Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en

Osisko Mining Corp.

Publié le 25 janvier 2018

Osisko Intersects 56.1 g/t Au Over 8.9 Metres at Windfall

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   9/11 | Canada | Cash | Exploration | Mine | Report |

Osisko Intersects 56.1 g/t Au Over 8.9 Metres at Windfall

TORONTO, ONTARIO--(Marketwired - Jan 25, 2018) - Osisko Mining Inc. (OSK.TO)("Osisko" or the "Corporation") is pleased to provide new results from the ongoing drill program at its 100% owned Windfall Lake gold project located in the Abitibi greenstone belt, Urban Township, Eeyou Istchee James Bay, Québec. The 800,000 metre drill program combines definition, expansion and exploration drilling in and around the main Windfall gold deposit and the adjacent Lynx deposit (located immediately NE of Windfall).

Significant new analytical results from 72 intercepts in 39 drill holes and 6 wedges focused on infill and expansion drilling in the Main Windfall lake deposit are presented below.

  • New "Bobcat Zone" with high-grades discovered near surface and at shallow depths
  • Continued high-grade infill and expansion from Underdog
  • New hit from Drake

Highlights from the new results include: 56.1 g/t Au over 8.9 metres in OSK-W-17-1336-W1; 218 g/t Au over 2.1 metres in OSK-W-17-1191; 160 g/t over 2.0 metres in OSK-W-17-1142-W1; 106 g/t Au over 3.0 metres in OSK-W-17-1305; 30.8 g/t over 9.9 metres in OSK-OBM-16-693; 83.5 g/t Au over 3.4 metres in OSK-W-17-780-W1; 128 g/t Au over 2.1 metres in OSK-W-17-1203; 58.8 g/t Au over 2.5 metres in OSK-W-17-1095; 72.8 g/t Au over 2.0 metres in OSK-W-17-1020; 42.4 g/t Au over 3.3 metres in OSK-W-17-1138; 52.8 g/t Au over 2.3 metres in OSK-W-17-1381; 26.2 g/t Au over 3.8 metres in OSK-W-17-1374; 41.9 g/t Au over 2.0 metres in OSK-W-17-1289; 14.1 g/t Au over 5.6 metres in OSK-W-17-1255; and 26.5 g/t Au over 2.1 metres in OSK-W-17-1142. Maps showing hole locations and full analytical results are available at www.osiskomining.com.

Hole Number From (m) To (m) Interval (m) Au (g/t) uncut Au (g/t)
cut to
100 g/t
Zone Corridor
OSK-OBM-16-630 518.2 521.0 2.8 4.82 FW3U HW Underdog
OSK-OBM-16-693 654.1 664.0 9.9 30.8 22.2 FW3U HW Underdog
including 654.1 656.0 1.9 80.0 45.5
including 658.1 661.9 3.8 37.4 32.1
OSK-W-16-747 936.9 939.3 2.4 6.96 FW3 Underdog
including 938.1 938.6 0.5 32.5
OSK-W-17-780-W1 1343.8 1347.2 3.4 83.5 29.4 FW3 HW Underdog
including 1346.6 1347.2 0.6 407 100
OSK-W-17-936-W1 776.0 778.0 2.0 3.65 Z27 Zone 27
including 777.2 778.0 0.8 8.07
785.0 787.7 2.7 4.03 Z27 Zone 27
including 787.0 787.7 0.7 7.71
OSK-W-17-936-W2 671.1 673.3 2.2 11.1 Wolf HW Wolf
OSK-W-17-968 102.0 109.4 7.4 4.02 Z27 Zone 27
including 107.4 109.4 2.0 7.77
118.0 122.3 4.3 11.2 10.5 QTV Zone 27
including 122.0 122.3 0.3 109 100
OSK-W-17-989-W2 664.6 667.0 2.4 4.56 Wolf Wolf
OSK-W-17-1020 271.5 273.5 2.0 72.8 Bobcat Bobcat
including 272.0 273.5 1.5 96.9
OSK-W-17-1095 88.2 90.7 2.5 58.8 52.9 Z27 Zone 27
including 88.6 89.7 1.1 114 100
OSK-W-17-1125 427.0 429.0 2.0 6.80 Vein Caribou
including 427.0 428.0 1.0 13.5
616.0 618.0 2.0 3.87 SHR Caribou
including 617.2 618.0 0.8 9.35
OSK-W-17-1138 11.0 14.3 3.3 42.4 Bobcat Bobcat
including 13.0 14.3 1.3 98.1
21.0 24.0 3.0 3.28 Bobcat Bobcat
OSK-W-17-1139 148.0 150.2 2.2 4.29 Vein
157.5 160.1 2.6 4.53 Vein
including 159.5 160.1 0.6 9.21
OSK-W-17-1140 781.2 783.3 2.1 7.07 Caribou Ext. Caribou
including 783.0 783.3 0.3 48.8
OSK-W-17-1142 13.1 15.2 2.1 26.5 CW4 Caribou
including 14.0 14.6 0.6 84.5
OSK-W-17-1142-W1 370.0 372.0 2.0 160 Vein Drake
including 370.5 371.5 1.0 320
OSK-W-17-1178 78.0 80.1 2.1 5.89 Bobcat Bobcat
including 79.5 80.1 0.6 17.5
OSK-W-17-1191 235.4 237.5 2.1 218 34.6 Z27 FW Zone 27
including 236.8 237.5 0.7 650 100
OSK-W-17-1203 27.9 30.0 2.1 128 42.9 Z27 Zone 27
including 27.9 28.8 0.9 298 100
OSK-W-17-1218 27.0 29.0 2.0 3.99 VNCR Bobcat
189.0 191.5 2.5 4.46 Bobcat Bobcat
OSK-W-17-1251 24.0 27.0 3.0 8.89 Bobcat Bobcat
including 24.0 25.0 1.0 21.0
55.0 59.0 4.0 3.86 Bobcat Bobcat
including 55.0 56.0 1.0 12.3
192.0 195.0 3.0 4.11 VNCR Bobcat
including 193.4 193.7 0.3 40.2
OSK-W-17-1255 156.0 161.6 5.6 14.1 Bobcat Bobcat
including 156.6 159.5 2.9 21.1
OSK-W-17-1273 54.9 57.0 2.1 4.05 Z27 HW Zone 27
including 54.9 55.4 0.5 14.3
OSK-W-17-1280 369.8 372.7 2.9 3.19 Caribou Ext. Caribou
OSK-W-17-1288 749.0 751.0 2.0 4.41 Caribou Ext. Caribou
OSK-W-17-1289 343.0 345.0 2.0 41.9 QTV Mallard
including 343.0 344.0 1.0 83.5
OSK-W-17-1305 348.0 351.0 3.0 106 50.1 Vein Caribou
including 349.5 351.0 1.5 211 100
OSK-W-17-1309 218.1 220.2 2.1 5.64 Z27 FW Zone 27
including 218.1 218.8 0.7 16.5
OSK-W-17-1313 425.1 427.3 2.2 5.46 Z27 FW Zone 27
including 425.9 426.7 0.8 14.2
443.0 445.5 2.5 3.50 Z27 FW Zone 27
19.0 22.0 3.0 3.05 Vein Caribou
OSK-W-17-1317 45.0 47.5 2.5 4.31 Z27 HW Zone 27
170.0 172.0 2.0 4.60 Z27 Zone 27
OSK-W-17-1336-W1 1064.1 1073.0 8.9 56.1 15.1 FW2 Underdog
including 1067.0 1070.1 3.1 151 33.7
OSK-W-17-1371 604.6 607.0 2.4 3.61 Caribou Ext. Caribou
OSK-W-17-1374 312.6 315.0 2.4 4.27 Z27 HW Zone 27
324.5 328.3 3.8 26.2 Z27 HW Zone 27
721.0 723.7 2.7 3.09 FW3 Underdog
including 723.0 723.7 0.7 10.5
OSK-W-17-1378 382.0 384.0 2.0 4.21 CS3 Caribou
477.2 479.3 2.1 5.49 Wolf Wolf
OSK-W-17-1381 111.5 113.8 2.3 16.7 Bobcat Bobcat
including 112.5 112.9 0.4 94.6
653.0 655.3 2.3 52.8 13.2 Vein Zone 27
including 654.2 654.5 0.3 404 100
OSK-W-17-1383 29.5 34.2 4.7 13.1 Bobcat Bobcat
83.0 87.0 4.0 4.01 Bobcat Bobcat
94.9 97.0 2.1 5.01 Bobcat Bobcat
102.0 104.1 2.1 5.33 Bobcat Bobcat
including 103.1 104.1 1.0 10.5
OSK-W-17-1385 734.7 737.2 2.5 8.40 Caribou Ext. Caribou
including 735.9 736.6 0.7 28.6
741.6 745.3 3.7 5.04 Caribou Ext. Caribou
including 744.3 745.3 1.0 13.0
820.5 824.0 3.5 6.64 Caribou Ext. Caribou
including 820.5 821.1 0.6 26.2
OSK-W-17-1388 368.6 371.0 2.4 11.9 CS1 Caribou
697.0 699.2 2.2 4.59 Wolf FW Wolf
OSK-W-17-1390 505.0 507.2 2.2 3.44 FW3 Underdog
OSK-W-17-1391 297.0 299.9 2.9 12.2 Bobcat Bobcat
including 299.4 299.9 0.5 65.4
OSK-W-17-1393 157.0 159.0 2.0 3.91 Bobcat Bobcat
including 158.3 158.7 0.4 16.7
OSK-W-17-1399 574.0 576.0 2.0 3.55 Caribou Ext. Caribou
OSK-W-17-1400 325.6 328.0 2.4 4.05 Caribou corridor Caribou
OSK-W-17-1404 141.4 144.0 2.6 4.28 Bobcat Bobcat
including 142.0 143.0 1.0 11.0
168.0 171.0 3.0 4.54 Bobcat Bobcat
including 170.7 171.0 0.3 13.4
535.0 537.0 2.0 3.96 Caribou Ext. Caribou
539.7 543.0 3.3 4.33 Caribou Ext. Caribou
356.8 359.5 2.7 10.4 Caribou Ext. Caribou
including 358.6 359.0 0.4 53.2
OSK-W-17-1406 79.3 81.8 2.5 6.97 VNCR Bobcat
including 79.7 80.0 0.3 47.7
248.5 250.9 2.4 3.47 Bobcat Bobcat
322.0 324.5 2.5 5.71 Bobcat Bobcat
Notes:
1. True widths are estimated at 65 - 80% of the reported core length interval. See "Quality Control" below.
2. Definitions: HW = Hanging Wall, FW = footwall, VNCR = Crustiform Vein, TBD = To be determined, Ext = extension.
Hole Number Azimuth
(°)
Dip
(°)
Length
(m)
UTM E UTM N Section
OSK-OBM-16-630 329 -51 699 452252 5434614 2375
OSK-OBM-16-693 331 -54 861 452443 5434600 2525
OSK-W-16-747 331 -57 1050 452449 5434488 2475
OSK-W-17-780-W1 331 -60 1533 452929 5434374 2850
OSK-W-17-936-W1 332 -56 808 452773 5434547 2775
OSK-W-17-936-W2 332 -56 819 452773 5434547 2775
OSK-W-17-968 152 -51 201 451948 5434759 2175
OSK-W-17-989-W2 335 -56 743 452660 5434497 2675
OSK-W-17-1020 337 -54 312 453217 5434928 3350
OSK-W-17-1095 147 -50 147 451959 5434734 2175
OSK-W-17-1125 331 -58 975 452563 5434568 2625
OSK-W-17-1138 327 -51 402 452888 5434989 3100
OSK-W-17-1139 333 -56 1092 452473 5434470 2500
OSK-W-17-1140 336 -55 975 453006 5434522 2975
OSK-W-17-1142 324 -45 680 452202 5434628 2325
OSK-W-17-1142-W1 324 -45 699 452202 5434628 2325
OSK-W-17-1178 330 -63 411 452917 5435014 3150
OSK-W-17-1191 315 -69 255 452067 5434617 2200
OSK-W-17-1203 333 -53 372 452275 5434867 2500
OSK-W-17-1218 327 -62 405 453004 5435009 3225
OSK-W-17-1251 326 -60 372 452889 5434989 3100
OSK-W-17-1255 130 -65 276 452947 5435107 3225
OSK-W-17-1273 338 -66 225 452081 5434634 2225
OSK-W-17-1280 335 -57 467 452857 5434931 3050
OSK-W-17-1288 331 -56 912 452945 5434561 2950
OSK-W-17-1289 339 -61 375 452277 5434866 2500
OSK-W-17-1305 330 -54 888 452499 5434592 2575
OSK-W-17-1309 330 -69 237 452073 5434610 2200
OSK-W-17-1313 331 -51 876 452279 5434573 2375
OSK-W-17-1317 327 -65 274 452072 5434611 2200
OSK-W-17-1336-W1 335 -61 1335 452616 5434449 2600
OSK-W-17-1371 334 -69 981 453100 5434875 3225
OSK-W-17-1374 317 -59 873 452273 5434579 2375
OSK-W-17-1378 331 -56 741 452688 5434638 2750
OSK-W-17-1381 329 -63 723 453018 5434935 3200
OSK-W-17-1383 331 -63 597 452767 5434864 2925
OSK-W-17-1385 319 -49 906 453379 5434741 3400
OSK-W-17-1388 332 -57 762 452716 5434605 2775
OSK-W-17-1390 329 -47 657 451911 5434437 1975
OSK-W-17-1391 327 -62 663 452981 5434900 3150
OSK-W-17-1393 332 -62 573 452725 5434862 2900
OSK-W-17-1399 332 -61 1053 453411 5434870 3500
OSK-W-17-1400 332 -52 769 452310 5434408 2325
OSK-W-17-1404 335 -67 635 452854 5434823 3000
OSK-W-17-1406 334 -60 579 452911 5434879 3075

OSK-OBM-16-693 intersected 30.8 g/t Au over 9.9 metres in the Underdog Corridor. Mineralization is composed of up to 10% pyrite-silica flooding, up to 5% pyrite stringers, 3% disseminated pyrite, and local visible gold. The host rhyolite, in contact with a porphyritic felsic dike, is strongly silica and sericite altered.

OSK-W-17-780-W1 intersected 83.5 g/t Au over 3.4 metres in FW3 HW. Mineralization is composed of 4% pyrite stringers and smoky quartz veins within a strongly silica altered porphyritic felsic dike.

OSK-W-17-1020 intersected 72.8 g/t Au over 2.0 meters in the new Bobcat Zone. This zone is NE along strike and on top of the Caribou corridor. The two zones have parallel plunges to the North-East. Mineralization is composed of 1% disseminated pyrite and 2% of pyrite-silica flooding within a strongly sericitized rhyolite.

OSK-W-17-1095 intersected 58.8 g/t Au over 2.5 metres in Zone 27. Mineralization is composed of up to 5% pyrite with low angle silica flooding hosted in a strongly silicified and fuchsitized andesite.

OSK-W-17-1138 intersected 42.4 g/t Au over 3.3 metres in Bobcat. Mineralization is very near surface (starting 11 metres downhole) and is composed of 3% silica flooding, 1% disseminated pyrite and crustiform vein within a sericitized rhyolite.

OSK-W-17-1139 intersected two veins in a sheared andesite south of the main zone. Mineralization, 4.29 g/t Au over 2.2 metres and 4.53 g/t au over 2.6 metres, is composed of up to 4% disseminated pyrite within a chloritized andesite.

OSK-W-17-1142-W1 intersected 160 g/t Au over 2.0 metres providing a new hit for Drake. Mineralization is composed of up to 10% pyrite, local visible gold and electrum associated in quartz-carbonate veins. The bleached andesite is near the Red Dog contact.

OSK-W-17-1191 intersected 218 g/t Au over 2.1 metres in Zone 27. Mineralization is composed of 5% pyrite stringers and 3% pyrite fragments within a strongly sericitized and silicified andesite.

OSK-W-17-1203 intersected 128 g/t Au over 2.1 metres in Zone 27. Mineralization is composed of up to 20% pyrite, pyrite silica flooding and local visible gold within a strongly silicified rhyolite.

OSK-W-17-1251 intersected 8.89 g/t Au over 3.0 metres, 3.86 g/t Au over 4.0 metres and 4.11 g/t Au over 3.0 metres in Bobcat. The first interval is composed of up to 7% pyrite-silica flooding and 1% ptygmatic tourmaline veins within a strongly sericitized and silicified felsic porphyritic dike. The second interval is within a sericitized rhyolite and composed of up to 5% pyrite stringers and disseminated pyrite. The third interval is within a quartz crustiform vein.

OSK-W-17-1255 intersected 14.1 g/t Au over 5.6 metres in Bobcat. Mineralization is composed of up to 10% pyrite within a pyrite-silica flooding running at low core angle. The hosting gabbro is strongly altered in silica and sericite.

OSK-W-17-1289 intersected 41.9 g/t Au over 2.0 meters in Mallard. Mineralization is composed of 1% disseminated pyrite in quartz-tourmaline veins within a chloritized andesite.

OSK-W-17-1305 intersected 106 g/t Au over 3.0 metres in Caribou Corridor. Mineralization is composed of disseminated pyrite within quartz-carbonate veins hosted in a sericitized andesite.

OSK-W-17-1336-W1 intersected 56.1 g/t Au over 8.9 metres in Underdog Corridor. Mineralization is composed of local visible gold with up to 8% pyrite stringers, disseminated chalcopyrite and quartz-tourmaline veins within a silicified porphyritic felsic dike.

OSK-W-17-1381 intersected 16.7 g/t Au over 2.3 metres in Bobcat and 52.8 g/t Au over 2.3 metres in Zone 27. The first interval is composed of 2% pyrite stringers, 3% pyrite fragments and a 10 centimetres quartz-carbonate vein within a sericitized and silicified rhyolite. The second interval, is composed of 4% disseminated pyrite and local visible gold within a quartz-cabonate vein hosted in a chloritized andesite.

OSK-W-17-1383 intersected four intervals in Bobcat: 13.1 g/t Au over 4.7 metres, 4.01 g/t Au over 4.0 metres, 5.01 g/t Au over 2.1 metres and 5.33 g/t Au over 2.1 metres. Mineralization is composed of up to 5% pyrite stringers, 1% pyrite tourmaline stringers and up to 1% disseminated pyrite. The first interval is in a porphyritic felsic dike and the three others are in crustiform veins within a silicified rhyolite.

Zone 27 results also include 12 intercepts from 7 drill holes and one wedge. Mineralization is composed of up to 15% pyrite, disseminated or in stringers associated with quartz-tourmaline veins. Host rocks are rhyolites, andesites and felsic dikes.

Caribou results also include 18 intercepts from 12 drill holes. Mineralization is composed of up to 20% pyrite, usually in stringers, locally semi-massive, and quartz-tourmaline veins hosted in altered porphyritic felsic dikes, andesites and rhyolites.

Wolf results include 4 intercepts from 2 drill holes and 2 wedges. Mineralization is composed of up to 70% pyrite-silica flooding, up to 20% pyrite stringers, and ptygmatic tourmaline veins hosted in silicified, sericitized and fuchsitized andesite.

Underdog results also include 4 intercepts from 4 drill holes. Mineralization is composed of up to 20% pyrite, usually in stringers associated with trace quartz-tourmaline veins and hosted in porphyritic felsic dikes. Host dikes are strongly silica altered.

Bobcat results also include 11 intercepts from 7 drill holes. Mineralization is composed of up to 10% pyrite-silica flooding, up to 5% disseminated pyrite and crustiform quartz veins within chloritized, sericitized andesites, rhyolites and felsic dikes.

Qualified Person

The scientific and technical content of this news release has been reviewed, prepared and approved by Mr. Louis Grenier, M.Sc.A., P.Geo. (OGQ 800), Project Manager of the Windfall Lake gold project, who is a "Qualified Person" as defined by National Instrument 43-101 - Standards of Disclosure for Mineral Projects ("NI 43-101").

Quality Control and Reporting Protocols

True widths determinations are estimated at 65-80% of the reported core length intervals for most of the zones. Assays are uncut except where indicated. Intercepts occur within geological confines of major zones but have not been correlated to individual vein domains at this time. Reported intervals include minimum weighted averages of 3.0 g/t Au diluted over core lengths of at least 2.0 metres. All NQ core assays reported were obtained by either 1-kilogram screen fire assay or standard 50-gram fire-assaying-AA finish or gravimetric finish at ALS Laboratories in Val d'Or, Québec, Thunder Bay and Sudbury, Ontario or Vancouver, British Colombia or Bureau Veritas in Timmins, Ontario. The 1-kilogram screen assay method is selected by the geologist when samples contain coarse gold or present a higher percentage of pyrite than surrounding intervals. Selected samples are also analyzed for multi-elements, including silver, using an Aqua Regia-ICP-AES method at ALS Laboratories. Drill program design, Quality Assurance/Quality Control ("QA/QC") and interpretation of results is performed by qualified persons employing a QA/QC program consistent with NI 43-101 and industry best practices. Standards and blanks are included with every 20 samples for QA/QC purposes by the Corporation as well as the lab. Approximately 5% of sample pulps are sent to secondary laboratories for check assay.

About the Windfall Lake Gold Deposit

The Windfall Lake gold deposit is located between Val-d'Or and Chibougamau in the Abitibi region of Québec, Canada. The mineral resource defined by the previous operator comprises 2,762,000 tonnes at 8.42 g/t Au (748.000 ounces) in the indicated category and 3,512,000 tonnes at 7.62 g/t Au (860,000 ounces) in the inferred category (sourced from a technical report dated June 10, 2015 entitled "Preliminary Economic Assessment of the Windfall Lake Gold Property, Québec, Canada" with an effective date of April 28, 2015, prepared in accordance with NI 43-101). The Windfall Lake gold deposit is currently one of the highest grade resource-stage gold projects in Canada. The bulk of the mineralization occurs in the Main Zone, a southwest/northeast trending zone of stacked mineralized lenses, measuring approximately 600 metres wide and at least 1.400 metres long. The deposit is well defined from surface to a depth of 500 metres, and remains open along strike and at depth. Mineralization has been identified only 30 metres from surface in some areas and as deep as 870 metres in others, with significant potential to extend mineralization up and down-plunge and at depth.

About Osisko Mining Inc.

Osisko is a mineral exploration company focused on the acquisition, exploration, and development of precious metal resource properties in Canada. Osisko holds a 100% in the high-grade Windfall Lake gold deposit located between Val-d'Or and Chibougamau in Québec and holds a 100% undivided interest in a large area of claims in the surrounding Urban Barry area and nearby Quevillon area (over 3,300 square kilometres), a 100% interest in the Marban project located in the heart of Québec's prolific Abitibi gold mining district, and properties in the Larder Lake Mining Division in northeast Ontario, including the Jonpol and Garrcon deposits on the Garrison property, the Buffonta past producing mine and the Gold Pike mine property. The Corporation also holds interests and options in a number of additional properties in northern Quebec and Ontario. Osisko continues to be well financed with approximately $190 million in cash and investments.

Cautionary Note Regarding Forward-Looking Information

This news release contains "forward-looking information" within the meaning of the applicable Canadian securities legislation that is based on expectations, estimates, projections and interpretations as at the date of this news release. The information in this news release about the Windfall Lake gold deposit being one of the highest grade resource-stage gold projects in Canada; the current 800,000 metre drill program; the significance of new results from the ongoing drill program at the Windfall Lake gold project; the significance of assay results presented in this press release; the type of drilling included in the drill program (definition drilling, expansion drilling to the NE of the main deposit and adjacent Lynx deposit, and exploration drilling on the greater deposit and Urban-Barry project area); potential mineralization; the potential to extend mineralization up and down-plunge and at depth at the Windfall Lake gold deposit; the ability to realize upon any mineralization in a manner that is economic; the ability to complete any proposed exploration activities and the results of such activities, including the continuity or extension of any mineralization; and any other information herein that is not a historical fact may be "forward-looking information". Any statement that involves discussions with respect to predictions, expectations, interpretations, beliefs, plans, projections, objectives, assumptions, future events or performance (often but not always using phrases such as "expects", or "does not expect", "is expected", "interpreted", "management's view", "anticipates" or "does not anticipate", "plans", "budget", "scheduled", "forecasts", "estimates", "believes" or "intends" or variations of such words and phrases or stating that certain actions, events or results "may" or "could", "would", "might" or "will" be taken to occur or be achieved) are not statements of historical fact and may be forward-looking information and are intended to identify forward-looking information.
This forward-looking information is based on reasonable assumptions and estimates of management of the Corporation. At the time it was made, involves known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of Osisko to be materially different from any future results, performance or achievements expressed or implied by such forward-looking information. Such factors include, among others, risks relating to the ability of exploration activities (including drill results) to accurately predict mineralization; errors in management's geological modelling; the ability of Osisko to complete further exploration activities, including drilling; property interests in the Windfall Lake gold project; the ability of the Corporation to obtain required approvals and complete transactions on terms announced; the results of exploration activities; risks relating to mining activities; the global economic climate; metal prices; dilution; environmental risks; and community and non-governmental actions. Although the forward-looking information contained in this news release is based upon what management believes, or believed at the time, to be reasonable assumptions. Osisko cannot assure shareholders and prospective purchasers of securities of the Corporation that actual results will be consistent with such forward-looking information, as there may be other factors that cause results not to be as anticipated, estimated or intended, and neither Osisko nor any other person assumes responsibility for the accuracy and completeness of any such forward-looking information, Osisko does not undertake, and assumes no obligation, to update or revise any such forward-looking statements or forward-looking information contained herein to reflect new events or circumstances, except as may be required by law.

Lire la suite de l'article sur https:
Données et statistiques pour les pays mentionnés : Canada | Tous
Cours de l'or et de l'argent pour les pays mentionnés : Canada | Tous

Osisko Mining Corp.

PRODUCTEUR
CODE : OSK.TO
ISIN : CA6882781009
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Osisko Mining est une société de production minière d'or basée au Canada.

Osisko Mining détient divers projets d'exploration au Bresil, au Canada et en Argentine.

Son principal projet en production est MALARTIC au Canada et ses principaux projets en exploration sont GOLDBORO, SLEITAT, JC - SMART SKARNS, HAMMOND REEF, MALARTIC CHL GOLD PROPERTY, DUPARQUET et CLEMENT LAKE au Canada, EL POTOSI et SANTA CLARA / CERRO BONITO au Salvador, CERRO CONDORINI et COAL CREEK au Perou, CASTELO DOS SONHOS au Bresil et FAMATINA en Argentine.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Dans les médias de Osisko Mining Corp.
20/12/2018Osisko Mining reports 39% higher grade than resource model a...
Rapports annuels de Osisko Mining Corp.
2008 Annual report
Financements de Osisko Mining Corp.
31/08/2011Osisko Announces an Increase in Caterpillar Lease Financing ...
31/08/2011Announces an Increase in Caterpillar Lease Financing Facilit...
18/11/2009Strengthens Balance Sheet With $241 M Proceeds From Exercise...
30/06/2009Closes $10.64 Million Flow-Through Financing
17/04/2006Announces C10$ million "bought deal" financing
Nominations de Osisko Mining Corp.
10/05/2013Anounces Election of Directors
17/04/2012Nominates Michele Darling to Board of Directors
14/03/2012Appoints Gary Sugar to Board of Directors
02/02/2012Board Member Resigns
16/09/2011Osisko Appoints Richard Ross to Board of Directors
15/09/2011Appoints Richard Ross to Board of Directors
22/08/2011Director Resigns
Rapports Financiers de Osisko Mining Corp.
14/02/2014Provides Notice of Fourth Quarter and Year End 2013 Results ...
01/08/2013Reports Second Quarter 2013 Results
15/07/2013Provides Notice of Second Quarter 2013 Operating and Financi...
09/05/2013Reports First Quarter 2013 Results
29/04/2013Provides Notice of First Quarter 2013 Financial Results Rele...
21/02/2013Reports Fourth Quarter and Year-End 2012 Results
13/11/2012Reports Third Quarter 2012 Results
05/07/2012Produces 92,003 Ounces Au in Second Quarter
09/05/2012Provides Notice of First Quarter 2012 Financial Results Rele...
27/02/2012Q4 2011 Net Profit of $37.8 Million
16/01/2012Provides Notice of Fourth Quarter and Year-End 2011 Financia...
11/08/2011Releases Second Quarter 2011 Results
16/05/2011Osisko Releases First Quarter 2011 Results
14/05/2011Osisko Releases First Quarter 2011 Results
28/02/2011Releases Year-End Financial Results and Review of 2010
28/02/2011publie ses résultats financiers de fin d'année
06/11/2009Releases Third Quarter 2009 Results
11/08/2009Releases Second Quarter 2009 Results
Projets de Osisko Mining Corp.
26/07/2017OSK Osisko Mining drills 2.7 m of 57 g/t Au at Windfall
21/02/2014Intersects 2.26 g/t Gold Over 128 Metres at Kirkland Lake
07/02/2014(Malartic)Commences 2014 Canadian Malartic Exploration Program
06/02/2014(Malartic)Reports Record January Production at Canadian Malartic
04/12/2013Intersects 61.6 Metres Averaging 1.44 g/t Au at Bidgood
21/11/2013(Malartic)Canadian Malartic Mine Produces Millionth Ounce
23/10/2013GLOBAL'S NEVADA PROJECTS ATTRACT STRONG THIRD PARTY INTEREST...
10/07/2013(Malartic)Deposits Study Reporting Local and Regional Economic Impact ...
30/01/2013Intersects 5.5 g/t Au Over 54.0 Metres at Upper Beaver
10/12/2012(Malartic)Reports November Production From Canadian Malartic
12/11/2012Announces Friendly Acquisition of Queenston
11/10/2012(Malartic)Canadian Malartic Mine Produces Half Millionth Ounce
10/10/2012(Malartic)Reports Record Quarterly Production from Canadian Malartic
06/09/2012(Malartic)Reports Record Monthly Production from Canadian Malartic
26/07/2012Acquires Common Shares of Bowmore Exploration Ltd=2E
17/05/2012(Malartic)Canadian Malartic Mill Returns to Operation
10/05/2012(Malartic)Reports Fire Damage at Canadian Malartic Mill Limited to Cyc...
30/01/2012(Famatina)s Status of Famatina Exploration Project
22/12/2011and DIOS Discover New Gold Showings on the AU33 WEST Project
28/11/2011TSX.V Company Adjacent to Osisko Property - 3 Minute Video
29/09/2011(Goldboro)Orex to Pursue Exploration Work on Goldboro Gold Project
08/09/2011(Malartic)Intersects 1.23 g/t Au Over 172 Metres at Barnat Extension
31/08/2011Osisko and EMSE Sign Agreement for Development of Famatina P...
31/08/2011(Famatina)and EMSE Sign Agreement for Development of Famatina Project ...
11/08/2011(Goldboro)Goldboro Gold Project Drill Assay Results Identify Extension...
05/08/2011Osisko Buys Back a 1% Royalty Interest on Canadian Malartic ...
05/08/2011(Malartic)Buys Back a 1% Royalty Interest on Canadian Malartic Propert...
21/06/2011Osisko Declares Commercial Production at Canadian Malartic
21/06/2011(Malartic)Declares Commercial Production at Canadian Malartic
17/06/2011Osisko Submits Notice of Termination in Duparquet Project
17/06/2011(Duparquet)Submits Notice of Termination in Duparquet Project
14/06/2011(Malartic)=?ISO-8859-1?Q?Osisko=20recoupe=201,50=20g/t=20Au=20sur=2063...
14/06/2011(Malartic)Intersects 1.50 g/t Au Over 63.6 Metres at Jeffrey Zone
13/06/2011(Duparquet)et Clifton Star annoncent une estimation de ressources pour ...
13/06/2011(Duparquet)and Clifton Star Release Resource Estimate for the Beattie D...
01/06/2011(Malartic)Officially Inaugurates the Canadian Malartic Mine
01/06/2011Osisko Officially Inaugurates the Canadian Malartic Mine
02/05/2011(Malartic)Announces Revised Mine Production Plan at Canadian Malartic
21/04/2011(Goldboro)Orex Exploration Inc.: Drilling Campaign Has Begun at Goldbo...
20/04/2011Osisko Mining Corporation - Drilling campaign has begun at G...
20/04/2011Osisko Mining Corporation - Drilling campaign has begun at G...
13/04/2011(Malartic)Pours First Gold at Canadian Malartic Mine
31/03/2011(Malartic)Osisko accroît les réserves aurifères de Canadian Malartic à...
31/03/2011(Malartic)Increases Gold Reserve at Canadian Malartic to 10=2E7 Millio...
29/03/2011(Malartic)Exercises Buy Out Option in Canadian Malartic Net Smelter Ro...
28/02/2011(Malartic) Découverte de minéralisation de type Canadian Malartic
24/02/2011(Hammond Reef)Reports 124 Metres Averaging 0.73 g/t Au in Southeast Extens...
29/01/2011(Malartic)Osisko Reports Significant New Intersections at Barnat Exten...
25/01/2011(Malartic)Reports Significant New Intersections at Barnat Extension, I...
21/12/2009(Malartic)Provides Update on Construction and Development Progress at ...
14/12/2009(Malartic)Releases New Resource Estimate for Canadian Malartic Project
20/10/2009(Malartic) Intersects New Gold Mineralization on the Malartic CHL Prop...
14/09/2009(Malartic)Intersects 1.20 g/t Au Over 86.9 Metres at Jeffrey Zone
01/09/2009(Malartic)Osisko Mining Corporation: Construction Activities at Canadi...
20/08/2009(Malartic)Quebec Government Authorizes Construction of Osisko's Canadi...
26/02/2009(Malartic) Preliminary Metallurgical Results on Barnat
26/01/2009(Malartic)Announces Inferred Resource Estimate for South Barnat Deposi...
03/12/2008(Malartic) Intersects 102 Metres Averaging 3.21 g/t Au at South Barnat
Communiqués de Presse en Français de Osisko Mining Corp.
01/06/2011(Malartic)inaugure officiellement la mine Canadian Malartic
Communiqués de Presse de Osisko Mining Corp.
13/02/2014Mails Letter to Shareholders Regarding Inadequate Goldcorp O...
05/02/2014Provides Corporate Update
29/01/2014Commences Legal Proceeding to Restrain Misuse of Confidentia...
29/01/2014Announces Filing and Mailing of Directors' Circular and Reco...
20/01/2014Reports Preliminary Fourth Quarter 2013 Production
15/01/2014Responds to Unsolicited Proposal From Goldcorp Inc=2E
13/01/2014Responds to Announcement by Goldcorp
16/12/2013Completes Long-Term Debt Renegotiation
24/10/2013Provides Notice of Third Quarter 2013 Operating and Financia...
30/07/2013Enhances Financial Flexibility by Improving Long-Term Debt T...
05/07/2013Intercepts 68 Metres Averaging 1=2E26 =?ISO-8859-1?Q?=20g/t=...
02/07/2013Receives Final $30 Million Payment from Kirkland Lake Gold
29/04/2013Corporate Update
17/04/2013Comments on Trading Activities
09/04/2013(Malartic)Previews Q1 2013 Canadian Malartic Operating Results
21/03/2013Discovers Two New Gold-Copper Zones at Upper Beaver
19/02/2013(Malartic)Receives Modified Operating Parameters at Canadian Malartic
19/02/2013(Malartic)s Reserves at Canadian Malartic
11/02/2013Denis Cimon Receives the 2013 Mineral Processor of the Year
29/01/2013(Hammond Reef)Provides Resource Update for Hammond Reef Project
24/01/2013(Malartic)Previews Q4 2012 Canadian Malartic Operating Results and 201...
12/11/2012(Malartic)Reports Record Monthly Throughput at Canadian Malartic
15/10/2012Founder Retires
09/10/2012Acquires Ground in Emerging Gold Belt in Mexico and Identifi...
03/10/2012Deposits the Second Tranche of itsFinancial Guarantee Coveri...
03/08/2012Secondary Crusher Installation Completed
24/07/2012Acquisition of Subscription Receipts of Druk Capital Partner...
16/05/2012Enhances Credit Agreement With CPPIB
14/05/2012(Malartic)Provides Update on Canadian Malartic
10/05/2012(Malartic)Reports Fire at Canadian Malartic Milling Plant
03/04/2012and Metis Nation of Ontario Sign Memorandum of Understanding
12/03/2012Brings First Half of Secondary Crusher Online
01/03/2012Announces Record Date for Annual Meeting
16/02/2012Canadian gold producer Osisko Mining Corporation joins Globa...
12/01/2012(Malartic)Previews Q4 2011 Canadian Malartic Operating Results
03/01/2012Responds to Below Market Price Offer for 5 Million Shares On...
14/12/2011Osisko Comments on Trading of Common Shares
14/12/2011Comments on Trading of Common Shares
08/10/2011President Sean Roosen Named Ernst & Young 2011 Quebec Entrep...
17/06/2011(Duparquet)met fin =E0 sa participation au projet Duparquet
13/06/2011Osisko and Clifton Star Release Resource Estimate for the Be...
14/05/2011Osisko publie ses r=E9sultats du premier trismestre de 2011
12/05/2011Annual and Special Meeting of Shareholders of Osisko Mining ...
29/04/2011Osisko Announces Revised Mine Production Plan at Canadian Ma...
29/03/2011Osisko Exercises Buy Out Option in Canadian Malartic Net Sme...
09/02/2011Goldcorp Sells Osisko Investment
22/12/2009Donates Shares to McGill University
11/12/2009and Clifton Star Complete Joint Venture Agreement on Duparqu...
13/11/2009Options Goldboro Gold Property From Orex Exploration
28/09/2009 Signs Option Agreement With Claim Post Resources for the Mo...
24/09/2009 Enters Into Financing Agreement With CPPIB Credit Investmen...
11/08/2009Signs Option Agreement With Midland Exploration for the Dunn...
10/07/2009Report on Osisko's Canadian Malartic Bape Hearings is Made P...
03/07/2009Osisko Mining Corporation Completes Strategic Investment
18/06/2009Comments on Trading of Common Shares
21/05/2009Discovers New Mineralized Zone Adjacent to South Barnat
19/05/2009Makes Strategic Investment
13/01/2009 Extends South Barnat to 1200 Metres Length
04/12/2008 Recognized for Strong Sustainability Performance
07/04/2006(Castelo Dos Sonhos)Résultats positifs sur le projet diamantifère Pontax
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TORONTO (OSK.TO)FRANKFURT (EWX.F)
3,13+2.29%2,43-1.62%
TORONTO
CA$ 3,13
19/04 11:30 0,070
2,29%
Cours préc. Ouverture
3,06 3,06
Bas haut
3,05 3,15
Année b/h Var. YTD
2,42 -  3,13 13,41%
52 sem. b/h var. 52 sem.
2,36 -  3,92 -23,47%
Volume var. 1 mois
374 145 11,79%
Produit Gold
Développe
Recherche Gold - Lead - Silver - Tin - Tungsten - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 23/01/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
202414,65%
2023-22,00%4,532,64
2022-6,17%5,022,36
20210,81%3,972,33
2020-4,88%4,851,67
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,82 AU$+1,69%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
11,18 US$+1,27%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,57 GBX+5,19%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,55 CA$+1,19%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
15,92 CA$-0,81%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+2,13%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,19 AU$-7,32%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,90 CA$+0,00%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
52,28 US$+1,64%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,03 AU$+0,00%Trend Power :