43-101 Pre-Feasibility Analysis Amended June 1, 2009 to Reflect Additional Data

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Canada | K Street |

News Release

January 1, 2009 NI 43-101 Pre-Feasibility Analysis Amended June 1, 2009 to Reflect Additional Data

Vancouver, British Columbia, June 2, 2009 - Silverado Gold Mines Ltd (OTCBB: SLGLF) (Frankfurt: SLGL) (www.silverado.com) ("Silverado") has amended its pre-feasibility analysis of January 1, 2009 entitled, "Update of Mineral Resource and Reserve Estimates and Preliminary Feasibility Study, Workman's Bench Antimony-Gold Lode Deposit, Nolan Creek, Wiseman B-1 Quadrangle, Koyukuk Mining District, Northern Alaska, January 1, 2009" or "Technical Report." These amendments are being made in response to review comments by the British Columbia Securities Commission (BCSC). Certain material changes are shown below:

The Economic Analysis Chapter (Section 18.9) was clarified by the qualified person (QP) in the amended Technical Report to include: 1) an explanation of metal price forecasts; 2) analysis of depreciation and sunken costs; 3) a review of the effect of variable interest rates on the economic model; and 4) multiple scenarios for the Base Cash Flow case study.

In the Base Cash Flow case study, assuming an antimony (Sb) price of US$2.25 per pound and a gold (Au) price at US$700 per ounce, a seasonally operated 125 tons per day concentrating plant could ship stibnite concentrates during a five year mine development period. The net present value (NPV), using a 4.0 percent interest on investment, amounts to US$7,589,441. An NPV, using a 6.0 interest rate on investment, is US$6,478,071. The internal rate of return (IRR) is calculated to be 31.2 percent for the Base Cash Flow case study. Other alternative assumptions were modeled including 1) reduced metal recovery; 2) ore dilution; 3) reduced metal recovery coupled with dilution of ore. All of these scenarios generated IRR values ranging from 25.2 to 29.4 percent, and all indicated positive NPV values, and favorable return on investment. Price sensitivity assumptions were also further explored in the economic analysis, which confirmed that antimony drives the project.

The QP also chose to modify inferred Sb and Au resources estimates on the Pringle Bench, which results in amendments to Figure 17.10, Table 17.15 (page 103), Table 17.16 (page 107), and Table 1.3 (page 16), of the Technical Report which may be viewed on www.sedar.com, www.sec.gov/edgar.shtml or the Company's website, www.silverado.com. The changes were made upon further review of the distance between drill control points used in a polygonal analysis of the inferred resources on Pringle bench. As a result, inferred resources in the Nolan Creek area as reported in the Technical Report changed from 27,697 tons grading 12.26 percent antimony and 0.230 oz/ton gold to 24,077 tons grading 12.45 percent antimony and 0.245 oz/ton gold. This results in reductions of 12 percent and 8 percent of in-place inferred resources of antimony and gold respectively.

The measured reserve estimates on Workman's Bench, on which the pre-feasibility study was based, have not changed.

The amended inferred resource estimates for the Pringle Bench and Nolan areas are shown below:

Summary of Amended Inferred Antimony and Gold resources from 'A' and 'West' Zones, Pringle Bench

Category

Cut-Off Grade (% Sb)

Quantity 
(tons)

Grade
(% Sb)

Metal
(ton Sb)

Grade
(oz/ton Au)

Metal
(oz gold)

�A� Vein Inferred

4.0

737

29.13

214.7

0.113

83.4

�West� Vein Inferred

4.0

1,951

9.86

192.3

0.049

94.7

TOTALS

4.0

2,688

15.14

407.0

0.067

178.1


Notes:
  • The effective date of these resources is January 1, 2009; amended June 1, 2009
  • Rounding may result in some discrepancies.
  • No processing recovery factors have been applied to these resource figures.
  • The unit ton refers to short tons.
  • Cut-off grade is 4.0% Sb 'equivalent', which is the combined
    values of gold plus antimony expressed in terms of antimony


Silverado's amended, inferred lode mineral resources, Nolan Creek area

Resource Category

Cut-off grade
(% Sb)

Quantity
(ton)

Grade
(% Sb)

Metal
(ton Sb)

Grade
(oz/ton Au)

Metal
(oz Au)

Inferred

4.0

24,077

12.45

2,997.6

0.245

5,894.7


Notes:
  • The effective date of these resources is January 1, 2009; amended June 1, 2009.
  • Rounding may result in some discrepancies.
  • No processing recovery factors have been applied to these resource figures.
  • The unit ton refers to short tons.
  • Cut-off grade is 4.0% Sb 'equivalent', which is the combined values of gold plus antimony expressed in terms of antimony

Other Amendments to the Technical Report made by the QP include: 1) the addition of permitting and regulatory information in Sections 4.3 and 18.5; 2) clarification of data presented in the Mineral Processing and Metallurgical Testing (Section 16); and 3) providing a project budget estimate for a 5,000 foot core drilling program that was recommended in Section 20 of the January 1, 2009 Technical Report. The drill program will seek to add further confidence to Sb and Au resource estimates on Workman's Bench and Pringle Bench.

Assumptions, Methods, and Parameters

The QP estimated mineral resources using the following steps:

  • Personal inspection of both Workman's Bench lode-style and the Nolan Creek placer-style gold properties during 1994, 1999, 2004, and 2006 to 2008.
  • Database compilation and data validation.
  • Geological interpretation and modeling.
  • Compositing assay intervals to a common length.
  • Determination of average material density for both lode and placer properties.
  • Analysis of grade variability.
  • Polygonal estimation of grade by compositing of sample assay information taken within designated widths and lengths of mineralized zones.
  • Assignment of appropriate cut-off grades, the lowest grade that can be mined economically.
  • Classification of confidence in the estimates with respect to CIM (2005) guidelines.
  • Mineral resource tabulation and validation of the resource estimate.

Data Verification

  • During numerous personal inspections of the Nolan Creek properties (2007 to 2008) the QP has observed sample collection and sample preparation practices for lode-style deposits.
  • On June 13 and 14 and September 28 and 29, 2008, the QP visited Nolan Camp and examined all significantly mineralized core intervals acquired from the 2007 and 2008 exploration of the Workman's Bench property. A total of 124 mineralized intervals were examined. The analytical data was compared with each of the mineralized zones to confirm the elevated antimony and gold values in the sampled intervals.
  • Drill core intervals were checked through re-assay and inspection. The QP is satisfied that the sampling and analysis of drill core was carried out in a sound manner.
  • Selected field duplicates of sampled intervals, two from underground channels, and one from a trench, were submitted by the QP to an umpire laboratory (Alaska Assay Laboratories LLC) to check analytical results from ALS Chemex. In as much that the samples are collected by different individuals at different times and analyzed by different labs, the QP judges that results from this limited comparison indicate acceptable levels of bias and accuracy for gold and antimony values and confirm the existence of mineralization.

Qualified Person

The information contained in this news release was prepared by Thomas K. Bundtzen, P.Geo, BS, MS, CPG-10912, ABSLN # 279639, President of Pacific Rim Geological Consulting, Inc. of Fairbanks, Alaska, who is independent of the Company as defined by NI 43-101. Bundtzen is a Certified Professional Geologist with the American Institute of Professional Geologists. Bundtzen is a "Qualified Person" as defined by NI 43-101 and also qualifies under the rules stated by the U.S. Securities and Exchange Commission ("SEC"), and has verified the data contained in this news release for accuracy.

Forward-Looking Statements

This news release may contain, in addition to historical information, forward-looking statements within the meaning of Section 27A of the Securities Act of 1933, as amended, and Section 21E of the Securities Exchange Act of 1934, as amended. Statements in this news release that are forward-looking statements are based on the current expectations, beliefs, assumptions, estimates and forecasts about the Company's business and the industry and markets in which it operates. Such forward-looking statements involve risks and uncertainties regarding the market price of gold, availability of funds, government regulations, common share prices, operating costs, capital costs, outcomes of test mining activities and other factors. Forward-looking statements are made, without limitation, in relation to operating plans, property exploration activities, including test mining activities, availability of funds, environmental reclamation, operating costs and permit acquisition. Any statements contained herein that are not statements of historical facts may be deemed to be forward-looking statements. In some cases, you can identify forward-looking statements by terminology such as "may", "will", "should", "expect", "plan", "intend", "anticipate", "believe", "estimate", "predict", "potential", or "continue", and the negative of such terms or other comparable terminology. Actual events or results may differ materially. In evaluating these statements, you should consider various factors, including the risks detailed in the Company's filings with the Canadian Securities Authorities and the US SEC. These factors may cause the Company's actual results to differ materially from any forward-looking statement. Except as required by applicable securities laws, the Company disclaims any obligation to publicly update these statements, or disclose any difference between its actual results and those reflected in these statements. Given these uncertainties, readers are cautioned not to place undue reliance on such forward-looking statements.

For further information, please contact:

Silverado Gold Mines Ltd
Investor Relations
1820-1111 West Georgia Street
Vancouver, BC V6E 4M3
Telephone: (604) 689-1535
E-mail: ir@silverado.com
Website: www.silverado.com

###

You can also view this News Release on our website at:
http://www.silverado.com/s/NewsReleases.asp?ReportID=351248
 

SILVERADO GOLD MINES LTD.

Suite 1820 - 1111 West Georgia Street, Vancouver, British Columbia, Canada V6E 4M3;
Telephone: (604) 689-1535, Facsimile: (604) 682-3519 Investor Relations: E-mail: ir@silverado.com;
Public Relations : E-mail: pr@silverado.com; Toll Free: 1-800-665-4646 (Canada and USA only)
Silverado Gold Mines Ltd. www.silverado.com

 
<
Données et statistiques pour les pays mentionnés : Canada | Tous
Cours de l'or et de l'argent pour les pays mentionnés : Canada | Tous

Silverado Gold Mines Ltd.

PRODUCTEUR
CODE : SLGLF.OB
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Silverado Gold est une société de production minière d'or et d'argent basée au Canada.

Silverado Gold est productrice d'or, d'argent, d'antimoine en USA, et détient divers projets d'exploration en USA.

Ses principaux projets en production sont NOLAN GOLD et ESTER DOME en USA et ses principaux projets en exploration sont EAGLE CREEK et MARSHALL DOME en USA.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Projets de Silverado Gold Mines Ltd.
06/06/2009(Nolan Gold)43-101 Pre-Feasibility Analysis Amended June 1, 2009 to Refl...
17/11/2008(Nolan Gold)Announces Updated Mineral Resource Estimates for Workman's B...
22/09/2008(Nolan Gold) New Drill Results at Nolan Creek Which Continue to Disclose...
10/09/2008(Nolan Gold)Commences Pre-Feasibility Study and Announces 2008 Geophysi...
Communiqués de Presse de Silverado Gold Mines Ltd.
07/07/2009Engages D&D Securities Company
06/07/2009Remember us? You are receiving this email because you reques...
28/01/2009SEC and BCSC Complete Reviews of Silverado
16/01/2009Announces Results of SEC Review
05/01/2009Announces Results of Preliminary Feasibility Study on Workma...
11/12/2008Announces Results of Annual General Meeting
06/08/2008Announces Revocation Of Cease Trade Order
01/08/2008 Releases Mineral Resource Estimates for its Ester Dome Prop...
16/07/2008Clarifies Disclosure
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
OTC BB (SLGLF.OB)FRANKFURT (SLGL.F)
0,002-33.33%
OTC BB
US$ 0,002
02/03 15:53 -
-33,33%
Cours préc. Ouverture
0,003 0,003
Bas haut
0,002 0,003
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
- -  0,002 1 900,00%
Volume var. 1 mois
8 452 451 1 900,00%
Produit Antimony - Gold
Développe
Recherche Gold
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 03/12/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
Variation annuelle
DateVariationMaxiMini
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,64 AU$+1,26%Trend Power :
OceanaGold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
12,09 US$+0,33%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,59 GBX+9,83%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,61 CA$-1,14%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
16,19 CA$+2,21%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+0,00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,20 AU$+2,50%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,84 CA$-1,60%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
50,98 US$+0,24%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+0,00%Trend Power :