Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en

Osisko Mining Corp.

Publié le 02 mars 2018

Osisko Intersects 265 g/t Au Over 2.4 Metres at Windfall

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Canada | Cash | Exploration | Mine | Report |

Osisko Intersects 265 g/t Au Over 2.4 Metres at Windfall

TORONTO, ONTARIO--(Marketwired - Mar 2, 2018) - Osisko Mining Inc. (OSK:TSX) ("Osisko" or the "Corporation") is pleased to provide new results from the ongoing drill program at its 100% owned Windfall Lake gold project located in the Abitibi greenstone belt, Urban Township, Eeyou Istchee James Bay, Québec. The 800,000 metre drill program combines definition, expansion and exploration drilling in and around the main Windfall gold deposit and the adjacent Lynx deposit (located immediately NE of Windfall).

Significant new analytical results from 61 intercepts in 34 drill holes and 5 wedges focused on infill and expansion drilling in the Main Windfall lake deposit are presented below.

Highlights from the new results include: 265 g/t Au over 2.4 metres in OSK-W-17-1168; 191 g/t Au over 2.6 metres in OSK-W-17-1087; 198 g/t Au over 2.3 metres and 116 g/t Au over 2.1 metres in OSK-EAG-12-333; 173 g/t Au over 2.3 metres in OSK-W-17-1383; 47.7 g/t Au over 2.2 metres in OSK-W-17-1402, 42.7 g/t Au over 2.0 metres in OSK-W-17-1391 and 9.53 g/t over 8.9 metres in OSK-W-18-823-W2. Maps showing hole locations and full analytical results are available at www.osiskomining.com.

Hole Number From
(m)
To
(m)
Interval
(m)
Au (g/t)
uncut
Au (g/t)
cut to
100 g/t
Zone Corridor
OSK-EAG-12-333 818.2 823.0 4.8 3.07 FW3 Underdog
including 822.7 823.0 0.3 23.1
848.1 850.2 2.1 116 59.4 FW3 Underdog
including 849.2 850.2 1.0 219 100
934.0 936.3 2.3 198 21.8 FW3U Underdog
including 935.2 935.7 0.5 910 100
OSK-EAG-12-427 1110.0 1112.2 2.2 4.29 VNCR Underdog
OSK-EAG-13-480 522.3 524.3 2.0 37.1 20.6 Vein
including 524.0 524.3 0.3 210 100
692.0 694.0 2.0 6.68 FW1 FW Underdog
including 692.0 693.0 1.0 12.4
OSK-W-16-762 1158.0 1160.5 2.5 6.59 FW3 Underdog
including 1158.0 1158.8 0.8 17.8
OSK-W-17-795 1110.3 1113.7 3.4 5.53 FW1 Underdog
including 1110.3 1110.9 0.6 23.1
OSK-W-17-866-W2 933.3 935.5 2.2 4.92 FW0 Underdog
1221.0 1223.0 2.0 7.59 FW3 Underdog
including 1221.7 1222.3 0.6 23.7
OSK-W-17-901 675.5 678.0 2.5 8.27 FW3U Underdog
including 676.6 676.9 0.3 65.9
OSK-W-17-903-W2 556.0 560.9 4.9 3.72 Z27 Zone 27
including 556.0 557.1 1.1 8.88
including 560.0 560.9 0.9 8.94
593.0 595.0 2.0 8.52 Z27 FW Zone 27
including 593.0 594.0 1.0 16.7
OSK-W-17-937-W1 756.2 758.6 2.4 26.6 Wolf 2 Wolf
including 757.0 758.6 1.6 39.0
OSK-W-17-943 491.0 493.0 2.0 3.00 CS1 Caribou
including 492.0 493.0 1.0 5.57
614.0 616.0 2.0 4.51 Wolf HW Wolf
688.0 690.0 2.0 4.96 Wolf Wolf
including 688.0 689.0 1.0 9.64
OSK-W-17-1025 690.0 692.3 2.3 3.13 FW0 Underdog
OSK-W-17-1051 954.0 956.4 2.4 7.60 FW3 Underdog
OSK-W-17-1087 354.0 356.6 2.6 191 19.6 Mallard Mallard
including 354.0 354.5 0.5 991 100
OSK-W-17-1168 503.6 506.0 2.4 265 13.3 VNCR Caribou
including 504.3 504.6 0.3 2110 100
OSK-W-17-1221 771.0 773.0 2.0 4.61 Vein Wolf
including 771.0 771.8 0.8 11.5
OSK-W-17-1226 662.0 664.0 2.0 11.5 Caribou Ext. Caribou
including 662.6 663.5 0.9 24.4
673.0 675.0 2.0 10.4 Caribou Ext. Caribou
including 673.0 674.0 1.0 20.3
823.8 826.0 2.2 6.57 Caribou Ext. Caribou
including 823.8 825.0 1.2 12.0
OSK-W-17-1232 331.0 333.0 2.0 4.70 Vein Caribou
OSK-W-17-1275 553.1 556.1 3.0 4.49 Z27 Zone 27
including 554.1 555.0 0.9 11.5
OSK-W-17-1293 802.7 805.0 2.3 6.54 Vein
including 803.7 804.0 0.3 49.7
OSK-W-17-1295 387.0 389.0 2.0 3.36 FW3 Underdog
OSK-W-17-1310 54.0 57.0 3.0 3.61 Caribou Caribou
354.0 357.0 3.0 3.37 Vein Mallard
OSK-W-17-1319 162.0 165.0 3.0 5.80 Z27 Zone 27
including 162.0 163.5 1.5 11.4
OSK-W-17-1320 557.5 560.8 3.3 3.46 Caribou Ext. Caribou
OSK-W-17-1334 86.0 88.0 2.0 4.05 Bobcat Bobcat
OSK-W-17-1336 277.4 279.5 2.1 4.16 Vein
810.0 813.0 3.0 17.0 FW0 Underdog
972.0 974.0 2.0 4.10 FW2 Underdog
OSK-W-17-1337 19.0 21.5 2.5 3.39 Mallard Mallard
including 20.0 20.4 0.4 13.7
OSK-W-17-1342 211.9 214.0 2.1 8.19 Mallard HW Mallard
including 211.9 231.0 1.1 15.4
OSK-W-17-1347 164.0 166.0 2.0 4.64 Vein
including 165.2 166.0 0.8 11.5
249.4 252.2 2.8 11.1 Mallard FW Mallard
including 250.4 251.3 0.9 27.3
OSK-W-17-1350 724.0 726.0 2.0 4.16 Caribou Ext. Caribou
OSK-W-17-1376 198.7 201.0 2.3 10.2 Vein
including 198.7 199.0 0.3 72.7
816.5 818.6 2.1 33.6 FW2 Underdog
including 816.5 817.3 0.8 73.3
OSK-W-17-1383 38.1 40.4 2.3 173 18.2 Bobcat Bobcat
including 39.0 39.4 0.4 990 100
OSK-W-17-1391 453.0 455.0 2.0 42.7 33 Caribou Ext. Caribou
including 454.0 454.6 0.6 133 100
OSK-W-17-1399 684.5 686.5 2.0 3.72 Caribou Ext. Caribou
OSK-W-17-1402 462.2 464.5 2.3 3.39 Caribou Caribou
820.1 822.3 2.2 47.7 18.4 FW1 Underdog
including 822.0 822.3 0.3 315 100
863.6 865.6 2.0 3.48 FW1 FW Underdog
including 864.1 864.9 0.8 7.60
873.5 876.3 2.8 3.35 FW1 FW Underdog
938.2 940.2 2.0 4.27 FW2 Underdog
OSK-W-18-823-W2 510.6 519.5 8.9 9.53 CS1 Caribou
including 510.6 513.5 2.9 18.0
526.0 528.0 2.0 5.22 CS1 Caribou
OSK-W-18-1402-W1 804.2 806.5 2.3 5.79 FW0 Underdog
including 805.0 805.5 0.5 23.5
OSK-W-18-1418 660.0 665.0 5.0 4.78 Caribou Ext. Caribou
710.0 717.0 7.0 5.95 Caribou Ext. Caribou
including 710.7 712.6 1.9 11.9
930.0 932.0 2.0 5.85 Caribou Ext. Caribou
OSK-W-18-1421 231.0 233.9 2.9 17.7 CW2 Caribou
OSK-W-18-1423 521.2 523.5 2.3 6.04 Caribou Ext. Caribou
556.0 559.0 3.0 3.97 Caribou Ext. Caribou
Notes:
1. True widths are estimated at 65 - 80% of the reported core length interval. See "Quality Control" below.
2. Definitions: HW = Hanging Wall, FW = footwall, VNCR = Crustiform Vein, Ext = extension.
Hole Number Azimuth
(°)
Dip
(°)
Length
(m)
UTM E UTM N Section
OSK-EAG-12-333 333 -58 983 452459 5434565 2525
OSK-EAG-12-427 330 51 1215 452701 5434438 2675
OSK-EAG-13-480 331 -57 991 452400 5434486 2450
OSK-W-16-762 332 -56 1311 452730 5434409 2675
OSK-W-17-795 333 -65 1428 452646 5434421 2625
OSK-W-17-866-W2 332 -57 1332 452633 5434280 2525
OSK-W-17-901 328 -55 810 452391 5434638 2500
OSK-W-17-903-W2 329 -56 795 452539 5434692 2650
OSK-W-17-937-W1 333 -57 945 452897 5434430 2850
OSK-W-17-943 331 -55 744 452660 5434495 2675
OSK-W-17-1025 330 -58 990 452486 5434439 2475
OSK-W-17-1051 138 -68 1248 452313 5435323 2775
OSK-W-17-1087 328 -61 381 452255 5434830 2475
OSK-W-17-1168 329 -57 717 453464 5435090 3650
OSK-W-17-1221 335 -51 1079 453082 5434544 3050
OSK-W-17-1226 331 -51 934 453371 5434726 3400
OSK-W-17-1232 154 -47 351 452025 5434834 2275
OSK-W-17-1275 331 -55 912 452499 5434592 2575
OSK-W-17-1293 329 -70 828 452904 5434849 3050
OSK-W-17-1295 334 57 801 451559 5434288 1600
OSK-W-17-1310 312 -45 375 452209 5434617 2325
OSK-W-17-1319 310 -50 291 452222 5434607 2325
OSK-W-17-1320 328 -76 852 452904 5434849 3050
OSK-W-17-1334 334 -70 657 452839 5434895 3025
OSK-W-17-1336 335 -61 1149 452616 5434449 2600
OSK-W-17-1337 140 -57 360 452053 5434963 2350
OSK-W-17-1342 333 -50 282 452086 5434761 2300
OSK-W-17-1347 151 -61 489 452160 5435159 2550
OSK-W-17-1350 328 -55 843 452993 5434557 2975
OSK-W-17-1376 330 -50 1125 452426 5434380 2400
OSK-W-17-1383 331 -63 597 452767 5434864 2925
OSK-W-17-1391 327 -62 663 452981 5434900 3150
OSK-W-17-1399 332 -61 1053 453411 5434870 3500
OSK-W-17-1402 330 -59 1122 452616 5434449 2600
OSK-W-18-823-W2 330 -56 918 452565 5434414 2550
OSK-W-18-1402-W1 330 -59 1224 452616 5434449 2600
OSK-W-18-1418 334 -45 1077 453288 5434531 3225
OSK-W-18-1421 340 -47 918 452216 5434360 2200
OSK-W-18-1423 327 -61 792 453025 5434853 3150

OSK-EAG-12-333 intersected FW3 returning 3.07 g/t au over 4.8 metres and 116 g/t Au over 2.1 metres, and FW3U with 198 g /t Au over 2.3 metres in Underdog Corridor. The first interval is composed of up to 10% pyrite within pervasive silica flooding and 1% disseminated pyrite hosted in a porphyritic felsic dike with moderate chlorite, silica and sericite alteration. The second interval contains up to 20% pyrite and local visible gold within intense silica alteration. The third interval is composed of 3% pyrite stringers and local visible gold within a strongly sericitized and silicified felsic porphyritic dike.

OSK-EAG-12-427 intersected crustiform veins in FW4 returning 4.29 g/t Au over 2.2 metres in the Underdog Corridor. Mineralization is composed of 30% pyrite and 1% chalcopyrite in quartz-tourmaline-sericite veins.

OSK-EAG-13-480 intersected a vein in the Red Dog intrusion returning 37.1 g/t Au over 2.0 metres and FW1 FW with 6.68 g/t au over 2.0 metres. The first interval is composed of local visible gold in a quartz-carbonate vein with up to 3% pyrite and 1 % chalcopyrite. The second interval is composed of 1% pyrite stringers within porphyritic felsic dikes with moderate sericite, chlorite and fuchsite alteration.

OSK-W-17-762 intersected FW3 with 6.59 g/t Au over 2.5 metres in Underdog. Mineralization is composed of local visible gold within 10 centimetre silica flooding bands and 10% pyrite hosted in a porphyritic felsic intrusion.

OSK-W-17-795 intersected FW1 with 5.53 g/t Au over 3.4 metres in Underdog. Mineralization is composed of up to 10% pyrite stringers in silica flooding alteration hosted in a sericite altered felsic porphyritic dike.

OSK-W-17-866-W2 intersected FW0 with 4.92 g/t Au over 2.2 metres and FW3 with 7.59 g/t Au over 2.0 metres in Underdog Corridor. Mineralization from FW0 corresponds with 70% massive pyrite over 30 centimetres hosted within a felsic porphyritic dike with strong sericitization. The second interval is composed of up to 15% pyrite stringers and 1% disseminated pyrite hosted in a porphyritic felsic dike with moderate silica and sericite alteration.

OSK-W-17-901 intersected 8.27 g/t Au over 2.5 metres in FW3U. Mineralization is composed of a 10 centimetres silica flooding zone with 55% pyrite, 1% pyrite stringers and 7% disseminated pyrite in a bleached andesite.

OSK-W-17-903-W2 intersected 3.72 g/t Au over 4.9 metres in Zone 27 and 8.52 g/t Au over 2.0 metres in Z27 FW. The first interval is composed of disseminated and stringer pyrite at the contact between a silicified and weakly sericitized porphyritic dike and a weak chlorite, sericite altered andesite. The second interval is composed of pyrite traces hosted in an andesite with strong chlorite and carbonates alteration.

OSK-W-17-937-W1 intersected 26.6 g/t Au over 2.4 metres in Wolf 2. Mineralization is composed of up to 9% disseminated pyrite and 5% tourmaline-pyrite stringers at the contact between a bleached and strongly sericitized andesite and a small sericitized porphyritic felsic dike.

OSK-W-17-943 intersected 3.00 g/t Au over 2.0 metres in Caribou, and 4.51 g/t Au over 2.0 metres and 4.96 g/t Au over 2.0 metres in Wolf. The first interval is composed of up to 10% pyrite stringers and 2% disseminated pyrite hosted in a sericitized rhyolite and a sericitized porphyritic felsic dike. The second interval is composed of 3% pyrite stringers within a sericitized and chloritized porphyritic felsic dike. The third interval is composed of disseminated pyrite within an andesite with chlorite and carbonate alteration.

OSK-W-17-1025 intersected FW0 with 3.13 g/t Au over 2.3 metres. Mineralization is composed of 3% pyrite in silica flooding and 1% pyrite stringers in weakly sericitized porphyritic felsic dike.

OSK-W-17-1051 intersected FW3 with 7.6 g/t Au over 2.4 metres in Underdog Corridor. Mineralization is composed of up to 1% pyrite clusters and disseminated pyrite within a weak sericite and silica altered felsic porphyritic dike.

OSK-W-17-1087 intersected Mallard with 191 g/t Au over 2.6 metres. Mineralization is composed of 5% pyrite stringers and 1% disseminated pyrite within a sericite altered andesite.

OSK-W-17-1168 intersected 265 g/t Au over 2.4 metres in Caribou Corridor. Mineralization is composed of a crustiform vein with local visible gold and 1% pyrite clusters with tourmaline and fuchsite hosted in a gabbro with moderate chlorite alteration. The interval is 150 metres East of OSK-W-17-787 (7.21 g/t Au over 6.5 metres previously reported March 21, 2017).

OSK-W-17-1221 intersected 4.61 g /t Au over 2.0 metres in Wolf corridor. Mineralization is composed of a centimetre scale quartz carbonate vein in a chloritized and slightly silicified porphyritic felsic dike with traces of pyrite stringer.

OSK-W-17-1226 intersected 11.5 g/t Au over 2.0 metres, 10.4 g/t Au over 2.0 metres and 6.57 g/t Au over 2.2 metres in Caribou Extension. First and second intervals are composed of up to 10% pyrite-tourmaline stringers and disseminated pyrite in a sericitized rhyolite. The third interval is composed of 1% pyrite stringers hosted in porphyritic felsic dike with sericite alteration.

OSK-W-17-1232 intersected a vein returning 4.70 g/t Au over 2.0 metres in Caribou Corridor. Mineralization is composed of 3% disseminated pyrite and 7% ptygmatic tourmaline veins within a weak sericite altered rhyolite.

OSK-W-17-1275 intersected 4.49 g/t Au over 3.0 metres in Zone 27. Mineralization is composed of traces of pyrite stringers within a sericitized porphyritic felsic dike.

OSK-W-17-1293 intersected 6.54 g/t Au over 2.3 metres. Mineralization is composed of 1% pyrite and 1% chalcopyrite in quartz veins within a silicified, chloritized and carbonate altered monzonite (Red Dog intrusion).

OSK-W-17-1295 intersected FW3 with 3.36 g/t Au over 2.0 metres in Underdog. Mineralization is composed of 2% pyrite clusters in a sericitized and weakly silicified porphyritic felsic dike.

OSK-W-17-1310 intersected 3.61 g/t Au over 3.0 metres in Caribou and 3.37 g/t Au over 3.0 metres in Drake. The first interval is composed of 1% pyrite stingers within a chloritized and sericitized rhyolite. The second interval is composed of chloritized and sericitized andesite with 5% quartz-carbonate veins.

OSK-W-17-1319 intersected 5.80 g/t Au over 3.0 metres in Zone 27. Mineralization is composed of traces of disseminated pyrite within a sericitized porphyritic felsic dike.

OSK-W-17-1320 intersected 3.46 g/t Au over 3.3 metres in Caribou Extension. Mineralization is composed of disseminated pyrite and quartz-pyrite clusters in a chloritized, sericitized and silicified andesite.

OSK-W-17-1334 intersected 4.05 g/t Au over 2.0 metres in Bobcat. Mineralization is composed of disseminated pyrite and crustiform quartz-carbonate veins in a chloritized, silicified and carbonate altered gabbro.

OSK-W-17-1336 intersected three intervals: 4.16 g/t Au over 2.05 metres in a vein, 17.0 g/t Au over 3.0 metres in FW0 and 4.10 g/t Au over 2.0 metres in FW2, Underdog Corridor. The first interval is composed of 1% disseminated pyrite in a quartz vein within a strongly chloritized gabbro. The second interval is composed of up to 2% disseminated pyrite and 1% pyrite stringers in a sericitized porphyritic felsic dike. The third interval is composed of 1% pyrite stringers and 1% pyrite in quartz-carbonate veins within a moderate sericite and silica altered felsic porphyritic dike.

OSK-W-17-1337 intersected 3.39 g/t Au over 2.5 metres in Mallard. Mineralization is composed of up to 20% pyrite stringers within a sericitized, silicified and bleached andesite.

OSK-W-17-1342 intersected Mallard HW with 8.19 g/t Au over 2.1 metres. Mineralization is composed of traces of disseminated and clustered pyrite within a chloritized andesite.

OSK-W-17-1347 intersected 4.64 g/t Au over 2.0 metres in a vein and 11.1 g/t Au over 2.8 metres in Mallard FW. The first interval is composed of a five centimetre quartz vein with 15% pyrite clusters hosted in a chloritized, silicified and weakly sericitized andesite. The second interval is at the contact between a strongly chlorite, fuchsite altered andesite and a porphyritic felsic dike. Mineralization is composed of 10% pyrite clusters and 3% pyrite stringers. The vein is located 100 metres north-west of Mallard corridor and is not related to any known zones.

OSK-W-17-1350 intersected Caribou Extension with 4.16 g/t Au over 2.0 metres. The mineralization is composed of up to 2% pyrite stringers within a sericitized, chloritized and carbonate altered large quartz eyes felsic porphyritic dike.

OSK-W-17-1376 intersected a vein returning 10.2 g/t Au over 2.3 metres and FW2 with 33.6 g/t Au over 2.1 metres. The first interval is composed of 5-10% quartz-carbonate veining with 5% disseminated pyrite in an andesite with chlorite, carbonate, sericite and silica alteration. Mineralization in FW2 is composed of a silica and sericite altered porphyritic dike with up to 5%, locally 80%, pyrite-tourmaline stringers.

OSK-W-17-1383 intersected 173 g/t Au over 2.3 metres in Bobcat. Mineralization is composed of local visible gold, 3% pyrite stringers with pervasive silica flooding within a gabbro with silica, carbonate and sericite alteration.

OSK-W-17-1391 intersected 42.7 g/t Au over 2.0 metres in Caribou Extension. Mineralization is composed of up to 10% pyrite stringers and 1% chalcopyrite, local visible gold, tourmaline ptygmatic veins, quartz-tourmaline veins and crustiform veins hosted in a silicified and bleached andesite.

OSK-W-17-1399 intersected 3.72 g/t Au over 2.0 metres in Caribou Extension. Mineralization is composed of up to 10% pyrite-tourmaline stringers within a strongly silicified rhyolite.

OSK-W-17-1402 intersected Caribou with 3.39 g/t Au over 2.3 metres and multiples intervals in Underdog corridor: FW1 with 47.7 g/t Au over 2.2 metres, FW1 FW with 3.48 g/t Au over 2.0 metres and 3.35 g/t Au over 2.8 metres, and FW2 with 4.27 g/t au over 2.0 metres. The first interval is composed of 3% pyrite stringers, 5% pyrite clusters within a sericitized andesite with weak silica and fuchsite alteration. The second interval is composed of local visible gold, 2% disseminated pyrite and 1% pyrite clusters, hosted in a moderately sericitized porphyritic dike. The third and fourth intervals are composed of 3% pyrite stringers and 1% disseminated pyrite in pervasive silica flooding within a sericitized porphyritic felsic dike. The last interval is composed of 2% pyrite stringers and 1% pyrite-silica flooding within a sericite, silica and fuchsite altered felsic porphyritic dike.

OSK-W-18-823-W2 intersected CS1 with 9.53 g/t Au over 8.9 metres and 5.22 g/t Au over 2.0 metres in Caribou. Mineralization is composed of 10% semi-massive pyrite bands, 10% pyrite stringers, up to 10% disseminated pyrite and up to 2% ptygmatic tourmaline veinlets hosted in a sericitized, chloritized and bleached andesite.

OSK-W-18-1402-W1 intersected 5.79 g/t Au over 2.3 metres in FW0. The mineralization is composed of 3% pyrite in a ptygmatic tourmaline vein at low core angle within a silicified and sericitized fragmental felsic intrusion.

OSK-W-18-1418 intersected 4.78 g/t Au over 5.0 metres, 5.95 g/t Au over 7.0 metres and 5.85 g/t Au over 2.0 metres in Caribou Extension. The first interval is composed of up to 5% pyrite stringers within a silicified and sericitized felsic porphyritic dike. The second interval is composed of up to 15% pyrite-tourmaline stringers hosted in a silicified and sericitized rhyolite. The third interval is composed of up to 10% pyrite-silica flooding within a silica altered andesite.

OSK-W-18-1421 intersected CW2 with 17.7 g/t Au over 2.9 metres in Caribou Corridor. Mineralization is composed of up to 8% pyrite stringers, 1% chalcopyrite, 1% sphalerite, ptygmatic tourmaline veins and local visible gold within a strongly silica altered rhyolite.

OSK-W-18-1423 intersected 6.04 g/t Au over 2.3 metres and 3.97 g/t Au over 3.0 metres in Caribou Extension. The first interval is composed of 7% disseminated pyrite within a bleached andesite. The second interval is composed of 4% disseminated pyrite, 2% pyrite stringers at a bleached andesite contact with a felsic porphyritic dike.

Qualified Person

The scientific and technical content of this news release has been reviewed, prepared and approved by Mr. Louis Grenier, M.Sc.A., P.Geo. (OGQ 800), Project Manager of the Windfall Lake gold project, who is a "Qualified Person" as defined by National Instrument 43-101 - Standards of Disclosure for Mineral Projects ("NI 43-101").

Quality Control and Reporting Protocols

True widths determinations are estimated at 65-80% of the reported core length intervals for most of the zones. Assays are uncut except where indicated. Intercepts occur within geological confines of major zones but have not been correlated to individual vein domains at this time. Reported intervals include minimum weighted averages of 3.0 g/t Au diluted over core lengths of at least 2.0 metres. All NQ core assays reported were obtained by either 1-kilogram screen fire assay or standard 50-gram fire-assaying-AA finish or gravimetric finish at ALS Laboratories in Val d'Or, Québec, Thunder Bay and Sudbury, Ontario or Vancouver, British Colombia or Bureau Veritas in Timmins, Ontario. The 1-kilogram screen assay method is selected by the geologist when samples contain coarse gold or present a higher percentage of pyrite than surrounding intervals. Selected samples are also analyzed for multi-elements, including silver, using an Aqua Regia-ICP-AES method at ALS Laboratories. Drill program design, Quality Assurance/Quality Control ("QA/QC") and interpretation of results is performed by qualified persons employing a QA/QC program consistent with NI 43-101 and industry best practices. Standards and blanks are included with every 20 samples for QA/QC purposes by the Corporation as well as the lab. Approximately 5% of sample pulps are sent to secondary laboratories for check assay.

About the Windfall Lake Gold Deposit

The Windfall Lake gold deposit is located between Val-d'Or and Chibougamau in the Abitibi region of Québec, Canada. The mineral resource defined by the previous operator comprises 2,762,000 tonnes at 8.42 g/t Au (748.000 ounces) in the indicated category and 3,512,000 tonnes at 7.62 g/t Au (860,000 ounces) in the inferred category (sourced from a technical report dated June 10, 2015 entitled "Preliminary Economic Assessment of the Windfall Lake Gold Property, Québec, Canada" with an effective date of April 28, 2015, prepared in accordance with NI 43-101). The Windfall Lake gold deposit is currently one of the highest grade resource-stage gold projects in Canada. The bulk of the mineralization occurs in the Main Zone, a southwest/northeast trending zone of stacked mineralized lenses, measuring approximately 600 metres wide and at least 1,400 metres long. The deposit is well defined from surface to a depth of 500 metres and remains open along strike and at depth. Mineralization has been identified only 30 metres from surface in some areas and as deep as 870 metres in others, with significant potential to extend mineralization up and down-plunge and at depth.

About Osisko Mining Inc.

Osisko is a mineral exploration company focused on the acquisition, exploration, and development of precious metal resource properties in Canada. Osisko holds a 100% in the high-grade Windfall Lake gold deposit located between Val-d'Or and Chibougamau in Québec and holds a 100% undivided interest in a large area of claims in the surrounding Urban Barry area and nearby Quevillon area (over 3,300 square kilometres), a 100% interest in the Marban project located in the heart of Québec's prolific Abitibi gold mining district, and properties in the Larder Lake Mining Division in northeast Ontario, including the Jonpol and Garrcon deposits on the Garrison property, the Buffonta past producing mine and the Gold Pike mine property. The Corporation also holds interests and options in a number of additional properties in northern Quebec and Ontario. Osisko continues to be well financed with approximately $190 million in cash and investments as of December 31, 2017.

Cautionary Note Regarding Forward-Looking Information

This news release contains "forward-looking information" within the meaning of the applicable Canadian securities legislation that is based on expectations, estimates, projections and interpretations as at the date of this news release. The information in this news release about the Windfall Lake gold deposit being one of the highest grade resource-stage gold projects in Canada; the current 800,000 metre drill program; the significance of new results from the ongoing drill program at the Windfall Lake gold project; the significance of assay results presented in this press release; the type of drilling included in the drill program (definition drilling, expansion drilling to the NE of the main deposit and adjacent Lynx deposit, and exploration drilling on the greater deposit and Urban-Barry project area); potential mineralization; the potential to extend mineralization up and down-plunge and at depth at the Windfall Lake gold deposit; the ability to realize upon any mineralization in a manner that is economic; the ability to complete any proposed exploration activities and the results of such activities, including the continuity or extension of any mineralization; and any other information herein that is not a historical fact may be "forward-looking information". Any statement that involves discussions with respect to predictions, expectations, interpretations, beliefs, plans, projections, objectives, assumptions, future events or performance (often but not always using phrases such as "expects", or "does not expect", "is expected", "interpreted", "management's view", "anticipates" or "does not anticipate", "plans", "budget", "scheduled", "forecasts", "estimates", "believes" or "intends" or variations of such words and phrases or stating that certain actions, events or results "may" or "could", "would", "might" or "will" be taken to occur or be achieved) are not statements of historical fact and may be forward-looking information and are intended to identify forward-looking information. This forward-looking information is based on reasonable assumptions and estimates of management of the Corporation. at the time it was made, involves known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of Osisko to be materially different from any future results, performance or achievements expressed or implied by such forward-looking information.
Such factors include, among others, risks relating to the ability of exploration activities (including drill results) to accurately predict mineralization; errors in management's geological modelling; the ability of Osisko to complete further exploration activities, including drilling; property interests in the Windfall Lake gold project; the ability of the Corporation to obtain required approvals and complete transactions on terms announced; the results of exploration activities; risks relating to mining activities; the global economic climate; metal prices; dilution; environmental risks; and community and non-governmental actions. Although the forward-looking information contained in this news release is based upon what management believes, or believed at the time, to be reasonable assumptions. Osisko cannot assure shareholders and prospective purchasers of securities of the Corporation that actual results will be consistent with such forward-looking information, as there may be other factors that cause results not to be as anticipated, estimated or intended, and neither Osisko nor any other person assumes responsibility for the accuracy and completeness of any such forward-looking information, Osisko does not undertake, and assumes no obligation, to update or revise any such forward-looking statements or forward-looking information contained herein to reflect new events or circumstances, except as may be required by law.

Lire la suite de l'article sur https:
Données et statistiques pour les pays mentionnés : Canada | Tous
Cours de l'or et de l'argent pour les pays mentionnés : Canada | Tous

Osisko Mining Corp.

PRODUCTEUR
CODE : OSK.TO
ISIN : CA6882781009
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Osisko Mining est une société de production minière d'or basée au Canada.

Osisko Mining détient divers projets d'exploration au Bresil, au Canada et en Argentine.

Son principal projet en production est MALARTIC au Canada et ses principaux projets en exploration sont GOLDBORO, SLEITAT, JC - SMART SKARNS, HAMMOND REEF, MALARTIC CHL GOLD PROPERTY, DUPARQUET et CLEMENT LAKE au Canada, EL POTOSI et SANTA CLARA / CERRO BONITO au Salvador, CERRO CONDORINI et COAL CREEK au Perou, CASTELO DOS SONHOS au Bresil et FAMATINA en Argentine.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Dans les médias de Osisko Mining Corp.
20/12/2018Osisko Mining reports 39% higher grade than resource model a...
Rapports annuels de Osisko Mining Corp.
2008 Annual report
Financements de Osisko Mining Corp.
31/08/2011Osisko Announces an Increase in Caterpillar Lease Financing ...
31/08/2011Announces an Increase in Caterpillar Lease Financing Facilit...
18/11/2009Strengthens Balance Sheet With $241 M Proceeds From Exercise...
30/06/2009Closes $10.64 Million Flow-Through Financing
17/04/2006Announces C10$ million "bought deal" financing
Nominations de Osisko Mining Corp.
10/05/2013Anounces Election of Directors
17/04/2012Nominates Michele Darling to Board of Directors
14/03/2012Appoints Gary Sugar to Board of Directors
02/02/2012Board Member Resigns
16/09/2011Osisko Appoints Richard Ross to Board of Directors
15/09/2011Appoints Richard Ross to Board of Directors
22/08/2011Director Resigns
Rapports Financiers de Osisko Mining Corp.
14/02/2014Provides Notice of Fourth Quarter and Year End 2013 Results ...
01/08/2013Reports Second Quarter 2013 Results
15/07/2013Provides Notice of Second Quarter 2013 Operating and Financi...
09/05/2013Reports First Quarter 2013 Results
29/04/2013Provides Notice of First Quarter 2013 Financial Results Rele...
21/02/2013Reports Fourth Quarter and Year-End 2012 Results
13/11/2012Reports Third Quarter 2012 Results
05/07/2012Produces 92,003 Ounces Au in Second Quarter
09/05/2012Provides Notice of First Quarter 2012 Financial Results Rele...
27/02/2012Q4 2011 Net Profit of $37.8 Million
16/01/2012Provides Notice of Fourth Quarter and Year-End 2011 Financia...
11/08/2011Releases Second Quarter 2011 Results
16/05/2011Osisko Releases First Quarter 2011 Results
14/05/2011Osisko Releases First Quarter 2011 Results
28/02/2011Releases Year-End Financial Results and Review of 2010
28/02/2011publie ses résultats financiers de fin d'année
06/11/2009Releases Third Quarter 2009 Results
11/08/2009Releases Second Quarter 2009 Results
Projets de Osisko Mining Corp.
26/07/2017OSK Osisko Mining drills 2.7 m of 57 g/t Au at Windfall
21/02/2014Intersects 2.26 g/t Gold Over 128 Metres at Kirkland Lake
07/02/2014(Malartic)Commences 2014 Canadian Malartic Exploration Program
06/02/2014(Malartic)Reports Record January Production at Canadian Malartic
04/12/2013Intersects 61.6 Metres Averaging 1.44 g/t Au at Bidgood
21/11/2013(Malartic)Canadian Malartic Mine Produces Millionth Ounce
23/10/2013GLOBAL'S NEVADA PROJECTS ATTRACT STRONG THIRD PARTY INTEREST...
10/07/2013(Malartic)Deposits Study Reporting Local and Regional Economic Impact ...
30/01/2013Intersects 5.5 g/t Au Over 54.0 Metres at Upper Beaver
10/12/2012(Malartic)Reports November Production From Canadian Malartic
12/11/2012Announces Friendly Acquisition of Queenston
11/10/2012(Malartic)Canadian Malartic Mine Produces Half Millionth Ounce
10/10/2012(Malartic)Reports Record Quarterly Production from Canadian Malartic
06/09/2012(Malartic)Reports Record Monthly Production from Canadian Malartic
26/07/2012Acquires Common Shares of Bowmore Exploration Ltd=2E
17/05/2012(Malartic)Canadian Malartic Mill Returns to Operation
10/05/2012(Malartic)Reports Fire Damage at Canadian Malartic Mill Limited to Cyc...
30/01/2012(Famatina)s Status of Famatina Exploration Project
22/12/2011and DIOS Discover New Gold Showings on the AU33 WEST Project
28/11/2011TSX.V Company Adjacent to Osisko Property - 3 Minute Video
29/09/2011(Goldboro)Orex to Pursue Exploration Work on Goldboro Gold Project
08/09/2011(Malartic)Intersects 1.23 g/t Au Over 172 Metres at Barnat Extension
31/08/2011Osisko and EMSE Sign Agreement for Development of Famatina P...
31/08/2011(Famatina)and EMSE Sign Agreement for Development of Famatina Project ...
11/08/2011(Goldboro)Goldboro Gold Project Drill Assay Results Identify Extension...
05/08/2011Osisko Buys Back a 1% Royalty Interest on Canadian Malartic ...
05/08/2011(Malartic)Buys Back a 1% Royalty Interest on Canadian Malartic Propert...
21/06/2011Osisko Declares Commercial Production at Canadian Malartic
21/06/2011(Malartic)Declares Commercial Production at Canadian Malartic
17/06/2011Osisko Submits Notice of Termination in Duparquet Project
17/06/2011(Duparquet)Submits Notice of Termination in Duparquet Project
14/06/2011(Malartic)=?ISO-8859-1?Q?Osisko=20recoupe=201,50=20g/t=20Au=20sur=2063...
14/06/2011(Malartic)Intersects 1.50 g/t Au Over 63.6 Metres at Jeffrey Zone
13/06/2011(Duparquet)et Clifton Star annoncent une estimation de ressources pour ...
13/06/2011(Duparquet)and Clifton Star Release Resource Estimate for the Beattie D...
01/06/2011(Malartic)Officially Inaugurates the Canadian Malartic Mine
01/06/2011Osisko Officially Inaugurates the Canadian Malartic Mine
02/05/2011(Malartic)Announces Revised Mine Production Plan at Canadian Malartic
21/04/2011(Goldboro)Orex Exploration Inc.: Drilling Campaign Has Begun at Goldbo...
20/04/2011Osisko Mining Corporation - Drilling campaign has begun at G...
20/04/2011Osisko Mining Corporation - Drilling campaign has begun at G...
13/04/2011(Malartic)Pours First Gold at Canadian Malartic Mine
31/03/2011(Malartic)Osisko accroît les réserves aurifères de Canadian Malartic à...
31/03/2011(Malartic)Increases Gold Reserve at Canadian Malartic to 10=2E7 Millio...
29/03/2011(Malartic)Exercises Buy Out Option in Canadian Malartic Net Smelter Ro...
28/02/2011(Malartic) Découverte de minéralisation de type Canadian Malartic
24/02/2011(Hammond Reef)Reports 124 Metres Averaging 0.73 g/t Au in Southeast Extens...
29/01/2011(Malartic)Osisko Reports Significant New Intersections at Barnat Exten...
25/01/2011(Malartic)Reports Significant New Intersections at Barnat Extension, I...
21/12/2009(Malartic)Provides Update on Construction and Development Progress at ...
14/12/2009(Malartic)Releases New Resource Estimate for Canadian Malartic Project
20/10/2009(Malartic) Intersects New Gold Mineralization on the Malartic CHL Prop...
14/09/2009(Malartic)Intersects 1.20 g/t Au Over 86.9 Metres at Jeffrey Zone
01/09/2009(Malartic)Osisko Mining Corporation: Construction Activities at Canadi...
20/08/2009(Malartic)Quebec Government Authorizes Construction of Osisko's Canadi...
26/02/2009(Malartic) Preliminary Metallurgical Results on Barnat
26/01/2009(Malartic)Announces Inferred Resource Estimate for South Barnat Deposi...
03/12/2008(Malartic) Intersects 102 Metres Averaging 3.21 g/t Au at South Barnat
Communiqués de Presse en Français de Osisko Mining Corp.
01/06/2011(Malartic)inaugure officiellement la mine Canadian Malartic
Communiqués de Presse de Osisko Mining Corp.
13/02/2014Mails Letter to Shareholders Regarding Inadequate Goldcorp O...
05/02/2014Provides Corporate Update
29/01/2014Commences Legal Proceeding to Restrain Misuse of Confidentia...
29/01/2014Announces Filing and Mailing of Directors' Circular and Reco...
20/01/2014Reports Preliminary Fourth Quarter 2013 Production
15/01/2014Responds to Unsolicited Proposal From Goldcorp Inc=2E
13/01/2014Responds to Announcement by Goldcorp
16/12/2013Completes Long-Term Debt Renegotiation
24/10/2013Provides Notice of Third Quarter 2013 Operating and Financia...
30/07/2013Enhances Financial Flexibility by Improving Long-Term Debt T...
05/07/2013Intercepts 68 Metres Averaging 1=2E26 =?ISO-8859-1?Q?=20g/t=...
02/07/2013Receives Final $30 Million Payment from Kirkland Lake Gold
29/04/2013Corporate Update
17/04/2013Comments on Trading Activities
09/04/2013(Malartic)Previews Q1 2013 Canadian Malartic Operating Results
21/03/2013Discovers Two New Gold-Copper Zones at Upper Beaver
19/02/2013(Malartic)Receives Modified Operating Parameters at Canadian Malartic
19/02/2013(Malartic)s Reserves at Canadian Malartic
11/02/2013Denis Cimon Receives the 2013 Mineral Processor of the Year
29/01/2013(Hammond Reef)Provides Resource Update for Hammond Reef Project
24/01/2013(Malartic)Previews Q4 2012 Canadian Malartic Operating Results and 201...
12/11/2012(Malartic)Reports Record Monthly Throughput at Canadian Malartic
15/10/2012Founder Retires
09/10/2012Acquires Ground in Emerging Gold Belt in Mexico and Identifi...
03/10/2012Deposits the Second Tranche of itsFinancial Guarantee Coveri...
03/08/2012Secondary Crusher Installation Completed
24/07/2012Acquisition of Subscription Receipts of Druk Capital Partner...
16/05/2012Enhances Credit Agreement With CPPIB
14/05/2012(Malartic)Provides Update on Canadian Malartic
10/05/2012(Malartic)Reports Fire at Canadian Malartic Milling Plant
03/04/2012and Metis Nation of Ontario Sign Memorandum of Understanding
12/03/2012Brings First Half of Secondary Crusher Online
01/03/2012Announces Record Date for Annual Meeting
16/02/2012Canadian gold producer Osisko Mining Corporation joins Globa...
12/01/2012(Malartic)Previews Q4 2011 Canadian Malartic Operating Results
03/01/2012Responds to Below Market Price Offer for 5 Million Shares On...
14/12/2011Osisko Comments on Trading of Common Shares
14/12/2011Comments on Trading of Common Shares
08/10/2011President Sean Roosen Named Ernst & Young 2011 Quebec Entrep...
17/06/2011(Duparquet)met fin =E0 sa participation au projet Duparquet
13/06/2011Osisko and Clifton Star Release Resource Estimate for the Be...
14/05/2011Osisko publie ses r=E9sultats du premier trismestre de 2011
12/05/2011Annual and Special Meeting of Shareholders of Osisko Mining ...
29/04/2011Osisko Announces Revised Mine Production Plan at Canadian Ma...
29/03/2011Osisko Exercises Buy Out Option in Canadian Malartic Net Sme...
09/02/2011Goldcorp Sells Osisko Investment
22/12/2009Donates Shares to McGill University
11/12/2009and Clifton Star Complete Joint Venture Agreement on Duparqu...
13/11/2009Options Goldboro Gold Property From Orex Exploration
28/09/2009 Signs Option Agreement With Claim Post Resources for the Mo...
24/09/2009 Enters Into Financing Agreement With CPPIB Credit Investmen...
11/08/2009Signs Option Agreement With Midland Exploration for the Dunn...
10/07/2009Report on Osisko's Canadian Malartic Bape Hearings is Made P...
03/07/2009Osisko Mining Corporation Completes Strategic Investment
18/06/2009Comments on Trading of Common Shares
21/05/2009Discovers New Mineralized Zone Adjacent to South Barnat
19/05/2009Makes Strategic Investment
13/01/2009 Extends South Barnat to 1200 Metres Length
04/12/2008 Recognized for Strong Sustainability Performance
07/04/2006(Castelo Dos Sonhos)Résultats positifs sur le projet diamantifère Pontax
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TORONTO (OSK.TO)FRANKFURT (EWX.F)
3,10+1.97%2,43-1.62%
TORONTO
CA$ 3,10
25/04 16:59 0,060
1,97%
Cours préc. Ouverture
3,04 3,04
Bas haut
3,02 3,14
Année b/h Var. YTD
2,42 -  3,21 12,32%
52 sem. b/h var. 52 sem.
2,36 -  3,87 -19,48%
Volume var. 1 mois
653 155 17,87%
Produit Gold
Développe
Recherche Gold - Lead - Silver - Tin - Tungsten - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 23/01/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
202413,55%
2023-22,00%4,532,64
2022-6,17%5,022,36
20210,81%3,972,33
2020-4,88%4,851,67
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,75 AU$+0,52%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
11,94 US$+9,34%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,54 GBX-2,55%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,69 CA$+13,03%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
15,60 CA$+1,83%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+0,00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,19 AU$+0,00%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,87 CA$+5,65%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
52,61 US$+0,98%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+0,00%Trend Power :