Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en
Thundermin and Cornerstone Intersect 4.1% Copper Over 10.6 m and 4.5% Copper Over 5.9 m in the Little Deer Copper Deposit, Newfoundland
Published : March 22, 2011
( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Canada | Chrome | Copper |

TORONTO, ONTARIO--(Marketwire - March 22, 2011) - Thundermin Resources Inc. ("Thundermin") (News - Market indicators) and 50% joint venture partner Cornerstone Resources Inc. ("Cornerstone") (TSX VENTURE:CGP) announce that they have intersected high grade copper mineralization assaying 4.1% Cu over 10.6 m, including 6.7% Cu over 5.8 m, and 4.5% Cu over 5.9 m within the Little Deer Copper Deposit ("Deposit") which is located approximately 10 km north of Springdale in north-central Newfoundland (see Table 1 and Figure 1).

Table 1: Little Deer Drill Results (2010/2011)
 
Hole No. East(m)   North(m) Dip(°) Az(°) From(m) To(m)  
 
Interval(m)**   Cu(%)
LD-10-39 * 14,057   4,459 -37.1 321.6 208.6 209.1   0.5   13.4
and           213.9 218.1   4.2   4.6
and           233.9 250.4   16.5   5.0
incl.           233.9 239.0   5.1   6.1
incl.           244.9 250.4   5.5   9.2
                       
LD-10-40 * 14,057   4,459 -35.8 315.0 294.5 295.2   0.7   2.4
                       
LD-10-41 14,057   4,459 -36.1 335.1 202.6 203.0   0.4   5.1
and           219.2 222.2   3.0   2.1
and           229.7 235.6   5.9   4.5
                       
LD-11-42 14,057   4,459 -63.0 305.5 306.8 308.0   1.2   1.0
                       
LD-11-43 13,536   4,545 -56.5 331.3     Nsv    
                       
LD-11-44 13,943   4,337 -48.1 318.8 413.8 415.4   1.6   9.3
and           469.3 479.9   10.6   4.1
incl.           469.3 475.1   5.8   6.7
                       
LD-11-45 13,536   4,545 -66.2 337.7 472.9 473.9   1.0   4.0
and           488.8 494.2   5.4   1.4
                       
LD-11-46 13,536   4,545 -60.8 338.7     Nsv    
                       
LD-11-47 13,943   4,337 -54.0 323.2     Nsv    
                       
LD-11-48 13,536   4,545 -54.5 351.5 366.2 367.2   1.0   1.4
                       
Notes:                       
Holes LD-10-39 and LD-10-40 were previously reported in a News Release dated January 20, 2011.         
**  The reported copper intersections are core lengths. The intersections in holes LD-10-39, LD-10-40 and LD-10-41 approach true thickness. The intersections in the remaining holes are estimated to be from 70% to 80% of true thickness.         
nsv  No significant values.         

A $1,600,000 diamond drilling program, comprising approximately 12,000 to 13,000 m of drilling in 18 to 20 holes and employing two drills, commenced on the Deposit on December 1, 2010. A total of 6,372 m of drilling in 13 holes has been completed to date. The primary purpose of this drill program is to increase the estimated mineral resources outlined to date in the Deposit to the five to six million tonne range. The potential increase of the current mineral resources is conceptual in nature and it is uncertain whether further exploration drilling will result in an expansion of this mineral resource.

The current drill program is focusing on three main areas: 1) above the -250 m elevation where the recent recovery of drill logs and assay data for 47 surface and 86 underground historical drill holes suggests that there is good potential for outlining additional high grade resources (see news release dated January 20, 2011); 2) along strike both east and west of the limits of the currently outlined mineral resource; and 3) at depth below the -650 m elevation where a preliminary interpretation of the results from borehole Pulse electromagnetic surveys suggest that there is potential for the discovery of additional copper mineralization.

The Deposit has been outlined by drilling over a strike length of 1,050 m and to a vertical depth of 1,000 m. Note that Figure 1 presented here shows only the upper eastern portion of the Deposit (see the longitudinal section accompanying the news release dated July 29, 2010 for a view of the complete Deposit). Additional details on the Deposit can be found in numerous Thundermin and Cornerstone news releases dated between May 1, 2007 and January 20, 2011 which are on each company's website and on SEDAR.

Holes LD-10-39, LD-10-40 (both previously reported) and LD-10-41 collectively totaling 966 m of drilling were completed in December prior to the seasonal shutdown (see Figure 1 and Table 1). These holes were drilled to confirm the presence of high grade copper mineralization believed to exist in the upper portion of the Deposit based on a review of the historical data referenced above. Hole LD-10-39, which intersected high grade massive, semi- massive and stringer chalcopyrite-pyrite-pyrrhotite mineralization was drilled to confirm the copper mineralization in historical surface hole LD-62-78 which intersected 2.9% Cu over 60.1 m, including intervals of 5.9% Cu over 7.9 m, 5.3% Cu over 15.5 m and 3.1% Cu over 11.6 m. Hole LD-10-40, which was drilled approximately 35 m west of LD-10-39, intersected minor copper mineralization comprising 2.4% Cu over 0.7 m. Hole LD-10-41 was drilled approximately 50 m east of hole LD-10-39 to confirm the copper mineralization in historical surface hole LD-62-83 which intersected 3.1% Cu over 13.7 m. Hole LD-10-41 intersected 2.1% Cu over 3.0 m and 4.5% Cu over 5.9 m. Three additional shallow holes are planned to the west in this area of the Deposit. These holes will be drilled on approximately 100 m centers to target the -100 m elevation (see Figure 1).

Hole LD-11-45, drilled on the upper western margin of the Deposit, intersected 1.4% Cu over a core length of 5.4 m and hole LD-11-48 intersected 1.4% Cu over 1.0 m. Holes LD-11-43 and LD-11-46, also on the upper western margin of the Deposit, intersected intervals of chlorite alteration with no significant copper mineralization. Hole LD-11-44, drilled on the upper eastern margin of the Deposit intersected high grade copper mineralization assaying 9.3% Cu over 1.6 m and 4.1% Cu over 10.6 m, including 6.7 % Cu over 5.8 m. Holes LD-11-42 and LD-11-47, also on the upper eastern margin of the Deposit, intersected thick sections of chlorite alteration with no significant copper mineralization. Holes LD-11-49, LD-11-50 and LD-11-51 have been completed. Assay results are awaited and will be reported when received.

Mineral Resource Estimate

On October 13, 2010, Thundermin and Cornerstone announced that an updated NI 43-101 compliant mineral resource estimate had been completed by Scott Wilson RPA under the supervision of Mr. Reno Pressacco, M.Sc. (A), P.Geo., Senior Geologist for Scott Wilson RPA and an independent Q.P. in accordance with NI 43-101. Scott Wilson RPA estimated that the Deposit contains Indicated Resources of 1,150,500 t at an average grade of 2.8% Cu within the Little Deer Zone and additional Inferred Resources of 1,227,300 t at an average grade of 2.2% Cu within the Little Deer Zone and 1,108,200 t at an average grade of 1.9% Cu within the Footwall Zone. A NI 43-101 compliant Letter Report entitled "Mineral Resource Update for the Little Deer Project" dated September 30, 2010, to support the updated mineral resource estimate, is available on Thundermin's and Cornerstone's websites.

Metallurgy

On October 19, 2010, excellent metallurgical results from scoping level test work on core samples from the Deposit were announced. This work, which was undertaken at SGS Lakefield Research Limited ("Lakefield") of Lakefield, Ontario, indicates that a saleable, high grade copper concentrate grading over 28% copper with over 97% recovery and free of any deleterious elements can be produced from the Deposit.

Qualified Person

Mr. Andrew Hussey, P.Geo., Project Geologist and Lands Manager, Cornerstone Resources Inc., is the Q.P. responsible for supervising the drilling program and the compilation of all of the historical data on the Deposit for the purposes of NI 43-101. Mr. Hussey has also reviewed the contents of this news release for accuracy. All holes drilled by Thundermin and Cornerstone are NQ in size. Specific gravity measurements, rock quality designations and photographic logging of significant mineralized intersections are performed systematically prior to assaying. The core is logged and the mineralized sections, where appropriate, are sawn in half at a core logging facility in Springdale. Half of the core is submitted for analyses to Eastern Analytical Limited, an independent and qualified assayer located in Springdale, and the remaining half of the core is kept for future reference. Blanks, duplicates and standards are routinely used as part of the assay procedures.

Little Deer Joint Venture

Thundermin, the operator, and Cornerstone have the option, on a 50/50 basis to earn a 100% interest in the Little Deer Copper Deposit and adjacent property from Weyburn Investments Ltd. Thundermin, under its joint venture agreement with Cornerstone, has the right to increase its interest in the Little Deer property to 75% by completing a feasibility study and by arranging 100% of the necessary bank financing required to place the property into commercial production. Details on the Deposit and the terms of the agreement with Weyburn can be found in numerous news releases and on Thundermin's and Cornerstone's respective websites and on SEDAR.

Junior Exploration Assistance Program

Thundermin and Cornerstone would like to acknowledge the financial support received from the Junior Exploration Assistance (JEA) Program of the Province of Newfoundland and Labrador in carrying out a portion of their work on the Little Deer property.

About Thundermin

Thundermin is a Canadian-based mineral exploration company focused on the exploration for and the discovery of economically viable base metal and gold deposits in Canada. Thundermin has an interest in, or the right to earn an interest in 11 base metal and gold properties in Canada. Thundermin also has royalty interests in a further 28 base metal and gold properties located in Manitoba, Saskatchewan, British Columbia and Quebec, the most significant being a 2.5% net smelter return royalty in the Pelletier Lake gold deposit which is under option to Alexis Minerals Corporation. Thundermin also has various shareholdings in thirteen other junior resource companies that are actively exploring for base metal, gold, chrome, vanadium-titanium and diamond deposits in Canada.

Forward-Looking Statements

This news release may contain "Forward-Looking Statements" that involve risks and uncertainties, such as statements of Thundermin's plans, objectives, strategies, intentions and expectations. The words "potential," "anticipate," "forecast," "believe," "estimate," "expect," "may," "project," "plan," and similar expressions are intended to be among the statements that identify "Forward-Looking Statements". Although Thundermin believes that its expectations reflected in these "Forward-Looking Statements" are reasonable, such statements may involve unknown risks, uncertainties and other factors disclosed in our regulatory filings that can be viewed on the SEDAR website at www.sedar.com. For us, uncertainties arise from the behavior of financial and metals markets and from numerous other matters of national, regional, and global scale, including those of an environmental, climatic, natural, political, economic, business, competitive, or regulatory nature. These uncertainties may cause our actual future results to be materially different than those expressed in our "Forward-Looking Statements". Although Thundermin believes the facts and information contained in this news release to be as correct and current as possible, Thundermin does not warrant or make any representation as to the accuracy, validity or completeness of any facts or information contained herein and these statements should not be relied upon as representing its views subsequent to the date of this news release.

For further information on Thundermin Resources Inc. please visit Thundermin's website at www.thundermin.com or the SEDAR website at www.sedar.com.

To view Figure 1, please visit the following link: http://media3.marketwire.com/docs/Figure1-THR.pdf.



Thundermin Resources Inc.
John B. Heslop
President & CEO
(647) 344-1167
or
Thundermin Resources Inc.
James W. Gill
Chairman
416-450-1851
info@thundermin.com
www.thundermin.com
Données et statistiques pour les pays mentionnés : Canada | Tous
Cours de l'or et de l'argent pour les pays mentionnés : Canada | Tous

Thundermin Resources Inc

PRODUCTEUR
CODE : THR.TO
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Thundermin est une société de production minière de zinc et d'or basée au Canada.

Thundermin détient divers projets d'exploration au Canada.

Son principal projet en production est PELLETIER LAKE (STADACONA MINE) au Canada et ses principaux projets en exploration sont LAC PELLETIER, ROD-LINDA-MCKAYSEFF (RLM), SCOTT LAKE, CAPE RAY, LITTLE DEER, DONALDA, PELLETIER LAKE et WESTARM MINE au Canada.

Thundermin est cotée au Canada, aux Etats-Unis D'Amerique et en Allemagne. Sa capitalisation boursière aujourd'hui est 1,8 millions CA$ (1,8 millions US$, 1,3 millions €).

La valeur de son action a atteint son plus haut niveau récent le 31 décembre 2007 à 0,58 CA$, et son plus bas niveau récent le 27 septembre 2013 à 0,01 CA$.

Thundermin possède 92 207 000 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Rapports annuels de Thundermin Resources Inc
2008 Annual Report
Financements de Thundermin Resources Inc
03/01/2012Completes $1,219,140 Flow Through Private Placement
29/11/2011Announces Non-Brokered Private Placement of Up to $1,500,000
11/02/2011Arranges Up to $1,750,000 Flow Through Private Placement
Rapports Financiers de Thundermin Resources Inc
14/04/2011. Re-Files September 30, 2010 Interim Financial Statements t...
Projets de Thundermin Resources Inc
16/10/2013(Little Deer)and Rambler Metals Become Joint Venture Partners on the Litt...
30/07/2013(Little Deer)Receives Offer from Cornerstone to Purchase Cornerstone's 50...
20/12/2011and Cornerstone File NI 43-101 Technical Report and Prelimin...
31/08/2011(Little Deer)and Cornerstone Exercise Their Option to Acquire A 100% Inte...
16/06/2011(Little Deer)and Cornerstone Report Final Drill Results for the First Hal...
Communiqués de Presse de Thundermin Resources Inc
13/09/2013. Responds to TSX Bulletin
13/08/2013.-Toronto Stock Exchange Listing
01/11/2012Discovers Additional Copper Mineralization on the Stirling B...
24/07/2012Commences 2,000 Metre Diamond Drilling Program on the Stirli...
28/06/2012and Cornerstone Retain P&E Mining Consultants Inc. to Undert...
10/05/2012and Cornerstone Extend Copper Mineralization at the Whalesba...
23/02/2012and Cornerstone Intersect High Grade Copper Mineralization a...
05/12/2011Receives Encouraging Results from a First Phase Exploration ...
09/08/2011(Little Deer)and Cornerstone File NI 43-101 Technical Report on Sedar in ...
21/07/2011Executes Formal Agreement to Earn a 100% Interest in a Large...
22/06/2011and Cornerstone Announce 66% Increase in Indicated and 61% I...
26/04/2011(Little Deer)& Cornerstone Intersect High Grade Copper Over Mineable Widt...
22/03/2011and Cornerstone Intersect 4.1% Copper Over 10.6 m and 4.5% C...
04/03/2011Completes $1 Million Flow Through Private Placement
31/10/2007 and Cornerstone intersect 2.5% Cu over 5.5 m at the Little ...
01/05/200707-09 - Cornerstone and Thundermin to Acquire 100% Interest ...
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TORONTO (THR.TO)Other OTC (TUDMF)
0,020+0.00%0,000-94.74%
TORONTO
CA$ 0,020
08/11 15:55 -
0%
Cours préc. Ouverture
0,020 0,020
Bas haut
0,020 0,020
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
- -  0,020 -%
Volume var. 1 mois
53 450 -%
24hGold TrendPower© : -31
Produit Gold
Développe
Recherche Copper - Gold - Silver - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 27/11/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,66 AU$-0,71%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
12,26 US$+2,68%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,53 GBX-1,87%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,64 CA$-1,86%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
16,23 CA$+4,04%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+4,26%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,22 AU$+2,38%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,88 CA$+0,53%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
52,71 US$+0,19%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+5,56%Trend Power :