Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en

Pele Mountain Resources Inc

Publié le 19 septembre 2007

Achieves Positive Results from 5,600-Metre Drill Program at Elliot Lake Uranium Projec

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   K Street | Uranium |

Pele Mountain Achieves Positive Results from 5,600-Metre Drill Program at Elliot Lake Uranium Project

Symbol: GEM
Listing: TSX Venture Exchange
Common Shares Outstanding: 72,071,310
Website: www.pelemountain.com
Highlights
  • Adit Block Results Confirm Favourable Uranium Grade, Thickness, and Continuity
  • Basal Conglomerate Bed Results Verify Exploration Model and Potential for More Resources
  • Scoping Study and Updated NI 43-101 Report Due from Scott Wilson RPA at Month End

FOR IMMEDIATE RELEASE

September 19, 2007 - Toronto - Pele Mountain Resources Inc. (TSX Venture: GEM) ("Pele" or the "Corporation") today announced results from the first 33 holes of its recent 35-hole, 5,600-metre drill program at its Elliot Lake Uranium Project in Northern Ontario. Pele is focused on advancing the project, and its inferred resource of over 33 million pounds of U3O8, toward objectives of development and production. Uranium mineralization extends across a strike length of 6,000 metres, and a dip length of at least 3,800 metres, within Pele's 100-percent owned property. 

An ongoing comprehensive scoping study (the "Scoping Study") is advancing under the supervision of Scott Wilson Roscoe Postle Associates ("Scott Wilson RPA") to establish the basis for economically viable, safe, and environmentally-compliant mining and processing facilities at Elliot Lake. The Scoping Study, along with an updated resource estimate, is expected to be available at the end of September in a NI 43-101 Preliminary Assessment report. 

The drill program successfully achieved its two primary objectives: 

  • It further defined the grade and continuity of the resource located within the "Adit Block", a 600 by 800-metre near-surface area that presents a favourable location for initial mining in the project evaluation. Pele's previous 22-hole program focused on the Adit Block, confirming historical results in the Main Conglomerate Bed ("MCB").
  • It confirmed the presence of higher grade uranium mineralization in the Basal Conglomerate Bed ("BCB") within the Canyon Lake Block, roughly 1,000 metres west of the Adit Block. Previous Adit Block drilling identified such mineralization in the BCB, located about 15 metres below the MCB at the Unconformity between volcanic basement rocks and overlying Huronian sediments. The Canyon Lake area was selected because of greater BCB thickness and continuity indicated by historic drilling and because the Canyon Lake Fault was projected to extend through it.

The Adit Block drilling included 23 holes, of which 21 have thus far been assayed. Highlights from the Adit Block drilling include the following: 

  • The U3O8 grades and distributions within the MCB are consistent with previous drill programs, confirming relatively higher grades and excellent continuity between holes within the Adit Block.
  • Best intercepts of the MCB include 0.083-percent U3O8 over 2.34 metres (PM-45), 0.070-percent U3O8 over 2.81 metres (PM-47), and 0.094-percent U3O8 over 1.94 metres (PM-52). The best intercept of the BCB within the Adit Block was 0.305-percent U3O8 (and 0.437 grams of gold per ton) over 0.45 metres (PM-42).
  • The MCB thickness exceeded expectations, averaging 2.78 metres compared to the 2.44 metre average from the previous drill program.
  • The areas exhibiting the highest U3O8 grades within the MCB in the Adit Block are located on the western flanks of a topographic high in the basement rocks. Historic drill results on the north and east flanks of this same structure indicate that these areas also have potential for the delineation of similar higher-grade zones.
  • Uranium within the MCB is primarily contained within the minerals pitchblende and brannerite.

The Canyon Lake Block drilling included 12 holes, all of which have been assayed. The BCB was intersected in 11 of the 12 holes and the Canyon Lake Fault was intersected in two of those holes. Highlights from the Canyon Lake Block drilling include the following: 

  • The BCB is thicker and more continuous in the Canyon Lake Block than in the Adit Block. The best intercept of the BCB within the Canyon Lake Block was 0.082-percent U3O8 over 2.64 metres (PM-24).
  • Mineralogical and assay analyses show that uranium within the MCB has been extensively leached and remobilized in the Canyon Lake Block in close proximity to where thicker and higher grade BCB occurrences have been intersected. This supports the "blue sky" potential to discover a significant secondary uranium deposit at Elliot Lake. By contrast, MCB mineralization in the Adit Block does not appear to have been mobilized any significant distance.
  • The BCB has the potential to significantly increase uranium resources at Elliot Lake and opens up a completely new target for future exploration. (All reported resources at Elliot Lake are currently contained in the MCB.)
  • Uranium within the BCB is primarily contained in secondary minerals coffinite, pitchblende, and uranium-pyrite-aluminum-silicate composite grains.

Significant Rare Earth Oxide (REO) content has been confirmed in both the MCB and BCB in all holes analysed for these metals to-date at the Elliot Lake Project. The economic potential of the REOs will be evaluated following the results of ongoing metallurgical recovery testing at SGS Lakefield. Drilling has also confirmed anomalous gold values in the BCB.. 

Follow-up drilling is planned for the north and east flanks of the basement high structure that appears to be related to higher grade zones within the MCB in the Adit Block. Follow-up drilling is also planned for the BCB in the Canyon Lake Block to extend the best results there and to further test the fault zone. Additional drill plans will be made based on recommendations in the Scoping Study. 

A map of drill hole locations for the recently completed program at Elliot Lake is available at www..pelemountain.com/pdfs/elliotlakeMap.pdf  

Drill results from the MCB within the Adit Block are included in the table below. 

Drill Results - Main Conglomerate Bed, Adit Block

Drill Hole From (m) Length (m) Est.. True Width (m) U3O8 (%)
PM-35 122.65 2.35 2.16 0.036
PM-36 117.03 2.22 2.21 0.033
PM-37 121.46 2.71 2.62 0.034
PM-38 120..12 3.03 2.93 0.038
PM-39 94.52 2.80 2.76 0.039
PM-40 76.00 2.70 2.66 0.056
PM-41 85.64 2.48 2.33 0.054
PM-42 141.20 4.55 3.10 0.065
PM-43 42.51 2.49 2.45 0.036
PM-44 45.45 3.80 3.58 0.052
PM-45 63.96 2.49 2.34 0.083
PM-46 56.80 3.83 3.52 0.052
PM-47 126.04 3.06 2.81 0.070
PM-49 174.44 4.76 3.24 0.063
PM-50 195.90 2..85 2.68 0.040
PM-51 161.38 3.46 3.25 0.046
PM-52 155.03 1.97 1.94 0.096
PM-53 185.37 3.36 3.31 0.062

Drill results from the BCB within the Canyon Lake Block are included in the table below. 

Drill Results - Basal Conglomerate Bed, Canyon Lake Block

Drill Hole From (m) Length (m) Est. True Width (m) U3O8 (%)
PM-23 96.03 0.97 0.93 0.019
PM-24 91.80 2.68 2.64 0.082
PM-25 127.00 2.00 1.26 0.048
PM-26 131.00 0.82 0.78 0.028
PM-27 119.20 1.00 0.97 0.027
PM-28 166.00 0.57 0.42 0.103
PM-29 53.71 1.44 1.35 0.041
PM-30 74.60 1.73 1.14 0.052
PM-32 131.60 0.45 0.45 0.145
PM-33 174.75 0.30 0.20 0.196
PM-34 125.33 1.17 1.06 0.020

A detailed report on the recent drill program including results from the MCB in the Canyon Lake Block, the BCB in the Adit Block, mineralogical studies, and the QA/QC program are included in the Scott Wilson RPA report which can be accessed on the Pele web site at www.pelemountain.com/pdfs/elliotlakeX.pdf  

The technical aspects of this press release have been reviewed and approved by Lawrence B. Cochrane, Ph.D., P. Eng. of Scott Wilson RPA, a "Qualified Person" under NI 43-101. 

About Pele Mountain Resources

Pele Mountain Resources is a Canadian energy and mineral exploration company focused on advancing its 100-percent owned Elliot Lake Uranium Project through comprehensive scoping studies toward objectives of development and production. The project hosts a NI 43-101 compliant inferred resource exceeding 33 million pounds of U3O8 (30.05 million tonnes grading 0.05-percent U3O8) with the potential for significant upgrade and expansion. Elliot Lake was once known as "the uranium capital of the world" and has produced more than 270 million pounds of U3O8 from vast, stratigraphically-bound deposits. 

Pele also holds a diverse portfolio of gold, diamond, and base metal projects located across Northern Ontario . Through project generation, strategic partnerships, and mineral discovery, Pele provides shareholders with exposure and leverage to the ongoing bull market in natural resources. Pele stock trades on the TSX Venture Exchange under the symbol “GEM”. 

For further information please contact Al Shefsky , President, at (416) 368-7224, or visit the Pele website at www.pelemountain.com . 

The TSX-V has not reviewed and does not accept responsibility for the adequacy or accuracy of this release . Some of the statements contained in this release are forward-looking statements, such as estimates and statements that describe Pele's future plans, objectives or goals, including words to the effect that Pele or management expects a stated condition or result to occur. Since forward-looking statements address future events and conditions, by their very nature, they involve inherent risks and uncertainties. Actual results in each case could differ materially from those currently anticipated in such statements. The economic viability of the 43-101 mineral resource at Pele's Elliot Lake Project has not yet been demonstrated by a preliminary feasibility study.


 
Sent to: .com
If you prefer not to receive
future e-mails of this type,
Leave this List.
Sent By:
Pele Mountain Resources
2200 Yonge Street
Suite 1002
Toronto Ontario M4S 2C6
To view as a web page.

Pele Mountain Resources Inc

EN DÉVELOPPEMENT
CODE : GEM.V
ISIN : CA7059071034
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Pele Mountain Res. est une société d’exploration minière et d'uranium basée au Canada.

Pele Mountain Res. est en développement de projets de rare earth au Canada, et détient divers projets d'exploration au Canada.

Son principal projet en développement est ECO RIDGE au Canada et ses principaux projets en exploration sont HIGHLAND (EAST / WEST), ARDEEN, ALLIANCE, SUDBURY et FESTIVAL au Canada.

Pele Mountain Res. est cotée au Canada et aux Etats-Unis D'Amerique. Sa capitalisation boursière aujourd'hui est 6,3 millions CA$ (4,6 millions US$, 4,3 millions €).

La valeur de son action a atteint son plus haut niveau récent le 31 décembre 2007 à 1,62 CA$, et son plus bas niveau récent le 02 juin 2017 à 0,01 CA$.

Pele Mountain Res. possède 210 000 000 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Dans les médias de Pele Mountain Resources Inc
24/10/2007 Advances Baseline Environmental Studies at Elliot Lake Uran...
Financements de Pele Mountain Resources Inc
23/09/2016Pele Mountain Enters Into Funding Agreement
13/04/2015Announces Closing of Private Placement
03/10/2013Announces Closing of Private Placement Offering
26/07/2013Announces Closing of Private Placement Offering
04/07/2013Announces Closing of Second Tranche of a Private Placement O...
Nominations de Pele Mountain Resources Inc
11/02/2014Nominates Janis Peleshok to its Board of Directors
27/11/2013John Wilkinson Former Ontario Cabinet Minister Joins Pele Mo...
07/11/2007 Appoints Fergus Kerr Vice-President of Uranium Operations t...
09/05/2007Appoints James Andersen as Chief Financial Officer and Renew...
Projets de Pele Mountain Resources Inc
09/10/2013Interview with Roger Payne P. Eng. Executive Vice President ...
12/09/2013(Eco Ridge)Reviews Economics at Its Eco Ridge Mine Rare Earth and Urani...
10/06/2013(Eco Ridge)Announces Major Increase in Uranium and Rare Earth Resources...
10/06/2013(Eco Ridge)Announces Major Increase in Uranium and Rare Earth Resources...
10/06/2013(Eco Ridge)Announces Major Increase in Uranium and Rare Earth Resources...
10/06/2013(Eco Ridge)Announces Major Increase in Uranium and Rare Earth Resources...
10/06/2013(Eco Ridge)Announces Major Increase in Uranium and Rare Earth Resources...
28/05/2013(Festival)Announces Reactivation of Festival Project Joint Venture Nea...
03/04/2013(Eco Ridge)to Update Eco Ridge Resource Estimate
29/01/2013Hits Higher Grade Uranium & Rare Earths at Elliot Lake
17/01/2013(Eco Ridge)Drilling Expands Eco Ridge Deposit
16/10/2012(Eco Ridge)Begins 6,500-Metre Drill Program at Its Eco Ridge Mine Rare ...
27/09/2012Samples High Grade Rare Earths at Mountain Pass
26/09/2012Closes Acquisition of Mining Claims 1800 Metres from Molycor...
15/05/2012(Eco Ridge)Closes Highland Project Sale Agreement; Will Focus on Eco Ri...
17/04/2012(Eco Ridge)Enters Agreement to Sell Highland Gold Projects; Will Focus ...
16/04/2012(Eco Ridge)Announces Robust Updated PEA for Eco Ridge Mine Rare Earths ...
06/03/2012Enters Agreement to Acquire Rare Earth Mining Claims Surroun...
13/10/2011(Eco Ridge)Announces Discovery of Continuous Rare Earths Mineralization...
07/09/2011(Eco Ridge)Files Preliminary Economic Assessment for Eco Ridge, Providi...
05/07/2011(Eco Ridge)Announces Preliminary Economic Assessment for Eco Ridge Mine...
26/05/2011(Eco Ridge)Launches 7,000 Metre Drill Program at Its Eco Ridge Mine Rar...
17/05/2011(Eco Ridge)Receives Mining Leases at Its Eco Ridge Mine Rare Earths and...
07/03/2011(Ardeen)Provides Gold Projects Update
24/02/2011(Eco Ridge)Announces Total Rare Earth Oxide Resources of 52-Million Pou...
24/01/2011(Eco Ridge)Announces Major Increase in Indicated Resources at its Eco R...
25/06/2010(Highland (east / West))Initiates Permitting Process to Mine Gold Bulk Sample
04/03/2010(Highland (east / West))Hits High Grade Gold at Highland’s A-Zone
18/01/2010(Highland (east / West))Begins Drilling at East Highland Gold Project
23/12/2009(Highland (east / West))Samples 14.76 g/t Gold Over 3.6 Metres at Its East Highland ...
11/12/2009(Highland (east / West))Samples 50 g/t Gold, 161 g/t Silver 4.3% Zinc, and 1.2% Lead...
10/11/2009(Highland (east / West))Discovers New Mineralized Zones, Expands Others, at East Hig...
17/09/2009Finds More High-Grade Gold at East Highland
01/09/2009(Ardeen)Coventry Resources Commences Diamond Drilling at Pele Mounta...
11/08/2009(Highland (east / West))High-Grade Gold Discovery at Its Highland Project
27/07/2009(Eco Ridge)Signs Agreement With the City of Elliot Lake for Surface Rig...
09/01/2009(Eco Ridge)Advances Eco Ridge Mine Project - Extensive Drill Program Re...
08/01/2009(Sudbury)Wallbridge Mining Company to Continue Exploration at Pele Mo...
09/09/2008(Eco Ridge)Initiates Permitting Process at Eco Ridge
26/08/2008(Eco Ridge)assembles team of uranium industry leaders to develop Eco Ri...
12/05/2008(Timmins - Whitney Township)Enters Into Option Agreement to Sell Its Timmins Nickel Proj...
02/05/2008(Eco Ridge)Launch Pre-Feasibility Study for Elliot Lake Uranium Mine Pr...
06/03/2008(Eco Ridge) Reports Additional Positive Drill Results from Its Elliot L...
13/02/2008(Eco Ridge)Identifies High Priority Geophysical Targets at its Elliot L...
25/01/2008(Eco Ridge)New Drill Results Expand Higher-Grade Zone at Pele Mountain'...
17/01/2008(Eco Ridge)Expands Exploration for Higher Grade Remobilized Uranium at ...
28/11/2007(Eco Ridge)Targets Remobilized Uranium at Elliot Lake
12/10/2007(Eco Ridge)Publishes Positive Scoping Study for Uranium Mine Project at...
04/10/2007Achieves Major Milestone with Positive Scoping Study for Ura...
02/10/2007Announces Scoping Study for Its Elliot Lake Uranium Project ...
19/09/2007(Eco Ridge)Achieves Positive Results from 5,600-Metre Drill Program at ...
09/07/2007(Eco Ridge)Advances Mine Planning and Scoping Studies on 33-Million Pou...
30/05/2007(Eco Ridge)Expands Drilling at Elliot Lake Uranium Project
07/05/2007(Eco Ridge)Intersects High-Grade Uranium In Basal Conglomerate Bed at E...
02/05/2007(Eco Ridge)Expands Elliot Lake Uranium Project
01/05/2007(Eco Ridge)Drilling Confirms Near-Surface, Higher-Grade Uranium at Pele...
26/01/2006hits more high grade gold at Talisker
Communiqués de Presse de Pele Mountain Resources Inc
05/07/2016Pele Mountain to Sell Its Ardeen Gold Project
04/05/2016Pele Mountain Provides Update on Development Plans and Progr...
15/01/2016Pele Mountain Resources Appoints Wayne Richardson as Chairma...
07/10/2015Pele Mountain Announces Option Grants
01/10/2015Pele Mountain Provides an Update on its Eco Ridge Monazite P...
28/07/2015Pele Mountain Advances Cogent Solution to Rare Earth Industr...
13/04/2015Pele Mountain Announces Closing of Private Placement
30/03/2015Pele Mountain Executes MOU with Major Chinese Rare Earth Pla...
30/03/2015IIROC Trading Resumption - GEM
30/03/2015Executes MOU with Major Chinese Rare Earth Player to Pursue ...
30/03/2015IIROC Trading Halt - GEM
05/03/2015Pele Mountain Shareholders Approve All Matters Presented at ...
05/03/2015Shareholders Approve All Matters Presented at the Annual and...
17/02/2015Pele Mountain Advances Monazite Recycling Strategy to Kick-S...
12/02/2015Pele Mountain Announces Option Grants
24/12/2014Pele Mountain Announces Closing of Private Placement
02/12/2014The Council of the City of Elliot Lake Supports Pele Mountai...
07/11/2014Pele Mountain Announces Proposed Shares for Debt Settlement
07/10/2014Pele Mountain Expands its Business Model to Include Recyclin...
25/09/2014Pele Mountain Appoints Martin S. Cooper As Vice President of...
11/09/2014Pele Mountain Acquires Key Mining Lease in Elliot Lake
02/09/2014Pele Mountain Announces Collaboration with Canmet to Advance...
08/07/2014Pele Mountain Participates in Regional Roundtable Discussion...
25/06/2014Parliamentary Committee on Natural Resources Publishes "The ...
24/06/2014Pele Mountain Announces Closing of Private Placement
09/05/2014Pele Mountain Announces Closing of Private Placement Offerin...
02/05/2014Pele Mountain Announces Closing of First Tranche of Private ...
01/05/2014Pele Mountain Announces Closing of First Tranche of Private ...
05/06/2013Shareholders Approve All Matters Presented at the Annual and...
29/01/2013Intersects Higher-Grade Uranium & Rare Earths; Discovers Wid...
17/01/2013CEO Interviewed by Jeb Handwerger
24/10/2012(Eco Ridge)Achieves Processing Milestone: Mixed Rare Earth Concentrate ...
04/07/2012(Eco Ridge)Files Updated Preliminary Economic Assessment for Eco Ridge ...
31/01/2012Updated PEA on Schedule for Q1 2012
12/09/2011(Eco Ridge)Drilling Expands Eco Ridge Deposit Northward, Demonstrates S...
27/07/2011Roger Payne Named Executive Vice-President at Pele Mountain
21/07/2011(Eco Ridge)to Separate Gold Assets from Eco Ridge
03/05/2011Commences Trading in the United States on OTCQX Internationa...
05/08/2010Dr. William Bird Joins Rare Metals Advisory Board
17/05/2010Begins Drilling Ni-Cu-PGE Targets at Pigeon River
29/04/2010to Drill Ni-Cu-PGE Targets at Pigeon River
03/05/2010Coventry Resources Reports Winter Drill Results from Pele Mo...
05/03/2010Completes VTEM Survey at Pigeon River, Identifies Several Pr...
07/01/2010Acquires Property in Thunder Bay Area with High Potential fo...
07/10/2009Confirms Significant Rare Earth Mineralization at Its Eco Ri...
05/08/2009Initiates Long-Term Research Study to Minimize Environmental...
05/02/2009Letter to Shareholders
05/02/2008Completes Acquisition of the Westward Extension of the Histo...
29/10/2007 Resumes Drilling at Its Elliot Lake Uranium Mine Project
26/07/2007Retains O&M Partners for Investor Relations
03/05/2007Announces Plan to Optimize Corporate Structure
27/04/2007Featured in Northern Miner Article
17/04/2007Expands Elliot Lake Uranium Project
29/03/2007Advances Mine Planning Studies on 33-Million Pound Uranium O...
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TSX-V (GEM.V)Other OTC (PMNHF)
0,030+20.00%0,040+0.00%
TSX-V
CA$ 0,030
26/04 12:16 0,010
20%
Cours préc. Ouverture
0,025 0,030
Bas haut
0,030 0,030
Année b/h Var. YTD
0,025 -  0,060 -50,00%
52 sem. b/h var. 52 sem.
0,025 -  0,080 -57,14%
Volume var. 1 mois
35 750 -%
24hGold TrendPower© : 22
Produit
Développe Rare earth
Recherche Diamonds - Gold - Platinum - Silver
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 13/11/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
2024-45,45%
202337,50%0,100,04
2022-70,37%0,180,04
202117,39%0,720,09
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,70 AU$-0,65%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
12,26 US$+2,68%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,53 GBX-1,87%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,64 CA$-1,86%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
16,23 CA$+4,04%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+4,26%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,20 AU$+2,63%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,88 CA$+0,53%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
52,71 US$+0,19%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+5,56%Trend Power :