Publié le 09 mai 2008

- May 2008 Newsletter

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter

Murgor

Welcome to the May 2008 edition of Murgor’s Monthly newsletter.  This newsletter provides a summary of Murgor’s key exploration activities and management decisions that have taken place during the month of April 2008..   An update on upcoming activities is also provided. 

APRIL 2008 EXPLORATION ACTIVITIES:

A total of 1326 metres in seven boreholes were drilled during the month of April 2008 at the Hudvam, Flin D, and Snow H projects. Drilling ended at Hudvam on April 2nd with the completion of borehole HVS08-050.  A total of 990 metres in four boreholes were completed at Flin-D and 312 metres in two boreholes were completed at the Snow-H project.

Murgor is waiting for the final assay results for the Hudvam and Wim projects.  The data of the Hudvam and Wim projects are being prepared and verified prior to sending them to Golder Associates for the new resource estimate at both deposits.  It is anticipated that the new resource estimate for both Hudvam and Wim deposits will be available later this summer.

Exploration drilling continued in Saskatchewan and started in Manitoba with one helicopter-supported drill rig.  Helicopter borne VTEM anomalies were tested at the Flin-D project in the Gifford Bay area and in the Tyr deposit area (both in Saskatchewan).  Bore-hole Pulse-EM (BHPEM) surveys were carried out in the boreholes where the anomaly remains unexplained or where the holes intersected mineralization of interest.  All results are pending. 

WIM PROPERTY:

At month-end, only a few assay results were missing from the boreholes drilled in 2008 at Wim.  Once all the results are received, they will be subjected to Murgor’s QA/QC procedure and released as soon as possible.  Essentially, the 2007-2008 drilling programs extended the mineralization of the Wim main zone to surface.

The data of the Wim deposit is being prepared and verified prior to sending them to Golder Associates for the new 43-101 compliant resource estimate.  It is anticipated that the new resource estimate at Wim will be available later this  summer, after the release of the resource estimate at Hudvam.

A wildlife distribution study was carried-out over the Wim project and air quality monitors were installed on the site for baseline environmental studies.

HUDVAM PROPERTY:

The 2008 definition and exploration drilling program ended on April 2nd with the completion of exploration borehole HVS08-050.  To date, Murgor has drilled 13,556 metres at the Hudvam project (4,211 metres in 2007 and 9345 metres in 2008).  Only 23.15 m was drilled during the month of April to complete borehole HVS08-050.

At month-end, only a few assay results were missing from the boreholes drilled in 2008 at Hudvam.  Once all the results are received, they will be subjected to Murgor’s QA/QC procedure and released as soon as possible.  Initial results were released by Murgor in press releases dated March 11th and 20th, April 22nd and today May 8th, 2008

Initial results show very high gold grades to complement the copper, zinc and silver values.  Some of the best assay results received during the month include:
 

                DDH HVS-08-41:        9.76 g/t Au,      0.74% Cu,      3.42% Zn,     18.91 g/t Ag  over  22.47 metres.

                                   Incl :      25.56 g/t Au,      1.24% Cu,      3.67% Zn,     35.97 g/t Ag  over    7.00 metres..

                DDH HVS-08-27:        7.07 g/t Au,      5.92% Cu,      1.65% Zn,     48.16 g/t Ag  over    6.33 metres.
                DDH HVS-08-29:        7.95 g/t Au,      2.38% Cu,      0.63% Zn,     22.51 g/t Ag  over    3.04 metres.
                DDH HVS-08-35:        5.55 g/t Au,      1.29% Cu,      2.07% Zn,     13.68 g/t Ag  over    2.03 metres.
                DDH HVS-08-43:        9.65 g/t Au,      2.72% Cu,      3.40% Zn,     28.29 g/t Ag  over    2.95 metres. 



Murgor’s New Discovery at Hudvam:

Murgor also made an important new discovery at the Hudvam deposit during the winter drilling.  Exploration borehole HVS08-44, drilled between Zone 1 and Zone 3 on a conceptual geological target, returned 2.17 g/t Au, 1.11 % Cu, 0.76% Zn, and 13.30 g/t Ag over 5.82 m.  The new intersection is located more than 275 metres to the west of Zone #1 at a vertical depth of 300 metres.

This new discovery is very important for many reasons:
        •    It is located near the down plunge extension of Zone #3, long suspected to be cut off by a fault at depth.
             The new discovery may be the offset part of that lens. 
        •    The intersection is poorly conductive and located at the limit of geophysical penetration for a surface
             survey (i.e never detected before).
        •    The new discovery opens a very large area between lenses #1 and #3 where no exploration has ever
             been conducted.
        •    The proximity of the new discovery to the Hudvam deposit greatly increases the probability of leading to
             extraction of the resource.


Furthermore, a Bore-hole Pulse-EM (BHPEM) survey identified an off-hole conductor interpreted to lie approximately deeper and to the west of the borehole, suggesting some size to the new lens.  Additional drilling is warranted to test the potential of this sector situated between Zone 1 and Zone 3.

Longitudinal section of the Hudvam deposit showing the location of the new discovery and the BHPEM anomaly.


In other news at Hudvam: a wildlife distribution study was carried-out and air quality monitors were installed on the site for baseline environmental studies.

FON PROPERTY:

Murgor has not yet received assay results from drill holes MSK08-001 and MSK08-002 drilled during the month of March at the Fon property. 

Borehole MSK08-001 was designed to test a large Infinitem anomaly detected to the east of the Abbott Lake zone, at a vertical depth of 250 metres.  The borehole intersected a unit of altered fragmental rhyolite with 3-7% disseminated pyrite from 336.17 and 346.22 metres which corresponds to the targeted Infinitem anomaly.  The sulphide content does not, however, explain the conductor.

A borehole Pulse EM survey detected a long wavelength off-hole anomaly near 300 metres down the hole. This anomaly is interpreted as being caused by a sizeable source located at least 30 metres below the current trace of the hole. 
This anomaly will need follow-up drilling.

Borehole MSK08-002 targeted a shallow VTEM anomaly in the structural footwall of a longer formational conductor, approximately two kilometres east of the Fon deposit.  Assay results are pending but no significant results are expected.

FLIN-D PROJECT:

Drilling was completed on the Flin D project on April 21st.  A total of 990.5 metres in four (4) boreholes were drilled during the month for year-to-date total of 1,528.5 metres.  The total amount of drilling completed in Saskatchewan in 2008 is 2,231.5 metres.  The drill rig was demobilized to the Snow H project at the end of the month (April 21st to 25th) to execute the 2008 exploration drilling program on this project.

Borehole MSK08-004 was designed to test a VTEM anomaly located some 5.3 kilometres west of the Tyr Cu deposit, along the same intrusive-volcanic contact.  At the end of March, this borehole was at depth of 194 metres and had intersected a total of three (3) weak to strong sulphide conductors.  All assays are pending.

Borehole MSK08-005 was drilled on a three line VTEM anomaly with great conductivity thickness and associated with a disrupted magnetic signature.  The drill hole intersected a sulphide conductor.  All assays are pending.

Borehole MSK08-006 was targeting a good ground TDEM anomaly on the northern western portion of the Flin-D project area at Gifford Bay.  This borehole intersected strongly altered gneiss containing garnet, cordierite, sillimanite, anthophyllite, and biotite in various amounts.  The targeted TDEM anomaly was intersected from 236.09 to 238..23 metres down the hole and explained by a sulphide conductor. All assays are pending.  A BHPEM survey was carried-out in the hole and geophysical interpretation is pending.

Borehole MSK08-007 was targeting the continuation of the same TDEM anomaly drilled with MSK08-006, at Gifford Bay.  This borehole intersected heavily altered gneiss containing botite-garnet-cordierite-sillimanite in variable amounts.  A sulphide conductor was intersected From 186.27 to 187.04 metres which explains the targeted TDEM anomaly.  All assays are pending.

SNOW-H PROJECT:

A total of 312 metres in two (2) boreholes was completed on the Snow H project. The two boreholes were drilled in the central part of the Snow-H project area, targeted on Infinitem anomalies defined during the 2007 winter geophysical survey.

Borehole MMB08-001 was designed to follow-up an intersection of 0.57 m @ 2.69% Zn and 0.24% Cu reported in borehole ROS-10 by HudBay Minerals Inc. in 2006.  This target coincides also with a 2 kilometre-long INFINITEM anomaly.  The borehole intersected actinolite-plagioclase-biotite-chlorite gneiss and quartzofeldspathic-biotite gneiss. The INFINITEM anomaly was explained by a sulphide conductor with quartz veins.  All assays are pending and a bore-hole Pulse EM survey is planned as a follow up. 

Borehole MMB08-002 was designed to test a ground INFINITEM anomaly south of MMB08-001. This anomaly corresponds to a 1 kilometre-long body of high conductance, flanking a magnetic body.

At the end of April 2008, this borehole was still in progress.

FINANCING:

Anytime Murgor raises money it is not a decision that is made lightly. Financings are used for the long term sustainability of the Company.

Unfortunately the market conditions have not treated junior mining companies well, as a whole, over the past year. With the current market conditions, those companies that continue to advance their projects forward with aggressive exploration programs, need to raise funds at conditions that are not ideal.  The bottom-line is, in order to keep the companies moving forward, money is required. 

In April, Murgor was faced with this decision while confronted with a weak stock price due to poor market conditions and compounded by the divesture of Murgor stock by institutional holders who are converting to cash during these uncertain times.  Murgor needed the money to continue drilling to further its exploration and to commission reports such as 43-101 resource estimates etc., none of which are inexpensive propositions, but Murgor must stay focused on the long term goals of the Company.

With that in mind Murgor elected to raise $2.3 million dollars in late April, through a private placement.  The financing was closed on May 6th.  

IN CLOSING:

Murgor is staying focussed on its goals.  Exploration programs are going extremely well and so far, Murgor has reached all the exploration milestones set when it acquired the Flin Flon group of properties from HudBay Minerals in late 2006.

Here are a few milestones achieved by Murgor during the last 17 months:
        •    Murgor completed over 36,000 metres of drilling,

        •    Murgor increased the 43-101 compliant resources of its three deposits (Hudvam, Wim and Fon)    

             compared to their historical resources.

        •    Murgor advanced the Hudvam and Wim copper-gold deposits to the point where a new 43-101 compliant
             resource estimate will be calculated this summer.  Based on the results from Murgor’s winter drilling,
             these new estimations should confirm larger resources that will be largely upgraded to the Indicated
             and/or Measured categories.

        •    Murgor advanced its exploration projects through strategic, multi-disciplinary exploration work.

Although the market conditions are poor, metal prices remain high. 
The rise of metal prices is predicted to continue as foreign mining projects are halted and/or delayed due to political decisions.  As stated in the Globe and Mail (Wednesday, April 30, 2008): “The political decisions that have taken a toll on mining companies trying to develop projects in risky jurisdictions will help keep metal prices strong, creating an added boon for miners already in production…”. 

Murgor intends to be in the producer category in the short term, in one of the most mining-friendly jurisdiction in the world: Manitoba. 

Log on to www.murgor.com for more up to date details on the Corporation.

Thank you for your interest in Murgor Resources and for your continued support. 

                Respectfully submitted,
         
                André C. Tessier, P.Eng, P.Geo
                President, CEO
                May 08, 2008.


This newsletter includes certain "forward-looking statements". All statements other than statements of historical fact, included in this newsletter, including, without limitation, statements regarding potential mineralization, resources and reserves, exploration results, and future plans and objectives of Murgor, are forward-looking statements that involve various risks and uncertainties. There can be no assurance that such statements will prove to be accurate and actual results and future events could differ materially from those anticipated in such statements. Important factors that could cause actual results to differ materially from Murgor's expectations are exploration risks detailed herein and from time to time in the filings made by Murgor with securities regulators.

The TSX Venture Exchange has not reviewed and does not accept responsibility for the adequacy or accuracy of this press release.


 

 

Murgor Resources Inc.

PRODUCTEUR
CODE : MGR.V
ISIN : CA62660P4024
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Murgor est une société de production minière de zinc et de cuivre basée au Canada.

Murgor détient divers projets d'exploration au Canada.

Son principal projet en production est FLIN-D au Canada et ses principaux projets en exploration sont GOLDEN ARROW MINE, BARRY - URBAN (EAGLE RIVER), CLAY LAKE, NELLIGAN, BARRY - URBAN (WINDFALL), LA TREVE, MISHIBISHU, MYSTERY, FANCAMP, MOUNT PLEASANT, BARRY - URBAN (BARRY), BENOIT, HUDVAM, WIM, FON, GULLROCK PROPERTY, PREMIERE PROPERTY et ELMTREE GOLD au Canada.

Murgor est cotée au Canada et aux Etats-Unis D'Amerique. Sa capitalisation boursière aujourd'hui est 1,2 millions CA$ (986 887 US$, 923 332 €).

La valeur de son action a atteint son plus haut niveau récent le 07 août 2020 à 1,89 CA$, et son plus bas niveau récent le 07 mars 2023 à 0,01 CA$.

Murgor possède 123 430 000 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Rapports annuels de Murgor Resources Inc.
2008 Annual Report
Financements de Murgor Resources Inc.
03/07/2009Announces the Closing of Private Placement
06/05/2008ANNOUNCES THE COMPLETION OF A $2.3 MILLION PRIVATE PLACEMENT
24/04/2008ANNOUNCES MAXIMUM $2.3 MILLION PRIVATE PLACEMENT
06/12/2007announces closing of $1.6 million private placement
Attributions d'options de Murgor Resources Inc.
15/07/2010Grant of 1,125,000 stock options
23/05/2008Grant of 1.239.174 stock options
Nominations de Murgor Resources Inc.
15/05/2008APPOINTS NEW VICE-P
Projets de Murgor Resources Inc.
10/02/2011(Golden Arrow Mine)INTERSECTS MORE GOLD, UNDERNEATH THE OPEN PIT AT THE GOLDEN ...
24/09/2009(Fancamp)Announces Trenching Returns at Fancamp Gol
17/09/2009(Hudvam)EARNS 100% INTEREST FROM HUDBAY AT THE WIM COPPER-GOLD AND H...
27/08/2009(Premiere Property)Murgor Resources Acquires Red Lake Gold Properties
12/02/2009(Fon) Announces Drilling at Abbott Lake, SK
18/09/2008(Hudvam)ANNOUNCES METALLURGICAL RESULTS AT THE HUDVAM AND WIM DEPOSI...
09/09/2008(Wim)'S NEW NI 43-101 RESOURCE ESTIMATE
30/08/2008(Hudvam)COMPLETES NI 43-101 RESOURCE ESTIMATE AT THE HUDVAM D
15/05/2008(Hudvam)DRILLS MORE HIGH GRADE GOLD A
09/05/2008(Hudvam)'S NEW DISCOVERY YIELDS SIGNIFICANT GRADES OVER MINEAB
23/04/2008(Hudvam)RELEASES FURTHER HIGH GRADE GOLD ASSAYS FROM THE HUDVAM COPP...
01/04/2008(Wim)DRILLING EXTENDS THE NEW UPPE
31/03/2008(Mishibishu) AND JOINT VENTURE PARTNER AWAIT GEOCHEMICAL RESULTS F
Communiqués de Presse de Murgor Resources Inc.
12/03/2015IIROC Trading Halt - MGR
10/03/2015Alexandria Minerals Acquisition of Murgor Resources Complete...
23/12/2014Alexandria Minerals Corporation to acquire Murgor Resources ...
03/06/2014acquires Wydee property in proximity to the Young Davidson G...
07/04/2014to sell royalties on Quebec properties
01/04/2014completes the sale of its remaining interest at Windfall
13/03/2014agrees to sell its remaining windfall property interest to E...
24/10/2013(Fancamp)signs option agreement with TomaGold Corporation at the Fanc...
27/05/2013Completes Sale of Benoist and Waconichi Properties for Total...
13/03/2013to sell its net smelter return royalty at the Barry 1 Proper...
09/02/2010Starts Drilling Copper-Gold Targets At the WIM-extension
14/01/2010Starts Exploration work on its Red Lake Gold properties
10/09/2009Fundamental research renews recommandation for Murgor
01/09/2009 Announces CNME Acquires 14.95% interest in
14/11/2008Announces First Closing of $403,000 Private
10/11/2008CEO Monthly Newsletter - November 2008
05/09/2008September 2008 Newsletter
27/06/2008SUMMARY OF RECENT EXPLORATION DEVELO
23/06/2008June 2008 Newsletter
18/06/2008ANNOUNCES A SIGNIFICANT SIZE
26/05/2008FUNDAMENTAL RESEARCH INITIATES COVER
09/05/2008- May 2008 Newsletter
07/02/2008February 2008 Newsletter
01/02/2008RETAINS LEADING INVESTOR RELA
30/01/2008ANNOUNCES RIGHTS OF
24/11/2007 ANNOUNCES SHARE CONSOLIDATION
15/11/2007RETAINS GOLDER ASSOCIATES FOR PRELIMINARY FEASIBILITY STUDIE...
06/11/2007 Bulletin de Novembre 2007
17/10/2007LE TROU DE FORAGE #3 DE MURGOR AU GISEMENT DE WIM
11/10/2007EXTENDS WIM COPPER-GOLD DEPOSIT
29/08/2007starts drilling at the Wim deposit in northern Manitoba
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TSX-V (MGR.V)Other OTC (MGRRF)
0,010+0.00%0,0130
TSX-V
CA$ 0,010
07/03 14:55 -
0%
Cours préc. Ouverture
0,010 0,010
Bas haut
0,010 0,010
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
- -  0,010 -%
Volume var. 1 mois
1 400 -%
24hGold TrendPower© : -37
Produit Copper - Zinc
Développe
Recherche Copper - Diamonds - Gallium - Gold - Silver - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 14/01/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
20240,00%
2023-66,67%0,040,01
2022-96,20%0,850,03
2021-24,04%1,200,72
2020258,62%1,890,24
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,70 AU$-0,65%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
11,94 US$+9,34%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,54 GBX-2,55%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,69 CA$+13,03%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
15,60 CA$+1,83%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+0,00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,20 AU$+2,63%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,87 CA$+5,65%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
52,61 US$+0,98%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+5,56%Trend Power :