Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en

Alexco Resource Corp.

Publié le 07 septembre 2011

Alexco Intersects 6=2E04 Meters of 31=2E5 Ou =?ISO-8859-1?Q?nces=20Per=20Ton=20Silver=20at=20Flame=2

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Canada | Zinc |

Marketwire

 
 
Alexco Resource Corp.
TSX: AXR
NYSE Amex: AXU
Other Recent News

September 7, 2011
Alexco Intersects 6.04 Meters of 31.5 Ounces Per Ton Silver at Flame & Moth, Significantly Expands Mineralized Zone
VANCOUVER, BRITISH COLUMBIA--(Marketwire - Sept. 7, 2011) - Alexco Resource Corp. (TSX:AXR)(NYSE Amex:AXU) today announced interim results from its 2011 drilling program at the recently discovered Flame & Moth prospect, located immediately adjacent to Alexco's milling complex within the Keno Hill Silver District in Canada's Yukon Territory. Mineralization has now been confirmed over intercepts ranging up to 11.96 meters within an extensive structural zone that is up to 33 meters wide. Silver mineralization is currently identified approximately 500 meters along strike and 320 meters down dip with the mineralized structure remaining open in all directions. The continuing excellent results outlined in the assay data below confirm the continuity of a significant mineralized structure containing high grade silver mineralization.

Alexco President and Chief Executive Officer Clynt Nauman said, "Our continuing positive results from Flame & Moth once again demonstrate the extent and potential of this large silver district. The Flame & Moth deposit represents a new discovery very close to our existing infrastructure, and continues to add to our understanding of the geology of the district. Our success at Flame & Moth justifies continued drilling at this discovery for the next two to three months to further define the deposit. We have therefore now brought an additional exploration drill rig on site to help accelerate our work elsewhere in the District, especially the Bermingham property."

Highlights

Results at Flame & Moth to date include the following composite assay intervals:

--  K-11-0350 intersected mineralized vein material over 4.7 meters true
    width from 190.95 meters with a composite interval of 1,080 grams per
    tonne (31.5 ounces per ton) silver over 6.04 meters from 190.95 meters
    that included 2.61 meters at 2,154 grams per tonne (62.8 ounces per ton)
    silver. 

--  K-11-0357 intersected veining over 6.6 meters that included a composite
    assay interval of 855 grams per tonne (25.0 ounces per ton) silver over
    4.56 meters from 260.64 meters that included 1.87 meters at 1,473 grams
    per tonne (43.0 ounces per ton) silver. 

--  K-11-0353 intersected a wide zone of mineralization with a composite
    assay of 285 grams per tonne (8.3 ounces per ton) silver over 10.64
    meters from 220.98 meters that included 2.42 meters at 688 grams per
    tonne (20.1 ounces per ton) silver. 

--  K-11-0340 intersected a 6 meter wide vein structure and three zones
    contained composite assay intervals of 267 grams per tonne (7.8 ounces
    per ton) silver over 1.01 meters from 51.07 meters, 1,132 grams per
    tonne (33.0 ounces per tonne) silver over 0.87 meters from 139.29
    meters, and 269 grams per tonne (7.8 ounces per ton) silver over 3.95
    meters from 181.98 meters. 

--  K-11-0342 intersected galena-bearing veining over 1.93 meters from
    122.83 meters, with a composite assay of 490 grams per tonne (14.3
    ounces per ton) silver over 2.56 meters from 122.2 meters. 

--  K-11-0343 intersected mineralized veining containing sphalerite, galena
    and silver sulphosalts over 12.29 meters from 170.07 meters, with a
    composite assay of 277 grams per tonne (8.1 ounces per ton) silver over
    11.96 meters from 170.07 meters. 

--  K-11-0341 intersected two galena bearing veins over intercept widths of
    0.99 meters and 0.66 meters as well as several stringer zones within a
    26.7 meter wide structure from 134.11 meters. Composite assay intervals
    include 344 grams per tonne (10.0 ounces per ton) silver over 3.66
    meters from 134.11 meters, 190 grams per tonne (5.5 ounces per ton)
    silver over 0.6 meters from 149.29 meters, and 607 grams per tonne (17.7
    ounces per ton) silver over 7.07 meters from 153.01 meters. 

--  K-11-0344 intersected mineralization with a composite assay of 202 grams
    per tonne (5.9 ounces per tone) silver over 3.32 meters from 169.51
    meters.
 
2011 Flame & Moth Geology Update and Results

The above results are from on-going drilling at the 2010 discovery site located at depth adjacent to the recently constructed Bellekeno mill. Through the 2010 and 2011 drill programs, Alexco has drilled 8,729.53 meters of core drilling in 39 holes on the northeast-trending Flame Vein, of which 31 were completed to target, over a strike length of approximately 500 meters and to a depth of 320 meters below surface. To date, assay results have been received from 14 of the 18 holes completed to target under the 2011 program that are in addition to those previously reported (see news release dated February 16, 2011 entitled "New Keno Hill Silver Discovery: 4.26 Meters of 49.9 Oz Per Ton Silver Intersected at Flame & Moth"). Since the recognition by Alexco of the Flame & Moth structural zone as a potentially significant mineralized feature in late 2009, additional detailed stratigraphic geological mapping, geochemical and geophysical surveys, and analysis of the 2010 drilling results, have permitted the construction of a 3D geological model to guide drilling and to enable the interpretation of key stratigraphic and structural data which includes post mineral faulting.

The structure hosting the mineralization at Flame & Moth varies in drill holes between 2 meters and 33 meters true width, forming a major structure within the Keno Hill District. The veining comprises multiphase quartz and siderite containing significant and locally massive, galena, sphalerite, pyrite and pyrrhotite with associated silver sulphosalts, arsenopyrite and chalcopyrite mineralization (that locally contains up to 1 gram per tonne gold), and varies up to 9.62 meters in calculated true width within the host fault structure.

The structural setting and style of the mineral veining at Flame & Moth is similar to that of the historical major producing Hector Calumet structural zone located nearby on Galena Hill, and is considered to be favourable for the potential to host significant resources.

The initial 2011 drilling has completed investigation of the Flame Vein at shallow depths, above the 2010 season drill intercepts. The mineralized structure remains open in both the strike and down-dip directions, and plans for continued drilling are designed to incrementally test these extensions with the objective of obtaining sufficient information to permit the scoping of a preliminary resource estimate in calendar 2012.

Updated composite assay tables, along with a drill hole location map and a long section plot, for drill holes completed at the Flame & Moth prospect are shown below, and are available for review on the Company's website at www.alexcoresource.com.

Table 1: Location of 2011 Flame & Moth drill holes completed at 31 August   
 2011                                                                       
                                                                            
----------------------------------------------------------------------------
Drill Hole      Easting   Northing Elevation Azimuth   Inclination Depth (m)
----------------------------------------------------------------------------
(i)K-11-0336  483955.48 7086648.49    905.22     300           -45     23.77
----------------------------------------------------------------------------
(i)K-11-0338  483953.21 7086646.64    905.13     300           -45     34.14
----------------------------------------------------------------------------
K-11-0340     483954.08 7086645.96    905.16     300           -67    249.94
----------------------------------------------------------------------------
K-11-0341     483901.02 7086564.38    912.65     300           -45    210.32
----------------------------------------------------------------------------
K-11-0342     483953.49 7086646.54    904.94     330           -65    205.89
----------------------------------------------------------------------------
K-11-0343     483901.53 7086564.11    912.53     300           -57    193.55
----------------------------------------------------------------------------
K-11-0344     483963.26 7086656.33    905.41     265           -65    229.51
----------------------------------------------------------------------------
(i)K-11-0345  483902.51 7086565.29    912.61     322           -56    185.93
----------------------------------------------------------------------------
K-11-0345a    483902.51 7086565.29    912.61     325           -55    205.74
----------------------------------------------------------------------------
K-11-0346     483963.29 7086655.92    905.56     255           -65    197.21
----------------------------------------------------------------------------
(i)K-11-0347  483903.08 7086567.26    912.60     286           -50     19.81
----------------------------------------------------------------------------
(i)K-11-0348  483912.73 7086550.09    914.64     286           -50     24.38
----------------------------------------------------------------------------
K-11-0349     483999.22 7086705.77    906.52     335           -60    217.93
----------------------------------------------------------------------------
K-11-0350     483912.99 7086550.00    914.66     286           -60    207.26
----------------------------------------------------------------------------
K-11-0351     483788.59 7086506.00    896.83     290           -50    137.76
----------------------------------------------------------------------------
K-11-0352     483789.20 7086505.76    896.70     320           -75    124.97
----------------------------------------------------------------------------
K-11-0353     483918.93 7086548.49    914.93     275           -66    236.28
----------------------------------------------------------------------------
K-11-0354     483875.36 7086532.11    910.34     300           -69    214.88
----------------------------------------------------------------------------
K-11-0357     484005.00 7086546.09    925.72     291           -46    290.00
----------------------------------------------------------------------------
K-11-0362     484005.52 7086545.01    925.74   283.5           -57    311.00
----------------------------------------------------------------------------
(i)K-11-0365  484033.78 7086460.86    929.09     294           -51     35.00
----------------------------------------------------------------------------
K-11-0367     484033.68 7086460.40    929.02     291           -51    362.00
----------------------------------------------------------------------------
(i)K-11-0371  484033.46 7086459.76    929.15     280           -45     74.00
----------------------------------------------------------------------------
K-11-0371a    484033.33 7086459.32    929.09     280           -45    371.00
----------------------------------------------------------------------------
K-11-0374     484034.05 7086458.60    929.24     272           -54    380.00
----------------------------------------------------------------------------
                                                                            
(i) denotes drill hole lost or re-drilled                                   
Map coordinate projection UTM NAD83 Z8                                      
                                                                            
Table 2: Assay Composites Calculated for Flame & Moth Drill Holes Completed 
 to August 2011                                                             
                                                                            
----------------------------------------------------------------------------
              From     To Interval   True    Ag       Ag     Au     Pb    Zn
Drill Hole     (m)    (m)      (m)  Width (g/t) (oz/Ton)  (g/t)    (%)   (%)
----------------------------------------------------------------------------
K-11-0340    51.07  52.08     1.01   0.74   267     7.79   0.04   0.20  0.05
           -----------------------------------------------------------------
            139.29 140.16     0.87   0.63  1132    33.02   0.96   0.77  2.01
           -----------------------------------------------------------------
 including  139.29  139.9     0.61   0.44  1499    43.71                    
           -----------------------------------------------------------------
            181.98 185.93     3.95   2.86   269     7.84   0.12   0.14  3.56
           -----------------------------------------------------------------
 including  181.98 182.52     0.54   0.39   913    26.62                    
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
K-11-0341   134.11 137.77     3.66   3.41   344    10.03   0.18   4.17  0.33
           -----------------------------------------------------------------
 including  136.95 137.37     0.42   0.39  1670    48.71                    
           -----------------------------------------------------------------
            149.29 149.89     0.60   0.56   190     5.54   0.16   0.54  2.83
           -----------------------------------------------------------------
            153.01 160.08     7.07   6.59   607    17.70   0.23   1.88  3.57
           -----------------------------------------------------------------
 including  154.23 154.89     0.66   0.62  1410    41.13                    
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
K-11-0342   122.20 124.76     2.56   1.87   490    14.29   0.39   4.12  6.29
           -----------------------------------------------------------------
            175.68 176.01     0.33   0.24    56     1.65   0.03   0.31  3.76
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
K-11-0343   166.86 168.04     1.18   0.94    48     1.39   0.05   0.52  3.75
           -----------------------------------------------------------------
            170.07 182.03    11.96   9.50   277     8.08   0.21   1.06  9.96
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
K-11-0344   169.51 172.83     3.32   2.39   202     5.89   0.61    0.6  1.43
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
K-11-0345   184.61 184.85     0.24   0.19    64     1.88   0.65   0.56  0.23
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
                                                           less             
                                                           than             
K-11-0345a  162.69 163.77     1.08   0.86    85     2.49   0.01   0.02  0.08
----------------------------------------------------------------------------
            178.69 184.27     5.58   4.42    74     2.14   0.43   0.29  1.91
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
K-11-0349   106.30 106.60     0.30   0.23    79     2.30   0.04   0.14  0.24
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
K-11-0350   190.95 196.99     6.04   4.63  1080    31.50   0.88   4.37 10.72
           -----------------------------------------------------------------
 including  192.27 194.88     2.61   2.00  2154    62.83                    
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
K-11-0351    78.92  79.94     1.02   0.91   109     3.17   0.01   0.27  2.95
           -----------------------------------------------------------------
             82.76  86.27     3.51   3.13    45     1.32   0.06   0.13   1.6
           -----------------------------------------------------------------
                                                           less   less      
                                                           than   than      
             88.39  89.11     0.72   0.64    36     1.06   0.01   0.01  0.01
           -----------------------------------------------------------------
            106.14 106.47     0.33   0.29   115     3.35   0.37   1.32  9.25
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
K-11-0352   109.60 112.68     3.08   1.98    79     2.30   0.29   0.09  0.21
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
                                                                        less
                                                                        than
K-11-0353   217.07 218.34     1.27   0.87    41     1.18   0.02   0.06  0.01
           -----------------------------------------------------------------
            220.98 231.62    10.64   7.34   285     8.31   0.24   0.99  3.18
           -----------------------------------------------------------------
 including  222.50 224.92     2.42   1.67   688    20.07                    
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
                                                                  less      
                                                                  than      
K-11-0354   147.35 147.98     0.63   0.50    35     1.02   0.10   0.01  0.08
----------------------------------------------------------------------------
            155.45 167.46    12.01   9.62   117     3.41   0.13   0.25  0.99
           -----------------------------------------------------------------
 including  163.29 164.49      1.2   0.96   659    19.22   0.60   0.38  0.05
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
K-11-0357   260.64 265.20     4.56   4.10   855    24.95   0.32   3.40 10.25
           -----------------------------------------------------------------
 including  261.13 263.00     1.87   1.68  1473    42.97   0.48   6.40 12.21
----------------------------------------------------------------------------
                                                                            
Using 30 g/t cut-off with a maximum of 2 meters unmineralized internal      
 dilution.
 
To view the Figures associated with this Press Release, please visit the following links:

http://media3.marketwire.com/docs/axr-0907-fig1.pdf

http://media3.marketwire.com/docs/axr-0907-fig2.pdf

Notes

The 2011 exploration drill program and sampling protocol has been reviewed, verified and compiled by Alexco's geologic staff under the supervision of Alan McOnie, Vice President, Exploration for Alexco and a Qualified Person as defined by National Instrument 43-101 ("NI 43-101"). A rigorous quality control and quality assurance protocol is used on the project, including blank, duplicate and standard reference samples in each batch of 20 samples delivered to the assay lab. Drill core samples were shipped to ALS Minerals Labs at Whitehorse, Yukon Territory for preparation, with fire assay and multi-element ICP analyses completed at the ALS Minerals facility in North Vancouver, British Columbia. The disclosure of scientific and technical information about Alexco's mineral projects contained in this news release has also been reviewed and approved by Mr. McOnie.

About Alexco

Alexco Resource Corp. owns and operates the Bellekeno silver mine, one of several mineral properties held by Alexco which encompass substantially all of the historical Keno Hill Silver District located in Canada's Yukon Territory. Bellekeno, which commenced commercial production at the beginning of calendar year 2011, is Canada's only operating primary silver mine. Alexco's primary near-term exploration objective is to unlock value in the silver-rich Keno Hill District, and is focused on growth by advancing its promising District properties to development decisions. The Company's goal is to produce 7 million to 10 million ounces of silver annually within the next decade. Employing a unique business model, Alexco also provides mine-related environmental services, remediation technologies and reclamation and mine closure services to both government and industry clients through the Alexco Environmental Group, its wholly-owned environmental services division.

Keno Hill Silver District History

Between 1921 and 1988, the Keno Hill Silver District was a world-class silver producer, with more than 217 million ounces of silver produced at average grades of 40.5 ounces per ton silver, 5.6% lead and 3.1% zinc (Yukon Government's Minfile database). These historical production grades would rank Keno Hill in the top 3% by grade of today's global silver producers.

Some statements ("forward-looking statements") in this news release contain forward-looking information concerning the Company's anticipated results and developments in the Company's operations in future periods, planned exploration and development of its properties, plans related to its business and other matters that may occur in the future, made as of the date of this news release. Forward-looking statements may include, but are not limited to, statements with respect to future remediation and reclamation activities, future mineral exploration, the estimation of mineral reserves and mineral resources, the realization of mineral reserve and mineral resource estimates, future mine construction and development activities, future mine operation and production, the timing of activities and reports, the amount of estimated revenues and expenses, the success of exploration activities, permitting time lines, requirements for additional capital and sources and uses of funds. Forward-looking statements are subject to a variety of known and unknown risks, uncertainties and other factors which could cause actual events or results to differ from those expressed or implied by the forward-looking statements. Such factors include, among others, risks related to actual results of exploration and development activities; actual results of mining activities; actual results of consulting activities; actual results of remediation and reclamation activities; conclusions of economic evaluations; changes in project parameters as plans continue to be refined; future prices of silver, gold, lead, zinc and other commodities; possible variations in mineable resources, grade or recovery rates; failure of plant, equipment or processes to operate as anticipated; accidents, labour disputes and other risks of the mining industry; First Nation rights and title; continued capitalization and commercial viability; global economic conditions; competition; and delays in obtaining governmental approvals or financing or in the completion of development activities. Forward-looking statements are based on certain assumptions that management believes are reasonable at the time they are made. In making the forward-looking statements included in this news release, the Company has applied several material assumptions, including, but not limited to, the assumption that market fundamentals will result in sustained silver, gold, lead and zinc demand and prices. There can be no assurance that forward-looking statements will prove to be accurate and actual results and future events could differ materially from those anticipated in such statements. The Company expressly disclaims any intention or obligation to update or revise any forward-looking statements whether as a result of new information, future events or otherwise, except as otherwise required by applicable securities legislation.

CONTACT INFORMATION:

Alexco Resource Corp.
Clynton R. Nauman
President and Chief Executive Officer
(604) 633-4888
Fax: (604) 633-4887
info@alexcoresource.com
www.alexcoresource.com

INDUSTRY: Manufacturing and Production - Mining and Metals

Footer


If you no longer want to receive announcements from us, please do not reply to this e-mail. Instead simply click .
Données et statistiques pour les pays mentionnés : Canada | Tous
Cours de l'or et de l'argent pour les pays mentionnés : Canada | Tous

Alexco Resource Corp.

PRODUCTEUR
CODE : AXR.TO
ISIN : CA01535P1062
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Alexco Resources est une société développant des projet miniers d'argent basée au Canada.

Alexco Resources est productrice d'argent, d'or, de plomb et de zinc au Canada, et détient divers projets d'exploration au Canada.

Son principal projet en production est KENO HILL (BELLEKENO) au Canada et ses principaux projets en exploration sont BREWERY CREEK, LUCKY QUEEN YUKON, SPROGGE YUKON, HARLAN, KLONDIKE, MCQUESTEN, FLAME AND MOTH et BERMINGHAM au Canada.

Alexco Resources est cotée au Canada et aux Etats-Unis D'Amerique. Sa capitalisation boursière aujourd'hui est 218,3 millions CA$ (165,2 millions US$, 147,5 millions €).

La valeur de son action a atteint son plus haut niveau récent le 29 avril 2011 à 9,75 CA$, et son plus bas niveau récent le 13 mars 2015 à 0,34 CA$.

Alexco Resources possède 93 680 000 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Dans les médias de Alexco Resource Corp.
14/06/2011(Keno Hill (bellekeno))Reports Grid Power Outage Affecting Keno Hill
Rapports annuels de Alexco Resource Corp.
Annual report 2007
Financements de Alexco Resource Corp.
16/04/2013Alexco Amends Terms of $7 Million Flow-Through Financing
23/12/2009Closes $9.5 Million Flow-Through Private Placement
09/03/2009Flow-Through Private Placement
11/12/2007Closes Flow-Through Private Placement
22/11/2007Announces Flow-Through Private Placement
Attributions d'options de Alexco Resource Corp.
13/12/2011Alexco Amends Stock Option Plan for Annual General Meeting
13/12/2011Amends Stock Option Plan for Annual General Meeting
Nominations de Alexco Resource Corp.
28/01/2010Appoints Jim Harrington to President President
14/12/2009New Management Appointments
Rapports Financiers de Alexco Resource Corp.
25/03/2015Reports Fourth Quarter and Year End 2014 Results
14/11/2013Alexco Reports Third Quarter 2013 Financial Results
15/08/2013Alexco Reports Second Quarter 2013 Financial Results
14/08/2013Reports Second Quarter 2013 Financial Results
08/05/2013Alexco Reports First Quarter 2013 Financial Results
08/05/2013Reports First Quarter 2013 Financial Results
27/03/2013Alexco Reports Financial Results for Year Ended December 31,...
27/03/2013Reports Financial Results for Year Ended December 31, 2012
05/11/2012Alexco Reports Third Quarter 2012 Financial Results
05/11/2012Reports Third Quarter 2012 Financial Results
07/08/2012Alexco Reports Second Quarter 2012 Financial Results
07/05/2012Alexco Reports First Quarter 2012 Earnings
07/05/2012Reports First Quarter 2012 Earnings
28/11/2011Alexco Reports First Fiscal Quarter Financial Results
28/11/2011Reports First Fiscal Quarter Financial Results
15/09/2011Reports Increased Revenue, Cash From Operations, Earnings an...
10/05/2010(Keno Hill (bellekeno))Bellekeno Silver Mine Project on Schedule for Third Quarter ...
Projets de Alexco Resource Corp.
05/12/2013Alexco Releases Positive Preliminary EconomicAssessment for ...
31/01/2013Alexco Expands Flame & Moth Indicated Resource to 22=2E9 Mil...
27/09/2012Alexco Completes Sale of Remaining Interest in Brewery Creek
27/09/2012(Brewery Creek)Completes Sale of Remaining Interest in Brewery Creek
28/06/2012Alexco Announces Initial Resource Estimates for Flame & Moth...
25/06/2012Alexco Reports Bellekeno Production Back Online After Wildfi...
25/06/2012Reports Bellekeno Production Back Online After Wildfire Disr...
22/02/2012Alexco Intersects Silver Mineralization to 26 Meters True Th...
22/02/2012(Bermingham)Intersects Silver Mineralization to 26 Meters True Thickness...
14/02/2012(Flame And Moth)Drills 8.9 Meters of 20.2 Ounces Per Ton Silver At Flame & M...
23/01/2012Alexco Silver Production Increases 21% to =?ISO-8859-1?Q?Mor...
08/12/2011Alexco Intersects Multiple Zones of Silver Mineralization to...
08/12/2011(Bermingham)Intersects Multiple Zones of Silver Mineralization to 22.2 M...
07/09/2011Alexco Intersects 6=2E04 Meters of 31=2E5 Ou =?ISO-8859-1?Q?...
07/09/2011(Flame And Moth)Intersects 6.04 Meters of 31.5 Ounces Per Ton Silver at Flam...
27/07/2011Alexco Announces Initial Resource Estimates for Lucky Queen ...
04/05/2011Alexco Releases Initial Production Results for Bellekeno Min...
04/05/2011(Keno Hill (bellekeno))Releases Initial Production Results for Bellekeno Mine; On T...
04/03/2011(Keno Hill (bellekeno))Provides Update on Bellekeno Operations and Outlines 2011 Ex...
03/03/2011Alexco Provides Update on Bellekeno Operations and Outlines ...
16/02/2011Alexco Resource Corp=2E: New Keno Hill Silver Discovery-4=2E...
16/02/2011(Flame And Moth)New Keno Hill Silver Discovery-4.26 Meters of 49.9 Oz Per To...
02/02/2011(Keno Hill (bellekeno))Receives Balance of Assays From Onek Zinc-Silver Deposit Dri...
06/01/2011(Keno Hill (bellekeno))Alexco Achieves Commercial Production at Bellekeno
04/03/2010(Keno Hill (bellekeno))Commences 2010 Expanded Exploration Program at Keno Hill
01/12/2009(Keno Hill (bellekeno))Additional 2009 Drill Results
18/11/2009(Keno Hill (bellekeno))Yukon Issues Quartz Mining License For Bellekeno Mine
12/11/2009(Keno Hill (bellekeno))Completes Positive Bellekeno Mine Development
05/11/2009(Keno Hill (bellekeno))Additional 2009 Drill Results
03/11/2009(Keno Hill (bellekeno))Additional 2009 Drill Results from Lucky Queen
15/10/2009(Keno Hill (bellekeno))Addicional 2009 Drill Results at Keno Hill
15/10/2009Announces Additional 2009 Drill Results at Keno Hill: Drilli...
15/07/2009(Keno Hill (bellekeno))Yukon Government Issues Positive Decision Document for Belle...
17/06/2009Passes Key Milestone in Permitting of the Bellekeno Mine
19/05/2009Intersects 7.8 Meters of 49.4 Ounces Per Ton Silver
14/05/2009(Keno Hill (bellekeno))Outlines 2009 Surface Exploration Plans at Keno Hill
19/09/2008(Keno Hill (bellekeno))Announces Additional 2008 Drill Results at Keno Hill
09/07/2008(Keno Hill (bellekeno))Positive Preliminary Economic Assessment on Bellekeno Deposi...
02/07/2008(Keno Hill (bellekeno))Announces Initial 2008 Drill Results at Keno Hill
25/03/2008(Keno Hill (bellekeno))Outlines 2008 Exploration and Development Plans at Keno Hill
13/02/2008(Keno Hill (bellekeno))Announces Final 2007 Drill Results from Keno Hill
23/10/2007Announces High Grade Native Silver Intercept from Lucky Quee...
16/10/2007Announces Significant High Grade Silver Intercepts From Sout...
06/09/2007Announces Discovery of High Grade Zinc Mineralization with S...
Communiqués de Presse de Alexco Resource Corp.
01/08/2016Alexco to Release Second Quarter 2016 Results on August 10, ...
29/07/2016Alexco Files Final Shelf Prospectus and Registration Stateme...
09/06/2016Alexco Reports Voting Results from Annual General Meeting
02/06/2016Alexco Resource Reminds Shareholders of Voting Cut-Off for U...
01/06/2016Alexco Initiates 2016 Bermingham Exploration and Other Work ...
17/05/2016Alexco Closed C$13 Million Non-Brokered Equity Financing
11/05/2016Alexco Reports First Quarter 2016 Results
11/05/2016Alexco Resource reports 1Q loss
05/05/2016Alexco Mails Information Circular in Connection with Annual ...
03/05/2016Alexco to Release First Quarter 2016 Results on May 11, 2016
27/04/2016Alexco Announces up to C$10 Million Non-Brokered Equity Fina...
23/03/2016Alexco Reports Fourth Quarter and Year End 2015 Results
23/03/2016Alexco Resource reports 4Q loss
26/10/2015Edited Transcript of AXR.TO earnings conference call or pres...
17/09/2015Alexco Drills 5 meters (True Width) of 7,462 grams per tonne...
11/08/2015Alexco Reports Second Quarter 2015 Financial Results
11/08/2015Alexco Resource reports 2Q loss
11/08/2015Alexco to Host Second Quarter 2015 Earnings Conference Call ...
26/05/2015Video-Mining Clips Analyst Update with Alexco President & CE...
10/04/2015Annual Report for Alexco Resource Corp.
25/03/2015Alexco Reports Fourth Quarter and Year End 2014 Results
13/03/2015Alexco to Release Fourth Quarter and Year End 2014 Results o...
13/03/2015to Release Fourth Quarter and Year End 2014 Results on March...
26/02/2015Yukon Ranks 1st in Mineral Potential and 9th Overall in the ...
20/01/2015Alexco Intersects 1,483 Grams per Tonne Silver (47.7 Ounces ...
23/12/2014Alexco Updates Positive Preliminary Economic Assessment for ...
14/11/2014Alexco Reports Third Quarter 2014 Financial Results
13/11/2014Alexco Reports Third Quarter 2014 Financial Results
13/11/2014Alexco to Host Third Quarter 2014 Earnings Conference Call a...
05/11/2014Alexco Drills Best Hole Ever: Intersects 5,667 Grams Per Ton...
04/11/2014Alexco to Release Third Quarter 2014 Results on November 13,...
03/11/2014Alexco Announces One Year Extension of Silver Stream Amendme...
28/08/2014Alexco Closes Underwriter's Over-Allotment Option
21/08/2014Completes C$7 Million Bought Deal Financing
29/07/2014Announces C$5 Million Equity Financing
12/12/2013Alexco Files Eastern Keno Hill Silver District Technical Rep...
04/11/2013Alexco to Release Third Quarter Financial Results On Novembe...
04/11/2013to Release Third Quarter Financial Results On November 14, 2...
23/09/2013Alexco Reports Silver Production for Third Quarter 2013
23/09/2013Reports Silver Production for Third Quarter 2013
18/09/2013Extends Flame & Moth to More Than 900 Meters in Strike Lengt...
27/08/2013Alexco Issues Statement on Market Activity
27/08/2013Issues Statement on Market Activity
09/08/2013Alexco to Release Second Quarter Financial Results On August...
08/08/2013to Release Second Quarter Financial Results On August 14, 20...
02/08/2013Alexco to Release Second Quarter Financial R =?ISO-8859-1?Q?...
02/08/2013to Release Second Quarter Financial Results the Week of Augu...
23/07/2013Alexco Announces Amended Environmental Subsidiar =?ISO-8859-...
23/07/2013Announces Amended Environmental Subsidiary Agreement with Ca...
17/07/2013Alexco Reports Increased Silver Production in Second Quarter...
17/07/2013Reports Increased Silver Production in Second Quarter 2013; ...
07/06/2013Alexco Reports Voting Results From Annual General Meeting
07/06/2013Reports Voting Results From Annual General Meeting
31/05/2013Alexco Implements Cost Savings Measures
31/05/2013Implements Cost Savings Measures
20/05/2013Alexco Receives Water Licence Amendment
20/05/2013Receives Water Licence Amendment
02/05/2013Alexco Adopts Advance Notice Policy
23/04/2013Alexco Reports Closing of $7 Million Flow-Through Financing
23/04/2013Reports Closing of $7 Million Flow-Through Financing
12/04/2013Alexco Reports First Quarter 2013 Production Results
12/04/2013Reports First Quarter 2013 Production Results
01/04/2013Alexco Arranges Fully Subscribed Flow-Through
15/03/2013Alexco Files Flame & Moth Technical Report
15/03/2013Files Flame & Moth Technical Report
31/01/2013Expands Flame & Moth Indicated Resource to 22.9 Million Ounc...
17/01/2013Alexco Reports 16% Increase in Silver Production for Fourth ...
14/01/2013Alexco Further Expands Flame & Moth Deposi =?ISO-8859-1?Q?t,...
14/01/2013Further Expands Flame & Moth Deposit, Robust Silver Grades a...
15/10/2012Alexco Reports 12% Increase in Silver Production for Third Q...
15/10/2012Reports 12% Increase in Silver Production for Third Quarter ...
09/10/2012Expands Flame & Moth Deposit: Reports Grades Up to 71 Ounces...
09/08/2012Alexco Files Flame & Moth and Bermingham Technical Reports
16/07/2012Alexco Reports Silver Production for Second Quarter 2012
16/07/2012Reports Silver Production for Second Quarter 2012
24/05/2012Alexco Commemorates Over Five Years at Keno Hill
24/05/2012Commemorates Over Five Years at Keno Hill
03/05/2012Alexco to Release Financial Results for Firs =?ISO-8859-1?Q?...
02/05/2012to Release Financial Results for First Quarter of 2012 on Ma...
16/04/2012Alexco Reports Silver Production Results for First Quarter 2...
16/04/2012Reports Silver Production Results for First Quarter 2012
29/03/2012Alexco Reports Fiscal Results for Six Months Ended December ...
26/03/2012=?ISO-8859-1?Q?Alexco=20to=20Release=20December=2031,=202011...
26/03/2012to Release December 31, 2011 Year End Financial Results on M...
05/03/2012Alexco Expands 2012 Surface and UndergroundExploration Plans...
05/03/2012Expands 2012 Surface and Underground Exploration Plans For K...
14/02/2012Alexco Drills 8=2E9 Meters of 20=2E2 Ounces =?ISO-8859-1?Q?=...
23/01/2012Silver Production Increases 21% to More Than 600,000 Ounces ...
15/09/2011=?ISO-8859-1?Q?Alexco=20Reports=20Increased=20Revenue,=20Cas...
09/09/2011Alexco to Release Fiscal 2011 Results on S =?ISO-8859-1?Q?ep...
03/08/2011Alexco Reports Increased Production in Second Quarter of Cal...
03/08/2011Reports Increased Production in Second Quarter of Calendar 2...
27/07/2011Announces Initial Resource Estimates for Lucky Queen and One...
17/06/2011Alexco Provides Update on Impact of Grid Power Outage at Ken...
15/06/2011Alexco Reports Grid Power Outage Affecting Keno Hill
12/05/2011Alexco Reports Net Income of $3=2E5M and Operating Cash Flow...
12/05/2011Reports Net Income of $3.5M and Operating Cash Flows of $7.2...
08/03/2010Awards Mining Services Contract
20/01/2010Terms of Equity Financing
29/06/2009Environmental Services Group Awarded Contract
08/01/2009Completes Disposition of Alexco Shareholding
22/05/2008 and the First Nation of the Na-Cho Nyak Dun Sign Cooperatio...
06/02/2008CLARIFIES TECHNICAL DISCLOSURE
15/01/2008Corporate Continuation Under Business Corporations Act
06/12/2007FINALIZES PURCHASE OF KENO HILL, FOCUSES ON BELLEKENO DEVELO...
16/11/2007Secures Water Licence for Care & Maintenance Work at Keno Hi...
13/11/2007Increases Bellekeno Resource in Keno Hill District: Initial ...
17/10/2007Corrects Website Problem
25/09/2007and First nation of the Na-Cho Nyak Dun Conclude Negatiation...
20/09/2007 Additional Bellekeno Project results at Keno Hill
18/09/2007Announces Additional 2007 Keno Drill results
17/09/2007Announces Approval to List its Common Share on the American ...
27/08/2007Continues to Advance the Keno Hill Project
21/08/2007Comments on Na-Cho Nyak Dun’s Suspension of Regulatory Dialo...
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TORONTO (AXR.TO)OTHER OTC (AXORF)
2,33-3.72%4,15+0.00%
TORONTO
CA$ 2,33
09/08 17:00 -0,090
-3,72%
Cours préc. Ouverture
2,42 2,43
Bas haut
2,33 2,45
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
- -  2,33 -%
Volume var. 1 mois
172 544 -%
24hGold TrendPower© : 8
Produit Gold - Lead - Silver - Zinc
Développe
Recherche Gold - Silver
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 06/11/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,82 AU$+1,69%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
11,04 US$+1,38%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,54 GBX-2,53%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,52 CA$+6,78%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
16,05 CA$+2,62%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+2,13%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,19 AU$-7,32%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,90 CA$+1,60%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
51,43 US$-0,46%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,03 AU$+0,00%Trend Power :