Medusa Mining Limited: Quarterly Activities Report Period Ended 31 March 2012
Published : April 24, 2012
( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Copper | Philippines |

TORONTO, ONTARIO--(Marketwire - April 24, 2012) - Medusa Mining Limited (News - Market indicators)(LSE:MML) -

Snapshot of Medusa:

  • Un-hedged, low cost, dividend paying gold producer focused on organic growth in the Philippines 


  • Growth path to production of 400,000 ozs per year by end 2015/early 2016 


  • Growth underpinned by strong cashflow from Co-O Mine (narrow vein underground) 


    • FY 2011/12: revised production guidance of 60-65,000 ozs at cash costs circa US$250/oz 


  • Current Mineral Resources comprise 


    • Co-O Mine: Indicated 616k ozs at 12.0 g/t gold; Inferred 1,344k ozs at 8.8 g/t gold 


    • Bananghilig: Inferred 650k ozs at 1.3 g/t gold 


  • Current Probable Reserves : Co-O Mine 502k ozs @ 10.1 g/t gold 


  • Co-O Mine Resources and Reserves to be maintained at current levels 


  • Conceptual exploration target size ** of Co-O Mine of 3 to 7 million ozs 


  • Excellent exploration upside: high grade vein and disseminated bulk gold targets, plus seven copper targets 


  • 820 km2 of tenements and exploration revised budget for FY 2011/12 of US$30M

Board of Directors:

Geoffrey Davis (Non-executive Chairman)
Peter Hepburn-Brown (Managing Director)
Ciceron Angeles (Non-executive Director)
Robert Weinberg (Non-executive Director)
Andrew Teo (Non-executive Director)

Capital Structure:

Ordinary shares: 188,903,911
Unlisted options: 1,715,000
Performance rights: 250,000

Listings:

ASX and LSE (Code: MML)

Address and Contact Details:

PO Box 860
Canning Bridge WA 6153
Telephone : +618 9367 0601
Facsimile : +618 9367 0602
Email : admin@medusamining.com.au
Website : www.medusamining.com.au

OVERVIEW:

Co-O MINE PRODUCTION & DEVELOPMENT

  • New Mill: Construction commenced, all long lead time items on schedule.

  • Production: 18,258 ounces at a recovered grade of 8.1 g/t gold and cash costs of US$239 per ounce. Production influenced by accelerated development and operational disruptions by leach tank tilting and continued torrential rainfall over the New Year period.

  • Saga Shaft: currently at 264 metres on its way to Level 8 (350 metres below surface) to install loading facilities. Completion estimated Q4 in CY12. Production influenced by high percentage of development ore produced to support Level 8 development.

  • Emergency assistance: two mines rescue teams assisted at the Negros Island earthquake area in February.

Co-O MINE EXPLORATION

  • Drilling is continuing with six surface and five underground rigs. Exploratory drilling of two vertical holes to 1,200 metres for new deep vertical shaft to the east of the Agsao Shaft completed. 

  • Drill results include: 1.90 metres at 79.18 g/t gold, 2.00 metres at 93.40 g/t gold, 1.90 metres at 79.94 g/t gold, 0.80 metres at 377.24 g/t gold, 8.50 metres at 89.17 g/t gold and 2.40 metres at 159.23 g/t gold. Deepest intersection to date at 1,076 metres vertical of 1.00 metre at 10.39 g/t gold.

TAMBIS AREA - BANANGHILIG DEPOSIT

  • Infill resource drilling in progress with seven rigs with the aim of upgrading majority of resources to Indicated category. Infill drilling should be completed in late August 2012 

  • An updated Inferred resource is planned for the September quarter followed by an Indicated resource and reserve when the infill drilling is completed.

SAUGON and LINGIG PROJECTS

  • Saugon IP survey completed and Lingig in preparation.

ANOLING 

  • Drilling with four rigs is on-going.

CORPORATE & FINANCIALS (unaudited)

  • Total cash, cash equivalent in gold on metal account and bullion at end of quarter of approximately US$71.3 million. 

  • An interim dividend of A$0.05 per share was paid to shareholders on 23 March 2012.
** The potential target size and grade is conceptual in nature, and there has been insufficient exploration to define a mineral resource, and it is uncertain if further exploration will result in the target being defined as a mineral resource. Refer to Stock Exchange announcement dated 24 August 2011.

PROJECT OVERVIEW

The locations of the Company's projects are shown on Figures 1 and 2.

To view Figure 1. Location diagram showing the Company's tenement areas and prominent East-West structures, please visit the following link:

http://media3.marketwire.com/docs/7866071.jpg

To view, Figure 2. Regional tenement map showing mines and prospects, please visit the following link:

http://media3.marketwire.com/docs/7866072.jpg

Co-O MINE

Gold Production

The production statistics for the March 2012 quarter with comparatives for the previous three quarters as well as the year-to-date production statistics are summarised in Table I below.

Table I. Gold production statistics
  Unit Qtr ended
31 Mar 12
Qtr ended
31 Dec 11
Qtr ended
30 Sep 11
Qtr ended
30 Jun 11
YTD
31 Mar 12
Tonnes mined WMT 85,748 71,872 41,596 69,562 199,216
Ore milled DMT 76,002 68,008 42,152 76,365 186,162
Recovered grade gpt 8.10 8.00 8.33 11.05 8.10
Recovery % 92% 93% 93% 93% 93%
Gold produced ozs 18,258 16,270 10,510 25,233 45,038
Cash costs (1) US$/oz $239 $242 $291 $194 $252
Gold sold ozs 10,000 10,000 15,446 21,423 35,446
Average gold price received US$ $1,738 $1,761 $1,587 $1,518 $1,679
 
Note:  
 
(1) Net of development costs and includes royalties and local business taxes

Gold production for the quarter was 18,258 ounces, at an average recovered grade of 8.10 g/t gold and cash costs of US$239 per ounce, inclusive of royalties and local business taxes.

As previously advised to the market, the mine continues to operate pre-dominantly in development mode to prepare for the future production increase and all development ore mined to date has been treated through the mill. The increased amount of development ore treated is the primary reason for the lower recovered grade for the past three quarters, compared to quarters from the previous years.

Disruption to production during the quarter was experienced following the passing of tropical storm Sendong (see announcement 19 December 2011) followed by continued torrential rain over the Christmas and New Year period. As a consequence of this disruption over several weeks, in combination with the accelerated development program currently undertaken to prepare for the future production increase and the decision to sink the Saga Shaft to Level 8 (previous target Level 6) and the tilting of four leach tanks as reported on 21 March 2012, the Company has since revised its production guidance to between 60,000 to 65,000 ounces for the financial year.

Cash costs per ounce for the quarter has improved marginally to US$239 per ounce (YTD: US$252 per ounce), and the Company anticipates, that the unit costs will now average circa US$250 per ounce for the year following the latest production guidance.

Medusa, an un-hedged gold producer, sold 10,000 ounces of gold at an average price of US$1,738 per ounce during the quarter.

Preliminary Development Timetable

Graph 1 is the updated Preliminary Development Timetable and Production Guidance for the new Co-O Mill followed by the Bananghilig Project.

The total estimated Capex (inclusive of mine development and shaft sinking) for the Phase 3 expansion of Co-O is US$70 million which will funded entirely from the Company's cash flow.

New Co-O Mill

In November 2010, the Board approved the construction of a new mill with capacity to produce 200,000 ounces of gold per year based on processing up to 750,000 tonnes per year at the current reserve grade of the Co-O Mine.

The application to upgrade the Environmental Clearance Certificate for the current Co-O Mill to 2,500 tonnes per day awaits signing in Manila pending completion of the mining industry policy review.

Operations

Mine Development

Major renovations are continuing at the Co-O Mine to modernise the mine for its expanded production.

Acceleration of the lateral development is on-going to ensure the underground infrastructure and on-vein development will be in place for the Saga Shaft. This accelerated development reached a new record during the quarter and consequently increased the proportion of development ore supplied to the mill which is expected to continue to comprise the majority of the mill feed during this accelerated development period.

Sinking of the Saga Shaft progressed smoothly, and is currently at 264 metres depth. It is anticipated that the Saga Shaft will be completed during the December quarter 2012 and hauling from Level 8 should commence shortly thereafter.

Mine Production

The haul road repairs were completed during the quarter, and the haul road will be further upgraded during the year as part of the expansion plans and to cater for increased truck traffic.

Ore trucked to the mill during the quarter was development ore and some stope ore.

The re-optimisation of the sinking of the Saga Shaft to Level 8 will mean that the high rate of development will continue until this shaft is completed, continuing the high percentage of development ore in the mill feed. Once the Saga Shaft is completed with an estimated haulage capacity to 1,500 tonnes per day, then it will be possible to increase the amount of stope ore that is hauled and processed.

The average development metres has increased by 18% and at the end of March, there were 68 development headings of which 54 headings were following veins. Haulage through the current shafts increased by 10% during the quarter.

Mill Expansion

The current status of activities is:

  • Rectification work for leach tank tilting is underway (see announcement dated 21 March 2012)
  • Construction of a new large leach tank is underway;
  • Planned re-furbishment of four small leach tanks re-scheduled;
  • Site works for the construction of new crushing and grinding sections (separate from the current crushing and grinding sections) commenced;
  • Upgrading of the thickener and the elution circuit on-going; and
  • Tailings dam number 5 completed.

Exploration

Recent statistical studies undertaken by Carras Mining Pty Ltd indicate that 3 to 5 holes out of every 10 holes in a particular vein are required to return ore-grades to indicate that the vein will be mineable.

Drilling with six surface rigs and five underground drilling rigs is continuing. Drilling of two vertical holes located east of the Agsao River to rig capacity of 1,200 metres completed.

Planning is underway for an extensive regional Induced Polarisation/Resistivity ("IP/Res") and ground magnetics programme around the Co-O Mine.

Drilling results

Detailed information is contained in the announcement dated 16 April 2012 which lists intersections down to 0.2 metres downhole width since 18 October 2011.

Figure 3 shows the locations of the recently completed surface drill holes EXP111 to EXP145 comprising 35 holes for a total of 25,152 metres. Table II lists the EXP surface diamond drill hole results ≥ 3 g/t gold over ≥ 0.5 metres downhole. Assay results are awaited for holes EXP138 to EXP145.

Holes EXP127 to 1,201 metres and EXP133 to 1,200 metres were completed to test for possible deep shaft positions. Hole EXP127 intersected a number of ore-grade veins, however EXP133 did not intersect any significant veins for its entire length.

Figure 4 shows the locations of the recently completed underground drill holes totalling 14,023 metres in 66 holes. Table III lists underground drill hole results ≥ 3 g/t gold over ≥ 0.5 metres received since 27 October 2011 as well as some previously completed holes whose locations are also shown in Figure 2. Assays are awaited for holes L2-051 to L2-053, L2-055 to L2-057, L3-022, L3-027, L3-028, L5-087, L5-088, L5-091 to L5-096, L5-105, L5-106, L6-023, L6-025, and LM-011.

Table II. Surface drill hole results > 3 g/t gold and ≥ 0.5 metres downhole for previously completed holes EXP102 to 110 and new holes EXP111 to EXP145.
Hole
number
East North Dip
(Degrees)
Azimuth
(Degrees)
From
(metres)
Width
(metres)
Grade
(uncut)
(g/t gold)
EXP103 614203 913145 -66 180 34.40 0.80 8.13*
EXP105 614670 913306 -50 160 434.40 1.00 3.83*
          534.20 0.95 22.27*
          675.30 0.60 4.70*
EXP106 614867 913453 -50 160 644.90 1.45 7.39*
          697.40 2.05 14.47*
          743.60 1.00 11.30*
EXP107 614108 913265 -60 180 556.90 0.80 21.27*
EXP108 614630 913331 -50 160 73.10 1.90 79.18*
          450.80 1.00 5.33*
          562.80 0.65 49.37*
          576.20 0.70 17.97*
          654.50 0.65 10.73*
          667.40 1.10 3.54*
          693.80 1.10 4.78*
          713.45 0.65 3.14*
          784.20 1.25 3.32*
EXP111 614041 913225 -57 160 160.05 1.65 8.03*
          403.55 0.70 3.96*
EXP112 614172 912957 -48 160 354.00 0.55 33.37*
          411.65 1.40 30.66*
EXP113 614928 913453 -50 160 615.45 1.00 4.25*
          658.55 0.65 7.47*
EXP114 614442 912987 -50 180 325.75 1.75 4.97*
          425.20 0.90 3.33*
          430.95 1.45 7.73*
          461.80 1.00 4.10*
          523.40 1.15 12.94*
EXP116 614107 913162 -50 180 360.00 0.80 8.40*
          482.40 0.85 83.33*
          497.60 1.65 3.10*
          567.30 0.95 4.43*
          672.30 1.15 53.70*
EXP117 614507 913213 -53 180 423.95 1.45 4.82*
          580.05 0.50 5.13*
          597.25 1.00 3.38*
          602.65 1.00 13.27*
          770.50 1.60 7.01*
          812.50 0.90 3.96*
EXP118 614134 912960 -50 160 244.40 2.20 16.39*
          314.05 0.80 36.17*
          396.90 2.40 15.79*
EXP119 613899 913105 -53 160 56.75 1.65 6.01*
          69.90 1.40 3.07*
          152.65 0.65 4.10*
          166.35 0.65 3.70*
          277.60 2.50 3.17*
          300.25 0.70 3.67*
          347.10 1.35 7.05*
          352.35 2.45 3.84*
          409.85 3.30 3.88*
          480.25 1.00 15.70*
          518.45 0.55 9.59*
EXP120 614586 913271 -50 160 474.40 2.35 10.53*
          488.35 1.20 5.33*
EXP121 614551 912992 -55 180 314.40 2.10 9.78*
          573.30 4.80 13.04*
          580.15 6.00 16.01*
EXP124 614549 913123 -52 160 452.05 1.35 7.09*
          463.85 2.90 20.16*
          783.55 1.75 17.01*
EXP125 614044 912858 -59 160 247.65 1.00 17.27*
          319.85 0.95 9.00*
EXP127 614551 912592 0 -90 1055.80 0.90 3.30*
          1076.40 1.00 10.39*
EXP128 614394 913026 -60 180 306.30 3.80 7.24*
          366.85 0.70 22.17*
EXP118 614134 912960 -50 160 244.40 2.20 16.39*
          314.05 0.80 36.17*
          396.90 2.40 15.79*
EXP134 614604 913032 -65 180 495.20 0.50 8.75*
          500.00 1.55 25.08*
          653.60 2.00 93.40*
          719.80 2.40 5.39*
          815.70 3.50 37.50*
          898.30 3.80 6.70*
          922.10 1.30 36.78*
EXP136 614655 913101 -57 180 321.05 0.65 14.43*
          413.30 0.65 9.00*
          455.40 1.30 11.27*
          521.70 1.90 79.94*
          657.40 1.00 5.67*
          771.75 1.05 3.40*
EXP137 614744 913100 -60 180 564.90 0.60 9.47*
 
Notes:  
 
(1) Intersection widths are downhole drill widths not true widths;
(2) Assays denoted by * are by Philsaga Mining Corporation's laboratory, all other assays are by McPhar Geoservices Inc. in Manila;
(3) Grid coordinates based on the Philippine Reference System 92.
 
Table III. Underground drill hole results ≥ 3 g/t gold and ≥ 0.5 metres downhole.
Hole
number
East North Dip
(Degrees)
Azimuth
(Degrees)
From
(metres)
Width
(metres)
Grade
(uncut)
(g/t gold)
LEVEL 2              
L2-054 613279 912925 3 356 70.55 0.75 10.00*
L2-057 613275 912928 0 61 20.90 1.00 4.41*
LEVEL 3              
L3-021 614103 913045 3 350 69.00 0.95 11.47*
LEVEL 5              
L5-070(t) 613951 912921 -47 138 30.65 0.55 3.10*
          33.55 0.50 3.27*
          143.95 1.80 9.27*
L5-075(t) 614143 912935 -33 166 278.40 0.60 44.07*
L5-077(t) 614146 912933 -33 55 277.45 0.55 25.57*
          307.60 1.25 7.02*
L5-078(t) 614146 912931 -33 160 71.90 1.35 27.23*
          76.85 1.60 69.11*
L5-079(t) 613950 912925 -60 9 26.95 6.55 6.45*
          80.60 0.60 15.21*
L5-081(t) 613948 912924 -60 335 46.60 0.80 7.40*
          93.90 1.10 9.50*
L5-082(t) 614146 912932 -47 59 147.85 0.60 37.26*
L5-083(t) 613947 912923 -60 333 139.90 1.15 3.93*
L5-084 614146 912933 -47 54 127.60 0.50 99.17*
          135.40 0.55 3.95*
          143.25 2.05 25.01*
L5-085 613947 912923 -47 321 23.00 0.50 3.55*
L5-086 614145 912933 -47 231 121.65 1.95 8.42*
L5-087 613950 912925 -60 8 25.50 0.70 4.80*
          82.70 4.15 4.37*
          127.55 0.70 3.32*
L5-089 613951 912923 -60 200 68.65 0.75 7.00*
          74.40 5.00 8.23*
          132.80 0.55 6.13*
L5-090 613951 912922 -60 323 15.90 1.65 7.14*
          97.10 1.80 27.44*
          102.85 1.15 63.00*
L5-091 613615 912851 0 63 244.30 0.50 4.85*
L5-097 613951 912924 -40 13 14.60 0.80 377.24*
          24.60 3.20 4.58*
          51.95 1.85 4.54*
L5-098 613950 912925 0 206 5.90 0.60 9.49*
          12.70 0.90 10.34*
          26.95 1.20 5.79*
          59.50 1.25 7.72*
L5-099 613612 912854 0 6 38.90 0.75 3.25*
          58.80 0.65 4.56*
L5-100 613949 912924 -40 186 4.40 8.50 89.17*
          57.50 3.50 9.86*
          51.55 10.85 16.52*
          269.85 0.55 6.74*
L5-101 613612 912855 0 206 49.30 0.70 12.87*
L5-102 613948 912924 -43 356 5.40 0.50 11.80*
          10.65 3.55 6.14*
          56.30 3.55 9.07*
          61.30 3.05 3.40*
          64.00 0.50 7.33*
          76.90 0.65 4.83*
          349.00 0.80 19.00*
L5-103 613947 912923 0 342 4.65 1.35 5.97*
          12.70 1.70 28.66*
          43.00 0.65 4.73*
          196.90 0.90 8.02*
LEVEL 6              
L6-005(t) 614096 912732 3 177 35.05 0.70 54.92*
L6-009(t) 614056 912834 3 53 3.45 1.00 72.50*
          61.60 1.10 12.80*
          68.00 1.00 4.93*
L6-010(t) 614055 912831 3 120 32.80 2.40 159.23*
          43.70 0.60 4.53*
          100.50 3.80 4.25*
          106.55 2.75 3.72*
L6-011 614055 912831 3 116 39.75 1.85 12.50*
L6-012 614054 912836 3 21 58.85 1.05 3.41*
L6-013 614053 912836 3 358 9.35 3.20 5.93*
          47.10 0.55 40.00*
L6-014 614052 912836 3 347 78.05 1.75 7.57*
L6-015 614051 912836 3 339 23.45 0.50 5.13*
          59.85 0.50 3.87*
          91.80 0.60 4.49*
          115.65 2.15 4.95*
          120.70 1.00 3.23*
          123.60 1.00 3.04*
L6-016 614050 912836 3 148 22.25 2.95 3.22*
          30.70 0.90 20.13*
L6-017 613963 613963 3 221 68.00 2.10 4.22*
L6-018 613958 912841 3 259 51.80 2.10 9.65*
L6-019 613961 912848 3 200 56.50 0.70 9.33*
L6-020 613960 912844 3 241 27.20 0.55 6.40*
          92.37 0.59 20.62*
          107.20 0.69 8.72*
L6-022 614062 912752 3 133 57.10 0.65 4.30*
          61.60 0.55 4.20*
LM series              
LM-002 614384 912722 0 319 66.00 1.40 10.33*
          107.35 0.60 3.98*
          182.00 2.00 3.21*
          212.10 1.40 30.94*
          219.45 0.75 13.47*
          223.00 1.25 3.06*
          228.10 0.55 13.20*
LM-004 614385 912724 0 323 106.75 0.80 5.73*
          110.35 0.55 13.93*
LM-005 614387 912724 0 342 92.60 0.50 6.20*
          146.50 0.60 24.00*
LM-006 614388 912722 0 354 102.80 1.55 4.48*
LM-007 614389 912723 0 10 181.25 0.50 4.70*
L6-016 614050 912836 3 148 22.25 2.95 3.22*
          30.70 0.90 20.13*
               
Notes:
 
(1) Intersection widths are downhole drill widths not true widths;
(2) Assays denoted by * are by Philsaga Mining Corporation's laboratory, all other assays are by Intertek McPhar Mineral Services in Manila;
(3) Grid co-ordinates based on the Philippine Reference System 92.

To view Figure 3. Map of the Co-O Mine Level 6 plan showing the locations of new drill holes EXP111 to EXP145, please visit the following link:

http://media3.marketwire.com/docs/7866073.jpg

To view Figure 4. Map of the Co-O Mine Level 6 plan showing the locations of the new underground drill holes, please visit the following link:

http://media3.marketwire.com/docs/7866074.jpg

Co-O Drill Hole Sampling and Assaying Procedures

Samples are taken from mainly HQ sized (hole outside diameter 96 mm, hole inside diameter 63.5mm) and some NQ sized (hole outside diameter 75.8 mm, hole inside diameter 47.6 mm) drill core. The selected sample intervals are halved by diamond saw and half the core is bagged, numbered and sent to the Company laboratory. In a small number of cases to confirm the geological logging, the selected interval was re-split and 1/4 core re-submitted for assay.

Initial sample preparation and assaying is undertaken at the Company's on-site laboratory. Samples are dried at 105ºC for 10 to 16 hours, crushed to less than 1.25 cm by jaw crusher, re-crushed to less than 50 mm using a secondary crusher followed by ring grinding of 1kilogram of sample to nominal particle size of less than 200 mesh. Barren rock wash is used after every five samples in the preparation equipment. The samples are assayed by fire assay with Atomic Absorption Spectrometer (AAS) finish on a 30 gram sample. All assays over 5 g/t gold are re-assayed using gravimetric fire assay techniques on a 30 gram sample. Duplicate samples are inserted every 10 samples and standard samples are included in every sample batch.

Check assaying of approximately 50% of samples used in the yearly resource estimates is undertaken by Intertek McPhar Mineral Services ("Intertek"), a NATA and ISO 9001/2000 accredited laboratory in Manila. The pulps are airfreighted to intertek who fire assay 30 grams of samples using AAS finish and a selected number of samples are checked using gravimetric fire assay techniques. Duplicate samples and standards are included in each batch of check samples. When reporting results, where available, the assays of Intertek as an independent laboratory have been given priority over the Company laboratory's results.

Health and Safety

Lost time accident frequency rate (LTAFR) for the nine months to 31 March 2012 is 1.19 including exploration. By comparison, the latest West Australian gold mining industry figure available to 30 September 2011 was 3.10, excluding exploration statistics of 6.70.

There were no breaches of any of the project's operating regulations during the quarter.

To view a figure associated with this section of the news release, please visit the following link:

http://media3.marketwire.com/docs/7866075.jpg

Production profile (ounces)          
           
Calendar years      
CY (Jan - Dec) CY 2011 (Actual) CY 2012 CY 2013 CY 2014 CY 2015 CY 2016
Co-O Mill 77,127 95-100,000 160,000 200,000 200,000 200,000
Bananghilig Mill - - - - 100,000 200,000
Total 77,127 95-100,000 160,000 200,000 300,000 400,000
             
Financial years            
FY (Jul - Jun) FY 2012 FY 2013 FY 2014 FY 2015 FY 2016 FY 2017
Co-O Mill 60-65,000 120,000 200,000 200,000 200,000 200,000
Bananghilig Mill - - - - 200,000 200,000
Total 60-65,000 120,000 200,000 200,000 400,000 400,000
 Graph 1. Preliminary Development Timetable     

TAMBIS REGION

The Tambis project comprising the Bananghilig Gold Deposit (Fig. 2) is operated under a Mining Agreement with Philex Gold Philippines Inc. over Mineral Production Sharing Agreement ("MPSA") 344-2010-XIII which covers 6,262 hectares.

BANANGHILIG GOLD DEPOSIT

In July 2010, new regional and detailed mapping and drilling programmes were commenced with the aim of validating the current resource of 650,000 ounces of gold and extending it to provide a reserve of approximately 1,000,000 ounces. This reserve would form the basis for a feasibility study which would target production of 200,000 ounces of gold per year from a new milling facility.

The announcement of 12 September 2011 summarises the Tambis regional geological setting, local geological setting, deposit description and mineralisation, shows a typical cross-section through the deposit and the drill hole intersections obtained for the period 24 July 2010 to 31 August 2011. Additional information is contained in the September 2011 quarterly report dated 24 October 2011 and in a drilling update on 17 January 2012.

Current drilling is focussed on infill to upgrade the resources to the Indicated category. The infill programme totals approximately 18,200 metres and is expected to be completed in late August 2012. A new Inferred resource estimate is planned for the September quarter 2012.

A further update of drilling results is planned during the September quarter.

USA PORPHYRY COPPER-GOLD PROSPECT

A Memorandum of Agreement with Corplex Resources Inc. covers the Usa prospect which is located within MPSA application XIII-00077. Processing of the tenement application is progressing.

LINGIG

The Lingig prospect is located in Mineral Production Sharing Agreement 343-2010-XIII with an area of 3,824 hectares over which the Company has an operating agreement.

Grid line preparation for an IP/Res and ground magnetics programme is underway.

ANOLING

The Mines Operating Agreement with Alcorn Gold Resources Inc. covers MPSA application 039-XIII situated approximately 8 kilometres by road to the north of the millsite as shown on Figure 2. Approval of the MPSA is awaited pending completion of the mining industry policy review. 

Four drill rigs are currently operating. Mapping, trenching and sampling are on-going.

SAUGON PROJECT

First Hit Vein 

Background

Figure 2 shows the Saugon Project located approximately 28 kilometres by road from the Co-O Mill. Work in 2004 involved drilling at the First Hit Vein (holes SDDH-001 to SDDH-035) in conjunction with underground development via a 30 metre deep inclined winze down the vein-breccia to assist in understanding the mineralisation.

Further details are contained in the announcements dated 20 April 2010 which summarised the historical results and 1 December 2010 which contained drilling results for holes SDDH-36 to SDDH-64A.

Exploration and Drilling

Drilling was terminated in the December 2011 quarter. Regional mapping is continuing and the IP/Res and ground magnetics programme has been completed.

Drilling continued at the First Hit Vein seeking extensions of the mineralisation previously reported and testing a number of other mapped structures with holes SDDH 65 to 104 in 37 holes for 10,790.20 metres. Holes SDDH 65 to 98 were drilled around the First Hit Vein, and SDDH 99 to 104 were drilled to test other regional targets.

Drilling at the First Hit Vein did not significantly extend mineralisation, however the strike length of the mineralisation possibly narrows down at depth and could continue below the drilling as shown on Figure 5.

Table IV summarises the results >1 g/t gold over >0.2 metres downhole.

Table IV. First Hit Vein drill hole results >1 g/t gold and >0.2 metres downhole and Cu, Pb and Zn ≥ 0.01%
Hole
number
East North Dip
(Deg-
rees)
Azi-
muth
(Deg-
rees)
From
(met-
res)
Width
(met-
res)
Assays
Au
(g/t)
Ag
(g/t)
Cu
(%)
Pb
(%)
Zn
(%)
SDDH-070 616764 899268 -50 310 29.00 2.00 1.83 15.20 0.03 - -
SDDH-076A 616651 899158 -50 310 93.55 0.30 2.47 30.90 0.05 0.58 0.70
SDDH-084 616613 899085 -60 310 60.30 0.70 1.17 1.00 - - 0.03
SDDH-086 617156 899414 -50 310 91.15 1.35 11.32 75.60 0.02 0.05 0.07
SDDH-094 617002 899228 -60 310 185.60 1.05 2.02 21.60 0.31 0.22 0.67
SDDH-095 617115 899245 -56 310 230.20 0.25 1.87 - 0.39 0.89 0.36
SDDH-096 617002 899123 -61 310 274.15 1.50 4.61 - 0.17 0.54 0.40
 
Notes:  
 
(1) Intersection widths are downhole drill widths not true widths;
(2) All assays are by Intertek McPhar Mineral Services laboratory in Manila except for holes SDDH-095 and SDDH-096 which are by the Philsaga laboratory; and
(3) Grid coordinates based on the Philippine Reference System 92

To view Figure 5. Saugon First Hit Vein longitudinal projection showing the outline of the mineralised zone, please visit the following link:

http://media3.marketwire.com/docs/7866076.jpg

FINANCIALS (unaudited)

As at 31 March 2012, the Company which is debt free, had total cash, cash equivalent in gold on metal account and bullion of approximately US$71.3 million (31 Dec 2011: US$80.2 million).

During the quarter,

  • the Company sold 10,000 ounces of gold at an average price of US$1,738 per ounce (YTD: sold 35,446 ounces of gold at an average price of US$1,679 per ounce);
  • incurred exploration expenditure of US$8.2 million (YTD: US$23.5 million);
  • spent US$7.6 million on capital works, associated sustaining capital at the mine and mill and also costs for the new mill construction and infrastructure (YTD: US$16.6 million); and
  • spent US$9.0 million on general and accelerated mine development, inclusive of shaft sinking costs (YTD: US$23.6 million).

CORPORATE

An interim unfranked dividend of A$0.05 per share was paid to shareholders on 23 March 2012. There was no foreign conduit income attributed to the dividend, and the total amount paid, inclusive of associated costs was US$10.2 million.

Information in this report relating to Exploration Results has been reviewed and is based on information compiled by Mr Geoff Davis, who is a member of The Australian Institute of Geoscientists. Mr Davis is the Chairman of Medusa Mining Limited and has sufficient experience which is relevant to the style of mineralisation and type of deposits under consideration and to the activity which he is undertaking to qualify as a "Competent Person" as defined in the 2004 Edition of the "Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves" and is a "Qualified Person" as defined in "National Instrument 43-101" of the Canadian Securities Administrators. Mr Davis consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.

Information in this report relating to Mineral Resources has been estimated and compiled by Mark Zammit of Cube Consulting Pty Ltd of Perth, Western Australia. Mr Zammit is a member of The Australasian Institute of Mining & Metallurgy and has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the "Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves" and is a "Qualified Person" as defined in "National Instrument 43-101" of the Canadian Securities Administrators. Mr Zammit consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.

Information in this report relating to Ore Reserves is based on information compiled by Dr Spero Carras of Carras Mining Pty Ltd. Dr Carras is a Fellow of the Australasian Institute of Mining & Metallurgy and has 30 years of experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as Competent Person as defined in the 2004 Edition of the "Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves" and is a "Qualified Person" as defined in "National Instrument 43-101" of the Canadian Securities Administrators. Dr Carras consents to the inclusion in the report of the matters based on his information in the form and context in which it appears. 

DISCLAIMER

This announcement may contain certain forward-looking statements. The words 'anticipate', 'believe', 'expect', 'project', 'forecast', 'estimate', 'likely', 'intend', 'should', 'could', 'may', 'target', 'plan' and other similar expressions are intended to identify forward-looking statements. Indications of, and guidance on, future earnings and financial position and performance are also forward-looking statements.

Such forward-looking statements are not guarantees of future performance and involve known and unknown risks, uncertainties and other factors, many of which are beyond the control of Medusa, and its officers, employees, agents and associates, that may cause actual results to differ materially from those expressed or implied in such statements.

Actual results, performance or outcomes may differ materially from any projections and forward-looking statements and the assumptions on which those assumptions are based.

You should not place undue reliance on forward-looking statements and neither Medusa nor any of its directors, employees, servants or agents assume any obligation to update such information.



Australia
Medusa Mining Limited
Geoffrey Davis
Chairman
+61 8 9367 0601
or
Medusa Mining Limited
Peter Hepburn-Brown
Managing Director
+61 8 9367 0601
+618 9367 0602 (FAX)
admin@medusamining.com.au
www.medusamining.com.au
or
United Kingdom
Fairfax I.S. PLC
Financial Adviser and Broker
Ewan Leggat/Laura Littley
+44 (0)20 7598 5368
Données et statistiques pour les pays mentionnés : Philippines | Tous
Cours de l'or et de l'argent pour les pays mentionnés : Philippines | Tous

Medusa Mining Ltd

EXPLORATEUR
CODE : MML.AX
ISIN : AU000000MML0
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Medusa Mining est une société de production minière d'or et de cuivre basée en Australie.

Medusa Mining détient divers projets d'exploration aux Philippines.

Ses principaux projets en exploration sont CO-O, CORPLEX, ABACUS, ANOLING et APICAL aux Philippines.

Medusa Mining est cotée au Canada, au Royaume-Uni, en Australie et en Allemagne. Sa capitalisation boursière aujourd'hui est 125,7 millions AU$ (90,7 millions US$, 79,5 millions €).

La valeur de son action a atteint son plus haut niveau récent le 03 juin 2011 à 8,60 AU$, et son plus bas niveau récent le 27 juin 2017 à 0,27 AU$.

Medusa Mining possède 207 790 000 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Présentations des Compagnies de Medusa Mining Ltd
05/09/2016Investor Presentation September 2016
14/02/2011Investor Presentation February 2011
18/08/2008Aegis report
16/06/2008 BGF Equities Research Report
12/03/2008Fairfax ResearchContent-class: urn:content-classes:message
31/07/2007 Quarterly Activity Report
11/03/2007Investor Presentation
Dans les médias de Medusa Mining Ltd
17/06/2008Building a low cost production base with blue sky potential
13/03/2007Broker Report
Rapports annuels de Medusa Mining Ltd
: 2013 Annual Report
: 2011 Annual Report
Annual Report and Notice of Meeting
2006 Annual Report
Nominations de Medusa Mining Ltd
31/05/2013: Retirement and Appointment of CFO
25/01/2013: New Board Appointments
09/06/2011Board Restructure Following TSX Delisting to Oversee the Nex...
09/07/2010Appointment of Non-Executive Chairman
15/02/2010Appointment of director
15/09/2009Appointment of Director
Rapports Financiers de Medusa Mining Ltd
21/02/2012: Interim Financial Results
27/04/2011March 2011Quarterly Report
22/02/2011MEDUSA ACHIEVES RECORD HALF-YEAR PROFIT
07/09/2009Records strong 2009 financial results
Projets de Medusa Mining Ltd
08/04/2013(Co-o): Co-O Mill & Mine Expansion Update
21/02/2013(Co-o): Co-O Drilling Update
18/10/2012(Co-o): Co-O Mine Shafts Update
15/08/2012(Co-o): Co-O Mine Geology and Mineralisation Update
10/07/2012(Co-o): Co-O Drilling Update
10/07/2012(Co-o)Limited: Co-O Drilling Update
16/04/2012(Co-o): Co-O Drilling Update
21/03/2012(Co-o): Co-O Operations-Unscheduled Mill Maintenance
05/04/2011(Co-o)Co-O DRILLING CONTINUES HIGH GRADE RESULTS
01/12/2010(Saugon) - Saugon Drilling Expands High-Grade Gold-Silver Potential
30/06/2010(Co-o)Co-O Mine Update
29/03/2010(Co-o)Co-O Mine drilling update
16/03/2010(Co-o)Co-O expanded mill commissionning
17/07/2009(Co-o)Co-O mine reserve now 500 000 ounces
19/01/2009(Co-o) Co-O MINE RESOURCES INCREASED 40% TO 1.2 MILLION OUNCES
01/12/2008MAJOR NEW HIGH GRADE VEIN DISCOVERY
12/08/2008(Co-o)Co-O MINE RESOURCE EXPANSION
07/05/2008(Co-o)WIDE-HIGH GRADE INTERSECTION AT Co-O MINE
26/03/2008(Co-o)Co-O MPSA GRANTED
21/01/2008(Co-o)NEW CATTO VEIN EXTENSIONS DISCOVERED
01/10/2007(Co-o)Co-O Mine Expansion
04/09/2007713,000 resource ounces and growing
15/08/2007CO-O MINE RESOURCE DRILL HOLE RESULTS
09/07/2007New Discoveries
20/06/2007(Anoling)POSITIVE RESULTS FROM ANOLING GOLD PROJECT
16/05/2007(Co-o)Co-O Mine Update
19/03/2007(Anoling)Anoling Gold Project tenements granted
23/05/2006Tambis project exploration, Philippines
Communiqués de Presse de Medusa Mining Ltd
20/06/2016Relocation of Office Premises
09/05/2016Investor Presentation May 2016
06/05/2016Market Briefing May 2016 – Medusa Mining Ltd
02/05/2016Cancellation of Unquoted Securities (Options)
05/04/2016Terms of Appointment of CEO
21/03/2016CEO Appointment
22/01/2016CEO Appointment Update
20/01/2016Exploration Pipeline and Tenement Review
18/01/2016L8 Shaft Upgrade
18/01/2016Mineral Resources and Reserves Statement Addendum to 2014 An...
18/01/2016Cancellation of Unquoted Securities
09/10/2015Notice of Annual General Meeting and Proxy Form
05/10/2015Investor Presentation October 2015
25/09/2015Annual Mineral Resources & Ore Reserve Update Statement
04/09/2015Annual Mineral Resources Update Statement
03/09/2015Asset Impairment of US260M
27/08/2015ASX Appendix 4E and Financial Results for ended year June 30...
27/08/2015Full Year Results 2015
28/07/2015Investor Presentation July 2015
27/07/2015Quarterly Report June 2015
07/07/2015Co-O Mine Service Shaft Update
13/04/2015Investor Presentation April 2015 – Zurich and London
09/04/2015Co-O Mine Geology & Service Shaft Updates
21/01/2015Exploration Pipeline and Tenement Review
16/01/2015L8 Shaft Upgrade
12/01/2015Cancellation of Unquoted Securities
12/01/2015Mineral Resources and Reserves Statement Addendum to 2014 An...
09/12/2014Appendix 3Z – Directors Final Notice (Gary Raymond Powell)
21/11/2014Results of Annual General Meeting November 2014
20/11/2014Executive Appointments
13/02/2014Fatality Underground
13/02/2014Medusa Mining Limited: Fatality Underground
31/01/2014Medusa Mining Limited Quarterly Activities Report: Period En...
28/01/2014Operations Update
28/01/2014Medusa Mining Limited: Operations Update
21/01/2014Operations Update
29/10/2013: Quarterly Activities Report Period Ended 30 September 2013
23/10/2013: SAG Mill Update
04/09/2013: Operations Update-New Mill and Level 8
31/07/2013: Quarterly Activities Report Period Ended 30 June 2013
08/07/2013(Co-o): Co-O Operations Update
02/05/2013: Quarterly Activities Report Period Ended 31 March 2013
15/04/2013: Investor Presentation April 2013
30/10/2012: Quarterly Activities Report Period Ended 30 September 2012
29/08/2012: Full Year Results
06/08/2012(Co-o): Co-O Mine Mineral Resource Update
31/07/2012: Quarterly Activities Report Period Ended 30 June 2012
30/04/2012: Investor Presentation May 2012
24/04/2012: Quarterly Activities Report Period Ended 31 March 2012
10/02/2012: Investor Presentation February 2012
30/01/2012December 2011 Quarterly Report
17/01/2012: Bananghilig Deposit Drilling Update
16/12/2011: Appendix 3B
05/12/2011: Issue of Performance Rights
24/10/2011: Investor Presentation
29/08/2011Achieves Record Full Year Profit
24/08/2011ASX Announcement
22/08/2011(Co-o): Co-O Mine Mineral Reserve Estimate
28/07/2011ASX Announcement - Quarterly Report
25/01/2011- Medusa Quarterly Report
24/05/2010AIM cancellation & admission to the official list
07/05/2010Copper portfolio - Lingig update
08/03/2010Bonus issue of shares
25/01/2010Notice of no corporate associations
09/10/2009Lingig drilling extends mineralisation
12/08/2009ASX Announcement
03/07/2009MML - ASX Ann - S&P/ASX 200 Index
22/06/2009ASX Announcement
01/06/2009MML - ASX Announcement
26/02/2009UNDERWRITTEN A$24.5 MILLION PLACEMENT
28/01/2009Quarterly Report
05/11/2008ASX Announcement
23/09/2008ASX Announcement
19/09/2008Crosby Makes $182 Million Takeover Bid for Medusa Mining
20/08/2008ASX Announcement
25/07/2008ASX Announcement
10/06/2008ASX Announcement
11/04/2008Joint Venture With Bunawan Mining Corporation
14/03/2008Half Year Financial Report – 31 December 2007
25/02/2008IRON ORE TARGETS IDENTIFIED
13/11/2007LINGIG PORPHYRY COPPER DISCOVERY
31/10/2007 QUARTERLY ACTIVITIES REPORT PERIOD ENDING 30 SEPTEMBER 2007
16/08/2007Ambrian Morning Research
01/08/2007Heads of Agreement and Placement with Sierra Mining Ltd
16/07/2007Barobo Mineralised Corridor
13/06/2007 Acquisition of Co-O Mine Royalty
25/05/2007Equity Research
15/05/2007ASX Announcement
30/04/2007Quarterly Report March 2007
21/03/2007Releases
08/03/2007 Dismissal of motion for reconsideration on CO-o mise
13/06/2006appointement of nominated advisor & broker - AIM London
17/05/2006Acquisition of Apical gold project, Philippines
10/04/2006Alternative Investment Market (AIM) London
16/03/2006half year financial report 31 december 2005
30/01/2006Gold Production started, increasing quickly from here
21/01/2006ANALYSIS : MEDUSA MINING
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
AUSTRALIA (MML.AX)TORONTO (MLL.TO)
0,605-15.38%7,43-0.80%
AUSTRALIA
AU$ 0,605
08/07 11:00 -0,110
-15,38%
Cours préc. Ouverture
0,715 0,615
Bas haut
0,600 0,625
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
- -  0,605 -%
Volume var. 1 mois
123 619 -%
24hGold TrendPower© : -44
Produit
Développe
Recherche Gold
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 02/03/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
2022-14,79%0,950,60
2021-7,79%0,990,66
20200,00%1,070,40
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,82 AU$+1,69%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
11,22 US$+1,63%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,55 GBX+2,59%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,48 CA$-1,59%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
15,84 CA$-1,31%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+0,00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,19 AU$-7,32%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,85 CA$-2,63%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
51,83 US$+0,78%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,03 AU$+0,00%Trend Power :