Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en

UEX Corp

Publié le 08 août 2012

/AREVA Drilling Continues to Outline Thick Mineralization at the Colette Deposit: Drill Hole SHE-66-

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Canada | Report | Uranium |
Wednesday, August 08, 2012

UEX/AREVA Drilling Continues to Outline Thick Mineralization at the Colette Deposit: Drill Hole SHE-66-10 Intersects 10.9 Metres Grading 1.96% eU3O8

UEX Corporation ("UEX") is pleased to announce results from the continued exploration of the Colette and the 58B deposits, both of which are located in the northern portion of the Shea Creek Project ("Shea Creek") in the Athabasca Basin of northern Saskatchewan. Shea Creek hosts the Kianna, Anne, Colette and 58B deposits (Figure 1) and is one of ten 49%-owned Western Athabasca Uranium Projects joint-ventured with AREVA Resources Canada Inc. ("AREVA"), the project operator.

The 2012 drilling program to date has met its objectives to confirm the continuity of mineralization in the northern portion of the Colette Deposit ("Colette") and further delineate the 58B Deposit ("58B"). Highlights of the program are as follows:

  • Confirmation that the higher grade unconformity and perched mineralization in the northern portion of the Colette Deposit is continuous over a lateral area of at least 100 x 50 metres and extends up to 25 metres above the unconformity; and
  • Further definition of northern portions of the 58B Deposit at the unconformity and better constraint of the distribution of basement mineralization.

Drilling Results - Colette Deposit

The mineralized intersections in holes SHE-66-7 to SHE-66-13 confirm the continuity of unconformity and perched mineralization in the northern portion of the Colette Deposit. The mineralization largely straddles the basal Athabasca unconformity ("UC") and also occurs perched ("P") above the unconformity. Highlights of the drill results include (see Table 1 for complete results):

SHE-66-7: (UC) 0.29% eU3O8 over 9.1metres, including
    0.54% eU3O8 over 2.0 metres, and
    0.58% eU3O8 over 1.9 metres;
SHE-66-8: (UC) 0.27% eU3O8 over 11.1 metres, including
    0.50% eU3O8 over 2.4 metres, and
    0.67% eU3O8 over 1.5 metres;
SHE-66-9: (P) 0.60% eU3O8 over 11.5 metres, including
    0.78% eU3O8 over 5.9 metres, and
    0.49% eU3O8 over 4.6 metres;
  (UC) 1.37% eU3O8 over 1.5 metres;
SHE-66-10: (P) 1.96% eU3O8 over 10.9 metres,
  (UC) 0.62% eU3O8 over 3.1 metres;
SHE-66-11: (UC) 0.45% eU3O8 over 4.9 metres, including
    0.68% eU3O8 over 3.0 metres;
SHE-66-13: (UC) 0.95% eU3O8 over 5.2 metres.

Drill holes SHE-66-7 to SHE-66-13, as identified in Figure 2, are the last directional drill cuts that were planned for the 2012 drilling program at the Colette Deposit. The holes were designed to follow up on successful drilling results from the SHE-66 series drill holes at Colette obtained in 2011 and early 2012. These included intervals of 1.28% eU3O8 over 26.0 metres in drill hole SHE-66-2 and 1.22% eU3O8 over 27.9 metres in drill hole SHE 66 3 (see UEX news release dated October 31, 2011). Previous results reported earlier this year include 0.98% eU3O8 over 19.4 metres in drill hole SHE-66-4 (see UEX news release dated May 31, 2012).

These drill holes continue to define a thick flat-lying lens of mineralization at the unconformity which, on the basis of its overall morphology, suggests that the new intercepts are within 90% of true thickness. Mineralization is open to the northeast in the direction of UEX's and AREVA's Douglas River Project.

In addition to the unconformity mineralization, drill holes SHE-66-9 and SHE-66-10 intersected perched mineralization grading 0.60% eU3O8 over 11.5 metres, including 0.78% eU3O8 over 5.9 metres and 1.96% eU3O8 over 10.9 metres, respectively.

Drilling Results -- 58B Deposit

Five drill holes were completed during the 2012 exploration program at 58B, an emerging new deposit identified during 2010 and located in an area between the Kianna and Colette deposits (Figure 3).

The 58B Deposit was not included in the May 2010 N.I. 43-101 mineral resource estimate. Previously reported drilling in 2010 includes unconformity and basement intercepts of 6.53% eU3O8 over 1.6 metres in drill hole SHE-133-5, 2.13% eU3O8 over 10.6 metres in drill hole SHE-133-7, 6.55% eU3O8 over 2.4 metres in drill hole SHE-133-4 and 1.32% eU3O8 over 5.8 metres in drill hole SHE-133-11 (see UEX news releases dated June 14, 2010, March 17, 2010 and September 21, 2010).

Drilling during 2012 in the 58B area was designed to test down dip and lateral extensions of basement mineralization and the extent and continuity of overlying unconformity mineralization. Significant intercepts include (see Table 2 for complete results):

SHE-104-9: (UC) 0.44% eU3O8 over 6.2 metres;
SHE-104-10: (UC) 0.49% eU3O8 over 1.2 metres,
  (B) 0.23% eU3O8 over 10.0 metres, and
  (B) 0.35% eU3O8 over 6.3 metres;
SHE-104-11: (UC) 2.12% eU3O8 over 2.3 metres, and
  (UC) 0.65% eU3O8 over 1.8 metres;
SHE-133-13: (B) 2.27% eU3O8 over 1.2 metres;
SHE-133-14: (UC) 0.19% eU3O8 over 1.4 metres.

The new 58B results further define northern portions of the mineralized zone at the unconformity and better constrain the distribution of basement mineralization. Broad areas of the highly prospective structural corridor hosting the 58B Deposit that lie between the Kianna and Colette deposits remain sparsely tested and will be the subject of additional drilling in future programs.

The holes drilled in the Colette and 58B areas are part of a larger, $6.0-million exploration program on the Shea Creek Project and conclude the 2012 planned exploration in these areas. Currently, the two drills operating on the project are being moved to the Kianna Deposit ("Kianna") to test basement mineralization discovered in 2011 which lies north of the main Kianna basement zone. Drilling in 2011 identified a new zone which extends from the north side of the Kianna main basement zone and may join with a second steeply dipping mineralized structure to the north. This new zone, which lies outside of the Kianna mineral resource estimate, has returned broad intercepts of mineralization including 1.28% eU3O8 over 25.1 metres in drill hole SHE-130-4 and 0.81% eU3O8 over 32.0 metres in drill hole SHE-130-12, for which true widths have not yet been determined (see UEX news releases dated May 3, 2011 and September 29, 2011). The 2012 drilling at Kianna will target these areas, as well as exploring the continuity of higher grade portions of unconformity and basement mineralization in the southern portion of the deposit.

Further information regarding UEX's projects, including maps, is available on UEX's website at www.uex-corporation.com.

Qualified Persons and Data Acquisition

Technical information in this news release has been reviewed and approved by R. Sierd Eriks, P.Geo., UEX's Vice-President of Exploration, David Rhys, P.Geo., UEX Advisory Board member and Erwin Koning, P.Geo., AREVA's District Geologist, West Athabasca Region, who are each Qualified Persons as defined by National Instrument 43-101.

Equivalent grade results reported here were obtained using a DHT27-STD gamma probe which collects continuous readings along the length of the drill hole. Probe results are calibrated using an algorithm calculated from the comparison of probe results against geochemical analyses in previous drill holes in the Shea Creek area.

About Shea Creek

Effective May 26, 2010, UEX reported a global mineral resource estimate for the Kianna, Anne and Colette deposits as tabulated below in "About UEX". This estimate is based on drilling information up to December 31, 2009. Subsequent results, which include the identification of the 58B Deposit and the expansion of the Kianna and Colette deposits, are not incorporated in the 2010 mineral resource estimate.

The 2010 mineral resource estimate confirmed Shea Creek as the largest undeveloped uranium resource in the Athabasca Basin. Shea Creek also ranks as the third largest uranium resource in the Basin, exceeded in size only by McArthur River and Cigar Lake. Resources at Shea Creek are largely open and have excellent potential for both expansion of known areas of mineralization and discovery of new zones.

At the conclusion of the 2012 exploration program, UEX intends to update its mineral resource estimates for the Shea Creek deposits to include the results from the 2010, 2011 and 2012 drilling campaigns.

About UEX

UEX is a Canadian uranium exploration and development company actively involved in 18 uranium projects, including six that are 100% owned and operated by UEX, one joint venture with AREVA that is operated by UEX, as well as ten joint-ventured with AREVA and one under option from JCU (Canada) Exploration Company, Limited, which are operated by AREVA. The 18 projects, totaling 308,320 hectares (761,875 acres), are located in the eastern, western and northern perimeters of the Athabasca Basin, the world's richest uranium belt, which accounts for approximately 17% of the global primary uranium production. UEX is currently advancing several uranium deposits at its two major projects which include the Kianna, Anne, Colette and 58B deposits at its 49%-owned Shea Creek Project, a joint venture with AREVA in the western Athabasca Basin, and the Horseshoe, Raven and West Bear deposits located at its 100%-owned Hidden Bay Project in the eastern Athabasca Basin. With a cash position of approximately $16.1 million at June 30, 2012, UEX is well-financed to carry out its remaining 2012 exploration and development programs.

UEX's two major projects have mineral resource estimates as follows:

UEX Corporation - Indicated Mineral Resources (1) (2) (3)
Project Tonnes Grade
U3O8 (%)
Total
U3O8 (lbs)
UEX�s share
U3O8 (lbs)
Shea Creek (4) 1,872,600 1.540 63,572,000 31,150,280
Hidden Bay (5) 10,372,500 0.160 36,623,000 36,623,000
TOTAL INDICATED 12,245,100 0.371 100,195,000 67,773,280

UEX Corporation - Inferred Mineral Resources (1) (2) (3)
Project Tonnes Grade
U3O8 (%)
Total
U3O8 (lbs)
UEX�s share
U3O8 (lbs)
Shea Creek (4) 1,068,900 1.041 24,525,000 12,017,250
Hidden Bay (5) 1,109,200 0.111 2,715,000 2,715,000
TOTAL INFERRED 2,178,100 0.567 27,240,000 14,732,250
Notes:
  1. The mineral resource estimates follow the requirements of National Instrument 43-101 -- Standards of Disclosure for Mineral Projects and classifications follow CIM definition standards.
  2. The Shea Creek mineral resources were estimated at a cut-off of 0.30% U3O8.
  3. The Hidden Bay mineral resources were estimated at a cut-off of 0.05% U3O8.
  4. The Shea Creek mineral resource estimates (including the Kianna, Anne and Colette deposits) are included in the Shea Creek Technical Report with an effective date of May 26, 2010 which was filed on SEDAR at www.sedar.com on July 9, 2010.
  5. The Hidden Bay mineral resource estimates (including the Horseshoe, Raven and West Bear deposits) are included in the Hidden Bay Technical Report with an effective date of February 15, 2011 which was filed on SEDAR at www.sedar.com on February 23, 2011. The West Bear mineral resource estimate is entirely in the Indicated category.

About AREVA Resources Canada Inc.

AREVA, a uranium exploration, mining and milling company, is a subsidiary of AREVA group, the global nuclear industry leader with an expanding presence in the renewable energies field, and 48,000 employees worldwide to help supply safer, cleaner and more economical energy to the greatest number of people. AREVA group, through its Canadian subsidiary, has significant interests in several uranium deposits in the Athabasca Basin, including the McClean Lake, Midwest and Shea Creek deposits operated by AREVA, as well as the McArthur River and Cigar Lake deposits operated by Cameco Corporation. AREVA also holds a majority interest in the Kiggavik deposits in Nunavut.

FOR FURTHER INFORMATION PLEASE CONTACT

Graham C. Thody
President & CEO
(604) 669-2349

Forward-Looking Information

This news release may contain statements that constitute "forward-looking information" for the purposes of Canadian securities laws. Such statements are based on UEX's current expectations, estimates, forecasts and projections. Such forward-looking information includes statements regarding UEX's mineral resource and mineral reserve estimates, outlook for our future operations, plans and timing for exploration activities, and other expectations, intention and plans that are not historical fact. The words "estimates", "projects", "expects", "intends", "believes", "plans", or their negatives or other comparable words and phrases are intended to identify forward-looking information. Such forward-looking information is based on certain factors and assumptions and is subject to risks, uncertainties and other factors that could cause actual results to differ materially from future results expressed or implied by such forward-looking information. Important factors that could cause actual results to differ materially from UEX's expectations include uncertainties relating to interpretation of drill results and geology, additional drilling results, continuity and grade of deposits, participation in joint ventures, reliance on other companies as operators, public acceptance of uranium as an energy source, fluctuations in uranium prices and currency exchange rates, changes in environmental and other laws affecting uranium exploration and mining, and other risks and uncertainties disclosed in UEX's Annual Information Form and other filings with the applicable Canadian securities commissions on SEDAR. Many of these factors are beyond the control of UEX. Consequently, all forward-looking information contained in this news release is qualified by this cautionary statement and there can be no assurance that actual results or developments anticipated by UEX will be realized. For the reasons set forth above, investors should not place undue reliance on such forward-looking information. Except as required by applicable law, UEX disclaims any intention or obligation to update or revise forward-looking information, whether as a result of new information, future events or otherwise.



TABLE 1
2012 Shea Creek (Colette) Drill Results

Results are reported with a grade of greater than 0.1% eU3O8 and a grade-thickness product of greater than 0.2

Hole Total Depth of Hole (metres) Depth to Unconformity
(metres)
From
(metres)
To
(metres)
Length
(metres)
Avg. Grade Within the Intersection
(% eU3O8)
Type�
SHE-66-4* 762.0 724.2 674.2 679.2 5.0 0.27 P
      including 674.2 676.7 2.5 0.45 P
      700.4 719.8 19.4 0.98 UC
      including 700.4 705.8 5.4 0.83 UC
      including 707.1 718.6 11.5 1.25 UC
SHE-66-5* 744.0 702.0 693.8 703.3 9.5 0.32 UC
      including 695.0 696.5 1.5 0.92 UC
SHE-66-6* 783.0 711.9 708.3 712.6 4.3 0.76 UC
      720.1 721.0 0.9 0.49 B
SHE-66-7 828.0 704.8 696.35 705.45 9.1 0.29 UC
      including 698.85 700.85 2.0 0.54 UC
      including 703.55 705.45 1.9 0.58 UC
      750.35 754.35 4.0 0.22 B
      including 750.35 752.05 1.7 0.37 B
SHE-66-8 806.0 709.3 702.6 713.7 11.1 0.27 UC
      including 702.6 704.2 1.6 0.49 UC
      including 708.8 711.2 2.4 0.50 UC
      including 712.2 713.7 1.5 0.67 UC
SHE-66-9 801.0 717.0 698.1 709.6 11.5 0.60 P
      including 698.1 704.0 5.9 0.78 P
      including 705.0 709.6 4.6 0.49 P
      714.3 715.8 1.5 1.37 UC
SHE-66-10 774.0 728.5 673.8 684.7 10.9 1.96 P
      710.8 713.9 3.1 0.62 UC
      including 710.8 712.9 2.1 0.88 UC
SHE-66-11 805.5 728.7 714.5 719.4 4.9 0.45 UC
      including 714.5 717.5 3.0 0.68 UC
SHE-66-12 789.0 722.4

No significant values

SHE-66-13 816.0 724.6 717.8 723.0 5.2 0.95 UC
* Previously reported hole - (see UEX news release dated May 31, 2012)
� P - Perched mineralization
  UC - Unconformity mineralization
  B - Basement mineralization


Note: Uranium grades are calculated from gamma probe logging. True widths of mineralized intervals have not yet been determined.

TABLE 2
2012 Shea Creek (58B) Drill Results

Results are reported with a grade of greater than 0.1% eU3O8 and a grade-thickness product of greater than 0.2

Hole Total Depth of Hole (metres) Depth to Unconformity
(metres)
From
(metres)
To
(metres)
Length
(metres)
Avg. Grade Within the Intersection
(% eU3O8)
Type�
SHE-104-9 921.0 725.9 718.7 724.9 6.2 0.44 UC
      783.7 784.3 0.6 0.34 B
SHE-104-10 945.0 729.4 723.8 725.0 1.2 0.49 UC
      770.8 780.8 10.0 0.23 B
      including 771.5 772.8 1.3 0.99 B
      including 779.0 780.8 1.8 0.42 B
      883.3 889.6 6.3 0.35 B
      including 883.3 886.9 3.6 0.44 B
      including 888.0 889.6 1.6 0.39 B
SHE-104-11 923.0 716.7 708.8 711.1 2.3 2.12 UC
      715.1 716.9 1.8 0.65 UC
SHE-133-13 887.0 720.4 756.6 757.8 1.2 2.27 B
      795.7 796.2 0.5 0.75 B
SHE-133-14 873.0 731.0 728.7 730.1 1.4 0.19 UC
� P - Perched mineralization
  UC - Unconformity mineralization
  B - Basement mineralization


Note: Uranium grades are calculated from gamma probe logging. True widths of mineralized intervals have not yet been determined.


FIGURE 1


FIGURE 2


FIGURE 3

Associated File: http://www.uex-corporation.com/i/pdf/nr/2012-08-08_NR.pdf
1216 KB in size, approx. 3 minutes, 47 seconds to download at 56.6Kbps
      
This email was sent to:.com      
Données et statistiques pour les pays mentionnés : Canada | Tous
Cours de l'or et de l'argent pour les pays mentionnés : Canada | Tous

UEX Corp

EXPLORATEUR
CODE : UEX.TO
ISIN : CA9026661061
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

UEX est une société d’exploration minière d'or et de cuivre basée au Canada.

UEX détient divers projets d'exploration au Canada.

Ses principaux projets en exploration sont BLACK LAKE, NORTHERN ATHABASCA PROJECTS, WESTERN ATHABASCA PROJECTS, DOUGLAS, BEATTY RIVER, RIOU LAKE, HIDDEN BAY, SHEA CREEK, FOND DU LAC, UCHRICH, JAMES CREEK PROJECTS et LAURIE au Canada.

UEX est cotée au Canada et en Allemagne. Sa capitalisation boursière aujourd'hui est 158,0 millions CA$ (126,3 millions US$, 110,7 millions €).

La valeur de son action a atteint son plus bas niveau récent le 15 août 2003 à 0,05 CA$, et son plus haut niveau récent le 09 novembre 2007 à 9,30 CA$.

UEX possède 319 240 000 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Financements de UEX Corp
18/05/2016Closes $7.25 Million Combined Flow-Through and Hard Dollar P...
05/06/2013Announces Closing of Private Placement
25/05/2013Announces $3.175 Million Private Placement
23/02/2012Announces $3 Million Private Placement
Nominations de UEX Corp
19/12/2013Announces the Appointment of Roger Lemaitre as President and...
29/04/2011appoints Ed Boney as Chief Financial Officer
27/05/2010Appoints Walter Segsworth and David Rhys to its Management A...
Rapports Financiers de UEX Corp
06/11/2013Third Quarter 2013 Financial Results and MD&A
Projets de UEX Corp
07/01/20142014 Joint Venture Exploration Programs Commence
04/06/2013(Shea Creek)Announces Additional $2.0 Million Drilling Budget for Shea C...
10/04/2013(Shea Creek)Secures Right to Fund $18 Million in Additional Drilling at ...
20/03/2013(Shea Creek)/AREVA Announce $3.1 Million Budget for Shea Creek Spring/Su...
13/02/2013(Black Lake)Regarding Uracan's Option for Black Lake Project in the Atha...
26/04/2012(Shea Creek)/AREVA 2012 Shea Creek Drilling Program Underway
16/02/2012(Hidden Bay)Commences Winter 2012 Hidden Bay Drilling Program
30/11/2011(Shea Creek)Announces Shea Creek Drilling Budget of $6 Million for 2012
09/08/2011(Hidden Bay)Commences 18,000 Metre Summer Drilling Program at Hidden Bay
24/02/2011(Western Athabasca Projects)/AREVA 2011 Western Athabasca Basin Drilling Programs Underw...
18/02/2010(Hidden Bay)Receives West Bear Preliminary Feasibility Study Reporting P...
27/01/2010(Shea Creek)2010 Western Athabasca Basin Drilling Programs Underway with...
06/01/2010(Hidden Bay)Reports Results of Summer 2009 Exploration on the Hidden Bay...
23/07/2009(Hidden Bay)Reports Significantly Expanded Resource Estimates for the Ho...
25/02/2009(Shea Creek)2009 Drill Program Underway at Shea Creek with Three Drills
12/01/2009(Shea Creek)/AREVA Drilling in the Prospective Corridor at Shea Creek Co...
05/01/2009Reports N.I. 43-101 Compliant Mineral Resource Estimate for ...
29/09/2008(Hidden Bay)reports N.I. 43-101 compliant mineral resource for Horseshoe...
18/06/2008/AREVA Drilling Outlines New Zone of High-grade Mineralizati...
17/01/2008(Hidden Bay) Launches Largest Winter Drilling Program at Hidden Bay with...
15/01/2008(Shea Creek)UEX/AREVA Launch Largest Drill Program to Date at Shea Creek...
05/12/2007(Shea Creek)/AREVA Plan $20.3 Million Program at Shea Creek for 2008 Whi...
04/12/2007(Shea Creek)/AREVA Report Additional High-Grade Basement-Hosted Minerali...
14/11/2007/AREVA Report High-Grade Basement-Hosted Mineralization in t...
18/10/2007Report Second-Best Hole Ever at the Anne Deposit Intersectin...
04/09/2007(Shea Creek)/AREVA to Commence Shea Creek Drilling Program with Three Dr...
21/08/2007(Black Lake)Extends Uranium Mineralization at Black Lake Hole BL-140 Int...
23/07/2007Reports Best Hole Ever from West Bear Deposit: Hole UEX-206 ...
12/07/2007Drilling Extends Mineralization at Kianna Deposit: SHE-115-1...
14/06/2007 Plans to Initiate Final Feasibility Study at Raven and Hors...
08/02/2006(Beatty River)2006 winter exploration commences at Beatty River Uranium pr...
Communiqués de Presse de UEX Corp
18/08/2016Research Reports Initiated on Uranium Miners Stocks U3O8, UE...
11/07/2016Paul Bay Continuity Confirmed and Down-Dip Drilling Underway
24/06/2016High Grade Zone Extended at Christie Lake
13/06/2016Drill Turning at Christie Lake
08/06/2016UEX Corporation Reports Results of Annual General Shareholde...
25/05/2016Highest Grade Hole at Christie Lake Project – 9.3% U3O8 over...
17/05/2016UEX Closes $7.25 Million Combined Flow-Through and Hard Doll...
02/05/2016UEX Places “Flow-Through” Shares and Overallotment Option; A...
28/04/2016UEX Announces $4.0 Million “Flow-Through” Private Placement
13/04/2016UEX intersects 4.27% eU3O8 over 10.2 m at Christie Lake
22/01/2016UEX Closes $2.0 Million Private Placement
19/01/2016Final Option Agreement Signed - Drill Program to Commence Im...
19/01/2016UEX Corporation: Final Option Agreement Signed-Drill Program...
22/12/2015UEX Announces $2.0 Million Private Placement
26/10/2015UEX Signs LOI on Advanced Stage Athabasca Uranium Project
21/09/2015Uranium companies could take the cake
21/04/2015UEX Announces $2.5 Million Private Placement
10/04/2015New Radioactive Fault at Wolf Lake Returns Probe Peak of 12,...
27/02/2015Promising Hydrothermal Clay Alteration Expanded at Dwyer Lak...
05/06/2014UEX/AREVA Report Drilling Results from Laurie and Mirror Riv...
02/04/2014(Black Lake)Uracan/UEX report uranium mineralization on the Black Lake P...
28/11/2013(Shea Creek)Reports 31.5 Metres Grading 0.80% eU3O8, Including 4.05% eU3...
06/08/2013(Shea Creek)Reports 22.3 Metres Grading 0.85% eU3O8, including 5.93% eU3...
04/06/2013(Shea Creek)Announces Completion and Filing of Shea Creek Technical Repo...
21/03/2013(Beatty River)Announces Completion of Beatty River Earn-in
08/08/2012/AREVA Drilling Continues to Outline Thick Mineralization at...
08/06/2012Board Re-elected and Mark Eaton Re-Appointed Chairman
31/05/2012/AREVA Drilling Continues to Outline Thick Unconformity Mine...
07/05/2012Terminates Shareholder Rights Plan
01/05/2012(Hidden Bay)Reports Summer-Fall 2011 Drilling Results for the Raven and ...
17/02/2012Announces $8 Million Bought Deal
16/12/2011Comments by David Talbot on UEX Corporation in the Energy Re...
07/12/2011Adopts Shareholder Rights Plan
06/12/2011(Shea Creek)/AREVA Drilling Expands Mineralization Northward from the Ki...
24/06/2011Board Re-elected
28/04/2011appoints Nan Lee as Vice-President of Project Development
17/03/2010Significant Unconformity Intersections at Shea Creek's 58B A...
23/09/2009CEO Stephen Sorensen to Retire; Board Names Current Chairman...
10/06/2009Stepout Drilling Expands Mineralization at Raven and Horsesh...
26/11/2008Announces Minimum $16.5 Million Budget for 2009
09/04/2008 reports final results of 2007 Horseshoe and Raven drilling,...
26/03/2008Eaton Joins UEX Board
22/01/2008UEX Commences 2008 Winter Exploration Program at Black Lake ...
14/01/2008UEX Earns Full 49% Interest in AREVA's Western Athabasca Ura...
14/12/2007Interim Resource Estimate for the West Bear Deposit Adds 223...
11/07/2007Commences Summer/Fall 2007 Drilling Programs at the Raven an...
23/04/2007on Riou Lake and Northern Athabasca Uranium Projects 2007 Ge...
28/02/2007Commences 2007 Winter Exploration Program at Black Lake Uran...
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TORONTO (UEX.TO)FRANKFURT (UXO.F)
0,495+16.47%0,385+2.67%
TORONTO
CA$ 0,495
24/08 16:59 0,070
16,47%
Cours préc. Ouverture
0,425 0,400
Bas haut
0,440 0,500
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
- -  0,495 -%
Volume var. 1 mois
9 418 620 -%
24hGold TrendPower© : 44
Produit
Développe
Recherche Uranium
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 07/12/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
202230,26%0,510,24
202146,15%0,600,25
2020108,00%0,280,07
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,72 AU$+0,06%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
11,11 US$+2,21%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,55 GBX-0,90%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$-8,33%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,47 CA$+3,78%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
15,25 CA$-3,42%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+0,00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,20 AU$+5,26%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,79 CA$-3,76%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
52,57 US$+0,84%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+0,00%Trend Power :