Vancouver, B.C. January 29, 2008. VMS Ventures
Inc. (TSX.V: VMS) (the "Company") is pleased to report assay
results and an update on the progress of its ongoing drill program at the
Reed Project Discovery Zone near Snow Lake, Manitoba.
Highlights:
Hole RD 07 07: ������ 26.27m (86.19 feet) of 1.0%
Cu & 4.48% Zn
�����
- Including 2.03 m
of 4.06% Cu & 3.8 m
of 10.75% Zn
�������������������������
Hole RD 07 10:������� 43.08m (141.34 feet) of
0.72% Cu & 4.27% Zn
������
-Including 10.26m of 8.26% Zn
������������������������
Hole RD 07 12: ������ 32.73m (107.38 feet) of
Near Solid Sulphide, Assays Pending
�������������������������
Hole RD 08 14: ������ 31.39m (102.99 feet) of
Near Solid Sulphide, Assays Pending
Hole RD 08 20: ������ 48.39m (158.73 feet) of
Near Solid Sulphide, Assays Pending
Vice-President of
Exploration, Dr. George Gale states "We are very encouraged by the
initial follow-up results to the discovery hole announced in October, 2007.
We have intersected additional mineralization with similar lengths and
values typical of those in operating mines in the area. We have
intersections of Near Solid Sulphides at depths as shallow as 30m and as
deep as 170m from surface. Preliminary Deep EM results also suggest that
the deposit is open at depth. Drill results to date indicate a near
vertical dip to the mineralization."
Hole #
|
From
(m)
|
To
(m)
|
Int
(m)
|
Cu
%
|
Zn
%
|
Ag
g/tn
|
Au
g/tn
|
PULSE
EM
|
Off
Hole
Conductor
|
RD07-07
|
123.43
|
150.10
|
26.27
|
1.00
|
4.48
|
12.34
|
0.81
|
|
|
� Inc
|
127.10
|
130.90
|
3.80
|
0.70
|
10.75
|
8.86
|
0.53
|
|
|
� Inc
|
134.76
|
136.24
|
1.48
|
3.84
|
1.88
|
43.92
|
1.86
|
|
|
� Inc
|
141.00
|
143.03
|
2.03
|
4.06
|
2.30
|
31.73
|
1.41
|
|
|
��Inc
|
143.03
|
149.54
|
6.51
|
0.35
|
4.38
|
4.37
|
0.37
|
|
|
RD07-08
|
|
|
NSI
|
|
|
|
|
Surveyed
|
YES
|
RD07-09
|
|
|
NSI
|
|
|
|
|
Surveyed
|
YES
|
RD07-10
|
98.28
|
141.36
|
43.08
|
0.72
|
4.27
|
9.39
|
0.62
|
|
|
� Inc
|
100.23
|
110.49
|
10.26
|
0.68
|
8.26
|
14.74
|
0.52
|
|
|
� Inc
|
124.05
|
129.75
|
5.70
|
0.27
|
4.26
|
3.61
|
0.07
|
|
|
RD07-11
|
|
|
NSI
|
|
|
|
|
|
|
RD07-12**
|
172.21
|
204.94
|
32.73
|
|
|
|
|
|
|
RD07-13
|
|
|
NSI
|
|
|
|
|
|
|
RD08-14**
|
70.79
|
102.18
|
31.39
|
|
|
|
|
|
|
RD08-15
|
|
|
NSI
|
|
|
|
|
|
|
RD08-16**
|
63.44
|
66.46
|
3.02
|
|
|
|
|
|
|
RD08-17
|
|
|
NSI
|
|
|
|
|
|
|
RD08-18
|
|
|
NSI
|
|
|
|
|
|
|
RD08-19
|
|
|
IP
|
|
|
|
|
|
|
RD08-20**�
|
41.61
|
90.00
|
48.39
|
|
|
|
|
|
|
** = Near Solid Sulphide intercept (assays pending)
NSI = no significant
interval; IP = in progress
The analysis of the Discovery Zone continues
with the following activities, all designed to assist in defining the
deposit as quickly and efficiently as possible:
UPCOMING DRILL TARGETS:
The two drills operating on the discovery zone
will continue to test the mineralization on 25m spaced sections to confirm
the strike, dip and extent of the body and to explore for additional
sulphide lenses. In addition, A third drill has been mobilized onto the
Tower Zone area, located approximately 1 km east of the discovery zone, where
alteration and minor mineralization typical of VMS deposits were
intersected in the summer program in holes RD 07 04, RD 07 05 and RD 07 06.
DOWN-HOLE PROBE/PULSE EM
Down-hole PULSE EM surveys of holes RD07-08 and
RD07-09, (which did not intersect near solid sulphides) indicate the
presence of strong off-hole conductors. Late time channel responses,
indicative of good conductivity, show off-hole responses near the end of
the boreholes. The geophysical responses of the borehole EM surveys are
complex and show that extensive conductivity is located near the boreholes.
The off-hole anomalies will be tested in this drill program. The Company
has left the casing in each completed drill hole and plans to probe a
number of these holes when the system returns to the property, anticipated
for mid-February.��
DEEP EM SURVEY
In anticipation of drill testing deeper
targets, the Company contracted to utilize a Deep EM ground survey which is
capable of detecting more subtle and deeper targets than the VTEM airborne
survey. Four lines of a planned twenty-two line ground DEEPEM survey have
been completed. The survey is estimated to detect conductive bodies to a
depth of at least 300m. The initial four lines of the DEEPEM survey, though
only covering 300
meters of the earlier identified 800 meter long VTEM
airborne anomaly, indicates a southerly plunging and strongly conductive
body. Further drilling will be required to confirm this
interpretation.��
HLEM SURVEY
�
Due to the fact that
mineralization has been intersected within 30m of surface (hole RD 08 20),
a Horizontal Loop EM survey is being
sourced to accurately delineate the near surface portion of the deposit.
These deposits often occur as multiple sheets, so the HLEM survey will help
to identify the presence of additional mineralized lenses near the surface
in the area surrounding the discovery.
VTEM SURVEY
Geotech is currently flying the southern
portions of the Reed Property which were not surveyed in the spring 2007
program. As part of this survey, the area surrounding the discovery is
being flown in a north-south orientation to provide greater definition to
the original VTEM anomalies.
Location of holes drilled on the Reed
Project Discovery Zone:
HOLE ID
|
NORTH
|
EAST
|
LENGTH
|
DIP
|
AZ
|
RO-07-01
|
6048741
|
393926
|
250.00
|
-50
|
325
|
RO-07-02
|
6048735
|
394004
|
300.00
|
-45
|
340
|
RO-07-03
|
6048922
|
393959
|
200.00
|
-70
|
160
|
RO-07-07
|
6048759
|
393998
|
200.00
|
-45
|
340
|
RD-07-08
|
6048748
|
394046
|
335.00
|
-45
|
340
|
RD-07-09
|
6048703
|
394014
|
329.00
|
-45
|
300
|
RD-07-10
|
6048784
|
394005
|
225.00
|
-45
|
340
|
RD-07-11
|
6048787
|
393946
|
277.00
|
-45
|
340
|
RD-07-12
|
6048752
|
393988
|
284.00
|
-45
|
340
|
RD-07-13
|
6048784
|
394061
|
303.73
|
-60
|
340
|
RD-08-14
|
6048787
|
393946
|
309.98
|
-45
|
25
|
RD-08-15
|
6048709
|
394041
|
316.99
|
-45
|
340
|
RD-08-16
|
6048787
|
393946
|
267.31
|
-45
|
45
|
RD-08-17
|
6048814
|
393997
|
128.00
|
-45
|
45
|
RD-08-18
|
6048839
|
393955
|
111.86
|
-45
|
45
|
RD-08-19
|
6048814
|
393997
|
�������
IP
|
-60
|
45
|
RD-08-20
|
6048817
|
393940
|
151.48
|
-45
|
45
|
Dr Gale summarizes
"Although we are still in the very early stages of delineating this
deposit, we are encouraged to find that we have similar textures and
compositions to the deposits of the Snow Lake camp.
And while it is well known that these deposits are fractured and faulted
and difficult to follow, I am impressed by the number of significant
intercepts we have been able to discover so far. The challenge now is to
maintain momentum, especially in the harsh winter conditions of northern Manitoba.
I'm confident our team can meet that challenge. "
VMS Ventures Inc. is
focused primarily on acquiring, exploring and developing copper-zinc
properties in the Flin
Flon-Snow Lake VMS Belt. The
Company also holds the largest land package considered prospective for
nickel-copper mineralization at Lynn Lake, which is to
date Canada's
third largest nickel producing camp. The Company's project portfolio
consists of the Snow Lake VMS project, the Lynn Lake Gabbros nickel-copper
project, the Nickel Belt project, the South Bay
nickel-copper-cobalt PGE property, and the Eden Lake Carbonatite
Complex, Specialty Metals property. All VMS Ventures Inc. properties are
located in the mining friendly province of Manitoba, Canada.
ON BEHALF OF THE BOARD OF
DIRECTORS
John Roozendaal B.Sc.
President &
Director