Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en

Everton Resources Inc

Publié le 02 mars 2011

and Brigus Report More Positive Drill Results on the La Lechoza VMS Prospect in the Dominican Republ

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter

 

Everton Res. and brigus report more positive drill results on the la lechoza vms prospect in the dominican republic

 

 

 

 

 

 

 

 

 

 

 

 

 

Everton Resources Inc., (TSX VENTURE:EVR - News; FRANKFURT:ERV - News) and its partner Brigus Gold Corp. (TSX:BRD - News; NYSE Amex:BRD) are pleased to announce the latest results received from the core drilling program currently underway at the La Lechoza VMS Prospect on the Ampliacion Pueblo Viejo property, located adjacent to the Pueblo Viejo gold deposit, in Central Dominican Republic. Highlights are:

 




--  Hole APV11-07: 0.31 g/t Au, 0.38% Cu and 1.05% Zn over 18.50 metres.
--  Hole APV11-08: 1.44 g/t Au and 85.98 g/t Ag over 6.00 metres.
--  Hole APV11-12: 1.72% Zn over 10 metres and 0.78% Zn over 7.5 metres.
--  Hole APV11-14: 1.35 g/t Au, 31.66 g/t Ag, 6.59% Cu and 0.35% Zn over 7.5
    metres.
--  Hole APV11-15: 22.94 g/t Ag and 0.48% Cu over 7.5 metres.

 

"Our discovery efforts continue to reward us and our shareholders. Today's results show these are some of the best holes we've seen yet," said Andre Audet, President and CEO of Everton Resources Inc.

 

"Combined with our previous results, our geologists' growing understanding of La Lechoza Prospect has led to a more targeted drilling program intent on discovering higher grades and thicker intercepts," Mr. Audet added.

 

"Ultimately, the value of our decision to focus our business activities almost entirely in the Central Dominican Republic has been endorsed by EVR stakeholders. The assays appear to support our decision too," he said.

 

Table of assay intercepts:

 




APV11-05 - North Hill                                                      
----------------------------------------------------------------------------
From m                  To mLength m  Au g/t  Ag g/t    Cu %    Zn %   Notes
0.00                    3.00    3.00    0.36   11.37       -       -       
1.00                   87.50   86.50       -       -       -   0.35%       
2.00                    5.00    3.00       -       -   0.34%       -       
----------------------------------------------------------------------------
                                                                           
APV11-06 - Pon Hill - Low values.                                          
----------------------------------------------------------------------------
                                                                           
                                                                           
APV11-07 - Pon Hill                                                        
----------------------------------------------------------------------------
From m                  To mLength m  Au g/t  Ag g/t     Cu%     Zn%   Notes
90.00                 126.00   36.00       -       -       -   0.62%       
Including                                                                   
106.50                125.00   18.50    0.31       -   0.38%   1.05%       
Other intercepts                                                           
97.50                 136.50   39.00    0.26    6.27       -   0.58%       
114.00                123.00    9.00    0.33    5.12   0.42%   1.63%       
Including                                                                  
114.00                117.00    3.00    0.52    8.00   0.47%   3.91%       
----------------------------------------------------------------------------
                                                                           
APV11-08 - Pon Hill                                                        
----------------------------------------------------------------------------
From m                  To mLength m  Au g/t  Ag g/t     Cu%     Zn%   Notes
0.00                   65.00   65.00    0.26   13.26   0.11%   0.66%       
Including                                                                   
3.50                   26.00   22.50    0.62   31.19   0.18%   0.37%       
And including                                                              
14.00                  20.00    6.00    1.44   85.98       -       -       
And                                                                         
24.50                  30.50    6.00       -    8.17   0.11%   1.72%       
----------------------------------------------------------------------------
Preliminary.                                                                
                                                                           
APV11-09 - Pon Hill - Low values                                           
----------------------------------------------------------------------------
                                                                           
APV11-10 - North Hill                                                      
----------------------------------------------------------------------------
From m                  To mLength m  Au g/t  Ag g/t     Cu%     Zn%   Notes
0.00                   30.50   30.50       -       -   0.14%       -       
Including                                                                  
0.00                    6.50    6.50    0.47       -       -       -       
----------------------------------------------------------------------------
                                                                           
APV11-11 - North Hill                                                       
----------------------------------------------------------------------------
From m                  To mLength m  Au g/t  Ag g/t     Cu%     Zn%   Notes
9.50                   35.00   25.50       -       -       -   0.31%       
Including                                                                  
9.50                   29.00   19.50       -       -   0.19%   0.35%       
And including                                                              
11.00                  14.00    3.00    0.22    4.15   0.34%   0.42%       
                                                                           
41.00                  48.50    7.50       -       -       -   0.81%       
Including                                                                   
44.00                  46.00    2.00    1.28   13.88       -   1.56%       
----------------------------------------------------------------------------
                                                                           
APV11-12 - Jasper Field                                                    
----------------------------------------------------------------------------
From m                  To mLength m  Au g/t  Ag g/t     Cu%     Zn%   Notes
0.00                   27.50   27.50       -    8.92       -   0.16%       
Including                                                                  
2.50                   12.50   10.00       -   12.82       -   1.72%       
                                                                            
54.50                  62.00    7.50    0.93   11.36       -   0.78%       
----------------------------------------------------------------------------
                                                                           
APV11-13 - Alfredito Farm - Low values.                                    
----------------------------------------------------------------------------
                                                                           
APV11-14 - North Hill                                                       
----------------------------------------------------------------------------
From m                  To mLength m  Au g/t  Ag g/t     Cu%     Zn%   Notes
0.00                   29.00   29.00       -       -   0.29%       -       
Including                                                                  
21.50                  29.00    7.50    1.35   31.66   6.59%   0.35%       
And including                                                               
24.50                  26.00    1.50    4.17  116.00  20.27%   1.50%     VMS
                                                                           
36.50                  48.50   12.00       -    8.66   0.68%   0.35%       
Including                                                                   
45.50                  48.50    3.00       -   27.75   1.36%   0.80%       
----------------------------------------------------------------------------
                                                                            
APV11-15 - North Hill                                                      
----------------------------------------------------------------------------
From m                  To mLength m  Au g/t  Ag g/t     Cu%     Zn%   Notes
0.00                   42.50   42.50       -       -   0.20%       -       
Including                                                                  
0.00                    6.50    6.50    0.88   11.72       -       -       
And                                                                         
17.00                  42.50   25.50       -       -   0.32%       -       
Including                                                                  
21.50                  29.00    7.50       -   22.94   0.48%       -       
----------------------------------------------------------------------------

 

This press release was reviewed by Robert Wheatley, P. Geo. and VP Exploration of Everton, who acts as Everton's Qualified Person as defined by NI 43-101. Personnel, at the project, photograph each individual core box from each core hole prior to measuring core recovery and geologically logging the hole. The core is then sawn in half with one half going to the lab and the other half kept for reference. All sample shipments are sealed and shipped to Acme Analytical Laboratories (R.D.) S.A. at Maimon for preparation. Prepared samples are then sent to the Acme Analytical Laboratories Ltd. in Vancouver for analysis. Acme's quality control system complies with the requirements for the International Standard ISO 9001:2000 by monitoring analytical accuracy and precision with the insertion and analysis of blanks, reference standards and duplicate samples. Everton's Quality Control is further assured by the use of in-house blanks. The use of certified standards and independent analysis of duplicate samples is being initiated.

 

Everton

 

Everton is partnered with Brigus Gold on actively exploring in the Dominican Republic adjacent to the US$3 billion Pueblo Viejo project, currently being developed by the world's largest gold mining company, Barrick Gold Corporation (60%) (NYSE/TSX: ABX) in partnership with Goldcorp (40%) ("Goldcorp") (NYSE: GG, TSX: G). Planned divestiture of its 100%-owned subsidiary Hays Lake Gold containing the Shoal Lake Gold Project in Kenora, Ontario is expected to provide internal funding to advance the Ampliacion Pueblo Viejo project. Everton also holds an interest in the Opinaca region of James Bay, Quebec where the Company has partnered with Aurizon Mines Ltd. who is advancing Everton's interest by funding 100% of all exploration work on one of the largest land packages adjacent to Goldcorp's Eleonore gold deposit.

 

This news release contains certain forward-looking statements that involve risks and uncertainties, such as statements of Everton's plans, objectives, strategies, expectations and intentions. The words "may", "would", "could", "will", "intend", "plan", "anticipate", "believe", "estimate", "expect" and similar expressions, as they relate to Everton, or its management, are intended to identify such forward-looking statements. Many factors could cause Everton's actual results, performance or achievements to be materially different any future results, performance or achievements that may be expressed or implied by such forward-looking statements. The forward-looking statements included in this press release represent Everton's views as of the date of the release. While Everton anticipates that subsequent events and developments may cause its views to change, it specifically disclaims any obligation to update these forward-looking statements, except in accordance with applicable securities laws. Accordingly, readers are advised not to place undue reliance on forward-looking information. All subsequent written and oral forward-looking statements attributable to Everton or persons acting on its behalf are expressly qualified in their entirety by this notice.

 

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

 

Contact:

 

Andre Audet
Everton Resources Inc.
Chairman and CEO
613-241-2332
613-241-8632 (FAX)
andre@evertonresources.com

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Everton Resources Inc

EXPLORATEUR
CODE : EVR.V
ISIN : CA3004101075
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Everton Res. est une société d’exploration minière d'argent et d'or basée au Canada.

Everton Res. détient divers projets d'exploration au Canada.

Ses principaux projets en exploration sont SHOAL LAKE EAST, HEMLO WEST PROPERTIES, WILDCAT, OPINACA, TIMMINS et SHOAL LAKE WEST au Canada et JOBO CLARO, PONTON DOMINICAN REPUBLIC, LA CUEVA, FRESSO, LOMA EL MATE, CUANCE / LOS HOJANCHOS et AMPLIACION PUEBLO VIEJO en Republique Dominicaine.

Everton Res. est cotée au Canada, aux Etats-Unis D'Amerique et en Allemagne. Sa capitalisation boursière aujourd'hui est 1,5 millions CA$ (1,1 millions US$, 1,0 millions €).

La valeur de son action a atteint son plus haut niveau récent le 11 février 2000 à 9,80 CA$, et son plus bas niveau récent le 05 février 2016 à 0,01 CA$.

Everton Res. possède 61 368 345 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Rapports annuels de Everton Resources Inc
2007 Annual report
Financements de Everton Resources Inc
25/10/2013to Acquire Option on Additional Dominican Properties, Arrang...
15/08/2013Extends Expiry Date of Warrants
25/09/2012Extends Expiry Date of Warrants
22/06/2011Cancels Previously Announced Financing
Nominations de Everton Resources Inc
29/05/2013Welcomes New Directors and Reports on Annual and Special Sha...
16/01/2013Nominates Salvador Brouwer to its Board of Directors
Projets de Everton Resources Inc
23/10/2012(Ampliacion Pueblo Viejo)Completes Option to Purchase Brigus Gold's Remaining Interes...
26/05/2011(La Cueva)Signs Letter of Intent To Buy Remaining Interest in Ampliaci...
17/05/2011(Hemlo West Properties) and Canadian Star Minerals Execute a Sales/Purchase Agreeme...
17/05/2011(Hemlo West Properties) and Canadian Star Minerals Execute a Sales/Purchase Agreeme...
13/04/2011(Ampliacion Pueblo Viejo)Reports Additional Results From La Lechoza Including 11.26 g...
25/03/2011(Ampliacion Pueblo Viejo)Commences 20,000-Metre Deep Drilling Program at Ampliacion P...
02/03/2011(Ampliacion Pueblo Viejo)and Brigus Report More Positive Drill Results on the La Lech...
16/02/2011(Ampliacion Pueblo Viejo)and Brigus Announce Start of 20,000 Meter Deep Drilling Prog...
27/01/2011(Ampliacion Pueblo Viejo)and Brigus Continue to Receive Positive Drill Results on the...
01/12/2010(Ampliacion Pueblo Viejo)Second Drill Deployed as Everton Accelerates Drilling Progra...
24/02/2010(Ampliacion Pueblo Viejo)& Linear release first drill results from a new discovery
01/06/2009(Ampliacion Pueblo Viejo)Drill 8,000 Meters at Ampliacion Pueblo Viejo, Dominican Rep...
25/11/2008(Fresso)Makes New Gold & Copper Surface Discovery on Fresso
29/04/2008(Cuance / Los Hojanchos) AND GLOBESTAR: EXPLORATION UPDATE ON NEW MINERALIZED ZONE
19/03/2008(Opinaca) COMMENCES 2,500-METER DRILL PROGRAM .. // EVERTON ENTREPREN...
03/03/2008(Cuance / Los Hojanchos) and GlobeStar Drill New Mineralized Zone at Cuance ...
Communiqués de Presse de Everton Resources Inc
25/11/2015Everton reports on Hecla Quebec’s progress on the Opinaca B ...
30/04/2014Everton Updates Drilling on Ampliacion Pueblo Viejo in Domin...
30/04/2013Settles with Focus Graphite Inc. and Provides Update on Tran...
21/03/2013Continues to Expand New Mineralized Zones at Ponton, New Res...
13/02/2013Discovers New Mineralized Zones at Ponton
31/01/2013Supported Study from University of Barcelona Confirms Epithe...
09/01/2013s Its Recent Exploration Activities in the Dominican Republi...
06/11/2012Options to Viking Gold Four Concessions in Dominican Republi...
07/06/2011. Announces Public Offering of Units for a Minimum of $5 Mil...
04/04/2011Appoints New CFO and Grants Options
26/05/2010The Beginning of Trading for Focus Metals Inc. ...
04/02/2010New Resource Estimate on Cedar Island Gold Deposit, Kenora R...
12/06/2008Acquires New Polymetallic Concession . . .
01/05/2008 Receives 12 Million Shares of NQ Exploration
04/04/2006(Coulon)Annual general meeting April 6, 2006
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TSX-V (EVR.V)FRANKFURT (ERV.F)
0,025-16.67%0,033+0.00%
TSX-V
CA$ 0,025
05/07 15:51 -0,010
-16,67%
Cours préc. Ouverture
0,030 0,025
Bas haut
0,025 0,025
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
- -  0,025 -%
Volume var. 1 mois
35 000 -%
24hGold TrendPower© : -30
Produit
Développe
Recherche Copper - Gold - Nickel - Silver - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 23/01/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,70 AU$+0,52%Trend Power :
OceanaGold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
11,46 US$-6,22%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,54 GBX+2,68%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,65 CA$+0,38%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
15,72 CA$-4,61%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,26 CA$+4,08%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,23 AU$+0,00%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,74 CA$-8,42%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
51,18 US$-3,58%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+0,00%Trend Power :