GobiMin Inc. - Diamond Drill Results Update for the 2012 Campaign at the Sawayaerdun Gold Project
Published : March 26, 2013
( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Copper | Report |

GobiMin Inc. - Diamond Drill Results Update for the 2012 Campaign at the Sawayaerdun Gold Project

TSX-V: GMN

TORONTO, March 26, 2013 /CNW/ - (TSX-V: GMN) GobiMin Inc. ("GobiMin") is pleased to announce diamond drill results for the 2012 diamond drilling campaign completed on its 70% owned Sawayaerdun Gold Project located in northwestern Xinjiang Uyger Autonomous Region of the Republic of China.

Highlights of the 2012 drill program include the following intersections from Zone IV.

ZK10019 with an intersection width of 35.8 m of 1.67 g/t gold from a depth of 451.12 m;
ZK2713 with an intersection width of 30.8 m of 1.17 g/t gold from a depth of 507.59 m;
ZK4318 with an intersection width of 56.6 m of 1.95 g/t gold from a depth of 497.67 m;
Z5912 with an intersection width of 27.1 m of 2.33 g/t gold from a depth of 349.75 m;
ZKWX-3 with an intersection width of 50.6 m of 1.73 g/t gold from a depth of 0 m.

Sawayaerdun Gold Project Update

GobiMin has completed a program of 68 diamond drill holes at Sawayaerdun in northwest Xinjiang, China in October 2012 as scheduled for a total of 31,000 m. This drilling concentrated on in-filling the main mineralized structure at Zone IV to improve the reliability of the previously announced National Instrument 43-101 compliant mineral resource estimate.  Further testing of the Zone I mineralization was also completed.  All of the assays for this drilling campaign have now been received.

Sawayaerdun Geology

The Zone IV and Zone I structures are part of a series of sub-parallel shears that dip steeply, at approximately 70°, to the west along a structural corridor that strikes east-northeast within fine-grained Devonian clastic metasedimentary rocks. These metasedimentary rocks are composed of a turbidite sequence that has been altered to phyllite and becomes more carbonaceous in the proximity of the mineralized shears.  The mineralized shear that hosts Zone IV is mapped over a strike length of about 6,500 m within GobiMin's tenements with drilling confirming the presence of gold mineralization over much of its length and to depth.  Mapping along Zone I, which is sub-parallel and 1,200 m east of Zone IV, has shown that this mineralized structure continues over 3,200 m of strike length.

Table 1 shows significant intersections in Zone IV for the 2012 drill program and Table 2 shows the same for Zone I. Estimated true width ("ETW") has been calculated for each intersection.

 
Table 1   Zone IV Significant Intersections for the 2012 Drill Program
Hole ID From (m) To (m) Length
(m)
Au (g/t) Approx.
Dip of Zone
ETW (m)
ZK0007 303.79 305.79 2.00 1.43 -70 1.06
ZK0305 147.80 158.80 11.00 2.39 -70 6.49
incl. 147.80 151.80 4.00 3.61 -70 2.36
ZK0402 198.00 200.00 2.00 1.32 -70 1.50
ZK10015 373.33 390.74 17.41 1.28 -70 8.18
ZK10019 451.12 486.88 35.76 1.67 -70 17.88
incl. 483.88 485.88 2.00 4.56 -70 1.00
ZK10716 388.81 413.43 24.62 0.97 -70 9.60
ZK11604 126.04 132.04 6.00 2.03 -70 4.26
ZK11616 453.93 460.93 7.00 1.09 -70 3.08
ZK13207 230.90 234.40 3.50 1.56 -70 2.00
ZK13211 260.00 263.00 3.00 1.08 -70 1.44
ZK13215 327.03 331.03 4.00 0.92 -70 2.00
ZK1906 89.34 93.34 4.00 1.89 -64 2.68
and 195.00 199.00 4.00 1.79 -64 2.68
and 214.00 235.00 21.00 2.21 -70 12.39
incl. 230.00 232.00 2.00 3.72 -70 1.18
ZK1908 98.48 100.48 2.00 2.71 -64 1.18
and 224.61 230.61 6.00 1.34 -64 3.54
and 244.61 266.23 21.62 1.97 -70 10.81
ZK2008 253.60 256.60 3.00 1.21 -70 1.35
ZK2307 167.01 186.01 19.00 2.18 -50 14.06
and 253.74 279.04 25.30 1.84 -70 11.89
incl. 174.01 177.01 3.00 4.78 -70 1.41
and 275.44 278.44 3.00 3.53 -70 1.41
ZK2705 66.91 86.91 20.00 1.78 -45 19.40
and 100.09 140.40 40.31 1.54 -70 31.04
incl. 136.40 138.40 2.00 4.24 -70 1.54
ZK2708 223.70 233.90 10.20 1.63 -45 8.36
and 294.22 309.22 15.00 1.36 -70 7.50
incl. 226.90 228.90 2.00 4.54 -70 1.00
ZK2713 507.59 538.37 30.78 1.17 -70 12.93
ZK3106 181.99 196.99 15.00 0.85 -70 11.10
ZK3512 361.18 365.18 4.00 1.51 -70 2.16
ZK3612 539.80 543.80 4.00 1.41 -70 1.68
ZK3616 594.10 606.10 12.00 1.16 -70 7.20
ZK4318 497.67 554.24 56.57 1.95 -70 32.20
incl. 498.67 500.67 2.00 6.98 -70 0.68
and 504.67 510.67 6.00 4.93 -70 2.04
ZK5105 236.05 250.05 14.00 1.95 -70 7.42
ZK5115 489.14 504.10 14.96 1.29 -70 5.83
ZK5211 457.96 461.96 4.00 0.96 -70 2.24
ZK5215 700.70 704.70 4.00 1.30 -70 1.68
ZK5912 349.75 376.80 27.05 2.33 -70 20.83
incl. 368.99 373.80 4.81 3.64 -70 3.70
and 468.50 490.36 21.86 1.14 -70 16.83
ZK5920 661.66 667.64 5.98 0.99 -70 3.80
ZK6710 315.26 329.26 14.00 2.23 -70 7.56
ZK6820 490.58 516.11 25.53 1.50 -70 13.20
ZK7505 77.22 87.45 10.23 1.26 -70 3.50
ZK7508 288.53 291.53 3.00 1.21 -70 1.50
ZK7516 400.11 451.24 51.13 1.17 -70 18.92
and 469.17 497.60 28.43 0.77 -70 10.52
ZK8419 591.60 607.60 16.00 1.37 -70 5.92
ZK8423 723.00 735.00 12.00 1.27 -70 6.30
ZK9111 305.89 311.89 6.00 1.59 -70 2.88
ZK9115 448.74 477.81 29.07 1.07 -70 7.90
and 491.71 500.03 8.32 2.07 -70 2.20
incl. 498.03 500.03 2.00 4.32 -70 0.50
ZK9119 627.07 651.12 24.05 1.25 -70 6.80
and 684.01 693.52 9.51 1.54 -70 2.70
ZKWX-3 0.00 50.60 50.60 1.73 -70 38.96
incl. 22.16 25.16 3.00 5.43 -70 2.31
             

Table 2   Zone I Significant Intersections for the 2012 Drill Program
Hole ID From To Core
Length
Au (g/t) Approx.
Dip of Zone
ETW (m)
IZK0002 80.77 86.27 5.50 0.90 -70 2.10
IZK0005 136.62 141.38 4.76 1.02 -70 3.38
IZK0007 261.60 264.30 2.70 1.23 -70 1.43
IZK0710 271.41 275.49 4.08 1.36 -70 2.33
IZK0813 359.64 362.65 3.01 0.99 -70 1.51
IZK1502 59.00 62.75 3.75 1.22 -70 2.89
IZK1504 209.20 248.71 39.51 1.61 -70 18.96
IZK1510 259.23 270.14 10.91 1.57 -70 4.58
IZK1603 68.82 71.82 3.00 1.04 -70 2.31
IZK1605 170.97 185.14 14.17 1.20 -70 9.07
IZK2405 171.10 181.10 10.00 1.85 -70 6.40
IZK2410 448.27 462.32 14.05 1.50 -70 7.17
IZK3908 141.47 148.45 6.98 1.12 -70 4.47

Sampling Methodology, Quality Control and Quality Assurance

Diamond drill core was sawn on site and samples were transported to the laboratory of the Brigade No. 2 of Xinjiang Bureau of Geology and Mineral Resources ("Brigade No. 2") located at Shanshan, Xinjiang. Samples were assayed by atomic absorption spectrometry ("AAS"). Five percent of the sample pulps were re-assayed by the laboratory of Bureau of Geology and Mineral Resources located in Urumqi, Xinjiang. Brigade No. 2 includes blank samples within the assay stream. GobiMin's geological consultant Roscoe Postle Associates Inc. ("RPA") examined the results of the duplicate assays and concluded that there is a close correlation in the results from the different laboratories. None of the blank samples indicated the presence of contamination between samples.

Prior to the property visit by RPA, GobiMin had sent 60 samples to the laboratory of SGS Ltd. in Tianjin, China for analysis using fire assay. The SGS Ltd. results show higher gold values than were obtained using AAS. RPA collected nine core duplicates and 20 pulp duplicates for analysis by SGS Ltd. in Tianjin. The results for the core duplicates collected by RPA were similar to the GobiMin results while the pulp duplicates yielded lower results similar to those obtained earlier by GobiMin. AAS is likely to give lower values than standard fire assay. RPA considers that GobiMin should examine whether the assay techniques being used are understating the amount of gold in the Sawayaerdun deposit.

Discussion of the Drilling Results

The results of the 2012 drilling demonstrate that the central part of the Zone IV mineralization is continuous along strike and to depth, that it is relatively wide, and that grades show good continuity. Drilling of the Zone I mineralization confirmed continuity.

Updated Mineral Resource Estimate

RPA is preparing a new mineral resource estimate for the Zone IV and Zone I mineralization.  The results of this estimate will be available soon. A copy of the revised technical report will be available on SEDAR (www.sedar.com) and the website of the Company (www.gobimin.com) within 45 days of this press release.

The technical content of this release has been reviewed and approved by Neil N. Gow, B.Sc.(Hons.), P.Geo., RPA Associate Geologist, a Qualified Person as defined by National Instrument 43-101.

About GobiMin

GobiMin owns a 70% equity interest in Xinjiang Tongyuan Minerals Ltd. for the development of the Sawayaerdun Gold Project in Xinjiang, China. GobiMin also owns a 40%-50% interest each in four other base metal joint ventures in Xinjiang and retains an 8% equity interest in the Yanxi Copper Property. In addition, GobiMin also holds a 48.02% equity interest in a silver operation.

GobiMin is aggressively seeking opportunities to acquire high quality mining and exploration projects.

Certain statements contained in this press release constitute forward-looking information. Such statements are based on the current expectations of management of GobiMin. You are cautioned that such statements are subject to a multitude of risks and uncertainties that could cause actual results, future circumstances or events to differ materially from those projected in the forward-looking information.  Forward looking information includes without limitation, statements regarding the size and quality of the Company's mineral resources, progress in development of mineral properties, the prospective mineralization of the properties, and planned exploration programs. The reader should not place undue reliance on the forward-looking information included in this press release given that (i) actual results could differ materially from a conclusion, forecast or projection in the forward-looking information, and (ii) certain material factors or assumptions were applied in drawing a conclusion or making a forecast or projection as reflected in the forward-looking information could prove to be inaccurate.  These statements speak only as of the date they are made, and GobiMin assumes no obligation to revise such statements as a result of any event, circumstance or otherwise, except in accordance with law.

"Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release."

To receive GobiMin press releases by email, send a message to info@gobimin.com and specify "GobiMin press releases" on the subject line.


 

 

SOURCE: GobiMin Inc.

For further information:

Felipe Tan, Chief Executive Officer
Tel: (852) 3586-6500
Email: felipe@gobimin.com

GobiMin Inc.

CODE : GMN.V
ISIN : CA38020T1021
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

GobiMin est une société développant des projet miniers de cuivre basée au Canada.

GobiMin est productrice de cuivre, de nickel en Chine, et détient divers projets d'exploration en Chine.

Son principal projet en production est HUANGSHAN DONG en Chine et ses principaux projets en exploration sont HUANGSHAN, YANXI et XIANSHAN en Chine.

GobiMin est cotée au Canada et aux Etats-Unis D'Amerique. Sa capitalisation boursière aujourd'hui est 92,1 millions CA$ (73,6 millions US$, 64,5 millions €).

La valeur de son action a atteint son plus haut niveau récent le 31 décembre 2007 à 4,24 CA$, et son plus bas niveau récent le 09 septembre 2021 à 0,19 CA$.

GobiMin possède 50 310 000 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Rapports annuels de GobiMin Inc.
Annual Report 2007
Financements de GobiMin Inc.
16/05/2007Announces Closing of Private Placement
Attributions d'options de GobiMin Inc.
09/08/2007New Grant of Stock Options
Rapports Financiers de GobiMin Inc.
21/11/2013Announces Third Quarter 2013 Results
30/05/2013Announces First Quarter 2013 Results
24/08/2007Earns Record $5.4 Million in Second Quarter
23/05/2007Reports Record Earnings Per Share of $0.07 for the First Qua...
Communiqués de Presse de GobiMin Inc.
11/06/2016Annual General Meeting of Shareholders
26/05/2016GobiMin Announces First Quarter 2016 Results
22/04/2016GobiMin Announces the 2015 Results and Pays Dividend
08/04/2016GobiMin Inc.'s Subsidiary Enter into a Loan Agreement
22/01/2016GobiMin Inc. Announces Continuation of Normal Course Issuer ...
21/01/2016GobiMin Inc. Announces Continuation of Normal Course Issuer ...
19/10/2015GobiMin: Mr. Felipe Tan To File New Early Warning Report
09/10/2015GobiMin: Mr. Felipe Tan To File Early Warning Report
08/10/2015GobiMin: Mr. Felipe Tan To File Early Warning Report
17/09/2015GobiMin Inc. Announces Partial Disposition of Investment in ...
28/08/2015GobiMin Announces Second Quarter 2015 Results
24/07/2015GobiMin: Mr. Felipe Tan To File Early Warning Report
09/07/2015Announces the Acquisition of an Office Property in Hong Kong
09/07/2015GobiMin Inc. Announces the Acquisition of an Office Property...
23/04/2015Announces the 2014 Results and Pays Dividend
23/04/2015GobiMin Announces the 2014 Results and Pays Dividend
16/04/2015s Resource Estimates at Sawayaerdun Gold Project
16/04/2015GobiMin Updates Resource Estimates at Sawayaerdun Gold Proje...
19/12/2014- New Grant of Stock Options
19/12/2014GobiMin Inc. - New Grant of Stock Options
26/11/2014GobiMin Announces Third Quarter 2014 Results
28/08/2014GobiMin Announces Second Quarter 2014 Results
05/08/2014GobiMin Inc. Announces Listing of Silver Operation on the Gr...
05/08/2014Announces Listing of Silver Operation on the Growth Enterpri...
08/07/2014GobiMin Announces Full Receipt of Consideration of Yanxi Cop...
30/06/2014GobiMin Inc. Announces to Retain Market-Making Services
30/06/2014Announces to Retain Market-Making Services
06/06/2014Annual General Meeting of Shareholders
27/05/2014GobiMin Announces First Quarter 2014 Results
25/04/2014GobiMin Announces the 2013 Results and Pays Dividend
23/04/2014GobiMin Inc. Announces Proposed Listing of Silver Operation ...
23/04/2014Announces Proposed Listing of Silver Operation in Hong Kong
17/04/2014GobiMin Updates Resource Estimates at Sawayaerdun Gold Proje...
17/04/2014s Resource Estimates at Sawayaerdun Gold Project
30/01/2014Announces Renewal of Normal Course Issuer Bid
29/07/2013Obtains Revocation of Cease Trade Orders
17/07/2013provides an update on cease trade order
15/05/2013s Resource Estimates at Sawayaerdun Gold Project
01/05/2013Announces Delay in Release of 2012 Results
26/03/2013- Diamond Drill Results Update for the 2012 Campaign at the ...
16/01/2013Announces Renewal of Normal Course Issuer Bid
09/06/2011- Annual General Meeting of Shareholders
21/03/2011announces resource estimate for Sawayaerdun Gold Project
15/10/2007 Announces Proposed IPO of Its Subsid =?ISO-8859-1?Q?iary=20...
10/09/2007Receives Government Production Development Permits For Its Y...
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TSX-V (GMN.V)OTHER OTC (GMNFF)
1,83+0.00%1,27+0.00%
TSX-V
CA$ 1,83
08/03 14:47 -
0%
Cours préc. Ouverture
1,83 1,84
Bas haut
1,83 1,84
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
- -  1,83 -%
Volume var. 1 mois
167 000 -%
24hGold TrendPower© : 18
Produit
Développe
Recherche
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
20240,00%
20237,65%1,831,56
2022750,00%1,720,20
2021-37,50%0,370,19
202056,10%0,350,20
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,82 AU$+1,69%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
11,04 US$+1,38%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,54 GBX-2,53%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,52 CA$+6,78%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
16,05 CA$+2,62%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+2,13%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,19 AU$-7,32%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,90 CA$+1,60%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
51,43 US$-0,46%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,03 AU$+0,00%Trend Power :