr...
28/06/2012(Donkin)to Separate into Two Public Companies focused on Donkin Coal...
17/01/2012Granite Hill Quarry Commences Production: Erdene Receives Mi...
27/07/2011(Nomin)Drill Results Confirm Continuity of Copper-Gold-Silver Sulfi...
30/06/2011(Donkin)Receives Independent Technical Report on Donkin Export Cokin...
01/06/2011(Zuun Mod Molybdenum)Receives Mining License for the Zuun Mod Molybdenum-Copper P...
04/03/2011(Zuun Mod Molybdenum)Reports Additional Results from Mongolian Copper Discovery: ...
28/11/2008(Donkin Coal Project)Provides Update on Donkin Coal Project
Communiqués de Presse de Erdene Resource Development Corporation
05/07/2016Morien Announces Appointment of CFO
03/11/2015Erdene Announces a Three Month Extension to Warrants
20/10/2015Erdene Announces Private Placement; Drilling to Commence on ...
15/10/2015RETRANSMISSION - Erdene Reports Multiple High-Grade Gold-Pol...
15/10/2015Erdene Reports Multiple High-Grade Gold-Polymetallic Interse...
05/10/2015IIROC Trade Resumption - ERD
05/10/2015Erdene Discovers Bonanza Grade Gold in Southwest Mongolia
05/10/2015IIROC Trading Halt - ERD
29/09/2015Erdene Drills 12 m of 5.3 g/t Gold Equivalent at Union North...
16/09/2015Metallurgical Testing at Erdene's Altan Nar Project Returns ...
15/07/2015Erdene and Tian Poh Amend Option Agreement; Drilling to Comm...
06/07/2015Erdene Appoints Layton Croft to the Board of Directors
17/04/2015Erdene Announces Private Placement
01/04/2015Erdene Provides Year-End Financial Results and Project Revie...
01/04/2015Provides Year-End Financial Results and Project Review
01/04/2015IIROC Trade Resumption - ERD
31/03/2015Reports Initial Resource Estimate for Altan Nar Gold-Polymet...
31/03/2015Erdene Reports Initial Resource Estimate for Altan Nar Gold-...
31/03/2015IIROC Trading Halt - ERD
12/02/2015IIROC Trade Resumption - ERD
12/02/2015Erdene Enters Agreement with Tian Poh Resources Ltd to Excha...
12/02/2015IIROC Trading Halt - ERD
09/02/2015IIROC Trade Resumption - ERD
09/02/2015Erdene Intersects Multiple High Grade Gold-Polymetallic Zone...
09/02/2015IIROC Trading Halt - ERD
12/01/2015Intersects 51 m of 2.5 g/t Gold Equivalent at Altan Nar Incl...
12/01/2015Erdene Intersects 51 m of 2.5 g/t Gold Equivalent at Altan N...
18/12/2014CWN Mining Acquisition Corporation Announces Private Placeme...
14/11/2014November 14, 2014 Erdene Secures Financing and Commences Res...
14/11/2014Erdene Secures Financing and Commences Resource Drilling on ...
07/10/2014IIROC Trade Resumption - ERD
06/10/2014Erdene Announces Private Placement; Altan Nar Gold-Polymetal...
06/10/2014IIROC Trading Halt - ERD
02/10/2014Erdene Provides Altan Nar Exploration Update
25/08/2014Erdene Provides Exploration and Corporate Update : Commences...
19/06/2014Erdene Provides Highlights of AGM and Project Updates
03/06/2014IIROC Trade Resumption - ERD
02/06/2014Erdene Intersects High Grade Gold and Base Metal Zone at Alt...
02/06/2014IIROC Trading Halt - ERD
23/01/2014Altan Nar Trenching Intersects Multiple High Grade Gold and ...
18/10/2013Announces Private Placement Altan Nar Gold Project - Explora...
18/10/2013Announces Private Placement : Altan Nar Gold Project-Explora...
07/10/2013Commences Exploration Program at Altan Nar Gold Project
02/07/2013Provides Highlights of AGM and Project Update
27/06/2013Reports Encouraging Metallurgical Results for Altan Nar Gold...
11/04/2013Establishes Strategic Alliance in Mongolia
03/04/2013Provides Year-End Financial Results and Project Review
09/11/2012and Morien Announce Completion of Plan of Arrangement and Co...
02/11/2012and APM Receive Final Court Approval for Plan of Arrangement...
26/10/2012and APM Shareholders Vote in Favor of Plan of Arrangement
09/10/2012Commences Drill Program on the Altan Nar Gold Project
02/10/2012Proposing Division into Two Public Companies
22/08/2012Provides Update on Mongolian Metals Projects
13/08/2012Morien Resources Corp. Selected as Proposed New Name and Joh...
30/05/2012Drilling Continues to Expand Altan Nar Gold Discovery
22/05/2012Announces Sale of its Land and Royalty Interest at the Grani...
17/05/2012Provides Project Updates and First Quarter Financial Results
26/04/2012(Donkin)Schedules Conference Call to Provide Update on Donkin Coal P...
29/03/2012Provides Project Updates and Reports Year End Financial Resu...
05/03/2012Announces Drilling Program for Altan Nar Gold-Silver Project
26/01/2012Confirms Continued Widespread Gold Mineralization at Altan N...
12/10/2011Drilling Confirms Significant Epithermal Gold Mineralization...
07/09/2011Announces Significant New Gold Discovery in Southwest Mongol...
15/08/2011Provides Project Updates and Second Quarter Financial Result...
06/07/2011(Nomin)Initial Drill Results Confirm Copper-Gold Sulfide Zone at Er...
21/06/20112010 Annual General Meeting-June 23, 2011
15/06/2011Provides Project Updates and First Quarter Financial Results
12/04/2011Provides Project Updates and Reports Year End Financial Resu...
17/02/2011Zuun Mod Results Continue to Enhance Potential of Copper and...
28/02/2009Concludes Reverse Takeover of Beta Minerals Inc.
15/09/2008Xstrata Coal Canada Increases Ownership in Erdene
29/05/2008Erdene Name Change Approved at Annual and Special Meeting
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TORONTO (ERD.TO)Other OTC (ERDGF)
0,385+0.00%210 713,380
TORONTO
CA$ 0,385
17/04 16:55 -
0%
Cours préc. Ouverture
0,385 0,395
Bas haut
0,385 0,400
Année b/h Var. YTD
0,300 -  0,410 13,24%
52 sem. b/h var. 52 sem.
0,280 -  0,410 -%
Volume var. 1 mois
72 450 -6,10%
24hGold TrendPower© : 21
Produit
Développe
Recherche Coal
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
202424,19%
20238,77%0,450,29
2022-34,48%0,500,25
20217,41%0,500,33
2020138,24%0,710,13
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,70 AU$-0,19%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
10,89 US$-1,36%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,55 GBX-0,72%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,36 CA$-3,28%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
15,64 CA$+2,69%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+2,17%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,20 AU$+2,63%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,87 CA$+6,25%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
51,67 US$-0,98%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,03 AU$-2,94%Trend Power :