Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en

Great Panther Silver Limited

Publié le 08 avril 2008

's Record Output Continues With 431,639 Ag Eq Oz In Q1

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Great Panther




 Monday, April 07, 2008
Great Panther's Record Output Continues With 431,639 Ag Eq Oz In Q1

 
Forecasting 1.75 million Ag Eq Oz, including 1.15 million ounces of silver, for 2008


Great Panther Resources Limited (TSX: GPR; the "Company") is very pleased to report that the operations improvement at both its 100% owned Mexican mines continues, with many quarterly production records being broken. The benefits from the ongoing exploration and the mine development at Guanajuato and Topia are now being realized.

Operational highlights include:
  • Highest ever metal production of 431,639 silver equivalent ounces (Ag Eq Oz), a 24% increase over the previous quarter, and an increase of 36% over the first quarter of 2007.
  • New record for total production of 285,139 ounces of silver, a 35% increase over the previous quarter, and an increase of 59% over the first quarter of 2007.
  • Records for silver and gold production from Guanajuato; at 198,663 ounces Ag and 1,369 ounces Au, were up by 56% and 45%, respectively, compared to the fourth quarter of 2007.
  • Records for silver and lead production from Topia; at 86,476 ounces and 217 tonnes, were up by 4% and 12%, respectively, compared to the fourth quarter 2007.
(Silver equivalents for 2008 are established using prices of US$800/oz Au, US$16/oz Ag, US$1.15/lb Pb and US$1.00/lb Zn.)

The Q1 2008 production of 431,639 Ag Eq Oz from both of Great Panther's mines includes 285,139 oz of silver, 1,589 oz of gold, 478,400 lbs of lead, and 523,400 lbs of zinc. This production level represents a 24% increase over the previous quarter, and an increase of 36% over the first quarter 2007.

The Guanajuato Mine produced a record 198,663 ounces of silver and 1,369 ounces of gold, from processing 40,393 tonnes of ore with average grades of 1.40g/t gold and 188g/t silver. The ore grades were 74% higher than the 2007 average and the production of silver and gold was 56% and 45%, respectively, greater than in the previous quarter. The turnaround reflects the success of the grade control measures coupled with the higher grade ore sources, a direct benefit from exploring and developing access to the Cata Clavo, Guanajuatito, Rayas and Promontorio mining areas.

The metal output in terms of equivalent ounces of silver, at 267,132 Ag Eq Oz, the processing plant metal recoveries, at 75.5% for gold and 81.5% for silver, and the concentrate quality of 6.40 kg/t silver, were all the highest for any quarter to date. The improvement plans for the Guanajuato plant were initiated in December and further improvement is expected as more modifications are being made. Improvements were made in the crushing plant, to deliver a consistent and finer mill feed; the grinding circuit, by increasing the power draw to produce a finer flotation feed; and in the flotation circuit, where the reagents were replaced in March with the effect of increasing the concentrate quality.

Mine development was focused on deepening the Guanajuatito area in the northwest portion of the mine property, at the deep Clavo de Cata in the central part, and exploratory development of the Promontorio area. Production from Guanajuato is projected to increase further in 2008. The internal, inclined ore hoisting shaft, servicing the 430 Level of the Cata Clavo area, was recommissioned and is now fully operational; cut and fill mining of the Guanajuatito Zona Norte is established on two levels; and exploratory development of two levels at Promontorio is in progress.

In addition, Great Panther Resources has committed to the purchase of two new 3.5 yd³ scoop trams, to be supplied by Atlas Copco for delivery by the end of the 2nd quarter, which will further enhance underground development and production performance.

Underground development is being supported by three small underground diamond drills, and exploration drilling continues in the Cata Clavo area to a depth of 200 metres below current workings, with all drillholes intersecting mineralization and excellent assay results being reported. Further exploration of this and the area between it and the prolific Rayas Clavo will continue through 2008.

In the first quarter, the Topia operations produced 86,476 ounces of silver, 220 ounces of gold, 217 tonnes of lead, and 237 tonnes of zinc, or 164,507 Ag Eq Oz. Silver production was a record 4% above the previous record quarter and 19% above the same period last year. Lead production was also a record, at 12% above the last quarter and 6% above the previous record quarter of a year ago. The Topia plant processed 9,457 tonnes of ore at grades of 326g/t Ag, 0.8g/t Au, 2.80% Pb and 2.89% Zn, and achieved excellent overall recoveries of 87.2% for Ag, 91.0% for Au, 81.8% for Pb and 86.8% for Zn.

The Topia operations are continuing to demonstrate improvements as a direct result of the investment to rehabilitate the many small mines, to explore, with surface and underground diamond drilling, and to develop the veins for production mining. On the Argentina vein, the production sub-level above Level 2 has exposed excellent vein widths and ore grades which confirm intersections from earlier surface drilling, (refer to drill results for A04-04 shown on the Argentina longitudinal section on the Company website at www.greatpanther.com), while the ramp has been extended to access the main level and is being deepened further to the 3rd and 4th levels. A decline has been driven from the Oliva Mine and has accessed the Victoria adit level, a main adit which intersects many veins including the Argentina vein below the 6th level. This level had been inaccessible for many years and it will provide access to the lower levels of the Argentina vein. The Don Benito vein is being developed for production at four locations and is expected to provide a source of higher grade ore, (refer to the plan and longitudinal entitled "Underground Exploration on the Don Benito Vein" on the Company website).

With the ongoing improvements in the mines and plants, the Company anticipates that quarterly production will continue to climb throughout the remainder of 2008 such that the Q1 production is on target to meet or exceed the annual goal of 1.75 million Ag Eq Oz.

Robert F. Brown, P.Eng. and Vice President of Exploration for the Company is the Qualified Person for both the Guanajuato Mine and the Topia Mine, under the meaning of NI 43-101. Aspects of both mines relating to mining and metallurgy are overseen by Charles Brown, Chief Operating Officer for Great Panther and its Mexican subsidiary, Minera Mexicana El Rosario, S.A. de C.V.

For further information please contact Brad Aelicks or Don Mosher at telephone 604 685 6465, fax 604 899 4303 or e-mail info@greatpanther.com.

ON BEHALF OF THE BOARD

"Robert A. Archer"

Robert A. Archer, President & CEO


This news release contains forward-looking statements within the meaning of the United States Private Securities Litigation Reform Act of 1995 and forward-looking information within the meaning of the Securities Act (Ontario) (together, "forward-looking statements"). Such forward-looking statements may include but are not limited to the Company's plans for production at its Guanajuato and Topia Mines in Mexico, exploring its other properties in Mexico, the overall economic potential of its properties, the availability of adequate financing and involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements expressed or implied by such forward-looking statements to be materially different. Such factors include, among others, risks and uncertainties relating to potential political risks involving the Company's operations in a foreign jurisdiction, uncertainty of production and cost estimates and the potential for unexpected costs and expenses, physical risks inherent in mining operations, currency fluctuations, fluctuations in the price of silver, gold and base metals, completion of economic evaluations, changes in project parametres as plans continue to be refined, the inability or failure to obtain adequate financing on a timely basis, and other risks and uncertainties, including those described in the Company's Annual Report on Form 20-F for the year ended December 31, 2007 and reports on Form 6-K filed with the Securities and Exchange Commission and available at www.sec.gov and Material Change Reports filed with the Canadian Securities Administrators and available at www.sedar.com.
 

Great Panther Silver Limited

PRODUCTEUR
CODE : GPR.TO
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Great Panther Silver est une société de production minière d'argent basée au Canada.

Great Panther Silver est productrice d'argent, d'or, de plomb et de zinc au Mexique, et détient divers projets d'exploration au Mexique.

Ses principaux projets en production sont TOPIA MINE et GUANAJUATO MINES au Mexique et ses principaux projets en exploration sont MAPIMI (KM 66), SAN ANTONIO (CHIHUAHUA), SAN IGNIACIO et LA SIERRA au Mexique.

Great Panther Silver est cotée au Canada, aux Etats-Unis D'Amerique et en Allemagne. Sa capitalisation boursière aujourd'hui est 181,3 millions CA$ (145,0 millions US$, 127,0 millions €).

La valeur de son action a atteint son plus haut niveau récent le 29 août 1997 à 9,00 CA$, et son plus bas niveau récent le 05 septembre 2003 à 0,10 CA$.

Great Panther Silver possède 166 370 000 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Dans les médias de Great Panther Silver Limited
22/07/2009Mining in Mexico with Great Panther
16/07/2009Mining in Mexico with Great Panther
01/08/2007Jay Taylor Reaffirms his "A" Progress Rating Of Great Panthe...
20/06/2006Presentation by Sean Rahkimov
18/04/2006Corporate analysis
Rapports annuels de Great Panther Silver Limited
2008 Annual report
Financements de Great Panther Silver Limited
07/07/2016Great Panther Silver increases previously announced bought d...
06/07/2016arranges US$20 million bought deal financing
24/03/2011Announces $21 Million Bought Deal Financing
13/03/2011EXTINGUISHES LONG TERM DEBT
27/10/2009Announces $10 Million Equity Offering
24/01/2009GPR - GREAT PANTHER CLOSES PRIVATE PLACEMENT
10/04/2008Reprices Out-Of-The-Money Warrants And Options
04/01/2008Sees 100% Exercise Of "J" Warrants
30/11/2007100% Exercise of Great Panther "I" Warrants
Nominations de Great Panther Silver Limited
07/08/2013Appoints New Director
14/05/2013Appoints New Director and Strengthens Senior Management Team...
24/01/2013Announces Resignation of Director
05/04/2012Appoints Rhonda Bennetto as Vice President Corporate Communi...
06/02/2012Appoints Independent Chairman
14/10/2011(Guanajuato Mines)Reports Third Quarter Production and Appoints New Mine Manag...
14/10/2011(Guanajuato Mines)Reports Third Quarter Production and Appoints New Mine Manag...
03/05/2011Appoints Martin Carsky Executive Vice President & Chief Fina...
17/03/2011ADDS MINING/METALLURGICAL EXPERTISE TO BOARD
03/07/2008Appoints Former Mexican Senior Trade Commissioner As Vice Pr...
20/03/2008Appoints Financial & Metallurgical Professionals To Ad...
26/11/2007Appoints New Management at Guanajuato Mine
Rapports Financiers de Great Panther Silver Limited
04/08/2016Reports Second Quarter 2016 Financial Results
25/07/2016to announce second quarter 2016 financial results on August ...
14/07/2016reports second quarter
05/05/2016First Quarter 2016 Financial Results Webcast and Conf
05/05/2016reports first quarter
05/11/2015Reports Third Quarter 2015 Financial Results
21/10/2015to Announce Third Quarter Consolidated Financial Results on ...
06/11/2013Reports Lower Costs and Improved Operating Margins for the T...
16/08/2013Second Quarter 2013 Financial Results Webcast Replay
07/08/2013Reports Second Quarter 2013 Financial Results
08/05/2013Reports First Quarter 2013 Financial Results
13/03/2013Reports Fiscal Year 2012 Financial Results
14/11/2012Postpones Release of Third Quarter 2012 Financial Results fo...
14/05/2012Reports First Quarter 2012 Financial Results
13/03/2012Reports 37% Increase in Revenues to $57.8 Million and $11.5 ...
14/10/2011Reports Third Quarter Production and Appoints New Mine Manag...
11/08/2011Reports Second Quarter Results
14/06/2011Reports Record Quarterly Net Income of $7 Million
18/04/2011REPORTS FIRST QUARTER PRODUCTION; SILVER INCREASES BY 15%, G...
07/04/2011FILES AMENDMENT TO ITS ANNUAL INFORMATION FORM WITH NO CHANG...
16/03/2011REPORTS ANNUAL NET PROFIT OF $5 MILLION
11/01/2010 Exceeds Production Target for 2009 With Record Fourth Quart...
22/10/2007Doubles Production in Third Quarter 2007
Projets de Great Panther Silver Limited
18/07/2016(Topia Mine)Resumes Full Operation
23/12/2015Great Panther Silver releases drill results for Guadalupe de...
09/07/2015Great Panther Silver updates mineral resources at Topia mine
14/01/2014Reports a 19% Increase in Metal Production in 2013
16/12/2013Announces Results of San Ignacio Surface Drilling
03/12/2013s Mineral Resource Estimates at the Guanajuato Mine Complex
21/10/2013Moves Ahead with El Horcon Project
08/10/2013Receives Final Permit for San Ignacio, Initiates Site Prepar...
14/01/2013(Topia Mine)s Mineral Resources at Topia Mine
09/05/2012s Mineral Resource Estimates at the Guanajuato Mine Complex ...
15/12/2011(Guanajuato Mines)Eliminates Backlog of Concentrate Inventory at Guanajuato an...
05/12/2011(San Igniacio)s Drilling Results for San Ignacio Property, Guanajuato; Gra...
30/11/2011(Guanajuato Mines)Confirms Continuity of Santa Margarita Gold-Silver Veins and...
13/10/2011(San Igniacio)Reports Initial Mineral Resource Estimate at San Ignacio Pro...
30/08/2011(Guanajuato Mines)Extends High Grade Silver-Gold Mineralization and Discovers ...
18/08/2011(Guanajuato Mines)Commences Shipment of Silver-Gold Concentrates From Guanajua...
21/07/2011(La Sierra)Purchases New Silver-Gold Project in Guanajuato
25/05/2011(San Igniacio)POSTPONES RESOURCE ESTIMATE FOR SAN IGNACIO MINE PROPERTY, G...
13/03/2011(Topia Mine)Increases Mineral Resources at the Topia Mine
27/01/2011(Guanajuato Mines)Extends Guanajuatito Silver-Gold Zones to Depth
22/07/2009(Topia Mine)Increases Resources At The Topia Mine
26/01/2009(Topia Mine)GPR - GREAT PANTHER REPORTS NEW HIGH GRADE SILVER ALONG THE ...
26/11/2008(Topia Mine)Samples 95 Metres Of 1,867G/T Silver, 1.00G/T Gold, 2.67% Le...
09/09/2008(Guanajuato Mines)ACQUIRES TWO NEW UNDERGROUND LOADERSTO BOOST PRODUCTION OF T...
14/07/2008(Guanajuato Mines)Produces Another Record of 436,072 Ag Eq Oz in Q2
03/06/2008(Topia Mine)Extends High Grade Argentina Veins At The Topia Mine
27/05/2008(Mapimi (km 66))Discovers Molybdenum-Rich Skarn and Carbonate Replacement St...
28/04/2008 PRODUCES FROM HIGH GRADE SILVER-GOLD ZONE AT GUANAJUATO; GR...
25/03/2008(Guanajuato Mines)Extends Strike Length Of Deep Mineralization At Guanajuato M...
26/02/2008(Topia Mine) Extends High Grade Silver-Gold To 600 Metre Depth At Guanaj...
20/02/2008(Topia Mine)Extends Silver-Gold-Lead-Zinc Veins At The Topia Mine
29/11/2007(Guanajuato Mines)Confirms Depth Continuity of High Grade Mineralization at Gu...
13/11/2007(San Antonio) Diamond Drilling Commences on the San Antonio Project, Chih...
30/10/2007(Guanajuato Mines) EXPANDS NEAR-SURFACE SILVER-GOLD ZONES AT GUANAJUATO
10/05/2007Releases Additional Drilling Results For Mapimi Silver-Lead-...
11/04/2007(Guanajuato Mines)Doubles Production At Guanajuato In First Quarter; Inc...
05/04/2007(Topia Mine)Extends Gold-rich Zones with Surface Drilling at Topia Mine
Communiqués de Presse de Great Panther Silver Limited
27/07/2016Coverage Initiated on Silver Stocks First Majestic Silver, S...
25/07/2016Great Panther Silver to announce second quarter 2016 financi...
15/07/2016Great Panther Silver Resumes Full Operation at Topia Mine
14/07/2016Great Panther Silver Reports Second Quarter 2016 Production ...
13/07/2016Great Panther Silver reports fatal accident at its Topia Min...
12/07/2016Great Panther Silver completes previously announced US$29.9 ...
06/07/2016Great Panther Silver arranges US$20 million bought deal fina...
23/06/2016Great Panther Silver reports fatality at Guanajuato
10/06/2016Great Panther Silver Reports Annual General and Special Meet...
05/05/2016Great Panther Silver reports first quarter 2016 financial re...
25/04/2016Great Panther Silver to Announce First Quarter 2016 Financia...
21/04/2016Great Panther Announces At-the-market Offering Of Up To Us$1...
21/04/2016Great Panther Silver Reports First Quarter 2016 Production R...
13/04/2016Great Panther Silver reports first quarter 2016 production r...
04/03/2016Great Panther reports 4Q loss
19/01/2016Great Panther Silver Reports 30% Increase In Metal Productio...
15/01/2016Great Panther resumes full operations at its Guanajuato Mine...
05/11/2015Great Panther Silver Reports Third Quarter 2015 Financial Re...
21/10/2015Great Panther Silver to Announce Third Quarter Consolidated ...
14/10/2015Great Panther Silver Reports Third Quarter 2015 Production R...
28/08/2015Great Panther Board Completes Review of Director Election St...
05/08/2015Great Panther Silver Reports Second Quarter 2015 Financial R...
30/07/2015Great Panther Silver to Release Second Quarter Financial Res...
14/07/2015Great Panther Silver Reports Second Quarter 2015 Production ...
09/07/2015(Topia Mine)s mineral resources at Topia mine
02/07/2015Great Panther Silver Provides Update on 2015 Drilling Progra...
15/04/2015Great Panther Silver Reports First Quarter 2015 Production R...
13/04/2015Cangold and Great Panther Silver Execute Definitive Arrangem...
13/04/2015Great Panther And Cangold Execute Definitive Arrangement Agr...
25/03/2015Why GoPro Will Trade Lower Until 'Capitulation'
15/03/2015Great Panther Silver to Acquire Cangold
05/03/2015Great Panther reports 4Q loss
04/03/2015Great Panther Silver reports fiscal year 2014 financial resu...
18/12/2013Season's Greetings from Great Panther Silver
10/10/2013Achieves Several Production Records in Third Quarter 2013
25/07/2013Announces 2013 Second Quarter Financial Results Release Date...
11/07/2013Reports Second Quarter 2013 Production
28/06/2013Reports Annual and Special Meeting Results
24/05/2013Adopts Advance Notice Policy
15/04/2013Reports First Quarter 2013 Production
14/03/2013Video Library Updates
05/02/2013Intersects High Grade Silver-Gold Mineralization and Discove...
16/01/2013Reports Improved Fourth Quarter and Fiscal 2012 Production R...
05/11/2012Announces 2012 Third Quarter Financial Results Release Date ...
10/10/2012Reports Third Quarter 2012 Production Results
18/09/2012Google Earth Virtual Tour
05/09/2012Purchases El Horcon Silver-Gold Project
21/08/2012Purchases Surface Rights for San Ignacio Project
02/08/2012Announces 2012 Second Quarter Financial Results Release Date...
12/07/2012Reports Second Quarter 2012 Production Results
28/06/2012Reports Annual and Special Meeting Results
08/05/2012Announces 2012 First Quarter Financial Results Release Date ...
16/04/2012Reports First Quarter 2012 Production
05/03/2012Announces 2011 Fourth Quarter And Year-End Financial Results...
17/01/2012Reports Improved Fourth Quarter Production
04/08/2011Announces Second Quarter 2011 Financial Results Release Date...
12/07/2011Reports Second Quarter Production
23/06/2011Set to Join the Russell Global Index
12/04/2011Closes $24 Million Bought Deal Financing
05/04/2011Receives Recognition for Corporate Social Responsibility
07/02/2011Secures US Listing on NYSE Amex
17/08/2010GPR - GREAT PANTHER SILVER REPORTS INCREASED REVENUE, EARNIN...
01/10/2009GPR - GREAT PANTHER DISCOVERS AND DEVELOPS 3 NEW ZONES AT GU...
14/08/2009Continues Production And Earnings Growth, Reduces Operating ...
07/07/2009continues record-setting growth with Q2 production
19/06/2009Signs New Sales Contracts For Topia Concentrates
18/02/2009Anticipates 20% Increase In Silver Production In 2009
10/12/2008 ANNOUNCES $2,700,000 FINANCING
15/11/2008LOWERS OPERATING COSTS TO KEEP MINES PROFITABLE
13/08/2008GPR - GREAT PANTHER ACHIEVES 488% INCREASE IN EARNING...
11/08/2008 INCREASES RESOURCES AT THE TOPIA MINE
23/06/2008Exposes Excellent Grades At Topia Ag-Pb-Zn Mine
03/06/2008Celebrates Renaissance Of 400+Year-Old Silver Mine
17/05/2008GRANTS STOCK OPTIONS
12/05/2008ANNOUNCES Q1 2008 RESULTS, ACHIEVES 55% INCREASE IN REVEN...
06/05/2008Drills 15.94 Metres @ 1,305G/T Silver And 4.60G/T Gold And D...
08/04/2008's Record Output Continues With 431,639 Ag Eq Oz In...
01/04/2008Announces Fy2007 Results, Achieves First Mining Profit...
19/03/2008Receives Upgraded Mineral Resource Estimate for La Gloria Zo...
08/03/2008ADOPTS SHAREHOLDER RIGHTS PLAN
28/01/2008SETS NEW PRODUCTION RECORDS TO END 2007
15/01/2008Provides Update On Resource Estimates
01/11/2007 COMMENCES PHASE II DRILLING PROGRAM ON MAPIMI SILVER-LEAD-Z...
19/09/2007Commences Deep Drilling Program at Guanajuato; Provides Prod...
14/09/2007OUTLINES EXPANSIVE GEOPHYSICAL ANOMALIES AND UPDATES PHASE 1...
12/09/2007Adds New COO To Management Team
28/08/2007'S FUNDS ARE SAFE
15/08/2007RELEASES Q2 RESULTS, REPORTS RECORD SALES MARGIN FROM MINING...
13/07/2007Closes $4.05 Million Convertible Loan Notes Placement
09/07/2007Discovers New Silver-Gold Zones At Guanajuato
04/07/2007To Raise $4.05 Million Through Convertible Loan Notes With T...
16/06/2007Dissident Members Abandon Lawsuit Against Cooperativa
28/05/2007Adds New Cfo To Management Team
30/04/2007Releases Results From First Year as Silver Producer
17/04/2007Confirms Grades, Completes Airborne Geophysical Survey On Ma...
04/04/2007Announces Delay in Filing Annual Financial Statements
01/03/2007UNDERGROUND DRILLING EXTENDS HIGH GRADE SILVER-GOLD-LEA...
04/04/2006Re-discovers spanish riches at Guanajuato
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TORONTO (GPR.TO)FRANKFURT (G3U.F)
1,09+0.00%0,102+0.00%
TORONTO
CA$ 1,09
14/10 10:30 -
0%
Cours préc. Ouverture
1,09 1,09
Bas haut
1,09 1,09
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
- -  1,09 -%
Volume var. 1 mois
0 -%
24hGold TrendPower© : 9
Produit Gold - Lead - Silver - Zinc
Développe
Recherche Gold - Molybdenum - Silver
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 27/12/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
2022240,63%1,520,12
2021-70,64%1,470,30
202065,15%1,420,32
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,75 AU$+0,52%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
10,92 US$-1,71%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,55 GBX+0,00%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$-8,33%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,38 CA$-3,64%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
15,32 CA$+0,46%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$-2,08%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,19 AU$+0,00%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,77 CA$-1,12%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
52,10 US$-0,89%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+0,00%Trend Power :