Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en

Pacific Rim Mining Corp

Publié le 02 août 2007

's Balsamo Gold Deposit Delineation Nearing Completion; Another New Gold-Bearing V

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
======================================================================
Re: 2007 News Releases - Thursday, August 02, 2007
Pacific Rim Mining's Balsamo Gold Deposit Delineation Nearing
Completion; Another New Gold-Bearing Vein Discovered
======================================================================

News Release #07-07

On-going delineation drilling at the Balsamo deposit on Pacific Rim
Mining Corp.'s ("Pacific Rim" or "the Company") El Dorado gold project
in El Salvador is nearing completion. Much like the Minita deposit
roughly 1 km to the northwest, the Balsamo deposit comprises a
high-grade zone where both vein widths and gold grades are robust and
persistent, surrounded by a gradational zone of more moderate gold
grades and 1 to 2 meter vein widths.

Recent drilling at the Balsamo deposit has focused on defining its
upper limits and stepping out from the high grade area. The Balsamo
deposit is deeper than the nearby Minita and South Minita deposits and
remains open at depth. It is hosted by a north-south structure that
will require additional broad step out drilling in both strike
directions to close off the known mineralization as well as to search
for additional high grade zones. The Balsamo structure can be projected
over a distance of several kilometers, the majority of which has never
been drill tested.

During the course of its Balsamo deposit drilling, the Company has
identified another new gold-bearing vein parallel to and 200 meters
east of the Balsamo structure. The Cerro Alto vein has been
intersected in a number of Balsamo-focused drill holes and locally
contains attractive grades such as 14.9 g/t gold over 1.3 meters in
hole P07-567. Deeper drilling is required to determine the full extent
of the gold mineralization in the Cerro Alto vein.

The Company has tentatively scheduled its resource consultants to
perform an updated resource estimate for the El Dorado project,
including the Balsamo deposit, this fall. Finalization of this
schedule will depend on completion of drilling on the Balsamo and Cerro
Alto veins. A list of the most recent drill results from the El Dorado
project is provided below. A grade-thickness longitudinal map of the
Balsamo deposit has been posted to the Company's website
www.pacrim-mining.com.

"We continue to be impressed by our El Dorado project's capacity to
deliver high grade gold," states Tom Shrake, President and CEO. "The
Balsamo deposit appears to have the added bonus of relatively high
silver to gold ratios, which we expect will boost the value of this
deposit. Our new discovery in the Cerro Alto vein is intriguing, and
we have only just scratched the surface. Most of our holes to have
intersected Cerro Alto did so at higher elevations above the
anticipated productive interval as the holes were designed to test the
Balsamo vein to the west. Two of our four drill rigs currently in
operation at El Dorado will therefore focus on testing Cerro Alto
within the productive interval while the two remaining rigs complete
the Balsamo deposit delineation. We are on track to complete this work
in the coming months and anticipate updating the El Dorado resource
estimate before the end of 2007."

Latest El Dorado Project Drill Results



-----------------------------------------------------------------------
-----------------------------------------------------------------------
Drill From To
hole (met- (met- True
Vein or UTM azimuth/ ers ers Inter- Width Sil-
Hole System Northing/ dip down down section (met- Gold ver
No. Tested Easting (degrees) hole) hole) (meters) ers) (g/t)(g/t)
-----------------------------------------------------------------------
-----------------------------------------------------------------------
P07- Moreno 301586/ 270/50 No significant results
553 534793
-----------------------------------------------------------------------
P07- Balsamo 300123/ 284/77 361.25 361.7 0.45 0.40 8.482 205
554 534766
-----------------------------------------------------------------------
P07- Balsamo 300474/ 270/70 326.70 335 8.30 6.20 2.584 49
555 534779
-----------------------------------------------------------------------
includes 327.25 328 0.75 0.70 11.322 123
-----------------------------------------------------------------------
330.20 331.35 1.15 1.10 7.759 186
-----------------------------------------------------------------------
P07- Balsamo 300177/ 270/62 No significant results
556 534943
-----------------------------------------------------------------------
P07- Balsamo 300325/ 270/45 No significant results
557 534761
-----------------------------------------------------------------------
P07- Balsamo 300025/ 265/70 No significant results
558 534900
-----------------------------------------------------------------------
P07- Cerro Alto 300595/ 270/50 193.90 194.7 0.8 0.50 18.563 158
559 535120
-----------------------------------------------------------------------
P07- Balsamo 300157/ 270/67 No significant results
560 534944
-----------------------------------------------------------------------
P07- Balsamo 300640/ 278/57 No significant results
561 534735
-----------------------------------------------------------------------
P07- Balsamo 299960/ 275/72 318.85 319.95 1.1 1.00 20.431 402
562 534873
-----------------------------------------------------------------------
327.80 328.30 0.5 0.30 14.303 625
-----------------------------------------------------------------------
P07- Balsamo 300438/ 270/72 296.95 298.05 1.1 1.10 7.487 72
563 534749
-----------------------------------------------------------------------
307.68 309.05 1.37 1.30 8.598 214
-----------------------------------------------------------------------
P07- Balsamo 300377/ 270/75 301.60 301.7 0.10 0.10 11.609 269
564 534672
-----------------------------------------------------------------------
P07- Balsamo 300375/ 258/60 No significant results
565 534800
-----------------------------------------------------------------------
P07- Balsamo 300260/ 270/61 420.90 429.3 8.40 6.95 1.856 49
566 534885
-----------------------------------------------------------------------
includes 422.40 422.75 0.35 0.29 8.906 314
-----------------------------------------------------------------------
P07- Balsamo 300400/ 258/70 106.65 107.95 1.30 1.30 14.932 20
567 534803
-----------------------------------------------------------------------
P07- Balsamo 300212/ 268/58 341.90 342.3 0.40 0.40 9.492
568 534851
-----------------------------------------------------------------------
345.85 352.75 6.90 6.00 16.272 211
-----------------------------------------------------------------------
includes 347.50 348.3 0.80 0.67 31.601 453
-----------------------------------------------------------------------
348.75 352.75 4 3.44 19.927 259
-----------------------------------------------------------------------
P07- Balsamo 300377/ 266/49 No significant results
569 534672
-----------------------------------------------------------------------
P07- Cerro Alto 300400/ 270/66 333.60 335.45 1.85 1.40 9.312 67
570 535050
-----------------------------------------------------------------------
P07- Cerro Alto 300275/ 273/65 321.25 323.2 1.95 1.70 10.145 63
571 534023
-----------------------------------------------------------------------
P07- Balsamo 300410/ 273/66 No significant results
572 534904
-----------------------------------------------------------------------
P07- Balsamo 299860/ 270/58 No significant results
573 534920
-----------------------------------------------------------------------
P07- Balsamo 300320/ 244/66 164.60 165.8 1.20 0.80 5.472 55
574 534853
-----------------------------------------------------------------------
388.65 394.7 6.05 4.50 4.926 129
-----------------------------------------------------------------------
includes 388.65 389.3 0.65 0.50 20.061 281
-----------------------------------------------------------------------
393.30 393.8 0.5 0.40 17.023 202
-----------------------------------------------------------------------
P07- Balsamo 300410/ 270/58 No significant results
575 534904
-----------------------------------------------------------------------
P07- Balsamo 300550/ 281/69 No significant results
576 534950
-----------------------------------------------------------------------
P07- Balsamo 300169/ 270/70 260.25 260.35 0.1 0.10 8.419 129
577 534705
-----------------------------------------------------------------------
P07- Balsamo 300123/ 270/67 286.60 287.3 0.7 0.65 21.886 264
578 534765
-----------------------------------------------------------------------
302.70 304.2 1.5 1.20 3.379 43
-----------------------------------------------------------------------
P07- Balsamo 300475/ 240/55 76.70 77.75 1.05 0.80 4.212 10
579 534789
-----------------------------------------------------------------------
326.00 327.15 1.15 1.00 3.752
-----------------------------------------------------------------------
P07- Balsamo 300243/ 270/65 262.25 263.7 1.45 1.30 6.856 111
580 534750
-----------------------------------------------------------------------
P07- Balsamo 300150/ 283/74 No significant results
581 534609
-----------------------------------------------------------------------
P07- Balsamo 300300/ 274/60 128.00 132.85 4.85 3.90 2.319 7
582 534832
-----------------------------------------------------------------------
345.90 348.15 2.25 2.25 10.454 na
-----------------------------------------------------------------------
includes 345.90 346.8 0.90 0.70 22.199 na
-----------------------------------------------------------------------
P07- Balsamo 299740/ 270/65 417.00 417.8 0.80 0.80 6.994 na
583 534803
-----------------------------------------------------------------------
P07- Balsamo 300850/ 270/60 269.70 270.45 0.75 0.50 10.197 na
584 534988
-----------------------------------------------------------------------
-----------------------------------------------------------------------

na = not currently available

About Pacific Rim Mining Corp.
Pacific Rim is a growth-oriented, revenue-generating, environmentally
and socially responsible gold exploration company with operations in
North America and exploration assets in North, Central and South
America. The Company is expanding and developing its advanced-stage,
high grade El Dorado gold project in El Salvador and is actively
exploring a pipeline of grassroots gold projects. Pacific Rim's goal
is to become a low cost, intermediate level gold producer.

On behalf of the board of directors,

"Thomas C. Shrake"

Thomas C. Shrake
President and CEO

Inquiries regarding this news release or Pacific Rim Mining can be
directed to
Barbara Henderson, VP Investor Relations, at 604-689-1976 or
1-888-775-7097.

NI 43-101 Disclosure

Readers are directed to the Company's website www.pacrim-mining.com and
SEDAR filings www.sedar.com for a complete list of drill results from
the El Dorado project, the results of past resource, reserve and
economic studies concerning the El Dorado project and full National
Instrument 43-101 disclosure.

Pacific Rim's exploration work on the El Dorado project is supervised
by William Gehlen a Certified Professional Geologist with the AIPG (No.
10626), an employee of Pacific Rim and a Qualified Person as defined in
NI 43-101. Mr. Gehlen has verified that the results presented above
have been accurately summarized from the official assay certificates
provided to the Company. Pacific Rim's sampling procedures follow the
Exploration Best Practices Guidelines outlined by the Mining Standards
Task Force and adopted by The Toronto Stock Exchange. Samples have
been assayed using fire assay with a gravimetric finish on a 30-gram
split. Quality control measures, including check- and sample
standard-assaying, are being implemented. Samples were assayed by
Inspectorate America Corporation in Reno, Nevada USA, an ISO 9002
certified laboratory, independent of Pacific Rim Mining Corp.

Cautionary Note Regarding Forward-Looking Information

Information set forth in this document includes forward-looking
statements. By their nature, forward-looking statements are subject to
numerous risks and uncertainties, some of which are beyond Pacific
Rim's control, including but not limited to: the timeframe and outcome
of delineation of the Balsamo discovery and its potential impact on the
El Dorado project; the timing for generation of an updated El Dorado
resource estimate; the geometry of the Balsamo deposit, which may
change as additional data is collected; the execution and outcome of
current or future exploration activities including drilling targeting
the Cerro Alto vein; and other factors detailed in the Company's
filings with Canadian regulatory agencies and the U.S. Securities and
Exchange Commission.

Readers are cautioned that the assumptions used in the preparation of
such information, although considered reasonable at the time of
preparation, may prove to be imprecise and, as such, undue reliance
should not be placed on forward-looking statements. Pacific Rim's
actual results, programs and financial position could differ materially
from those expressed in or implied by these forward-looking statements.

Cautionary Note to U.S. Investors -- The United States Securities and
Exchange Commission permits U.S. mining companies, in their filings
with the SEC, to disclose only those mineral deposits that a company
can economically and legally extract or produce. This news release may
include such terms as "measured," "indicated," and "inferred"
"resources" that the SEC guidelines strictly prohibit U.S. registered
companies from including in their filings with the SEC. U.S. Investors
are urged to consider closely the disclosure in our Form 40-F, File No.
001-31328, which may be secured from us, or from the SEC's website at
www.sec.gov/edgar.shtml.

The TSX and the AMEX have neither reviewed nor accept responsibility
for the adequacy or accuracy of this release.

======================================================================
Copyright (c) 2007 PACIFIC RIM MINING CORP. (PMU) All rights reserved.
For more information visit our website at
http://www.pacrim-mining.com/ or send mailto:info@pacrim-mining.com
Message sent on Thu Aug 2, 2007 at 9:39:15 AM Pacific Time
======================================================================
.

Pacific Rim Mining Corp

PRODUCTEUR
CODE : PMU.TO
CUSIP : 694915208
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Pacific Rim Mining est une société développant des projet miniers d'or et d'argent basée au Canada.

Pacific Rim Mining détient divers projets d'exploration au Salvador.

Ses principaux projets en production sont DENTON RAWHIDE et DENTON-RAWHIDE en USA et ses principaux projets en exploration sont SANTA RITA, ZAMORA AND CERRO COLORADO, EL DORADO PROJECT - BALSAMO, EL DORADO EL SALVADOR, EL DORADO PROJECT - SOUTH MINITA, EL DORADO PROJECT - MINITA, EL DORADO PROJECT - NANCE DULCE, EL DORADO PROJECT - COYOTERA et EL DORADO PROJECT - NUEVA ESPERANZA au Salvador.

Pacific Rim Mining est cotée au Canada, aux Etats-Unis D'Amerique et en Allemagne. Sa capitalisation boursière aujourd'hui est 14,8 millions CA$ (13,9 millions US$, 10,2 millions €).

La valeur de son action a atteint son plus haut niveau récent le 31 décembre 2003 à 2,39 CA$, et son plus bas niveau récent le 11 octobre 2013 à 0,04 CA$.

Pacific Rim Mining possède 210 952 000 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Financements de Pacific Rim Mining Corp
04/10/2012Closes Private Placement Financing
20/04/2011Financing Increased
07/04/2011Undertaking Financing
14/01/2010Closes Private Placement Financing
28/08/2009Resolution to Extend Expiration Date of Warrants Passed at P...
29/02/2008 Closes Private Placement Financing
Nominations de Pacific Rim Mining Corp
07/03/2012Announces Changes to Board of Directors
Rapports Financiers de Pacific Rim Mining Corp
25/07/2013Announces Fiscal 2013 Year End Results
11/12/2012Announces Fiscal 2013 Second Quarter Results
07/09/2012Announces Fiscal 2013 First Quarter Results
27/07/2012Announces Fiscal 2012 Year End Results
05/03/2012Announces Fiscal 2012 Third Quarter Results
13/12/2011Announces Fiscal 2012 Second Quarter Results
15/09/2011Announces Fiscal 2012 First Quarter Results
27/07/2011Announces Fiscal 2011 Year End Results
16/03/2010Announces Fiscal 2010 Third Quarter Results
07/12/2009Announces Fiscal 2010 Second Quarter Results
10/09/2009Announces Fiscal 2010 First Quarter Results
15/12/2008Announces Fiscal 2009 Second Quarterly Results
12/09/2008Announces Fiscal 2009 First Quarterly Results
11/03/2008Announces Fiscal 2008 Third Quarter Results
11/12/2007 Announces Fiscal 2008 Second Quarter Results
11/09/2007Announces Fiscal 2008 First Quarter Results
13/03/2007Pacific Rim Announces Fiscal 2007 Third Quarter Results
Projets de Pacific Rim Mining Corp
03/07/2008(El Dorado El Salvador)Suspends Further Drilling in El Salvador Until Mining Permit...
23/01/2008Surface Trenching at Santa Rita Project Reveals High Grade G...
17/01/2008(El Dorado El Salvador)El Dorado Gold Project M&I Resources Top 1.4 Million Gold Eq...
02/08/2007(El Dorado Project - South Minita)'s Balsamo Gold Deposit Delineation Nearing Completion; Anot...
10/04/2007(El Dorado - Pacific Rim)Balsamo Gold Zone on Pacific Rim Mining's El Dorado Project ...
27/03/2007Zamora Project Yields High Grade Gold in Surface Trenching
Communiqués de Presse de Pacific Rim Mining Corp
02/12/2013Shareholders Approve Plan of Arrangement and Final Court App...
27/11/2013OceanaGold and Pacific Rim Mining Complete Plan of Arrangeme...
12/11/2013ISS And Glass Lewis Recommend Pacific Rim Mining Shareholder...
28/10/2013Mails Information Circular in Connection With Special Meetin...
08/10/2013OceanaGold Agrees to Acquire Pacific Rim Mining
16/09/2013Announces Results of Annual General Meeting of Shareholders
07/06/2013Adopts Advance Notice and Majority Voting Policies
07/06/2013Adopts Advance Notice and Majority Voting Policies
06/05/2013Announces Termination of the Hog Ranch Option Agreement and ...
01/04/2013Statement Filed in Arbitration Case Against El Salvador; Pac...
13/03/2013Announces Fiscal 2013 Third Quarter Results
25/10/2012Negotiates Set Fee Structure for Final Phase of ICSID Arbitr...
25/09/2012OceanaGold Corporation Takes Placement in Pacific Rim Mining...
04/06/2012World Bank Tribunal Allows Pacific Rim Subsidiary to Continu...
04/06/2012World Bank Tribunal Allows Pacific Rim Subsidiary to Continu...
30/04/2012Provides a Progress Report on Activities in El Salvador and ...
14/06/2011Finalizes Hog Ranch Property Joint Venture Acquisition
02/05/2011CAFTA Hearing on Jurisdiction Objection Underway
30/03/2011Signs Letter of Intent to Acquire Majority Interest in Hog R...
22/03/2011Upcoming CAFTA Hearings Delayed
19/08/2010Notifies NYSE Amex of its Intent to Delist
03/08/2010ICSID Tribunal Rejects Government of El Salvador's Prelimina...
31/05/2010Cafta Hearing On Preliminary Objection Underway
04/03/2010Provides Update on Exploration Focus and CAFTA Proceedings
11/02/2010NYSE Amex Accepts Pacific Rim Mining's Compliance Plan
11/12/2009Undertaking Financing
19/11/2009CAFTA Proceedings Begin as Tribunal Constituted
12/11/2009Receives NYSE Amex Notification
24/07/2009Announces Fiscal 2009 Year End Results
12/02/2009Defers Completion of El Dorado Fesibility Study
09/12/2008Files Notice of Intent to Seek CAFTA Arbitration
19/09/2008Announces Head Office Cutbacks
22/07/2008Announces Fiscal 2008 Year End Results
14/02/2008 Financing Increased to 6,711,000 Units
06/02/2008Undertaking Financing
07/11/2007Denton-Rawhide Land Sale Closing Date Extended
25/10/2007 Contact Information Update
23/07/2007Announces 2007 Year-End Results
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TORONTO (PMU.TO)FRANKFURT (PRM.F)
0,070+0.00%9,92+0.43%
TORONTO
CA$ 0,070
02/12 15:48 -
0%
Cours préc. Ouverture
0,070 0,070
Bas haut
0,070 0,070
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
- -  0,070 -%
Volume var. 1 mois
100 000 -%
24hGold TrendPower© : 24
Produit Gold - Silver
Développe
Recherche Gold - Silver
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 20/11/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,70 AU$-0,65%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
12,26 US$+2,68%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,53 GBX-1,87%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,64 CA$-1,86%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
16,23 CA$+4,04%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+4,26%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,20 AU$+2,63%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,88 CA$+0,53%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
52,71 US$+0,19%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+5,56%Trend Power :