Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en

Agnico-Eagle Mines Limited

Publié le 13 mars 2015

Agnico Eagle completes updated NI 43-101 technical report on the Meliadine gold project in Nunavut

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Canada | G Mexico | Precious Metals | Report |

Agnico Eagle completes updated NI 43-101 technical report on the Meliadine gold project in Nunavut

(All amounts expressed in U.S. dollars unless otherwise noted)

TORONTO, March 12, 2015 /PRNewswire/ - Agnico Eagle Mines Limited (NYSE:AEM, TSX:AEM) ("Agnico Eagle" or the "Company") has completed and filed with Canadian securities regulators an updated National Instrument 43-101 ("NI 43-101") technical report on the Meliadine gold project in Nunavut, Canada.  The technical report has an effective date of February 11, 2015 and is available on www.sedar.com under Agnico Eagle's profile.

The Meliadine project was acquired in July 2010, and it is the Company's largest development project based on reserves and resources.  The Company has a 100% interest in the 111,757 hectare property, which is linked to the town of Rankin Inlet by a 25 kilometer all-weather access road.

"Given the large reserve and resource base, Meliadine is a key asset in our Nunavut development strategy," said Sean Boyd , President and CEO of Agnico Eagle.  "We continue to study and analyze various scenarios and alternatives at Meadowbank, Amaruq and Meliadine to capitalize on our large and growing reserves and resources in the region.  We believe that between the Meliadine and Amaruq deposits, the Company has a significant mining platform that could potentially be producing gold for several decades," added Mr. Boyd.

[Link to project location map]

Highlights from the Updated Meliadine 43-101 Technical Report

The updated technical study at Meliadine is based on extracting only the 3.3 million ounces of gold in proven and probable mineral reserves (13.9 million tonnes of ore at 7.44 grams per tonne ("g/t") gold), which is all contained in the Tiriganiaq and Wesmeg deposits.

Not currently considered in the study are the 3.3 million ounces of gold in measured and indicated mineral resources (20.2 million tonnes at 5.06 g/t gold) and 3.5 million ounces of gold in inferred mineral resources (14.1 million tonnes at 7.65 g/t gold).  As drilling continues it is anticipated that a significant amount of the current mineral resource will eventually be converted to mineral reserves and be considered in future development plans.  A detailed breakdown of the mineral reserves and resources as of December 31, 2014 is presented below.

The Meliadine mineral reserves were estimated using a gold price of $1,150 per ounce and a US$/C$ exchange rate of 1.08.  A $150 per ounce increase in the gold price results in approximately a 5% increase in gold contained in the reserves and conversely a $150 per ounce decrease in the gold price results in approximately a 5% decrease in reserves.

The technical report outlines a phased approach to the development of the Meliadine operations, with the mill averaging 3,000 tonnes per day ("tpd") of ore in years one to three, and 5,000 tpd of ore in years four to nine.  The plan is that ore will come from underground operations in years one to nine, with open pit operations in two pits occurring in years four to seven as shown in the Tiriganiaq longitudinal section below.  The current mine plan will be focused on the Tiriganiaq and nearby Wesmeg mineralized zones that will be accessed from the Tiriganiaq underground infrastructure.

Metallurgical recoveries are estimated to average approximately 96% for the Tiriganiaq and Wesmeg reserves, resulting in average annual gold production of approximately 326,000 ounces in years one to three and 362,000 ounces in years four to nine. Life-of-mine total cash costs per ounce of gold produced on a by-product basis at Meliadine are expected to average $531.

Initial capital costs are estimated at approximately $911 million and sustaining capital costs are forecast to total approximately $357 million.  Mine closure costs are estimated to be approximately $41 million.

The technical report concludes with an economic analysis that assumes a gold price of $1,300 per ounce and a US$/C$ exchange rate of $1.15. Based on proven and probable reserves only, the technical study estimates that the Meliadine project will generate an after-tax internal rate of return (IRR) of approximately 10.3%, and an after-tax net present value (NPV), at a 5% discount rate, of $267 million.

Considering all the geological knowledge acquired since 2011, the exploration program has demonstrated the excellent potential of the Meliadine property to host even larger reserves and resources with a mine life possibly longer than nine years, which would also improve the profitability of the project.  All deposits are still open at depth, and many other regional targets have been identified on the large property.  Additional exploration and conversion drilling from surface and from the exploration ramp is planned in the coming years to test this potential.

Summary of the Meliadine Project Key Facts and Parameters

Location Nunavut, Canada
Proven & probable reserves 13.9 million tonnes of ore grading 7.44 g/t gold (3.3 million oz)
Average metallurgical recovery Approximately 96% for reserves
Average annual gold production Approximately 326,000 ounces (years 1 - 3)
Approximately 362,000 ounces (years 4 - 9)
Minesite costs per tonne Approximately C$139 per tonne milled
Average total cash costs on a by-product basis Approximately $531 per ounce of gold produced
Mine life Approximately 9 years
Initial capital costs Approximately $911 million
Sustaining capital costs Approximately $357 million
After-tax IRR
After-tax NPV (at a 5% discount rate) 
Approximately 10.3%
Approximately $267 million 

Assumptions for Economic Analysis

$1,300 per ounce gold
US$/C$ exchange rate of $1.15
C$0.95 per litre diesel cost
Statutory tax rate: approximately 26%

After-tax IRR sensitivity to gold price and exchange rate variation

Exchange rate Gold Price ( US$/oz )
US$/C$ 1,000 1,100 1,150 1,200 1,245 1,300 1,400 1,500 1,600 1,700
              0.90    -11.11% -4.90% -2.55% -0.73% 0.70% 2.35% 4.85% 7.08% 9.13% 10.99%
              0.95    -7.36% -2.13% -0.28% 1.36% 2.75% 4.20% 6.61% 8.80% 10.79% 12.65%
              1.00    -4.33% -0.01% 1.69% 3.25% 4.46% 5.87% 8.23% 10.39% 12.37% 14.19%
              1.05    -1.92% 1.86% 3.46% 4.85% 6.06% 7.43% 9.76% 11.90% 13.84% 15.66%
              1.10    -0.01% 3.53% 4.97% 6.37% 7.53% 8.91% 11.19% 13.30% 15.23% 17.07%
              1.15    1.69% 4.97% 6.43% 7.77% 8.95% 10.28% 12.56% 14.63% 16.59% 18.40%
              1.20    3.25% 6.37% 7.77% 9.13% 10.26% 11.60% 13.84% 15.92% 17.86% 19.67%
              1.25 4.59% 7.66% 9.08% 10.39% 11.52% 12.84% 15.06% 17.15% 19.08% 20.90%
              1.30    5.87% 8.91% 10.28% 11.60% 12.72% 14.01% 16.26% 18.32% 20.26% 22.09%
              1.40    8.23% 11.19% 12.56% 13.84% 14.94% 16.26% 18.47% 20.55% 22.50% 24.36%

After-tax NPV sensitivity to gold price and exchange rate variation (C$ millions)

Exchange rate Gold Price ( US$/oz )
US$/C$ 1,000 1,100 1,150 1,200 1,245 1,300 1,400 1,500 1,600 1,700
              0.90    $(8) $115 $235 $ 352
              0.95    $(42) $88 $215 $339 $ 463
              1.00    $(92) $(29) $47 $181 $313 $444 $ 573
              1.05    $(81) $(8) $58 $135 $274 $412 $547 $ 682
              1.10    $(77) $(1) $75 $141 $222 $365 $508 $650 $ 793
              1.15    $(1) $78 $155 $224 $307 $457 $605 $754 $ 907
              1.20    $(92) $75 $155 $235 $305 $392 $547 $702 $857 $1,011
              1.25 ($22) $148 $232 $313 $387 $476 $637 $799 $959 $1,119
              1.30    $47 $222 $307 $392 $468 $560 $729 $895
              1.40    $181 $365 $457 $547 $628 $729 $908

Meliadine gold project mineral resources and reserves (as at December 31, 2014)

Classification Deposit Category(1) Tonnes (000) Gold grade
(g/t)
Contained gold
(000 Oz)
Proven Reserves Tiriganiaq Stockpile             34         7.31                 8
Subtotal           34         7.31                  8
Probable Reserves Tiriganiaq Open pit     3,862        5.13               638
Underground      9,787         8.39            2,640
Wesmeg Underground         261         5.84                 49
Subtotal   13,910         7.44            3,327
Total Proven +
Probable Reserves
13,944 7.44 3,335
Indicated Resources(2) Tiriganiaq Open pit 1,208 3.79 147
Underground 6,756 5.66 1,230
F zone Open pit 1,254 4.46 180
Underground 1,275 5.16 212
Wesmeg Open pit 2,241 4.12 297
Underground 1,522 5.23 256
Normeg Open pit 1,250 3.99 160
Underground 346 5.06 56
Discovery Open pit 945 5.00 152
Underground 1,572 6.35 321
Pump Open pit 671 5.32 115
Underground 707 4.54 103
Wolf Open pit 115 3.63 13
Underground 383 4.12 51
Total 20,246         5.06 3,293
Inferred Resources(3) Tiriganiaq Open pit - - -
Underground 2,402 9.59 740
F zone Open pit 46 6.26 9
Underground 1,427 6.82 313
Wesmeg Open pit 181 5.92 35
Underground 2,175 7.59 531
Normeg Open pit 237 4.24 32
Underground 2,351 8.51 643
Discovery Open pit - - -
Underground 529 7.55 128
Pump Open pit 304 6.78 66
Underground 2,022 7.75 504
Wolf Open pit 262 4.43 37
Underground 2,145 6.17 425
Total 14,083         7.65 3,464
(1) Open pit mineral reserves are classified inside the operational pit design and open pit mineral resources are classified inside the ultimate pit shells
(2) Indicated resources are diluted and are exclusive of mineral reserves
(3) Inferred resources are not diluted

[Link to Tiriganiaq longitudinal section]

2015 Meliadine Work Program

The expected capital budget at Meliadine for 2015 is approximately $64 million.  Of this total, approximately $21 million will be allocated towards planned underground development (2,500 metres). This development will allow for cost-effective exploration and conversion drilling of the deeper parts of the Tiriganiaq and Wesmeg/Normeg zones, and help to optimize potential mining plans. A portion of the 2015 budget is also allocated to camp operation, construction activities, permitting and technical services.

The Company is currently studying various options and alternatives in Nunavut to capitalize on the large and growing resource base in the region and maximize value.  The timing of future capital expenditures on the Meliadine project beyond 2015 and the determination of whether to build a mine at Meliadine are subject to Board approval, prevailing market conditions, and outcomes of the various potential scenarios being evaluated.

Meliadine Permitting Activities Continue to Advance

On January 27, 2015, the Minister of Aboriginal Affairs and Northern Development for Canada approved the environmental assessment findings and recommendations made by the Nunavut Impact Review Board (NIRB) on their Part 5 Review of the Meliadine project under the Nunavut Land Claim Agreement. Subsequently, the NIRB issued the Project Certificate on February 26, 2015.

The issuance of the Project Certificate enables Agnico Eagle to apply for the various operating permits/licences/authorizations required to start construction and operation of a gold mine at Meliadine. One of the key permits is the Type A Water License which authorizes all water use and waste disposal requirements for the Meliadine mine during the construction, operation and ultimate reclamation phases of the project. The Company is currently working on this application with the intent to file with the Nunavut Water Board in the next few months.

Amaruq Project - 2015 Drill Program Expected to Begin Shortly

Mobilization is now underway for the 2015 exploration program at the Amaruq project, which is located approximately 50 kilometres northwest of the Meadowbank mine.  In February 2015, the Company announced an initial inferred mineral resource containing 1.5 million ounces of gold (6.6 million tonnes at 7.07 g/t gold) at the project.

Agnico Eagle has a 100% interest in the Amaruq project.  The large property consists of 114,761 hectares of Inuit-owned and federal crown land. Agnico Eagle acquired its initial interest in April 2013 pursuant to a mineral exploration agreement with Nunavut Tunngavik Incorporated.

The first phase of the drilling program in 2015 is expected to include approximately 50,000 metres of drilling (costing approximately $20 million) with the intent of infill drilling and expanding the known mineralized zones and testing other favourable targets.  The first rig is expected to begin drilling shortly and three drills are expected to be in operation by the end of this month.  The Company expects to have up to eight drills in operation by the end of April 2015.  The initial drilling program is expected to be completed in June; based on the results the drilling could be extended until mid-October.

Permitting and preliminary engineering activities will also continue for the possible construction of an all-weather exploration road linking the Amaruq exploration site to the Meadowbank mine. This road would facilitate exploration activities such as fuel, equipment and personnel transportation.

A resource update is expected in the second half of 2015.  The Company hopes ultimately to develop Amaruq as a satellite operation to Meadowbank.

About Agnico Eagle

Agnico Eagle is a senior Canadian gold mining company that has produced precious metals since 1957.  Its nine mines are located in Canada, Finland and Mexico, with exploration and development activities in each of these regions as well as in the United States. The Company and its shareholders have full exposure to gold prices due to its long-standing policy of no forward gold sales. Agnico Eagle has declared a cash dividend every year since 1983.

Note Regarding Certain Measures of Performance

This news release presents certain financial performance measures, including ''total cash costs per ounce of gold produced'', and ''minesite costs per tonne'',that are not recognized measures under IFRS. This data may not be comparable to data presented by other gold producers. The Company believes that these generally accepted industry measures are realistic indicators of operating performance and are useful in allowing comparisons between periods. Non-GAAP financial performance measures should be considered together with other data prepared in accordance with IFRS. This news release contains non-GAAP financial performance measure information for a project under development incorporating information that will vary over time as the project is developed and mined. It is therefore not practicable to reconcile these forward-looking non-GAAP financial performance measures.

Forward-Looking Statements

The information in this news release has been prepared as at March 12, 2015. Certain statements contained in this document constitute "forward-looking statements" within the meaning of the United States Private Securities Litigation Reform Act of 1995 and "forward-looking information" under the provisions of Canadian provincial securities laws and are referred to herein as forward-looking statements. When used in this document, the words "anticipate", "believe", "estimate", "expect", "forecast", "planned", "potentially", "will" and similar expressions are intended to identify forward-looking statements.

Such statements include without limitation: statements regarding estimates of future production; estimates of mineral reserves and resources; the methods by which ore will be extracted or processed; statements regarding timing and amounts of capital expenditures and other assumptions; estimates of mine life; estimates of future mining costs, total cash costs, minesite costs,and other expenses; estimates of metallurgical recovery; estimates of internal rates of return and net present value; estimates of future capital expenditures and other cash needs, and expectations as to the funding thereof; and statements and information as to the projected development of certain ore deposits, including estimates of exploration, development and production and other capital costs, and estimates of the timing of such exploration, development and production or decisions with respect to such exploration, development and production. Such forward-looking statements reflect the Company's views as at the date of this news release and are subject to certain risks, uncertainties and assumptions, and undue reliance should not be placed on such statements and information. Many factors, known and unknown could cause the actual results to be materially different from those expressed or implied by such forward-looking statements and information. Such risks include, but are not limited to: the volatility of prices of gold and other metals; uncertainty of mineral reserves, mineral resources, and mineral grades and mineral recovery estimates; uncertainty of future production, capital expenditures, and other costs; currency fluctuations; financing of additional capital requirements; cost of exploration and development programs; mining risks; community protests; governmental and environmental regulation; and the volatility of the Company's stock price. The material factors and assumptions used in the preparation of the forward-looking statements and information contained herein, which may prove to be incorrect, include, but are not limited to, the assumptions set forth herein and in management's discussion and analysis ("MD&A") and the Company's Annual Information Form ("AIF") for the year ended December 31, 2013 filed with Canadian securities regulators and that are included in its Annual Report on Form 40-F for the year ended December 31, 2013 ("Form 40-F") filed with the U.S. Securities and Exchange Commission (the "SEC"), other documents filed with Canadian securities regulators and the SEC as well as: that there are no significant disruptions affecting operations; that production, permitting and expansion at each of Agnico Eagle's properties proceeds on a basis consistent with current expectations and plans; that the relevant metals prices, exchange rates and prices for key mining and construction supplies will be consistent with Agnico Eagle's expectations; that Agnico Eagle's current estimates of mineral reserves, mineral resources, mineral grades and metal recovery are accurate; that there are no material delays in the timing for completion of ongoing growth projects; that the Company's current plans to optimize production are successful; and that there are no material variations in the current tax and regulatory environment.

For a more detailed discussion of such risks and other factors that may affect the Company's ability to achieve the expectations set forth in the forward-looking statements contained in this document, see the Company's AIF, MD&A and Form 40-F, as well as the Company's other filings with the Canadian securities regulators and the SEC. The Company does not intend, and does not assume any obligation, to update these forward-looking statements and information. For a detailed breakdown of the Company's reserve and resource position see the Company's Press release dated February 11, 2015.

Notes to Investors Regarding the Use of Resources

Cautionary Note to Investors Concerning Estimates of Measured and Indicated Resources

This news release uses the terms "measured resources" and "indicated resources". Investors are advised that while those terms are recognized and required by Canadian regulations, the SEC does not recognize them. Investors are cautioned not to assume that any part or all of mineral deposits in these categories will ever be converted into reserves.

Cautionary Note to Investors Concerning Estimates of Inferred Resources

This news release also uses the term "inferred resources". Investors are advised that while this term is recognized and required by Canadian regulations, the SEC does not recognize it. "Inferred resources" have a great amount of uncertainty as to their existence, and great uncertainty as to their economic and legal feasibility. It cannot be assumed that all or any part of an inferred mineral resource will ever be upgraded to a higher category. Under Canadian rules, estimates of inferred mineral resources may not form the basis of feasibility or pre-feasibility studies, except in rare cases. Investors are cautioned not to assume that part or all of an inferred resource exists, or is economically or legally mineable.

Scientific and Technical Data

Cautionary Note To U.S. Investors - The SEC permits U.S. mining companies, in their filings with the SEC, to disclose only those mineral deposits that a company can economically and legally extract or produce. Agnico Eagle reports mineral resource and reserve estimates in accordance with the CIM guidelines for the estimation, classification and reporting of resources and reserves in accordance with the Canadian securities regulatory authorities' (the "CSA") National Instrument 43-101 Standards of Disclosure for Mineral Projects ("NI 43-101"). These standards are generally similar to those used by the SEC's Industry Guide No. 7, as interpreted by Staff at the SEC ("Guide 7"). However, the definitions in NI 43-101 differ in certain respects from those under Guide 7. Accordingly, mineral reserve information contained herein may not be comparable to similar information disclosed by U.S. companies. Under the requirements of the SEC, mineralization may not be classified as a "reserve" unless the determination has been made that the mineralization could be economically and legally produced or extracted at the time the reserve determination is made. A "final" or "bankable" feasibility study is required to meet the requirements to designate reserves under Industry Guide 7. Agnico Eagle uses certain terms in this news release, such as "measured", "indicated", and "inferred", and "resources" that the SEC guidelines strictly prohibit U.S. registered companies from including in their filings with the SEC.

NI 43-101 requires mining companies to disclose reserves and resources using the subcategories of "proven" reserves, "probable" reserves, "measured" resources, "indicated" resources and "inferred" resources. Mineral resources that are not mineral reserves do not have demonstrated economic viability.

A mineral reserve is the economically mineable part of a measured and/or indicated mineral resource. It includes diluting materials and allowances for losses, which may occur when the material is mined or extracted and is defined by studies at pre-feasibility or feasibility level as appropriate that include application of modifying factors. Such studies demonstrate that, at the time of reporting, extraction could reasonably be justified.

Modifying factors are considerations used to convert mineral resources to mineral reserves. These include, but are not restricted to, mining, processing, metallurgical, infrastructure, economic, marketing, legal, environmental, social and governmental factors.

A proven mineral reserve is the economically mineable part of a measured mineral resource. A proven mineral reserve implies a high degree of confidence in the modifying factors. A probable mineral reserve is the economically mineable part of an indicated and, in some circumstances, a measured mineral resource. The confidence in the modifying factors applying to a probable mineral reserve is lower than that applying to a proven mineral reserve.

A mineral resource is a concentration or occurrence of solid material of economic interest in or on the Earth's crust in such form, grade or quality and quantity that there are reasonable prospects for eventual economic extraction. The location, quantity, grade or quality, continuity and other geological characteristics of a mineral resource are known, estimated or interpreted from specific geological evidence and knowledge, including sampling.

A measured mineral resource is that part of a mineral resource for which quantity, grade or quality, densities, shape and physical characteristics are estimated with confidence sufficient to allow the application of modifying factors to support detailed mine planning and final evaluation of the economic viability of the deposit. Geological evidence is derived from detailed and reliable exploration, sampling and testing and is sufficient to confirm geological and grade or quality continuity between points of observation. An indicated mineral resource is that part of a mineral resource for which quantity, grade or quality, densities, shape and physical characteristics are estimated with sufficient confidence to allow the application of modifying factors in sufficient detail to support mine planning and evaluation of the economic viability of the deposit. Geological evidence is derived from adequately detailed and reliable exploration, sampling and testing and is sufficient to assume geological and grade or quality continuity between points of observation. An inferred mineral resource is that part of a mineral resource for which quantity and grade or quality are estimated on the basis of limited geological evidence and sampling. Geological evidence is sufficient to imply but not verify geological and grade or quality continuity.

A feasibility study is a comprehensive technical and economic study of the selected development option for a mineral project that includes appropriately detailed assessments of applicable modifying factors together with any other relevant operational factors and detailed financial analysis that are necessary to demonstrate, at the time of reporting, that extraction is reasonably justified (economically mineable). The results of the study may reasonably serve as the basis for a final decision by a proponent or financial institution to proceed with, or finance, the development of the project. The confidence level of the study will be higher than that of a pre-feasibility study.

In prior periods, reserves for all properties were typically estimated using historic three-year average metals prices and foreign exchange rates in accordance with the SEC guidelines. These guidelines require the use of prices that reflect current economic conditions at the time of reserve determination, which the Staff of the SEC has interpreted to mean historic three-year average prices. Given the current lower commodity price environment, Agnico Eagle has decided to use price assumptions that are below the three-year averages. The assumptions used for the mineral reserve and resource estimates for the Meliadine project as of December 31, 2014 are $1,150 per ounce gold, a cut-off grade between 2.28 g/t and 4.80 g/t gold (depending on the deposit and mining method), and a US$/C$ exchange rate of 1.08.

The mineral reserve figures presented herein are estimates, and no assurance can be given that the anticipated tonnages and grades will be achieved or that the anticipated level of recovery will be realized. The mineral reserves presented in this disclosure are a subset of the mineral resources.

The effective date for the Meliadine project mineral resource and reserve estimates in this news release is December 31, 2014. Other important operating information can be found in Agnico Eagle's AIF and Form 40-F.

Additional information about the Meliadine project that is required by NI 43-101 sections 3.2 and 3.3 and paragraphs 3.4 (a), (c), and (d) can be found in the Updated Technical Report on the Meliadine Gold Project, Nunavut, Canada, filed with Canadian Securities Regulators on SEDAR on the date hereof.

The scientific and technical information relating to Agnico Eagle's reserves and resources contained herein has been approved by Daniel Doucet , Senior Corporate Director, Reserve Development. Mr. Doucet is a designated Ing. with the Ordre des ingénieurs du Québec, and a "qualified person" as defined by NI 43-101.

The scientific and technical information contained in this news release relating to the Meliadine project has been approved by Alexandre Proulx , Program Manager, Meliadine Project.  Mr. Proulx is a designated Ing. with the Ordre des ingénieurs du Québec, and a "qualified person" as defined by NI 43-101.

The scientific and technical information contained in this news release relating to exploration has been approved by Alain Blackburn , Ing., Senior Vice-President, Exploration and a "Qualified Person" for the purposes of NI 43-101.

SOURCE Agnico Eagle Mines Limited

Lire la suite de l'article sur www.noodls.com
Données et statistiques pour les pays mentionnés : Canada | Tous
Cours de l'or et de l'argent pour les pays mentionnés : Canada | Tous

Agnico-Eagle Mines Limited

PRODUCTEUR
CODE : AEM.TO
ISIN : CA0084741085
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Agnico-Eagle est une société de production minière d'or basée au Canada.

Agnico-Eagle est productrice d'or, d'argent, de cuivre, de plomb et de zinc au Canada, au Mexique et en Finlande, en développement de projets d'argent, de cuivre, d'or, de plomb et de zinc au Canada, et détient divers projets d'exploration au Canada.

Ses principaux projets en production sont LARONDE, LARONDE EXTENSION, MEADOWBANK et LARONDE (EL COCO) MINE au Canada, PINOS ALTOS au Mexique et KITTILA en Finlande, ses principaux projets en développement sont LAPA, GOLDEX et LARONDE au Canada et ses principaux projets en exploration sont BOUSQUET MINE, JOUTEL, NIGHTHAWK, THORNLOE, REID, NW DELORO, CARR - WILKIE, WHITNEY TISDALE, WARK, GERMAN PROPERTY, MOUNTJOY PROPERTY, EASTER DOME, MELIADINE, ELLISON, BOUSQUET AND ELLISON, COLOMAC MINE, CABALLO BLANCO PROPERTY et VICTORY LAKE au Canada et MORELOS SUR au Mexique.

Agnico-Eagle est cotée au Canada, aux Etats-Unis D'Amerique et en Allemagne. Sa capitalisation boursière aujourd'hui est 19,9 milliards CA$ (15,9 milliards US$, 13,9 milliards €).

La valeur de son action a atteint son plus bas niveau récent le 29 octobre 1999 à 10,10 CA$, et son plus haut niveau récent le 13 novembre 2020 à 99,66 CA$.

Agnico-Eagle possède 230 990 000 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Rapports annuels de Agnico-Eagle Mines Limited
2008 Annual Report
Annual Report 2007
Financements de Agnico-Eagle Mines Limited
21/01/2015Agnico Eagle announces sale of Probe shares and warrants
26/04/2013Kootenay closes $4.75M Private Placement with Agnico-Eagle M...
16/08/2007Expiry Of Warrants
Nominations de Agnico-Eagle Mines Limited
19/03/2015Agnico Eagle Announces Senior Management Appointments and Pr...
Rapports Financiers de Agnico-Eagle Mines Limited
01/05/2014Agnico Eagle reports first quarter 2014 operating and financ...
13/02/2014Agnico Eagle reports fourth quarter and full year 2013 resul...
23/10/2013Agnico Eagle reports third quarter 2013 results - Strong ope...
24/07/2013Agnico Eagle reports second quarter 2013 results - Significa...
12/10/2011AGNICO-EAGLE PROVIDES THIRD QUARTER OPERATING UPDATE; ANNOUN...
12/10/2011Provides Third Quarter Operating Update; Announces Expanded ...
27/07/2011(angl) reports second quarter 2011 results; Provides explora...
07/07/2011AGNICO-EAGLE PROVIDES NOTICE OF RELEASE FOR SECOND QUARTER 2...
02/05/2011Reports First Quarter 2011 Results
17/02/2011Reports Fourth Quarter and Full Year 2010 Results; New Mines...
23/07/2008Reports Second Quarter 2008 Results
02/04/2008Provides notice of release of first quarter 2008 results; Se...
20/02/2008Reports Record Fourth Quarter 2007 Results
25/10/2007Reports Strong Third Quarter 2007 Results and Steady Progres...
01/10/2007Provides Notice of Release Of Third Quarter 2007 Results
04/07/2007Provides notice of release of second quarter 2007 results
Projets de Agnico-Eagle Mines Limited
21/09/2015Agnico Eagle provides Mexican exploration update - El Barque...
28/11/2014Agnico Eagle completes acquisition of Cayden Resources Inc.
29/10/2014Gold miner Agnico earnings miss but raises output forecasts
29/10/2014Canada gold miner Agnico Eagle Mines reports loss on one-off...
05/12/2011(Goldex)files new technical report on Goldex confirming reclassifica...
27/07/2011(Goldex)(angl) reports second quarter 2011 results; Provides explora...
28/06/2011AGNICO-EAGLE PROVIDES AN UPDATE ON ITS NUNAVUT OPERATIONS IN...
29/04/2011(Kittila)Announces Expanded Mineralization at Kittila, Goldex and Mel...
13/03/2011(Meadowbank)reports fire at its kitchen facilities at its Meadowbank min...
30/04/2010(Meadowbank)reports Q1 2010 results; Record quarterly revenue and gold p...
20/02/2009(Meliadine)43-101 Mivon technical report
16/12/2008(Pinos Altos)completes purchase of surface rights at Pinos Altos; Funded ...
17/11/2008(Kittila)hosts analyst and investor tour at Kittila gold mine in nort...
15/02/2008(Pinos Altos)'s gold reserves and resources at record levels; gold zones ...
05/06/2006(Lapa)to build Kittila gold mine in Finland and complete construct...
Communiqués de Presse de Agnico-Eagle Mines Limited
28/07/2016Agnico beats 2Q profit forecasts
27/07/2016Mid-Year 2016 Exploration Update: Expansion of Whale Tail an...
27/07/2016Mid-Year 2016 Exploration Update: Expansion of Whale Tail an...
27/07/2016Mid-Year 2016 Exploration Update: Expansion of Whale Tail an...
27/07/2016Mid-Year 2016 Exploration Update: Expansion of Whale Tail an...
27/07/2016Mid-Year 2016 Exploration Update: Expansion of Whale Tail an...
27/07/2016Mid-Year 2016 Exploration Update: Expansion of Whale Tail an...
27/07/2016Mid-Year 2016 Exploration Update: Expansion of Whale Tail an...
27/07/2016Mid-Year 2016 Exploration Update: Expansion of Whale Tail an...
27/07/2016Mid-Year 2016 Exploration Update: Expansion of Whale Tail an...
27/07/2016Mid-Year 2016 Exploration Update: Expansion of Whale Tail an...
27/07/2016Agnico Eagle Reports Second Quarter 2016 Operating and Finan...
27/07/2016Agnico Eagle Reports Second Quarter 2016 Operating and Finan...
27/07/2016Agnico Eagle Reports Second Quarter 2016 Operating and Finan...
27/07/2016Agnico Eagle Reports Second Quarter 2016 Operating and Finan...
27/07/2016Agnico Eagle Reports Second Quarter 2016 Operating and Finan...
27/07/2016Agnico Eagle Reports Second Quarter 2016 Operating and Finan...
27/07/2016Agnico Eagle Reports Second Quarter 2016 Operating and Finan...
27/07/2016Agnico Eagle Reports Second Quarter 2016 Operating and Finan...
27/07/2016Agnico Eagle Reports Second Quarter 2016 Operating and Finan...
27/07/2016Agnico Eagle Reports Second Quarter 2016 Operating and Finan...
27/07/2016How to View Gold Mining Earnings for Barrick, Goldcorp, Kinr...
25/07/2016Agnico Eagle announces additional investment in Belo Sun
20/07/2016Coverage Initiated on Select Canadian Basic Material Stocks ...
23/06/2016Agnico Eagle Provides Notice of Release of Second Quarter 20...
29/04/2016Agnico Eagle Announces Election of Directors
28/04/2016Agnico beats 1Q profit forecasts
28/04/2016Agnico Eagle Reports First Quarter 2016 Operating and Financ...
06/04/2016Agnico Eagle provides notice of release of first quarter 201...
11/02/2016Agnico reports 4Q loss
19/01/2016Today’s Top Gold Miner Is Barrick; Which Will It Be Tomorrow...
15/01/2016Investors Fearlessly Buying These 5 Stocks Amid Sinking Mark...
14/01/2016New ADX Uptrends In These 3 Gold Miners
08/01/20162 Top RBC Gold Stock Picks for Investors Worried About a Cra...
30/12/2015Gold Miner Outlook: Which Stocks Are Worth Their Weight in G...
25/12/2015Striking Gold: Agnico and Goldcorp Offer a Long-Term Upside
24/12/2015Why Have Newmont and Agnico Outperformed?
16/12/2015Five Gold Mining Stocks to Own Now
02/12/2015Do Hedge Funds Love IDEX Corporation (IEX)?
30/11/2015Barclays' Year-In-Review On Gold
27/11/2015Do Hedge Funds Love Allegion PLC (ALLE)?
30/10/2015Agnico Eagle (AEM) Q3 Earnings & Revenues Beat Estimates
30/10/2015Why Growth in Gold Production Is Important for Gold Miners
29/10/2015Edited Transcript of AEM.TO earnings conference call or pres...
28/10/2015Agnico Eagle Reports Record Third Quarter 2015 Gold Producti...
07/10/2015Almadex Minerals Options Gold Project in Mulatos Camp, Mexic...
05/10/20155 Commodity Stocks Marching Higher in October
30/09/2015Agnico Eagle Provides Notice of Release of Third Quarter 201...
04/09/2015Edited Transcript of AEM.TO earnings conference call or pres...
20/08/2015Agnico Eagle Announces 35% Increase in Inferred Resource at ...
19/08/2015Agnico Eagle Announces 35% Increase in Inferred Resource at ...
31/07/2015Edited Transcript of AEM.TO earnings conference call or pres...
29/07/2015Agnico Eagle Reports Second Quarter 2015 Results; Strong Ope...
29/07/2015Agnico Eagle Reports Second Quarter 2015 Results; Strong Ope...
29/07/2015Agnico Eagle Reports Second Quarter 2015 Results; Strong Ope...
29/07/2015Agnico Eagle Reports Second Quarter 2015 Results; Strong Ope...
29/07/2015Agnico Eagle Reports Second Quarter 2015 Results; Strong Ope...
29/07/2015Agnico Eagle Reports Second Quarter 2015 Results; Strong Ope...
29/07/2015Agnico Eagle Reports Second Quarter 2015 Results; Strong Ope...
29/07/2015Agnico Eagle Reports Second Quarter 2015 Results; Strong Ope...
29/07/2015Agnico Eagle Reports Second Quarter 2015 Results; Strong Ope...
29/07/2015Agnico Eagle Reports Second Quarter 2015 Results; Strong Ope...
29/07/2015Agnico Eagle Reports Second Quarter 2015 Results; Strong Ope...
29/07/2015Agnico Eagle Reports Second Quarter 2015 Results; Strong Ope...
29/07/2015Agnico Eagle Reports Second Quarter 2015 Results; Strong Ope...
29/07/2015Agnico Eagle Reports Second Quarter 2015 Results; Strong Ope...
30/04/2015Agnico Eagle Reports First Quarter 2015 Operating and Financ...
30/04/2015Agnico Eagle Reports First Quarter 2015 Operating and Financ...
30/04/2015Agnico Eagle Reports First Quarter 2015 Operating and Financ...
30/04/2015Agnico Eagle Reports First Quarter 2015 Operating and Financ...
30/04/2015Agnico Eagle Reports First Quarter 2015 Operating and Financ...
24/04/2015Lower Profits, Output on Tap for Barrick, Goldcorp -- Earnin...
23/04/2015Investor sees top in Agnico Eagle
14/04/2015UPDATE 3-Canada's Alamos Gold, AuRico merger may spark rival...
13/04/2015Canada's Alamos Gold, AuRico merger may spark rival bids
31/03/20155 Top Gold Stocks in 2015 Q1
23/03/2015Agnico Eagle Announces Senior Management Appointments and Pr...
19/03/2015Agnico hires former Barrick Gold CFO Ammar Al-Joundi as pres...
19/03/2015Agnico Eagle Announces Senior Management Appointments and Pr...
13/03/2015Agnico Eagle completes updated NI 43-101 technical report on...
11/02/2015Agnico Eagle quarterly adjusted earnings beat market
11/02/2015Agnico Eagle reports fourth-quarter loss on non-cash items
11/02/2015Agnico Eagle reports fourth quarter and full year 2014 resul...
29/01/2015Agnico Eagle announces sale of Probe shares and warrants
09/01/2015Agnico Eagle Provides Notice of Release of Fourth Quarter 20...
28/11/2014Agnico Eagle completes acquisition of Cayden Resources Inc.
26/11/2014Canada Stocks to Watch: Golds and Pacific Rubiales
13/11/2014S&P Dow Jones Indices Announces Changes to the S&P/TSX Canad...
11/11/2014Agnico Eagle completes major drill program at Amaruq project...
29/10/2014Agnico Eagle reports third quarter 2014 results - 2014 Gold ...
29/10/2014Agnico Eagle reports third quarter 2014 results - 2014 Gold ...
29/10/2014Agnico Eagle reports third quarter 2014 results - 2014 Gold ...
29/09/2014(Meadowbank)Agnico Eagle's Amaruq project (formerly "IVR") near Meadowba...
08/09/2014Agnico Eagle to Acquire Cayden Resources
13/08/2014Technical report filed on the Canadian Malartic mine
27/06/2014Agnico Eagle provides notice of release of second quarter 20...
01/04/2014Agnico Eagle provides notice of release of first quarter 201...
27/01/2014Agnico Eagle provides notice of release of fourth quarter 20...
20/12/2013Agnico Eagle announces investment in Pershimco Resources Inc...
01/10/2013Agnico Eagle provides notice of release of third quarter 201...
08/07/2013Agnico Eagle provides notice of release of second quarter 20...
08/07/2013Agnico Eagle provides notice of release of second quarter 20...
16/05/2013Agnico Eagle Completes Acquisition of Urastar
23/04/2013Kootenay Announces Strategic Investment by Agnico-Eagle Mine...
23/04/2013announces investment in Kootenay Silver Inc.
18/04/2013Alliance Updates Mexico Gold Assets between Agnico-Eagle’s ...
04/04/2013provides notice of release of first quarter 2013 results, co...
26/03/2013Alliance Mining Initiates 43-101 on its Gold Assets between ...
15/01/2013Provides Notice of Release for Fourth Quarter 2012 Results a...
12/12/2012- Dividend Increased 10% - Declared For 31st Consecutive Yea...
14/10/2011commences formal take-over bid to acquire Grayd
13/10/2011Agnico-Eagle commences formal take-over bid to acquire Grayd
23/09/2011AGNICO-EAGLE BECOMES SIGNATORY TO INTERNATIONAL CYANIDE MANA...
22/09/2011and Grayd enter into a definitive agreement whereby Agnico-E...
19/09/2011Agnico-Eagle and Grayd enter into a definitive agreement whe...
02/08/2011Agnico-Eagle reports second quarter 2011 results; Provides e...
30/05/2011Reports Investment in Colibri Resource Corporation
28/07/2010Reports Q2 2010 results; record quarterly revenue, net inco...
07/07/2010completes acquisition of Comaplex
04/05/2010enters into a definitive agreement to acquire Comaplex
20/04/2010Comaplex and Agnico-Eagle announce extension of exclusivity ...
07/04/2010closes $600,000,000 issuance of long-term unsecured notes
24/03/2010reports investment in Alexandria Minerals Corporation
19/03/2010to issue $600,000,000 of long-term unsecured notes
29/07/2009Reports Q2 2009 Results
18/02/2009reports 2008 results; Record quarterly and annual gold produ...
06/11/2008=5B=3F=3F Probable Spam=5D Agnico-Eagle Mines Limited visit...
04/09/2008Doubles Credit Lines to US$600 Million
31/07/2008announces refinancing transaction with Stornoway Diamond Cor...
23/07/2008/ CEO - INTERVIEW
16/07/2008Senior VP Financial & CFO Interview
14/07/2008Agrees to Purchase Investment in Comaplex Minerals
18/06/2008strengthens Board and management
03/03/2008Reports Investment in Forum Uranium Corp. and Concurrent Opt...
08/01/2008CFO Interview
20/11/2007 Receives $130,640,561 and Issues 6,875,819 Common Shares on...
09/07/2007Completes Compulsory Acquisition Of Remaining Cumberland Com...
27/06/2007Expands Gold Zones at Pinos Altos; Signs Option to Acquire E...
14/06/2006conclut son placement d'actions ordinaires
12/01/2006RESEARCH : Follow up N° 18
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TORONTO (AEM.TO)NYSE (AEM)
86,08+0.91%62,49+1.21%
TORONTO
CA$ 86,08
17/04 17:00 0,780
0,91%
Cours préc. Ouverture
85,30 85,34
Bas haut
85,34 86,88
Année b/h Var. YTD
61,03 -  86,08 19,47%
52 sem. b/h var. 52 sem.
59,62 -  86,08 12,21%
Volume var. 1 mois
1 118 087 15,02%
24hGold TrendPower© : 5
Produit Copper - Gold - Silver - Zinc
Développe Copper - Gold - Silver - Zinc
Recherche Copper - Gold - Silver - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 24/02/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
202428,19%
2023-4,56%82,9060,21
20226,56%84,6648,88
2021-26,30%97,2160,27
202011,68%99,66100,81
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,72 AU$-0,06%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
10,89 US$-1,36%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,55 GBX-0,72%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,36 CA$-3,28%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
15,64 CA$+2,69%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+2,17%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,19 AU$-2,56%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,87 CA$+6,25%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
51,67 US$-0,98%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,03 AU$-2,94%Trend Power :