Activity Report for Quarter Ended 31 October 2013

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Copper | K Street | Precious Metals |

Activity Report for Quarter Ended 31 October 2013

QUARTERLY REPORT IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII PERIOD ENDING 31 OCTOBER 2013

Hillgrove Resources Limited (ASX: HGO) reports for the quarter ended 31 October 2013

HIGHLIGHTS

Kanmantoo Copper Mine, South Australia

Hillgrove's Kanmantoo Copper Mine produced 4,306 tonnes copper in concentrate for the Quarter, a
25% increase over Q2 and a record production for the mine during a significant changeover of mining operations. The October month production of 2,014 tonnes copper is a monthly record for the mine.

Revenue for the Quarter was AUD32.8 million at an average realised price for copper of USD3.29/lb.

C1 costs for the Quarter of USD2.80/lb were impacted by the mining changeover in the first half of the

Quarter, but have decreased to below target range for the October month at USD2.07/lb.

Year to date C1 unit cost was USD2.63 per pound, however full financial year C1 unit cost is projected to be within the previous guidance of USD2.25 to USD2.50 with lower unit costs projected in Q4.

Mill throughput was a record, with 756k tonnes of ore milled for the quarter (at 3Mtpa rates) further reducing milling costs per tonne of ore.

Significant areas of higher grade ore were extracted later in the Quarter from the Kavanagh Pit below the old Kanmantoo Pit, allowing an average Quarter processing grade of 0.63% Cu. This comprised primarily low grade feed for the first six weeks (following the changeover from contract to owner operated mining), combined with an ore grade of 0.79% Cu processed in October.

New mining operations were ramped up during the Quarter, with productivity improvements increasing through September and October. Shift crews were fully established by early November. Larger excavators have been ordered for further increase of mining tonnes early next year in line with the life of mine plan.

Guidance for Quarter 4 includes mill throughput rates of 725k to 750k tonnes at a grade of approximately

0.8% copper. Full year copper production guidance is maintained at 16,500t to 18,000t copper contained in concentrates.

New Ore Reserve now stands at 22.1Mt at 0.71% copper, 0.18g/t gold and 1.9g/t silver for contained metal of 157k tonnes (346Mlbs) of copper, 128k ounces of gold and 1.35M ounces of silver.

Total Recordable Injury Frequency Rate improved by 47% from 28 to 15.

Indonesia

Hillgrove initiated further redundancies of personnel and closed its Jakarta office, however maintains a core crew at both its Indonesian project offices. The Company is continuing to pursue interest from potential investors for these projects.

Corporate

Cash on hand as at 31 October 2013 was AUD16.5 million, with debt reducing from AUD48.2 million to

AUD44.5 million. A capital raise of $10.8M before costs was completed.

IIIIIIIIIIIIIIIIIIIIIIIII HILLGROVE RESOURCES LIMITED ACN 004 297 116

IIIIIIIIIIIIIIIIIIIIIIIII HILLGROVE RESOURCES LIMITED ACN 004 297 116

KANMANTOO COPPER MINE, SOUTH AUSTRALIA

Mining Lease 6345 (Hillgrove 100%) Executive Summary

At the end of Quarter 2, Hillgrove announced a mutual termination of its Mining Services contract, and a move to
owner operated mining with some specialised contractors. During the initial weeks of Quarter 3 a fully leased mining fleet was mobilised, a Hillgrove mining workforce was employed, specialised blast hole drilling was engaged on contract, and explosives suppliers arranged. The ramp up of mining back to planned rates was completed during the quarter. Refer to the various announcements regarding this changeover.
The transfer of management and operation of mining to Hillgrove has been completed successfully. Mining rates are now in line with FY14* plan requirements, and will continue to be ramped up early next year with increased stripping requirements for the mining plan. Mining costs were impacted by the changeover and ramp up, however by Quarter end they were in line with first half rates and still improving.
Higher grade areas of ore below the old Kanmantoo pit were reached in the second half of the Quarter, with a substantial lift in grades. These were reflected particularly in the October processing grade of 0.79% Cu.
The processing plant is achieving volumes required to meet production targets of 80,000 to 85,000 dry metric tonnes of copper concentrate per annum, with focus continuing on ore feed and dilution control. Copper recoveries through the plant have increased during the second half of the Quarter in line with ore grades.
Kanmantoo Mine commenced the community consultation part of the State Government approval for the mine life extension previously announced in February 2013, and submitted the application under the Federal Government EPBC Act for certain vegetation clearance for this extension also.
Cash on hand was AUD16.5M at Quarter end, with total debt reducing from AUD48.2M to AUD44.5M through payments both to Senior Debt and the Gold Loan. A capital raising of $10.8M before costs was undertaken at a price of AUD0.07 per share, which was a 12% discount to the 5 day VWAP. The capital raising allowed the final settlement payment with the previous mining contractor, initial increase to proceeds account, and working capital during mining changeover.

PLATE 1. KANMANTOO COPPER MINE

Safety

The quarter saw a continued improvement in safety performance for the site with the 12 month rolling Total
Recordable Injury Frequency Rate (TRIFR) reducing from 27.9 to 15.0.
A high level of induction, skills assessment and training has been instigated for all staff accessing the
Kanmantoo Mine, including new mining services staff and all contracted services.

[* Note: FY14 refers to current financial year ending 31 January 2014]

Note: HGO has a 31 January Year End, therefore quarter references are Q1 Feb-Apr, Q2 May-Jul, Q3 Aug-Oct and Q4 Nov-Jan. 2.

IIIIIIIIIIIIIIIIIIIIIIIII HILLGROVE RESOURCES LIMITED ACN 004 297 116

PLATE 2. 12 MONTH ROLLING KANMANTOO TRIFR

Operations - Mine

The transfer of management and operation of mining to Hillgrove has been completed successfully and is now fully ramped up. Significant productivity improvements were implemented through September and October, and shift crews were fully established by early November. Initial equipment fleets are complete, with larger excavators now ordered. Mining rates are now in line with FY14 plan requirements, and will continue to be ramped up early next year with increased stripping requirements for the life of mine plan.
Mining costs were impacted by the changeover from mining contract to owner operated, and the ramp up in pit mining back to planned mining rates. However by Quarter end mining costs were in line with first half cost rates and still improving.
Higher grade areas of ore below the old Kanmantoo Pit were reached in the second half of the Quarter, resulting in a substantial lift in grades in line with our resource model.
Mining performance for the quarter focussed on the Kavanagh pit, with re-start of Nugent pit waste removal operations during October.

PLATE 3. KANMANTOO COPPER MINE BCM RATES

Operations - Crushing and Processing

The mill and wet plant continued to perform well. Mill throughput was a record for the quarter, with 756kt tonnes of ore milled at an average grade of 0.63% copper, resulting again in reduced milling costs per tonne of ore.

Note: HGO has a 31 January Year End, therefore quarter references are Q1 Feb-Apr, Q2 May-Jul, Q3 Aug-Oct and Q4 Nov-Jan. 3.

IIIIIIIIIIIIIIIIIIIIIIIII HILLGROVE RESOURCES LIMITED ACN 004 297 116

PLATE 4. KANMANTOO QUARTERLY MILL TONNES


Copper production continued running to the revised plan, producing some 4,306 tonnes copper in concentrate for the quarter, a record production rate for the mine. October production of 2,014 tonnes copper in concentrate achieved a record monthly production. Production guidance for the year to end January 2014 remains on target of 16,500 to 18,000 tonnes copper.
Copper recoveries were lower during the first half of the Quarter with low grade stockpiles primarily being processed (in line with recovery model). However this improved with the increased pit mining during the quarter, with recovery lifting to 92% for October in line with plan.

PLATE 5. KANMANTOO QUARTERLY COPPER PRODUCTION

Shipping

During the quarter, Hillgrove shipped its eleventh copper concentrate parcel of 10kWMT to China. Another shipment (~11,200WMT) was loaded in early November. Hillgrove is currently producing copper concentrates for its thirteenth shipment and continues to be engaged in the vessel chartering market to manage freight rate exposures.

Note: HGO has a 31 January Year End, therefore quarter references are Q1 Feb-Apr, Q2 May-Jul, Q3 Aug-Oct and Q4 Nov-Jan. 4.

IIIIIIIIIIIIIIIIIIIIIIIII HILLGROVE RESOURCES LIMITED ACN 004 297 116

TABLE 1. KANMANTOO COPPER MINE PRODUCTION STATISTICS

Period

FY 2012

FY 2013

Apr-13

QTR

Jul-13

QTR

Oct-13

QTR

FY 2014

YTD

Ore to ROM from Pit

kt

495

2,221

689

555

656

1,900

Ore to/(from)

long term stockpiles

kt

1,267

849

(137)

(84)

3

(218)

Mined Waste

kt

7,446

11,777

2,728

2,158

1,658

6,544

Total Tonnes Mined

kt

9,208

14,847

3,417

2,713

2,430

8,560

Mining Grade to ROM

%

0.75

0.76

0.67

0.67

0.63

0.66

Ore Milled

kt

331

2,303

708

720

756

2,184

Milled Grade - Cu

%

0.56

0.66

0.57

0.54

0.63

0.58

- Au

g/t

0.11

0.16

0.18

0.09

0.10

0.12

- Ag

g/t

2.22

2.96

3.21

2.11

3.00

2.78

Recovery - Cu

%

69.6

89.9

89.1

89.5

90.7

89.8

- Au

%

67.5

54.7

54.0

57.8

50.3

54.2

- Ag

%

46.6

55.4

38.7

56.0

45.3

45.5

Cu Concentrate Produced

Dry mt

4,774

56,431

15,510

15,699

19,161

50,370

Concentrate Grade - Cu

%

30.2

24.4

23.1

22.0

22.5

22.5

- Au

g/t

6.0

3.6

4.5

2.5

1.9

2.9

- Ag

g/t

79.9

67.0

56.8

54.1

45.3

54.8

Contained Metal in

Concentrate - Cu

t

1,481

13,744

3,590

3,450

4,306

11,346

- Au

oz

816

6,570

2,237

1,268

1,178

4,683

- Ag

oz

12,194

121,656

28,304

27,302

33,097

88,703

Total Concentrate Sold

Dry mt

4,263

56,526

16,184

14,134

18,919

49,237

Revenue

Revenue for the quarter was AUD32.8 million at an average realised price for copper of USD3.29/lb.

Costs

C1 unit costs of USD2.80 per pound were higher due to the mining services change out and ramp up. Key one-off cost areas included recruitment and training of new mining operators, some temporary arrangements awaiting final contracts to be signed, lower productivity during training of crews and reduced capitalisation of costs. October's C1 cost reduced to USD2.07 per pound.
Year to date C1 unit cost was USD2.63 per pound (using an average AUD/USD exchange rate of 0.9923). Increased grades and improved mining productivity will see a marked lowering of C1 costs during Q4, with the FY14 C1 unit cost projected to be maintained within the previous guidance of USD2.25 to USD2.50.
Processing costs continued to improve (shown in the graph above).

Note: HGO has a 31 January Year End, therefore quarter references are Q1 Feb-Apr, Q2 May-Jul, Q3 Aug-Oct and Q4 Nov-Jan. 5.

IIIIIIIIIIIIIIIIIIIIIIIII HILLGROVE RESOURCES LIMITED ACN 004 297 116

TABLE 2. KANMANTOO COPPER MINE COSTS

Period

US cents per lb

FY 2013

Apr-13

QTR

Jul-13

QTR*

Oct-13

QTR

FY14 Year

To Date

Mining Costs

Processing Costs

Other Direct Cash Costs

92

117

102

156

127

Mining Costs

Processing Costs

Other Direct Cash Costs

97

97

92

65

85

Mining Costs

Processing Costs

Other Direct Cash Costs

23

24

29

25

27

Total Onsite Costs

Transport & Shipping

Treatment, Refining & Smelter Charges

212

238

223

246

239

Total Onsite Costs

Transport & Shipping

Treatment, Refining & Smelter Charges

18

18

17

16

18

Total Onsite Costs

Transport & Shipping

Treatment, Refining & Smelter Charges

36

39

44

41

43

Total Offsite Costs

Precious Metals Credits

54

57

61

57

61

Total Offsite Costs

Precious Metals Credits

(46)

(54)

(35)

(23)

(37)

Total Direct Operating Costs

(C1 Cash Costs)

220

241

249

280

263

Royalties

D&A

5

5

4

4

5

Royalties

D&A

96

86

75

56

71

TOTAL

321

332

328

340

339

* July numbers updated per audit adjustment.

New Mining Operations

Towards the end of the last quarter Hillgrove instigated new mining operations at Kanmantoo. The new mining operational arrangements comprise a combination of specialist contractors and Hillgrove personnel. The new Hillgrove employee positions are mine and pit supervision, mining operators and drill and blast operators. Interim arrangements using experienced pit supervisory personnel were put in place while transitioning to permanent personnel. Mine management and supervision of contractors continues as previously by Hillgrove.

PLATE 6. MINING OPERATIONS IN KAVANAGH PIT

Note: HGO has a 31 January Year End, therefore quarter references are Q1 Feb-Apr, Q2 May-Jul, Q3 Aug-Oct and Q4 Nov-Jan. 6.

IIIIIIIIIIIIIIIIIIIIIIIII HILLGROVE RESOURCES LIMITED ACN 004 297 116

Eighty eight new Hillgrove Kanmantoo Mine employees were recruited during the Quarter. This represents the following statistics:

147% increase from Local Region (Callington/Kanmantoo)

141% increase from the Adelaide Hills Region

26% increase from the Greater Adelaide Region.

Along with this direct employment, specialist contract services are now being undertaken by Andy's Earthmovers (equipment supply and maintenance) and Roc-Drill (blast hole drilling), who have a combined permanent workforce of some 55 employees on site.

PLATE 7. KANMANTOO COPPER MINE EMPLOYMENT GROWTH BY REGION


This represents a total of 230 permanent employees on site at quarter end.

New Mineral Resource Estimate

On 30 August a new Mineral Resource estimate was released. The 2013 Mineral Resource Estimate is similar in tonnes to the 2012 Mineral Resource Estimate, and slightly lower in grade, due to the following key factors:

An additional 4.1Mt largely as a result of new data from 141 drillholes drilled in 2012;

1.89Mt of stockpile;

Depletion due to mining of 2.1Mt;

Reduction of 3.7Mt due to a more thorough and conservative application to the economic constraints being applied to the Resource model; and

Slightly lower overall grade due mainly to lower operating costs allowing a reduced economic cut off and the grade of additional Resource tonnes added.

The 2013 In Situ Mineral Resource Estimation has resulted in 29.5Mt at grades of 0.80% copper, 0.20g/t gold and 2.11g/t silver using a cut-off grade of 0.20% copper beneath the end of February 2013 topographic surface.

New Ore Reserve Estimate

On 1 November a new Ore Reserve estimate was released, having been prepared in accordance with The
JORC Code 2012 Edition, with the following highlights:

Increase in In Situ Ore Reserve to 20.7Mt @ 0.73% Cu, 0.18g/t Au and 1.9g/t Ag;

Increase in Total Ore Reserve (including stockpiles) to 22.1Mt @ 0.71% Cu, 0.18g/t Au and 1.9g/t Ag;

25% increase in total Reserves of contained copper to 157k tonnes;

58% Increase in total Reserves of contained gold to 128k ounces;

8% Decrease in total Reserves of contained silver to 1.35M ounces.

The new Ore Reserve shows an increase in both the reserve confidence and contained metal when compared to the May 2010 Ore Reserve, and after taking into account reserve depletion from mining. The total Ore Reserve now stands at 22.1Mt at 0.71% copper, 0.18g/t gold and 1.9g/t silver for contained metal of 157k tonnes (346Mlbs) of copper, 128k ounces of gold and 1.35M ounces of silver.

Note: HGO has a 31 January Year End, therefore quarter references are Q1 Feb-Apr, Q2 May-Jul, Q3 Aug-Oct and Q4 Nov-Jan. 7.

IIIIIIIIIIIIIIIIIIIIIIIII HILLGROVE RESOURCES LIMITED ACN 004 297 116

PLATE 8. SUMMARY OF MAJOR CHANGES FROM 2010 TO 2013 ORE RESERVE ESTIMATE (Units are Mlbs Contained Copper metal)

Next Steps

Focus will be on the continued optimising of the new mining services arrangements to ore mining and mill feed, and increases in mill capability to be converted into increased copper production and lower costs.

INDONESIAN GOLD AND GOLD/COPPER EXPLORATION

Following Hillgrove's decision to wind back the exploration activity for both the Bird's Head and Sumba assets in order to preserve cash, activities during the quarter continued to concentrate on the remaining service contracts and reducing staff levels where appropriate. Hillgrove initiated further redundancies of personnel and closed its Jakarta office; however as previously reported a core crew is being maintained at both its Indonesian project offices. The Company is continuing to pursue interest from potential investors for these projects, with one interested party visiting the Sumba project during the quarter.

PLATE 9. INDONESIAN ARCHIPELAGO

BIRD'S HEAD COPPER/GOLD PROJECT, WEST PAPUA, INDONESIA IUP40/2010 (Hillgrove 80%)

Hillgrove is an 80% shareholder in PT. Akram Resources which holds IUP40/2010 in the Bird's Head region of West Papua. Hillgrove is responsible for the management of exploration and development activities up to a decision to mine. The IUP covers 992.3km² and is valid until March 2017.
The IUP overlies a variety of forestry class designations, with exploration within the licence restricted to an Izin Pinjam Pakai area of ~8000ha, which covers the primary porphyry target of West Delta. As previously reported, a number of drill targets have now been generated and progress on these will be determined by successful alternate funding arrangements.

Note: HGO has a 31 January Year End, therefore quarter references are Q1 Feb-Apr, Q2 May-Jul, Q3 Aug-Oct and Q4 Nov-Jan. 8.

IIIIIIIIIIIIIIIIIIIIIIIII HILLGROVE RESOURCES LIMITED ACN 004 297 116

SUMBA GOLD PROJECT, INDONESIA IUP 322/KEP/HK/2009 (Hillgrove 80%)

Hillgrove is an 80% shareholder in PT Fathi Resources which holds IUP 322 on the island of Sumba. Hillgrove is responsible for the management of exploration and development activities, up to a decision to mine. The IUP Explorasi (Exploration and Mining Business Licence) covers 750km² and is valid until December 2016.
At this stage there are now a number of porphyry and epithermal targets which require drill testing. The timing for this work is dependent on the company's assessment of funding arrangements.

Next Steps

Hillgrove continues to look for joint venture interest to raise the level of investment needed to realise the potential of discovery and future development of these projects.

HILLGROVE CORPORATE

Capital Raise

Hillgrove successfully completed a placement to raise $10.8 million through the issue of approximately 153.7 million ordinary shares during the quarter. The Placement was well oversubscribed and received strong support from both current and new shareholders, endorsing Hillgrove's commercial and operational outlook. The Placement price of $0.07 per share represents a discount of 12.0% to the volume weighted average price of Hillgrove during the 5 trading days up to and including 18 September 2013.

Debt Repayments

Hillgrove made a significant reduction to its debt balance during the quarter. Total debt was reduced from
$48.2m as at 31 July 2013 to $44.5m at 31 October 2013. During the period a Gold Loan repayment of $1.2m
(818 ounces) was made in addition to the first repayment of $2.5m principal in relation to the Senior Debt.

Strategic Review

The significant operational and corporate improvements the Board and management team have implemented, has positioned Hillgrove for growth in production and cash flow from its major producing asset, the Kanmantoo Copper Mine in South Australia. These significant changes have been documented through numerous releases to shareholders and the ASX over the last five months. The Company is now developing further strategies and plans to build value, with the directors regularly reviewing opportunities to drive operational and corporate improvements.

Cash and Investments

Cash on hand as at 31 October 2013 was AUD16.5 million. Debt as at 31 October 2013 was AUD44.5 million.
The market value of Hillgrove's listed investment portfolio as at 31 October 2013 was approximately

AUD0.3 million.

CORPORATE INFORMATION

Issued Share Capital at 31 October 2013

Ordinary shares

Employee Performance Rights

Unlisted options

Share price activity for the October Quarter

High

Low

Last (31 October 2013) Average Daily Volume

1,178,589,221

25,710,000

50,000,000

0.092

0.071

0.090

3,062,796

Note: HGO has a 31 January Year End, therefore quarter references are Q1 Feb-Apr, Q2 May-Jul, Q3 Aug-Oct and Q4 Nov-Jan. 9.

IIIIIIIIIIIIIIIIIIIIIIIII HILLGROVE RESOURCES LIMITED ACN 004 297 116

SHARE REGISTRY REGISTERED OFFICE

Boardroom Limited

GPO Box 3993

Sydney NSW 2001, Australia

F: +61 2 9290 9655

T: (within Australia) 1300 737 760

T: (outside Australia) +61 2 9290 9600

Hillgrove Resources Limited

Suite 1709, Level 17 Australia Square Tower

264-278 George Street

Sydney NSW 2000, Australia

E: [email protected]

T: +61 2 8247 9300

For more information contact:

Greg Hall

Russell Middleton

Shanthi Smith

Managing Director

Tel: +61 (0)2 8247 9300

CFO

Tel: +61 (0)2 8247 9300

Company Secretary

Tel: +61 (0)2 8247 9300

ABOUT HILLGROVE

Hillgrove Resources is an Australian mining company listed on the Australian Securities Exchange (ASX: HGO) focused on the operation of the Kanmantoo Copper Mine in South Australia, and with exploration projects on its Indonesian tenements. The Kanmantoo Copper Mine is located less than 55km from Adelaide in South Australia. With construction completed in late 2011, Kanmantoo is an open-cut mine which has now ramped up to a throughput of

2.8Mtpa, to produce approximately 80,000 dry metric tonnes of copper concentrate containing 20,000t copper and associated gold and silver per annum.

Kanmantoo Global Mineral Resource Estimate at End February 2013

In Situ Resource

Long Term Stockpiles

Note: In Situ Resource >0.20% Cu, Long Term Stockpiles >0.15% Cu.

Kanmantoo Global Mineral Reserve Estimate at End February 2013

JORC 2012 Tonnage Cu Au Ag

Classification (Mt) (%) (g/t) (g/t)

Proven 2.5 0.77 0.08 1.7

In Situ Reserve

Probable 18.2 0.72 0.20 2.0

20.7 0.73 0.18 1.9

Long Term Stockpiles

Proven

1.4

0.46

N/A

N/A

1.4 0.46 - -

Total 22.1 0.71 0.18 1.9

Note: In Situ Reserve >0.20% Cu. Long Term Stockpiles >0.15% Cu.

Competent Person's Statement

The information in this release that relates to Mineral Resources is based upon information compiled by Mrs Michaela Wright, who is a Member of The Australasian Institute of Mining and Metallurgy. Mrs Wright is a full-time employee of Hillgrove Resources Limited and has sufficient experience relevant to the styles of mineralisation and type of deposit under consideration to qualify as a Competent Person as defined in the

2012 Edition of the 'Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (JORC Code)'. Mrs Wright has consented to the inclusion in the release of the matters based on their information in the form and context in which it appears.

The information in this release that relates to Mineral Reserves is based upon information compiled by Mr Steven McClare, who is a Member of The Australasian Institute of Mining and Metallurgy. Mr McClare is a full-time employee of Hillgrove Resources Limited and has sufficient experience relevant to the styles of mineralisation and type of deposit under consideration to qualify as a Competent Person as defined in the

2012 Edition of the 'Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (JORC Code)'. Mr McClare has consented to the inclusion in the release of the matters based on their information in the form and context in which it appears.

Note: HGO has a 31 January Year End, therefore quarter references are Q1 Feb-Apr, Q2 May-Jul, Q3 Aug-Oct and Q4 Nov-Jan. 10.

Lire la suite de l'article sur www.noodls.com

Hillgrove Resources

CODE : HGO.AX
ISIN : AU000000HGO6
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Hillgrove Res. est une société développant des projet miniers de zinc basée en Australie.

Hillgrove Res. détient divers projets d'exploration en Australie et en Indonesie.

Ses principaux projets en exploration sont WHEAL ELLEN en Australie et SUMBA et BIRD'S HEAD en Indonesie.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Nominations de Hillgrove Resources
31/05/2007Appointment of John Gooding as an Independent Non-Executive ...
Rapports Financiers de Hillgrove Resources
09/09/2009Half Year Financial Results
Projets de Hillgrove Resources
29/01/2009(Bird's Head)Alpha Prospect Shapes up as Major Gold Target
15/08/2007(Wheal Ellen)Drilling recommences at Wheal Ellen project, Sth Aust
25/07/2007(Wheal Ellen)High Grade Lead Zinc Drill Hits at Wheal Ellen, Sth Aust
27/06/2007(Wheal Ellen)Drilling commences at Wheal Ellen Zinc Project, Sth Aust
25/06/2007More significant high grade copper-gold zones encountered at...
23/04/2007More High Grade Copper-Gold Zones drilled at Kanmantoo Proje...
Communiqués de Presse de Hillgrove Resources
27/07/2016Activity Report for Quarter Ended 30 June 2016
14/07/2016Lapse of Performance Rights
04/07/2016Balance Sheet Restructure Update
29/06/2016Succesful Balance Sheet Restructure
27/05/2016Hillgrove Resources Results of AGM
26/05/2016MD's Presentation to AGM
26/05/20162016 Mineral Resource Statement
26/05/2016Chairman's Address to AGM
18/04/2016Change to Mine Plan Update
31/03/2016Hillgrove Resources 2015 Annual Report
31/03/2016Change to Mine Plan
29/03/2016Trading Halt Request
29/01/2016Activity Report for Quarter Ended 31 Dec 2015
15/12/2015Change of Registered Office Address
11/09/2015Results for Half Year Ended 30 June 2015
20/08/2015SACOME Breakfast Presentation
29/07/2015Activity Report for Quarter Ended 30 June 2015
03/07/2015Hillgrove Announces Change of CFO
03/07/2015Despatch of Rights Issue Statements
03/07/2015Results of Non Renounceable Entitlement Offer
27/04/2015Hillgrove Executes Additional Waiver
26/04/2015Notice of Annual General Meeting
31/03/2015Annual Report to 31 December 2014
31/03/2015Hillgrove Audited Annual Report Released
26/02/2015Annual Company Update Presentation
26/02/2015Preliminary Final Results - CY14
26/02/2015Hillgrove Reports Profits
02/02/2015Activity Report for Quarter Ended 31 December 2014
02/02/2015Fourth Quarter Presentation
22/01/2015Wilson HTM - Hedging Expands Hedge Book
22/01/2015Market Update on Strong Copper Hedge Position
11/12/2014New Exploration Underway on SA Tenements
11/12/2014Unmarketable Parcel Sale Facility Concluded
20/10/2014Activity Report for Quarter Ended 30 Sep 2014
03/03/2014Fourth Quarter FY14 Presentation
03/03/2014Quarterly Production Report - Record Production
03/03/2014Activity Report for Quarter Ended 31 January 2014
25/11/2013Activity Report for Quarter Ended 31 October 2013
17/03/2010Indonesia Announcement
01/03/2010Kanmantoo Announcement
26/02/2010Quarterly Report to 31/01/10
11/02/2010Indonesia Announcement
18/01/2010Placement and SPP Annoucement
18/12/2009Kanmantoo Announcement
03/12/2009Kanmantoo Announcement
30/11/2009Quarterly Report to 31/10/09
01/10/2009Annoucement
07/09/2009Indonesia Announcement
31/08/2009Quarterly Report to 31/07/09
10/08/2009Kanmantoo Announcement
15/07/2009Completion of Sale of Eastern Star Gas Investment
02/07/2009Eastern Star Gas Annoucement
21/05/2009Indonesia
27/02/2009Quarterly Report to 31/01/09
18/02/2009Eastern Star Gas Annoucement
09/02/2009Raises $4.1M from SPP and Placement
16/07/2007Minerals Partnership in Madagascar
12/06/2007 Molybdenum, Cobalt, Uranium hits at Alford
23/05/2007Significant New Geophysical Anomalies Discovered at Wheal El...
22/05/2007Potential Olympic Dam Style Mineralisation at Alford
14/05/2007Dale Ferguson appointed to the Board as Executive Director -...
30/04/2007Significant resource upgrade at Kanmantoo Copper Gold Mine, ...
19/04/2007Drilling starts at Alford Project, Hillgrove investing $4m i...
18/04/2007 Kanmantoo targetting early 2009 for first copper gold produ...
04/04/2007posts maiden $10.8 million NPAT for 2006/ Cashed up to progr...
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
AUSTRALIA (HGO.AX)
0,073-3.95%
AUSTRALIA
AU$ 0,073
08/05 11:00 -
-3,95%
Cours préc. Ouverture
0,076 0,076
Bas haut
0,073 0,076
Année b/h Var. YTD
0,060 -  0,090 -18,89%
52 sem. b/h var. 52 sem.
0,044 -  0,090 35,19%
Volume var. 1 mois
5 811 344 -6,41%
24hGold TrendPower© : 15
Produit
Développe
Recherche
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
Variation annuelle
DateVariationMaxiMini
2024-18,89%0,100,06
202366,67%0,090,04
20220,00%0,090,00
202168,75%0,090,03
2020-46,67%0,070,03
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,63 AU$+1,06%Trend Power :
OceanaGold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
12,18 US$+0,74%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,62 GBX+5,07%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,64 CA$+1,15%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
15,85 CA$-2,10%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+0,00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,20 AU$+2,50%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,84 CA$+0,00%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
50,56 US$-0,82%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+0,00%Trend Power :