Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en

Osisko Mining Corp.

Publié le 09 janvier 2018

Osisko Intersects 140 g/t Au over 5.0 Metres at Lynx

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Canada | Cash | Exploration | Mine | Report |

Osisko Intersects 140 g/t Au over 5.0 Metres at Lynx

TORONTO, ONTARIO--(Marketwired - Jan 9, 2018) - Osisko Mining Inc. (OSK.TO) ("Osisko" or the "Corporation") is pleased to provide new results from the ongoing drill program at its 100% owned Windfall Lake gold project located in the Abitibi greenstone belt, Urban Township, Eeyou Istchee James Bay, Québec. The 800,000 metre drill program combines definition, expansion and exploration drilling in and around the main Windfall gold deposit and the adjacent Lynx deposit (located immediately NE of Windfall).

Significant new analytical results from 90 intercepts in 52 drill holes focused on infill and expansion drilling in the Lynx deposit are presented below. Osisko continues to extend the known Lynx zones of mineralization through the application of the Windfall geological model and as the density of drilling increases.

  • The main Lynx Corridor has been extended up plunge 250 metres SW from the last drill intercept for a total current strike length of confirmed mineralization over 1,550 metres and remains open.
  • Lynx HW is showing good continuity and grades towards the NE.
  • Lynx 4 has been extended 75 metres NE for a total current strike length of 1,350 metres and new infill drillholes continue to demonstrate continuity and robust gold grades between sections 3650E and 4225E.

Highlights from the new results include: 140 g/t Au over 5.0 metres in OSK-W-17-1343; 210 g/t Au over 2.4 metres in OSK-W-17-923; 28.3 g/t Au over 7.7 metres in OSK-W-17-1193; 83.0 g/t Au over 2.0 metres in OSK-W-17-1059; 43.1 g/t Au over 4.4 metres in OSK-W-1343-W2; 48.7 g/t Au over 2.6 metres in OSK-W-17-1104; 43.8 g/t Au over 2.5 metres in OSK-W-17-1242; 22.6 g/t Au over 4.8 metres in OSK-W-17-888; 16.0 g/t Au over 5.5 metres and 22.9 g/t Au over 2.4 metres in OSK-W-17-1177; 29.8 g/t Au over 2.2 metres in OSK-W-17-1085; 14.8 g/t Au over 4.4 metres in OSK-W-1193-W1; 27.9 g/t Au over 2.4 metres in OSK-W-17-1181-W1; and 20.6 g/t Au over 2.2 metres in OSK-17-W-945. Maps showing hole locations and full analytical results are available at www.osiskomining.com.

Hole No. From
(m)
To
(m)
Interval
(m)
Au
(g/t)
uncut
Au (g/t)
cut to
100 g/t
Zone Corridor
OSK-W-17-883 229.0 231.0 2.0 10.3 Lynx 1 Lynx
OSK-W-17-888 235.2 240.0 4.8 22.6 21.8 Lynx 2 Lynx
including 236.0 237.2 1.2 52.3 48.9
including 236.3 236.75 0.45 109 100
OSK-W-17-888 248.0 250.0 2.0 17.8 Lynx 2 Lynx
including 248.5 249.1 0.6 58.1
OSK-W-17-888 257.3 259.4 2.1 4.06 Lynx 2 Lynx
including 257.3 257.8 0.5 16.2
OSK-W-17-902 398.0 400.0 2.0 3.67 QTV Lynx
including 398.8 399.2 0.4 16.8
OSK-W-17-902 431.0 433.1 2.1 11.7 VNCR Lynx
including 431.0 432.1 1.1 22.0
OSK-W-17-909-W2 795.8 797.9 2.1 19.2 Lynx 1 Lynx
including 797.4 797.9 0.5 61.6
OSK-W-17-909-W3 824.0 826.0 2.0 5.93 Lynx 1 Lynx
including 824.7 825.0 0.3 39.0
OSK-W-17-909-W3 836.2 838.3 2.1 5.86 Lynx 1 Lynx
OSK-W-17-923 890.1 892.5 2.4 210 44.3 Lynx 4 Lynx
including 890.8 891.8 1.0 498 100
including 890.8 891.3 0.5 838 100
OSK-W-17-945 466.6 468.8 2.2 20.6 Lynx 1 Lynx
including 466.6 467.6 1.0 44.5
OSK-W-17-945 472.8 476.8 2.0 7.74 Lynx 1 Lynx
including 474.8 476.0 1.2 16.7
OSK-W-17-953 370.0 372.0 2.0 6.02 Lynx 3 Lynx
including 370.8 371.1 0.3 38.1
OSK-W-17-998 261.0 263.0 2.0 15.8 Lynx 1 + Lynx 2 Lynx
including 261.0 262.0 1.0 31.5
OSK-W-17-1006 707.8 710.0 2.2 13.8 Lynx 4 Lynx
including 707.8 708.4 0.6 49.1
OSK-W-17-1015 344.1 346.2 2.1 4.02 Lynx 2 Lynx
including 344.9 345.5 0.6 13.7
OSK-W-17-1015 357.9 360.5 2.6 6.26 Lynx 2 Lynx
including 358.8 359.2 0.4 33.7
OSK-W-17-1015 400.0 402.3 2.3 8.38 VNCR Lynx
including 400.7 401.7 1.0 19.0
OSK-W-17-1019 227.0 229.0 2.0 11.3 Lynx 1 Lynx
including 227.5 228.5 1.0 22.6
OSK-W-17-1019 329.0 331.2 2.2 3.21 Lynx 4 Lynx
including 329.5 330.0 0.5 13.5
OSK-W-17-1019 589.0 591.0 2.0 9.04 Vein Lynx
OSK-W-17-1024 134.0 136.0 2.0 3.97 Lynx 1 Lynx
OSK-W-17-1024 138.0 140.0 2.0 3.64 Lynx 1 Lynx
OSK-W-17-1027 604.0 606.0 2.0 3.85 Lynx 2 Lynx
OSK-W-17-1027 625.0 627.2 2.2 12.2 Vein Lynx
including 626.0 627.2 1.2 22.3
OSK-W-17-1027 779.5 782.0 2.5 3.47 Lynx HW Lynx
OSK-W-17-1028 76.0 78.0 2.0 8.18 Lynx 1 Lynx
including 770. 77.3 0.3 45.4
OSK-W-17-1040 162. 164.0 2.0 15.9 Lynx 2 Lynx
including 162.3 162.7 0.4 68.3
OSK-W-17-1043 374.0 376.0 2.0 3.11 Lynx 1 + Lynx 2 Lynx
OSK-W-17-1044 264.6 266.7 2.1 3.59 Lynx 2 Lynx
OSK-W-17-1059 264.0 266.0 2.0 83.0 55.9 Lynx 3 Lynx
including 264.9 266.0 1.1 149 100
OSK-W-17-1059 362.8 365.2 2.4 17.7 Lynx 1 Lynx
including 362.8 364.0 1.2 33.6
OSK-W-17-1067 512.6 515.7 3.1 4.54 Lynx HW Lynx
OSK-W-17-1072-W2 842.8 845.9 3.1 5.24 Lynx 4 Lynx
OSK-W-17-1072-W2 885.2 887.2 2.0 17.7 Lynx 4 Lynx
including 886.9 887.2 0.3 98.2
OSK-W-17-1072-W2 908.0 911.0 3.0 8.60 Lynx 4 Lynx
including 910.6 911.0 0.4 56.6
OSK-W-17-1072-W2 915.0 917.0 2.0 10.9 Lynx 4 Lynx
including 915.5 916.2 0.7 30.9
OSK-W-17-1072-W2 989.7 992.0 2.3 17.1 Lynx 4 Lynx
including 990.1 990.4 0.3 127
OSK-W-17-1072-W2 1019.7 1022.0 2.3 4.16 Lynx 4 Lynx
including 1020.2 1020.5 0.3 31.0
OSK-W-17-1072-W3 906.6 909.0 2.4 4.02 Lynx 4 Lynx
OSK-W-17-1085 230.0 232.5 2.5 4.41 Lynx 1 Lynx
OSK-W-17-1085 328.5 330.7 2.2 29.8 Lynx 2 Lynx
including 329.5 330.7 1.2 54.6
OSK-W-17-1099 83.0 85.0 2.0 7.87 Lynx 1 Lynx
including 83.0 83.3 0.3 51.9
OSK-W-17-1104 857.4 860.0 2.6 48.7 27.3 Vein Lynx
including 857.4 858.0 0.6 193 100
OSK-W-17-1112 603.0 605.1 2.1 9.96 Lynx HW Lynx
including 604.0 604.7 0.7 24.0
OSK-W-17-1113 374.1 376.2 2.1 6.35 Lynx 2 Lynx
including 374.7 375.2 0.5 25.2
OSK-W-17-1113 382.4 387.0 4.6 8.46 Lynx 1 + Lynx 2 Lynx
including 386.4 387.0 0.6 22.2
OSK-W-17-1128 985.5 988.5 3.0 17.4 Lynx 4 Lynx
including 987.0 988.5 1.5 32.3
OSK-W-17-1128 1256.0 1258.0 2.0 4.49 TBD Lynx
including 1257.0 1257.7 0.7 12.7
OSK-W-17-1128 1286.1 1288.1 2.0 8.25 TBD Lynx
including 1286.1 1286.7 0.6 20.0
OSK-W-17-1131 135.0 137.0 2.0 3.28 Lynx 1 Lynx
including 136.4 137.0 0.6 10.8
OSK-W-17-1166-W1 662.0 665.0 3.0 3.32 TBD Lynx
OSK-W-17-1166-W1 676.3 682.0 5.7 3.13 TBD Lynx
including 676.3 677.0 0.7 11.4
OSK-W-17-1166-W1 799.0 801.0 2.0 3.12 Lynx 1 Lynx
OSK-W-17-1166-W2 1048.6 1050.8 2.2 5.06 Vein Lynx
OSK-W-17-1166-W3 941.4 944.0 2.6 4.21 VNCR Lynx
OSK-W-17-1166-W3 969.4 971.5 2.1 6.63 QTV Lynx
including 969.4 970.0 0.6 16.1
OSK-W-17-1166-W3 1267.0 1269.1 2.1 6.96 Lynx 6 Lynx
including 1267.5 1268.2 0.7 16.6
OSK-W-17-1166-W3 1477.0 1479.0 2.0 4.05 TBD Lynx
including 1477.0 1477.4 0.4 16.8
OSK-W-17-1168 213.0 217.0 4.0 6.05 Lynx 3 Lynx
including 216.0 217.0 1.0 14.5
OSK-W-17-1169 624.0 627.0 3.0 9.75 Lynx 1 Lynx
including 625.5 627.0 1.5 19.4
OSK-W-17-1170 232.0 234.0 2.0 4.22 VNCR Lynx
OSK-W-17-1170 417.0 419.0 2.0 3.23 Vein Lynx
including 417.0 417.5 0.5 12.3
OSK-W-17-1177 571.0 576.5 5.5 16.0 Lynx 1 Lynx
including 572.2 573.0 0.8 97.6
OSK-W-17-1177 764.0 766.4 2.4 22.9 TBD Lynx
including 765.3 766.0 0.7 77.0
OSK-W-17-1181 933.5 936.0 2.5 4.46 Lynx 4 Lynx
including 934.25 935.1 0.85 12.7
OSK-W-17-1181-W1 920.9 923.3 2.4 27.9 25.6 Lynx 1 Lynx
including 921.5 922.1 0.6 110 100
OSK-W-17-1181-W1 1030.0 1032.3 2.3 14.4 Lynx 4 Lynx
including 1031.1 1031.7 0.6 48.2
OSK-W-17-1181-W1 1040.5 1042.6 2.1 4.66 Lynx 4 Lynx
including 1041.0 1041.8 0.8 12.2
OSK-W-17-1181-W2 909.0 915.0 6.0 5.92 Lynx 1 Lynx
OSK-W-17-1181-W2 938.0 942.0 4.0 4.60 Lynx 4 Lynx
OSK-W-17-1181-W2 949.0 954.0 5.0 10.5 Lynx 4 Lynx
including 949.5 950.0 0.5 59.5
OSK-W-17-1181-W2 961.1 963.2 2.1 41.0 Lynx 4 Lynx
OSK-W-17-1181-W3 1097.5 1101.0 3.5 5.31 Lynx 4 Lynx
OSK-W-17-1187 264.0 266.7 2.7 3.43 Lynx 3 Lynx
OSK-W-17-1193 971.3 979.0 7.7 28.3 24.9 Lynx 4 Lynx
including 971.3 974.4 3.1 66.5 58.1
OSK-W-17-1193-W1 947.6 952.0 4.4 14.8 VNCR Lynx
including 947.6 948.1 0.5 27.7
including 950.5 951.5 1.0 45.5
OSK-W-17-1242 820.0 822.5 2.5 3.68 Lynx 4 Lynx
including 821.3 822.1 0.8 9.25
OSK-W-17-1242 871.0 873.0 2.0 4.38 Lynx 4 Lynx
including 871.7 872.2 0.5 15.3
OSK-W-17-1242 1032.0 1034.5 2.5 43.8 12.3 Lynx 4 Lynx
including 1034.2 1034.5 0.3 362 100
OSK-W-17-1242-W2 601.0 603.0 2.0 7.18 Lynx HW Lynx
including 602.1 603.0 0.9 13.2
including 38.4 39.2 0.8 21.4
OSK-W-17-1320 61.8 64.3 2.5 4.72 Lynx 1 Lynx
OSK-W-17-1320 112.0 114.0 2.0 5.45 Lynx 1 Lynx
including 112.4 112.7 0.3 31.0
OSK-W-17-1343 541.0 546.0 5.0 140 30.8 Lynx HW Lynx
including 544.7 545.6 0.9 704 100
OSK-W-17-1343-W2 507.3 511.7 4.4 34.1 29.5 Lynx HW Lynx
including 507.3 509.1 1.8 77.7 66.6
OSK-W-17-1343-W2 636.5 639.0 2.5 3.11 Lynx HW Lynx
OSK-W-17-1346 214.0 218.1 4.1 3.26 Lynx 1 + Lynx 2 Lynx
OSK-W-17-1350 386.7 388.7 2.0 6.31 Lynx 4 Lynx
OSK-W-17-1356 195.2 197.5 2.3 10.0 Lynx 1 Lynx
OSK-W-17-1364 301.0 307.1 6.1 15.0 Lynx 1 Lynx
including 303.8 305.1 1.3 35.0
Notes:
1. True widths are estimated at 65 - 80% of the reported core length interval. See "Quality Control" below.
2. Definitions: HW = Hanging Wall, VNCR = Crustiform Vein, TBD = To be determined, QTV: quartz tourmaline vein
Hole Number Azimuth
(°)
Dip
(°)
Length
(m)
UTM E UTM N Section
OSK-W-17-883 326 -60 396 453455 5434983 3600
OSK-W-17-888 333 -52 402 453367 5434941 3500
OSK-W-17-902 331 -50 468 453390 5434852 3475
OSK-W-17-909-W2 131 -55 1071 453683 5435677 4125
OSK-W-17-909-W3 131 -55 1066 453683 5435677 4125
OSK-W-17-923 137 -56 1062 453607 5435603 4025
OSK-W-17-945 149 -50 557 453374 5435444 3750
OSK-W-17-953 131 -48 762 453218 5435353 3575
OSK-W-17-998 330 -57 372 453313 5434909 3425
OSK-W-17-1006 136 -49 762 453281 5435348 3625
OSK-W-17-1015 137 -51 474 453232 5435294 3550
OSK-W-17-1019 140 -52 606 452660 5434917 2875
OSK-W-17-1024 330 -53 360 453295 5434947 3450
OSK-W-17-1027 134 -59 825 453437 5435481 3825
OSK-W-17-1028 326 -59 807 452860 5434814 3000
OSK-W-17-1040 327 -45 294 453295 5434948 3450
OSK-W-17-1043 133 -47 438 453284 5435344 3625
OSK-W-17-1044 333 -70 381 453477 5435045 3650
OSK-W-17-1059 136 -46 660 453284 5435344 3625
OSK-W-17-1067 132 -48 653 453339 5435400 3700
OSK-W-17-1072-W2 144 -57 1059 453612 5435535 4000
OSK-W-17-1072-W3 144 -57 1110 453612 5435535 4000
OSK-W-17-1085 339 -68 447 453460 5435020 3625
OSK-W-17-1099 335 -56 264 453143 5434935 3300
OSK-W-17-1104 142 -50 1059 453383 5435455 3775
OSK-W-17-1112 136 -54 636 453437 5435481 3825
OSK-W-17-1113 138 -50 480 453280 5435347 3625
OSK-W-17-1128 129 -53 1419 453272 5435392 3625
OSK-W-17-1131 337 -60 342 453329 5435010 3500
OSK-W-17-1166-W1 132 -59 1516 453621 5435639 4050
OSK-W-17-1166-W2 132 -59 1197 453621 5435639 4050
OSK-W-17-1166-W3 132 -59 1551 453621 5435639 4050
OSK-W-17-1168 329 -57 717 453464 5435090 3650
OSK-W-17-1169 129 -55 1437 453330 5435468 3725
OSK-W-17-1170 154 -49 594 452878 5435048 3125
OSK-W-17-1177 340 -67 1422 454113 5435090 4225
OSK-W-17-1181 133 -58 1082 453789 5435793 4275
OSK-W-17-1181-W1 133 -58 1395 453789 5435793 4275
OSK-W-17-1181-W2 133 -58 1158 453789 5435793 4275
OSK-W-17-1181-W3 133 -58 1247 453789 5435793 4275
OSK-W-17-1187 333 -55 477 453441 5435025 3600
OSK-W-17-1193 141 -59 1803 453806 5435726 4275
OSK-W-17-1193-W1 141 -59 1320 453806 5435726 4275
OSK-W-17-1242 144 -58 1206 453570 5435490 3950
OSK-W-17-1242-W2 144 -58 1110 453570 5435490 3950
OSK-W-17-1320 328 -76 852 452904 5434849 3050
OSK-W-17-1343 137 -56 681 453570 5435490 3950
OSK-W-17-1343-W2 137 -56 1323 453570 5435490 3950
OSK-W-17-1346 334 -64 396 453466 5435070 3650
OSK-W-17-1350 328 -55 843 452993 5434557 2975
OSK-W-17-1356 334 -67 429 453442 5435026 3600
OSK-W-17-1364 139 -45 534 452889 5435073 3150

OSK-W-17-883 intersected 10.3 g/t Au over 2.0 metres in Lynx 1. Mineralization is composed of 2% disseminated pyrite in a silicified rhyolite with trace local visible gold and 1% pyrite in a one-metre crustiform vein.

OSK-W-17-888 intersected 22.6 g/t Au over 4.8 metres, 17.8 g/t Au over 2.0 metres and 4.06 g/t Au over 2.1 metres in Lynx 2. The first and second intervals are composed of up 2% disseminated pyrite with pervasive silica flooding in a fragmental felsic intrusive. The third interval corresponds to a rhyolite containing 1% disseminated pyrite and 5% pyrite in association with pervasive silica flooding.

OSK-W-17-902 intersected 3.67 g/t Au over 2.0 metres and 11.7 g/t Au over 2.1 metres in the Lynx Corridor. The first interval is composed of 2% pyrite stringers and 1% pyrite in tourmaline ptygmatic veins hosted in a gabbro. The second is composed of trace to 2% stringers and disseminated pyrite in a crustiform vein hosted in the same gabbroic unit.

OSK-W-17-909-W2 intersected 19.2 g/t Au over 2.1 metres in Lynx 1. Mineralization is composed of 5 to 10% pyrite stringers in a fuchsitized, sericitized and silicified gabbro.

OSK-W-17-909-W3 intersected Lynx 1 with 5.93 g/t Au over 2.0 metres and 5.86 g/t Au over 2.1 metres. The first interval is composed of 5% pyrite stringers in a crustiform vein with fuchsite and trace local visible gold hosted is a chloritized and sericitized andesite. The second interval is composed of 15% pyrite clusters and stringers in a silicified and sericitized andesite.

OSK-W-17-923 intersected Lynx 4 returning 210 g/t Au over 2.4 metres with local visible gold in a slightly sericitized and silicified gabbro with fuchsite.

OSK-W-17-945 intersected Lynx 1 returning 20.6 g/t Au over 2.2 metres and 7.74 g/t Au over 4.0 metres. The first interval corresponds to a quartz vein in a sericitized zone at the contact between gabbro and rhyolite with 1% disseminated and stringer pyrite. The second interval is composed of up to 5% disseminated pyrite and trace pyrite stringers at the contact between a rhyolite and a sericitized gabbro.

OSK-W-17-953 intersected 6.02 g/t Au over 2.0 metres in Lynx 3. Mineralization is composed of 8% pyrite with quartz clusters and veins, hosted in a slightly sericitized and silicified rhyolite with trace disseminated and stringer pyrite.

OSK-W-17-998 intersected Lynx 1 returning 15.8 g/t Au over 2.25 metres. The interval is composed of 3% disseminated pyrite and 5% pyrite stringers in a sericitized rhyolite.

OSK-W-17-1006 intersected 13.8 g/t Au over 2.2 metres in Lynx 4. Mineralization is composed of local visible gold, trace disseminated pyrite and 2% pyrite stringers in a rhyolite with a strong pervasive silica flooding.

OSK-W-17-1015 intersected 4.02 g/t Au over 2.1 metres and 6.26 g/t Au over 2.6 metres in Lynx 2 and 8.38 g/t Au over 2.3 metres in a crustiform vein within the Lynx Corridor. The first interval corresponds to a sericitized and silicified rhyolite containing trace disseminated pyrite and a decimetre scale quartz-tourmaline vein. The second interval is composed of 4% pyrite clusters and trace pyrite stringers in a strongly chloritized gabbro with weak silica and sericite alteration. The third interval corresponds with a decimetre scale quartz-tourmaline vein in a gabbro with sericite, silica and chlorite alteration.

OSK-W-17-1019 intersected 11.3 g/t Au over 2.0 metres, 3.21 g/t Au over 2.2 metres and 9.04 g/t Au over 2.0 metres. The first interval is composed of local visible gold within a pervasive silica flooding zone with 30-40% pyrite and 5% pyrite tourmaline stringers associated with a five-centimetre tourmaline ptygmatic vein. This interval is the the south-west extension of the Lynx 1 Corridor, 250 metres south-west of OSK-W-17-1052 (7.65 g/t Au over 4.1 metres, previously reported, October 30, 2017). The second interval is related to Lynx 4, geometry to be determined, and is composed of 5% pyrite stringers in a sericitized and weakly silicified porphyry felsic dike. The third interval is composed of a partially dismembered quartz vein and local visible gold.

OSK-W-17-1024 intersected Lynx 1 with 3.97 g/t Au over 2.0 metres and 3.64 g/t Au over 2.0 metres. Mineralization is composed of trace disseminated pyrite in a sericitized porphyritic felsic dike.

OSK-W-17-1027 returned 3.85 g/t Au over 2.0 metres, 12.2 g/t Au over 2.2 metres and 3.47 g/t Au over 2.5 metres in the Lynx Corridor. The first interval is in Lynx 2 and composed of trace disseminated pyrite in a sericitized and strongly chloritized gabbro. The second interval corresponds to a 20-centimeter-wide quartz-carbonate vein in the same gabbroic unit. The third interval is related to the Lynx HW and is composed of 20% pyrite stringers and 10% disseminated pyrite in a bleached gabbro.

OSK-W-17-1028 intersected 8.18 g/t Au over 2.0 metres in the Lynx Corridor. Mineralization is composed of up to 3% pyrite clusters and 10% pyrite stringers in a sericitized and silicified porphyric felsic dike. It is in the south west extension of the Lynx 1 Corridor, 145 metres southwest of OSK-W-17-1052 (7.65 g/t Au over 4.1 metres, previously reported, October 30, 2017). Geometry of this intercept is yet to be determined.

OSK-W-17-1040 intersected 5.9 g/t Au over 2.0 metres in Lynx 2. The interval is composed of highly silicified and fuschitized felsic intrusive with 5% pyrite stringers, 2% disseminated pyrite and local visible gold.

OSK-W-17-1043 intersected 3.11 g/t Au over 2.0 metres. Mineralization is composed of trace pyrite fragments and 1% pyrite stringers in a chloritized and slightly silicified fragmental felsic intrusive. This interval is located between Lynx 1 and Lynx 2.

OSK-W-17-1044 intersected 3.60 g/t Au over 2.1 metres in Lynx 2. Mineralization is composed of 4% disseminated and clustered pyrite in a sericitized fragmental felsic rock.

OSK-W-17-1059 intersected 83.0 g/t Au over 2.0 metres and 17.7 g/t Au over 2.4 metres in Lynx 3 and Lynx 1, respectively. Mineralization is composed of 3% pyrite fragments and 1% pyrite stringers in a chloritized and slightly sericitized gabbro.

OSK-W-17-1067 intersected Lynx HW returning 4.54 g/t Au over 3.1 metres. Mineralization is composed of 3% pyrite stringers and 1% disseminated pyrite at a chloritized and sericitized contact between an andesite and a fragmental felsic dike.

OSK-W-17-1072-W2 intersected six intervals all related to Lynx 4: 5.24 g/t Au over 3.1 metres, 17.7 g/t Au over 2.0 metres, 8.60 g/t Au over 3.0 metres, 10.9 g/t Au over 2.0 metres, 17.1 g/t Au over 2.3 metres and 4.16 g/t Au over 2.3 metres. The first interval consists of traces of ptygmatic tourmaline veins and pyrite-tourmaline stringers in a four-metre interval composed of sericitized and partially silicified rhyolite within a large gabbro. The other five intervals consist of chloritized and slightly sericitized rhyolite containing 1% pyrite stringers, trace to 20% tourmaline-pyrite veins and local, but intense, pervasive silica flooding.

OSK-W-17-1072-W3 intersected Lynx 4 returning 4.02 g/t Au over 2.4 metres. Mineralization is composed of trace disseminated pyrite at the sericitized contact between rhyolite and small porphyry felsic dike.

OSK-W-17-1085 intersected 4.41 g/t Au over 2.5 metres and 29.8 g/t Au over 2.2 metres in Lynx 1 and Lynx 2, respectively. The first interval is composed of trace disseminated and stringer pyrite with 2% crustiform veins hosted in a chloritized and slightly silicified gabbro. The second interval consist of 5% disseminated pyrite in a sericitized and strongly chloritized gabbro.

OSK-W-17-1099 intersected 7.87 g/t Au over 2.0 metres in Lynx 1. Mineralization consists of 5% disseminated pyrite and 2% pyrite-tourmaline stringers in a silicified and slightly sericitized rhyolite.

OSK-W-17-1104 intersected 48.7 g/t Au over 2.6 metres in the Lynx Corridor. Mineralization is composed of a quartz-carbonate vein containing multiple local visible gold over 0.4 metres hosted in a fuchsitized and strongly chloritized gabbro.

OSK-W-17-1112 intersected 9.96 g/t Au over 2.1 metres in the Lynx HW. Mineralization is composed of up 3% pyrite stringers and 1% disseminated pyrite at a sericitized contact between a rhyolite and a chloritized-fuchsitized gabbro.

OSK-W-17-1113 intersected 6.35 g/t Au over 2.1 metres and 8.46 g/t Au over 4.6 metres. The first interval is in Lynx 2 and is composed of trace pyrite stringers and clusters in quartz veining within a sericitized and silicified rhyolite. The second interval is composed of 5% pyrite clusters at a contact between a pervasively silica flooded rhyolite and a sericitized and chloritized gabbro with trace ptygmatic tourmaline veining and located between Lynx 1 and Lynx 2.

OSK-W-17-1128 intersected 17.4 g/t Au over 3.0 metres in Lynx 4. Two additional intervals returned 4.49 g/t Au over 2.0 metres and 8.25 g/t Au over 2.0 metres in an area with geometry yet to be determined. The first interval is composed of 2% pyrite stringers in a chloritized and sericitized andesite with 30% smoky quartz veinlets. The second interval is composed of slightly silicified and sericitized porphyry felsic dike with trace pyrite stringers, clusters, and 1% quartz veining. The third interval is composed of 5% pyrite in pervasive silica flooding and disseminated pyrite in a slightly sericitized rhyolite.

OSK-W-17-1131 intersected Lynx 1 with 3.28 g/t Au over 2.0 metres. Mineralization is composed of trace pyrite fragments in a sericitized fragmental felsic intrusion.

OSK-W-17-1166-W1 intersected 3.32 g/t Au over 3.0 metres, 3.13 g/t Au over 5.7 metres, and 3.12 g/t Au over 2.0 metres. The first and second intervals are composed of up to 5% pyrite stringer and 4% fragments in a sericitized and silicified fragmental felsic intrusive with fuchsite. The second interval contains 15% crustiform veins. Geometry of this intercept is yet to be determined; it is 230 metres north east of and in the trend of Lynx 2. The third interval is in Lynx 1 and composed of 8% interstitial and fragmental pyrite in a chloritized rhyolite.

OSK-W-17-1166-W2 intersected 5.06 g/t Au over 2.2 metres related to a shear zone within the Lynx Corridor. Mineralization is composed of 5% pyrite clusters and 1% disseminated pyrite in a rhyolite with moderate silica, sericite and carbonate alteration. The mineralization is in contact with a chloritized andesite.

OSK-W-17-1166-W3 returned four intervals; 4.21 g/t Au over 2.6 metres, 6.63 g/t Au over 2.1 metres, 6.96 g/t Au over 2.1 metres and 4.05 g/t au over 2.0 metres. The first interval in Lynx 1 is composed of dismembered crustiform veins with 3-5% disseminated pyrite hosted in gabbro with sericite, chlorite, carbonates and fuchsite alteration. The second interval is composed of 5% pyrite clusters and stringers with 30% quartz-tourmaline veins in a silicified rhyolite. The third interval, in Lynx 6, is composed of a strongly sericitized mafic dike with 5% pyrite stringers and massive sulfides over 1 metre with quartz tourmaline and quartz carbonates veinlets. The fourth interval consists of 6% pyrite stringers and up 3% sphalerite in a sericitized gabbro at contact with porphyric felsic dike in an area with geometry yet to be determined.

OSK-W-17-1168 intersected 6.05 g/t Au over 4.0 metres in Lynx 2. Mineralization is composed of 1% pyrite stringers hosted in a sericitized and slightly silicified felsic porphyritic dike.

OSK-W-17-1169 intersected Lynx 1 returning 9.75 g/t Au over 3.0 metres. Mineralization is composed of trace disseminated pyrite in a strongly chloritized, moderately fuchsitized and carbonatized gabbro.

OSK-W-17-1170 intersected 4.22 g/t Au over 2.0 metres and 3.23 g/t au over 2.0 metres within the Lynx Corridor. The first interval consists of a quartz crustiform veins with 15% pyrite stringers and fuchsite alteration. The mineralization is hosted in a sericitized felsic porphyritic dike. The second interval is related to a quartz crustiform vein with traces of clustered or disseminated pyrite hosted in a hematized and sericitized felsic porphyritic dike.

OSK-W-17-1177 intersected 16.0 g/t Au over 5.5 metres and 22.9 g/t Au over 2.4 metres in Lynx 1 and Lynx 3, respectively. The first interval is composed of 1% pyrite stringers and 5% pyrite associated with pervasive silica flooding. The interval is hosted in a felsic porphyritic intrusion. The second interval is at the contact between a silicified and sericitized rhyolite and a gabbroic dike. Mineralization is composed of 5% pyrite stringers.

OSK-W-17-1181 intersected 4.46 g/t Au over 2.5 metres in Lynx 4. Mineralization is composed of 3% pyrite in quartz-tourmaline veinlets in a rhyolite with pervasive silica flooding, and local sericite and fuchsite alteration. This interval extends Lynx 4 approximatively 75 metres north-east of OSK-W-17-909 (11.8 g/t Au over 2.0 metres previously reported September 18, 2017, and 301 g/t Au over 6.2 metres and 10.7 g/t Au over 6.0 metres previously reported November 14, 2017).

OSK-W-17-1181-W1 intersected 27.9 g/t Au over 2.4 metres, 14.4 g/t Au over 2.3 metres and 4.66 g/t Au over 2.1 metres. The first interval corresponds to a quartz-tourmaline vein with local visible gold hosted in an altered gabbro containing fuschite and sericite. The vein is located between Lynx 1 and Lynx 4. The second interval is a small silicified porphyritic felsic dike with 15% pyrite and correlates to Lynx 4. The third interval consists of 15% pyrite in silicified contact between a sericite gabbro and an altered rhyolite.

OSK-W-17-1181-W2 intersected 5.92 g/t Au over 6.0 metres in Lynx 1, and 4.60 g/t Au over 4.0 metres, 10.5 g/t Au over 5.0 metres and 41.0 g/t Au over 2.1 metres in Lynx 4. The first interval is composed of 7% pyrite clusters and stringers in a sericitized gabbro. The three intervals related to Lynx 4 are composed of moderately sericitized and silicified rhyolite with 2% pyrite clusters and stringers. The high grade in the third interval consists of a small felsic dike with sericite and silica alteration with 5% pyrite clusters and 1% pyrite stringers.

OSK-W-17-1181-W3 intersected 5.31 g/t Au over 3.5 metres in Lynx 4. Mineralization is composed of 3% pyrite stringers, 1% pyrite tourmaline stringers, and 1% tourmaline in a moderately sericitized and slightly chloritized gabbro.

OSK-W-17-1187 intersected 3.43 g/t au over 2.7 metres in Lynx 3. Mineralization is composed of 6% pyrite clusters stringers with 1% tourmaline ptygmatic veins in a moderately chloritized gabbro with fuchsite.

OSK-W-17-1193 intersected 28.3 g/t Au over 7.7 metres in Lynx 4. High grade mineralization is composed of local visible gold, up 10% pyrite stringers in pervasive silica flooding hosted in a breccia unit with strong fuchsite and silica alteration. This unit is at a contact of a sericitized porphyric felsic dike containing trace pyrite stringers.

OSK-W-17-1193-W1 intersected 14.8 g/t Au over 4.4 metres in the Lynx 4 Corridor. High grade mineralization is composed 7% pyrite stringer and 1% chalcopyrite in 20-30% crustiform veins at low angles with quartz tourmaline veins hosted in gabbro with moderate fuchsite alteration.

OSK-W-17-1242 intersected 3.68 g/t Au over 2.5 metres, 4.38 /t Au over 2.0 metres and 43.8 g/t Au over 2.5 metres, all in Lynx 4. The first interval is composed of up to 5% tourmaline-pyrite stringers hosted in a strongly sericitized gabbro with fuchsite and rhyolite fragments. The second interval is composed of 5% pyrite in quartz-tourmaline veins with locally intense pervasive silica flooding hosted in a moderately sericitized rhyolite. High grade mineralization in the third interval is composed of local trace electrum in millimetre fracture fillings and 3% disseminated and stringer pyrite hosted in a strongly chloritized fragmental rhyolite.

OSK-W-17-1242-W2 intersected 7.18 g/t au over 2.0 metres related to the Lynx HW. Mineralization is composed of 4% pyrite clusters and 1% pyrite in quartz veins with patches of silica flooding. The interval is hosted in a fragmental rhyolite.

OSK-W-17-1320 intersected 4.72 g/t Au over 2.5 metres and 5.45 g/t Au over 2.0 metres in the southwest extension of Lynx 1 Corridor. The first interval is composed of 65% crustiform vein and 5% disseminated and stringer pyrite in a strongly silicified and fuchsitized andesite at the contact with porphyric felsic dike. The second interval is composed of 5% disseminated pyrite, 1% sphalerite clusters with intense and local pervasive silica flooding hosted in a porphyritic felsic dike with moderate carbonate and sericite alteration. It is located 90 metres south-west and up-plunge of OSK-W-17-1052 (7.65 g/t Au over 4.1 metres, previously reported October 30, 2017).

OSK-W-17-1343 intersected Lynx HW returning 140 g/t Au over 5.0 metres. High grade mineralization is composed of disseminated local visible gold in stringers filling up micro fractures with electrum in a smoky quartz vein. It is host in a moderate sericitized and silicified rhyolite.

OSK-W-17-1343-W2 intersected 34.1 g/t Au over 4.4 metres related to Lynx HW. Mineralization is composed of local visible gold and up to 10% pyrite with pervasive silica flooding hosted in a moderately silicified and sericitized fragmental felsic intrusive.

OSK-W-17-1346 intersected 3.26 g/t Au over 4.1 metres in Lynx 2. Mineralization is composed of 6% pyrite clusters and 2% pyrite stringers at the contact between a chloritized gabbro and a silica altered porphyritic felsic intrusion.

OSK-W-17-1350 intersected 6.31 g/t Au over 2.0 metres in Lynx 4. Mineralization is composed of 5% pyrite in a sericitized rhyolite in contact with andesite. The contact contains brecciated smoky quartz veins with sericite, carbonate, tourmaline and sulfides over 1.0 metres with local visible gold.

OSK-W-17-1356 intersected 10.0 g/t Au over 2.3 metres in Lynx 1. Mineralization is composed of 5% pyrite in low core angle ptygmatic tourmaline vein and 1% disseminated pyrite at the strongly epidotized, moderately sericitized rhyolite-gabbro contact.

OSK-W-17-1364 intersected 15.0 g/t Au over 6.1 metres in the south west extension of Lynx 1 corridor. Mineralization is at contact between a porphyric felsic dyke and andesite. The porphyric felsic dike is moderately silica and sericite altered with up to 5% disseminated and stringer pyrite with local and intense pervasive silica flooding and fuchsite. The andesite is moderately silicified and sericitized with 6% disseminated or stringer pyrite, and one-meter crustiform vein. It is located 110 metres at north-east and down-plunge of OSK-W-17-1052 (7.65 g/t Au over 4.1 metres, previously reported October 30, 2017).

Qualified Person

The scientific and technical content of this news release has been reviewed, prepared and approved by Mr. Louis Grenier, M.Sc.A., P.Geo. (OGQ 800), Project Manager of the Windfall Lake gold project, who is a "Qualified Person" as defined by National Instrument 43-101 - Standards of Disclosure for Mineral Projects ("NI 43-101").

Quality Control and Reporting Protocols

True widths determinations are estimated at 65-80% of the reported core length intervals for most of the zones. Assays are uncut except where indicated. Intercepts occur within geological confines of major zones but have not been correlated to individual vein domains at this time. Reported intervals include minimum weighted averages of 3.0 g/t Au diluted over core lengths of at least 2.0 metres. All NQ core assays reported were obtained by either 1-kilogram screen fire assay or standard 50-gram fire-assaying-AA finish or gravimetric finish at ALS Laboratories in Val d'Or, Québec, Thunder Bay and Sudbury, Ontario or Vancouver, British Colombia or Bureau Veritas in Timmins, Ontario. The 1-kilogram screen assay method is selected by the geologist when samples contain coarse gold or present a higher percentage of pyrite than surrounding intervals. Selected samples are also analyzed for multi-elements, including silver, using an Aqua Regia-ICP-AES method at ALS Laboratories. Drill program design, Quality Assurance/Quality Control ("QA/QC") and interpretation of results is performed by qualified persons employing a QA/QC program consistent with NI 43-101 and industry best practices. Standards and blanks are included with every 20 samples for QA/QC purposes by the Corporation as well as the lab. Approximately 5% of sample pulps are sent to secondary laboratories for check assay.

About the Windfall Lake Gold Deposit

The Windfall Lake gold deposit is located between Val-d'Or and Chibougamau in the Abitibi region of Québec, Canada. The mineral resource defined by the previous operator comprises 2,762,000 tonnes at 8.42 g/t Au (748.000 ounces) in the indicated category and 3,512,000 tonnes at 7.62 g/t Au (860,000 ounces) in the inferred category (sourced from a technical report dated June 10, 2015 entitled "Preliminary Economic Assessment of the Windfall Lake Gold Property, Québec, Canada" with an effective date of April 28, 2015, prepared in accordance with NI 43-101). The Windfall Lake gold deposit is currently one of the highest grade resource-stage gold projects in Canada. The bulk of the mineralization occurs in the Main Zone, a southwest/northeast trending zone of stacked mineralized lenses, measuring approximately 600 metres wide and at least 1.400 metres long. The deposit is well defined from surface to a depth of 500 metres, and remains open along strike and at depth. Mineralization has been identified only 30 metres from surface in some areas and as deep as 870 metres in others, with significant potential to extend mineralization up and down-plunge and at depth.

About Osisko Mining Inc.

Osisko is a mineral exploration company focused on the acquisition, exploration, and development of precious metal resource properties in Canada. Osisko holds a 100% in the high-grade Windfall Lake gold deposit located between Val-d'Or and Chibougamau in Québec and holds a 100% undivided interest in a large area of claims in the surrounding Urban Barry area and nearby Quevillon area (over 3,300 square kilometres), a 100% interest in the Marban project located in the heart of Québec's prolific Abitibi gold mining district, and properties in the Larder Lake Mining Division in northeast Ontario, including the Jonpol and Garrcon deposits on the Garrison property, the Buffonta past producing mine and the Gold Pike mine property. The Corporation also holds interests and options in a number of additional properties in northern Quebec and Ontario. Osisko continues to be well financed with approximately $190 million in cash and investments.

Cautionary Note Regarding Forward-Looking Information

This news release contains "forward-looking information" within the meaning of the applicable Canadian securities legislation that is based on expectations, estimates, projections and interpretations as at the date of this news release. The information in this news release about the Windfall Lake gold deposit being one of the highest grade resource-stage gold projects in Canada; the current 800,000 metre drill program; the significance of new results from the ongoing drill program at the Windfall Lake gold project; the significance of assay results presented in this press release; the type of drilling included in the drill program (definition drilling, expansion drilling to the NE of the main deposit and adjacent Lynx deposit, and exploration drilling on the greater deposit and Urban-Barry project area); potential mineralization; the potential to extend mineralization up and down-plunge and at depth at the Windfall Lake gold deposit; the ability to realize upon any mineralization in a manner that is economic; the ability to complete any proposed exploration activities and the results of such activities, including the continuity or extension of any mineralization; and any other information herein that is not a historical fact may be "forward-looking information". Any statement that involves discussions with respect to predictions, expectations, interpretations, beliefs, plans, projections, objectives, assumptions, future events or performance (often but not always using phrases such as "expects", or "does not expect", "is expected", "interpreted", "management's view", "anticipates" or "does not anticipate", "plans", "budget", "scheduled", "forecasts", "estimates", "believes" or "intends" or variations of such words and phrases or stating that certain actions, events or results "may" or "could", "would", "might" or "will" be taken to occur or be achieved) are not statements of historical fact and may be forward-looking information and are intended to identify forward-looking information.

This forward-looking information is based on reasonable assumptions and estimates of management of the Corporation. at the time it was made, involves known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of Osisko to be materially different from any future results, performance or achievements expressed or implied by such forward-looking information. Such factors include, among others, risks relating to the ability of exploration activities (including drill results) to accurately predict mineralization; errors in management's geological modelling; the ability of Osisko to complete further exploration activities, including drilling; property interests in the Windfall Lake gold project; the ability of the Corporation to obtain required approvals and complete transactions on terms announced; the results of exploration activities; risks relating to mining activities; the global economic climate; metal prices; dilution; environmental risks; and community and non-governmental actions. Although the forward-looking information contained in this news release is based upon what management believes, or believed at the time, to be reasonable assumptions. Osisko cannot assure shareholders and prospective purchasers of securities of the Corporation that actual results will be consistent with such forward-looking information, as there may be other factors that cause results not to be as anticipated, estimated or intended, and neither Osisko nor any other person assumes responsibility for the accuracy and completeness of any such forward-looking information, Osisko does not undertake, and assumes no obligation, to update or revise any such forward-looking statements or forward-looking information contained herein to reflect new events or circumstances, except as may be required by law.

Lire la suite de l'article sur https:
Données et statistiques pour les pays mentionnés : Canada | Tous
Cours de l'or et de l'argent pour les pays mentionnés : Canada | Tous

Osisko Mining Corp.

PRODUCTEUR
CODE : OSK.TO
ISIN : CA6882781009
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Osisko Mining est une société de production minière d'or basée au Canada.

Osisko Mining détient divers projets d'exploration au Bresil, au Canada et en Argentine.

Son principal projet en production est MALARTIC au Canada et ses principaux projets en exploration sont GOLDBORO, SLEITAT, JC - SMART SKARNS, HAMMOND REEF, MALARTIC CHL GOLD PROPERTY, DUPARQUET et CLEMENT LAKE au Canada, EL POTOSI et SANTA CLARA / CERRO BONITO au Salvador, CERRO CONDORINI et COAL CREEK au Perou, CASTELO DOS SONHOS au Bresil et FAMATINA en Argentine.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Dans les médias de Osisko Mining Corp.
20/12/2018Osisko Mining reports 39% higher grade than resource model a...
Rapports annuels de Osisko Mining Corp.
2008 Annual report
Financements de Osisko Mining Corp.
31/08/2011Osisko Announces an Increase in Caterpillar Lease Financing ...
31/08/2011Announces an Increase in Caterpillar Lease Financing Facilit...
18/11/2009Strengthens Balance Sheet With $241 M Proceeds From Exercise...
30/06/2009Closes $10.64 Million Flow-Through Financing
17/04/2006Announces C10$ million "bought deal" financing
Nominations de Osisko Mining Corp.
10/05/2013Anounces Election of Directors
17/04/2012Nominates Michele Darling to Board of Directors
14/03/2012Appoints Gary Sugar to Board of Directors
02/02/2012Board Member Resigns
16/09/2011Osisko Appoints Richard Ross to Board of Directors
15/09/2011Appoints Richard Ross to Board of Directors
22/08/2011Director Resigns
Rapports Financiers de Osisko Mining Corp.
14/02/2014Provides Notice of Fourth Quarter and Year End 2013 Results ...
01/08/2013Reports Second Quarter 2013 Results
15/07/2013Provides Notice of Second Quarter 2013 Operating and Financi...
09/05/2013Reports First Quarter 2013 Results
29/04/2013Provides Notice of First Quarter 2013 Financial Results Rele...
21/02/2013Reports Fourth Quarter and Year-End 2012 Results
13/11/2012Reports Third Quarter 2012 Results
05/07/2012Produces 92,003 Ounces Au in Second Quarter
09/05/2012Provides Notice of First Quarter 2012 Financial Results Rele...
27/02/2012Q4 2011 Net Profit of $37.8 Million
16/01/2012Provides Notice of Fourth Quarter and Year-End 2011 Financia...
11/08/2011Releases Second Quarter 2011 Results
16/05/2011Osisko Releases First Quarter 2011 Results
14/05/2011Osisko Releases First Quarter 2011 Results
28/02/2011Releases Year-End Financial Results and Review of 2010
28/02/2011publie ses résultats financiers de fin d'année
06/11/2009Releases Third Quarter 2009 Results
11/08/2009Releases Second Quarter 2009 Results
Projets de Osisko Mining Corp.
26/07/2017OSK Osisko Mining drills 2.7 m of 57 g/t Au at Windfall
21/02/2014Intersects 2.26 g/t Gold Over 128 Metres at Kirkland Lake
07/02/2014(Malartic)Commences 2014 Canadian Malartic Exploration Program
06/02/2014(Malartic)Reports Record January Production at Canadian Malartic
04/12/2013Intersects 61.6 Metres Averaging 1.44 g/t Au at Bidgood
21/11/2013(Malartic)Canadian Malartic Mine Produces Millionth Ounce
23/10/2013GLOBAL'S NEVADA PROJECTS ATTRACT STRONG THIRD PARTY INTEREST...
10/07/2013(Malartic)Deposits Study Reporting Local and Regional Economic Impact ...
30/01/2013Intersects 5.5 g/t Au Over 54.0 Metres at Upper Beaver
10/12/2012(Malartic)Reports November Production From Canadian Malartic
12/11/2012Announces Friendly Acquisition of Queenston
11/10/2012(Malartic)Canadian Malartic Mine Produces Half Millionth Ounce
10/10/2012(Malartic)Reports Record Quarterly Production from Canadian Malartic
06/09/2012(Malartic)Reports Record Monthly Production from Canadian Malartic
26/07/2012Acquires Common Shares of Bowmore Exploration Ltd=2E
17/05/2012(Malartic)Canadian Malartic Mill Returns to Operation
10/05/2012(Malartic)Reports Fire Damage at Canadian Malartic Mill Limited to Cyc...
30/01/2012(Famatina)s Status of Famatina Exploration Project
22/12/2011and DIOS Discover New Gold Showings on the AU33 WEST Project
28/11/2011TSX.V Company Adjacent to Osisko Property - 3 Minute Video
29/09/2011(Goldboro)Orex to Pursue Exploration Work on Goldboro Gold Project
08/09/2011(Malartic)Intersects 1.23 g/t Au Over 172 Metres at Barnat Extension
31/08/2011Osisko and EMSE Sign Agreement for Development of Famatina P...
31/08/2011(Famatina)and EMSE Sign Agreement for Development of Famatina Project ...
11/08/2011(Goldboro)Goldboro Gold Project Drill Assay Results Identify Extension...
05/08/2011Osisko Buys Back a 1% Royalty Interest on Canadian Malartic ...
05/08/2011(Malartic)Buys Back a 1% Royalty Interest on Canadian Malartic Propert...
21/06/2011Osisko Declares Commercial Production at Canadian Malartic
21/06/2011(Malartic)Declares Commercial Production at Canadian Malartic
17/06/2011Osisko Submits Notice of Termination in Duparquet Project
17/06/2011(Duparquet)Submits Notice of Termination in Duparquet Project
14/06/2011(Malartic)=?ISO-8859-1?Q?Osisko=20recoupe=201,50=20g/t=20Au=20sur=2063...
14/06/2011(Malartic)Intersects 1.50 g/t Au Over 63.6 Metres at Jeffrey Zone
13/06/2011(Duparquet)et Clifton Star annoncent une estimation de ressources pour ...
13/06/2011(Duparquet)and Clifton Star Release Resource Estimate for the Beattie D...
01/06/2011(Malartic)Officially Inaugurates the Canadian Malartic Mine
01/06/2011Osisko Officially Inaugurates the Canadian Malartic Mine
02/05/2011(Malartic)Announces Revised Mine Production Plan at Canadian Malartic
21/04/2011(Goldboro)Orex Exploration Inc.: Drilling Campaign Has Begun at Goldbo...
20/04/2011Osisko Mining Corporation - Drilling campaign has begun at G...
20/04/2011Osisko Mining Corporation - Drilling campaign has begun at G...
13/04/2011(Malartic)Pours First Gold at Canadian Malartic Mine
31/03/2011(Malartic)Osisko accroît les réserves aurifères de Canadian Malartic à...
31/03/2011(Malartic)Increases Gold Reserve at Canadian Malartic to 10=2E7 Millio...
29/03/2011(Malartic)Exercises Buy Out Option in Canadian Malartic Net Smelter Ro...
28/02/2011(Malartic) Découverte de minéralisation de type Canadian Malartic
24/02/2011(Hammond Reef)Reports 124 Metres Averaging 0.73 g/t Au in Southeast Extens...
29/01/2011(Malartic)Osisko Reports Significant New Intersections at Barnat Exten...
25/01/2011(Malartic)Reports Significant New Intersections at Barnat Extension, I...
21/12/2009(Malartic)Provides Update on Construction and Development Progress at ...
14/12/2009(Malartic)Releases New Resource Estimate for Canadian Malartic Project
20/10/2009(Malartic) Intersects New Gold Mineralization on the Malartic CHL Prop...
14/09/2009(Malartic)Intersects 1.20 g/t Au Over 86.9 Metres at Jeffrey Zone
01/09/2009(Malartic)Osisko Mining Corporation: Construction Activities at Canadi...
20/08/2009(Malartic)Quebec Government Authorizes Construction of Osisko's Canadi...
26/02/2009(Malartic) Preliminary Metallurgical Results on Barnat
26/01/2009(Malartic)Announces Inferred Resource Estimate for South Barnat Deposi...
03/12/2008(Malartic) Intersects 102 Metres Averaging 3.21 g/t Au at South Barnat
Communiqués de Presse en Français de Osisko Mining Corp.
01/06/2011(Malartic)inaugure officiellement la mine Canadian Malartic
Communiqués de Presse de Osisko Mining Corp.
13/02/2014Mails Letter to Shareholders Regarding Inadequate Goldcorp O...
05/02/2014Provides Corporate Update
29/01/2014Commences Legal Proceeding to Restrain Misuse of Confidentia...
29/01/2014Announces Filing and Mailing of Directors' Circular and Reco...
20/01/2014Reports Preliminary Fourth Quarter 2013 Production
15/01/2014Responds to Unsolicited Proposal From Goldcorp Inc=2E
13/01/2014Responds to Announcement by Goldcorp
16/12/2013Completes Long-Term Debt Renegotiation
24/10/2013Provides Notice of Third Quarter 2013 Operating and Financia...
30/07/2013Enhances Financial Flexibility by Improving Long-Term Debt T...
05/07/2013Intercepts 68 Metres Averaging 1=2E26 =?ISO-8859-1?Q?=20g/t=...
02/07/2013Receives Final $30 Million Payment from Kirkland Lake Gold
29/04/2013Corporate Update
17/04/2013Comments on Trading Activities
09/04/2013(Malartic)Previews Q1 2013 Canadian Malartic Operating Results
21/03/2013Discovers Two New Gold-Copper Zones at Upper Beaver
19/02/2013(Malartic)Receives Modified Operating Parameters at Canadian Malartic
19/02/2013(Malartic)s Reserves at Canadian Malartic
11/02/2013Denis Cimon Receives the 2013 Mineral Processor of the Year
29/01/2013(Hammond Reef)Provides Resource Update for Hammond Reef Project
24/01/2013(Malartic)Previews Q4 2012 Canadian Malartic Operating Results and 201...
12/11/2012(Malartic)Reports Record Monthly Throughput at Canadian Malartic
15/10/2012Founder Retires
09/10/2012Acquires Ground in Emerging Gold Belt in Mexico and Identifi...
03/10/2012Deposits the Second Tranche of itsFinancial Guarantee Coveri...
03/08/2012Secondary Crusher Installation Completed
24/07/2012Acquisition of Subscription Receipts of Druk Capital Partner...
16/05/2012Enhances Credit Agreement With CPPIB
14/05/2012(Malartic)Provides Update on Canadian Malartic
10/05/2012(Malartic)Reports Fire at Canadian Malartic Milling Plant
03/04/2012and Metis Nation of Ontario Sign Memorandum of Understanding
12/03/2012Brings First Half of Secondary Crusher Online
01/03/2012Announces Record Date for Annual Meeting
16/02/2012Canadian gold producer Osisko Mining Corporation joins Globa...
12/01/2012(Malartic)Previews Q4 2011 Canadian Malartic Operating Results
03/01/2012Responds to Below Market Price Offer for 5 Million Shares On...
14/12/2011Osisko Comments on Trading of Common Shares
14/12/2011Comments on Trading of Common Shares
08/10/2011President Sean Roosen Named Ernst & Young 2011 Quebec Entrep...
17/06/2011(Duparquet)met fin =E0 sa participation au projet Duparquet
13/06/2011Osisko and Clifton Star Release Resource Estimate for the Be...
14/05/2011Osisko publie ses r=E9sultats du premier trismestre de 2011
12/05/2011Annual and Special Meeting of Shareholders of Osisko Mining ...
29/04/2011Osisko Announces Revised Mine Production Plan at Canadian Ma...
29/03/2011Osisko Exercises Buy Out Option in Canadian Malartic Net Sme...
09/02/2011Goldcorp Sells Osisko Investment
22/12/2009Donates Shares to McGill University
11/12/2009and Clifton Star Complete Joint Venture Agreement on Duparqu...
13/11/2009Options Goldboro Gold Property From Orex Exploration
28/09/2009 Signs Option Agreement With Claim Post Resources for the Mo...
24/09/2009 Enters Into Financing Agreement With CPPIB Credit Investmen...
11/08/2009Signs Option Agreement With Midland Exploration for the Dunn...
10/07/2009Report on Osisko's Canadian Malartic Bape Hearings is Made P...
03/07/2009Osisko Mining Corporation Completes Strategic Investment
18/06/2009Comments on Trading of Common Shares
21/05/2009Discovers New Mineralized Zone Adjacent to South Barnat
19/05/2009Makes Strategic Investment
13/01/2009 Extends South Barnat to 1200 Metres Length
04/12/2008 Recognized for Strong Sustainability Performance
07/04/2006(Castelo Dos Sonhos)Résultats positifs sur le projet diamantifère Pontax
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TORONTO (OSK.TO)FRANKFURT (EWX.F)
3,20+0.16%2,43-1.62%
TORONTO
CA$ 3,20
23/04 15:52 -
0,16%
Cours préc. Ouverture
3,19 3,15
Bas haut
3,09 3,23
Année b/h Var. YTD
2,42 -  3,21 15,94%
52 sem. b/h var. 52 sem.
2,36 -  3,92 -17,95%
Volume var. 1 mois
796 365 17,65%
Produit Gold
Développe
Recherche Gold - Lead - Silver - Tin - Tungsten - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 23/01/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
202417,03%
2023-22,00%4,532,64
2022-6,17%5,022,36
20210,81%3,972,33
2020-4,88%4,851,67
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,72 AU$-0,19%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
11,03 US$+1,47%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,55 GBX-0,90%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$-8,33%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,48 CA$+4,20%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
15,20 CA$-3,74%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+2,08%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,19 AU$+0,00%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,82 CA$-2,15%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
52,58 US$+0,87%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+5,88%Trend Power :