ANNOUNCES 1.69 OZ/TON GOLD AND 37 OZ/TON SILVER FROM SAN JOSE DRILLING

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Canada | Copper | Johnson | K Street | Precious Metals |
 


MINERA ANDES ANNOUNCES 1.69 OZ/TON GOLD
AND 37 OZ/TON SILVER FROM SAN JOSE DRILLING

  
TSX: MAI   
NASD-OTCBB: MNEAF    
   

SPOKANE, WA––March 7, 2008–– Minera Andes Inc. (TSX: MAI and US OTC: MNEAF) is pleased to announce that during the fourth quarter of 2007 drilling has defined 2.8 km of strike length along the Odin and Ayelén veins that have significant potential to further increase the current reserves/resources at its producing San José mine in southern Argentina. The highest grade intercept from this drilling campaign was in hole SJD-412 that encountered 52.44 g/t (1.69 ounces per ton “opt”) gold and 1,147 g/t (37 opt) silver over 1.68 meters (see table below).

During 2007, approximately 28,587 meters of core drilling totaling 113 drill holes was conducted on several targets identified at San José. In September thru December of 2007, 82 holes totaling 20,274 meters were drilled at the Frea, Odin, Ayelén, Frigga, and Lourdes targets. Assay results for 19 drill holes are still pending. Three of the areas (Frea, Odin, and Ayelén) contained high-grade gold/silver mineralization discovered in late 2005 through reconnaissance drilling of blind geophysical targets.

The majority of the fourth quarter 2007 drilling concentrated on the Odin and Ayelén veins covering approximately 2.8 kilometers of strike length along these open-ended mineralized veins. The drilling completed in 2007 extended the known mineralization along the Odin and Ayelén vein trends another 1000 meters along strike – more than a 64% increase in strike length from the 2005 discovery drilling.

Allen Ambrose, president of Minera Andes, said: “The drilling results from the 2007 exploration drilling program continue to expand the San José projects size. This should further facilitate MSC’s plan to double production from 750 to 1500 tonnes per day by the end of this year.”

The San José project is operated by Minera Santa Cruz S.A. (“MSC”) (owned 51% by Hochschild Mining plc (“Hochschild”) (HOC.L: Reuters and HOC.LN: Bloomberg - London Stock Exchange) and 49% by Minera Andes. The discovery of new high-grade silver/gold mineralization in veins such as Odin, Ayelén and Frea represents additional mineralization that can add to the current reserves/resources at the project where production has recently commenced. These discoveries also indicate the large mineral potential of the San José property where more than 40 kilometers of vein trend target is currently known to exist, and of which less than 15% has been explored to date.

Odin Vein
During the 2007 campaign, 30 holes were drilled on the Odin target and the vein is currently defined by a total of 44 holes in an area approximately 1600 meters along the strike of the vein to a depth of approximately 200 meters (see attached map). Highlights of the program included the identification of massive and banded quartz veining with disseminated pyrite and argillic alteration. The Odin vein remains open along strike and to depth.

High-grade gold and silver mineralization was intersected in the fourth quarter 2007 drilling campaign at the Odin vein (see table below). The highest grade intercept drilled in this drilling campaign is described above. Highlights of the Odin vein drilling include values up to 0..46 meters of 34.43 g/t (1.11 opt) gold and 321 g/t (10 opt) silver (SJ-368) which is part of a larger interval running 3.15 meters of 10.57 g/t (0.34 opt) gold and 244 (8 opt) g/t silver. Hole SJD-398 contains 0.50 meters of 6.30 g/t (0.20 opt) gold and 1074 g/t (35 opt) silver at depth of 220 meters below surface. See table below for important intercepts.

Ayelén Vein
Drilling in the fourth quarter has expanded the Ayelén high-grade gold silver vein to a strike length of 1200 meters and a depth of 200 meters (see attached map).  A total of 45 holes have been drilled on the Ayelén vein with 37 holes drilled in the 2007 campaign. The Ayelén vein structure is sub parallel to the Odin vein and dips in the same direction southwest.

Significant intercepts (see table below) at Ayelén include SJD-397 that encountered 28.22 g/t (0.91 opt) gold and 1,759 g/t (57 opt) silver over 1.02 meters. Drill hole SJD-426 encountered 1.53 meters grading 8.21 g/t  (0.26 opt) gold and 1,161 g/t (37 opt) silver within a larger interval of 2.95 meters of 5.41 g/t (0.17 opt) gold and 804 g/t  (26 opt) silver. Hole SJD-428 encountered 1.55 meters containing 15.41 g/t (0.50 opt) gold and 736 g/t (24 opt) silver.

Frea Vein
The Frea vein is located 2 kilometers northeast of the Huevos Verdes vein, and both veins are currently being mined on several levels. Proven reserves of 587,000 tonnes and probable reserves 350,000 tonnes ( totaling 937,000 tonnes grading 7.77 g/t gold and 343 g/t silver – see November 26, 2007 News Release) at the Frea vein are currently delineated over a strike length of about 575 meters and to a depth of approximately 350 meters below the surface. The drilling completed in 2007 extends the known mineralization along the Frea vein trend another 500 meters along strike - an increase of 87% in strike length. Frea Vein mineralization now extends for 700 meters of strike and it remains open to further expansion to the northwest and to depth.

The 2007 drilling concentrated on infill and drilling the northwest extension of the Frea vein. Significant drilling results include SJD-364 that encountered 11.57 g/t (0.37 opt) gold and 1,291 g/t (42 opt) silver over 3.64 meters of high grade mineralization. Drill hole SJD-386 encountered 1.50 meters grading 12.87 g/t (0.41 opt) gold and 710 g/t (23 opt) silver. Hole SJD-391 encountered 1.47 meters containing 9.41 g/t (0.30 opt) gold and 758 g/t (24 opt) silver. In 2007, the drilling at the Frea vein indicates that it is an open-ended mineralized silver/gold vein. Assay results are pending for hole SJD-442.

September through December 2007 Drilling Highlights, San José Project

Drill Hole/Vein

From
(meters)

To
(meters)

Interval
(meters)

Au
(g/t)

Ag
(g/t)

Frea

 

 

 

 

 

SJD-364

142.26

145.90

3.64

11.57

1,291

SJD-367

291.78

293.86

2..08

1..54

30

SJD-383

125.77

126.15

0..38

0..30

78

SJD-386

128.20

128.75

0..55

1..86

118

and

171.90

173.40

1.50

12.87

710

SJD-391

62.53

64.00

1.47

9.41

758

Odin

 

 

 

 

 

SJD-366

130.2

130.57

0..37

2..63

226

SJD-368

101.20

104.35

3.15

10.57

244

includes

101.20

103.13

1.93

15.25

334

includes

102.57

103.13

0.56

34.43

321

SJD-369

144.7

145.52

0.82

8.44

539

SJD-371

130.2

130.22

0..20

0..23

22

SJD-375

123.38

124.02

0..66

0..76

146

SJD-376

66.50

66.95

0..45

0..66

213

SJD-379

198.94

202.45

3..51

3..74

108

includes

198.94

199.24

0.30

9.29

360

includes

200.87

202.45

1.58

5.06

144

SJD-381

193.65

194.82

1..17

4..15

85

SJD-382

108.44

109.33

0..89

0..36

49

SJD-384

219.85

220.35

0..50

0..23

16

SJD-388

230.23

230.55

0..32

1..51

10

SJD-392

114.21

116.28

2..07

3..59

418

includes

114.80

115.48

0.68

6.99

951

and

134.80

135.80

1..00

1..23

189

SJD-398

125.80

126.30

0.50

6.30

1,074

SJD-401

115.60

116.05

0..45

0..45

47

SJD-403

150.20

151.80

1..60

5..20

72

SJD-404

222.10

222.90

0..80

0..99

33

SJD-409

60.87

62.40

1..53

1..05

131

SJD-412

116.66

118.34

1.68

52.44

1,147

and

122.53

123.3

0..77

4..43

335

SJD-414

58.70

61.50

2.80

6.23

110

SJD-419

115.53

116.50

0..97

3..32

90

SJD-420

234.50

235.00

0..50

0..53

95

SJD-423

136.76

137.18

0..84

3..52

388

Ayelén

 

 

 

 

 

SJD-363

74.4

75.9

1..50

2..57

297

and

168.70

169.70

1.00

5.97

587

SJD-364

 

 

 

 

 

SJD-374

155.66

156.85

1.19

11.67

721

SJD-385

106.15

115.40

9.25

4.10

248

includes

106.87

108.35

1.48

11.95

240

and

111.95

115.40

3..45

3..65

343

SJD-387

204.68

205.68

1..00

0..48

62

SJD-390

203.20

204.09

0..89

1..10

196

SJD-394

228.70

229.80

1..10

3..30

482

SJD-397

186.88

187.90

1.02

28.22

1,759

SJD-406

177.93

178.90

0..97

0..04

450

SJD-412

135.4

140.53

5.13

7.11

382

and

138.81

140.53

1.72

15.41

461

SJD-420

234.50

235.00

0..50

0..53

95

SJD-421

208.20

210.25

2..05

4..60

294

SJD-422

118.35

119.10

0..75

0..13

39

SJD-425

94.35

96.00

1..65

4..86

67

SJD-426

234.07

237.02

2.95

5.41

804

including

234.63

236.16

1.53

8.21

1,161

SJD-427

75.45

77.90

2.45

6.42

861

SJD-428

77.65

79.20

1.55

15.41

736

SJD-429

101.68

103.20

1..52

4..51

584

SJD-430

236.37

237.00

0..63

4..54

656

and

241.34

243.44

2..1

3..05

308

SJD-431

124.70

125.04

0..34

0..01

684

*All of the drill holes are angle holes. True thickness of the vein is undetermined.

For maps showing long sections of the Odin vein, please click on the following link:

http://www.minandes.com/i/maps/2008-03-07_NRM1.gif

and for the Ayelén vein:

http://www.minandes.com/i/maps/2008-03-07_NRM2.jpg

In addition to the holes listed in the table above, four holes (SJD-370, 372, 377, and 395) were drilled in the Lourdes target plus five holes (SJD-400, 402, 405, 408, and 413) were drilled in the Frigga target and one hole SJD-396 was drilled at the Kospi vein. These holes encountered quartz veining and/or hydrothermal breccia that did not return values above background levels of gold and silver. Although only background gold and silver values were encountered, the geologic features identified at these targets are consistent with precious metal-bearing epithermal systems. One goal of this reconnaissance drilling is to identify promising geologic trends that will be further tested in order to explore for high-grade shoots typical of the mineralization found at the Frea, Kospi, and Huevos Verdes veins. Also, several other targets, such as Aguas Vivas to the north, remain to be drill tested on the property. Assay results are pending on drill holes SJD- 407 and SJD-408.

At Odin drill holes SJD-373, 393, and 399 did not intersect the vein and holes SJD-362, 365, 407, 415, and 424 contained no gold and silver values. Assay results are pending for Odin holes SJD-410, 411, 418, 438, and 440. At Ayelén drill holes SJD-378, 380, and 411 intersected the quartz vein without precious metal values and assay results are pending on SJD-416, 432-439, 441, and 443.

Assay results for the drilling were reviewed by Brian Gavin, Minera Andes’ vice president, exploration, who is an appropriately qualified person as defined by National Instrument 43-101. All samples were collected in accordance with industry standards. Splits from the drill core samples were submitted to Alex Stewart Assayers, Argentina, S.A., in Mendoza, Argentina, for fire assay and ICP analysis. Accuracy of results is tested through the systematic inclusion of standards, blanks and check assays.

Minera Andes is a gold, silver and copper exploration company working in Argentina. The Corporation holds about 410,000 acres of mineral exploration land in Argentina including the co-owned San José silver/gold mine that has recently commenced production. Minera Andes is also exploring the Los Azules copper project in San Juan province, where an exploration program is underway to define a resource. Other exploration properties, primarily silver and gold, are being evaluated in southern Argentina. The Corporation presently has 189,324,935 shares issued and outstanding.

This news is submitted by Allen V. Ambrose, President and Director of Minera Andes Inc.



For further information, please contact: Art Johnson at the Spokane office, or Krister A. Kottmeier, investor relations – Canada, at the Vancouver office. Visit our Web site: www.minandes.com.

Spokane Office
111 East Magnesium Rd.,
Spokane, WA 99208 USA
Phone: (509) 921-7322
E-mail: mineraandes@minandes.com

Vancouver Office
Suite 911 - 470 Granville St,
Vancouver, BC. V6C 1V5
Phone: (604) 689-7017 / 877-689-7018
E-mail: ircanada@minandes.com

Caution Concerning Forward-Looking Statements:
This press release contains certain "forward-looking statements", including, but not limited to, the statements regarding the Company's strategic plans, evolution of mineral resources and reserves, work programs, development plans and exploration budgets at the Company’s San José Project. Investors should be aware that the introduction of new technology such as ILR can create added risk in achieving metallurgical performance. The forward-looking statements express, as at the date of this press release, the Company's plans, estimates, forecasts, projections, expectations or beliefs as to future events and results. Forward-looking statements involve a number of risks and uncertainties, and there can be no assurance that such statements will prove to be accurate. Therefore, actual results and future events could differ materially from those anticipated in such statements. In particular, there can be no assurance that commercial production at the San José mine will be achieved on a timely basis, or at all, that production capacity at the San José mine will be successfully increased, that resources and reserves at the San José mine will be increased or that Minera Andes will successfully raise the funds necessary to maintain its interest in the San José mine. Risks and uncertainties that could cause results or future events to differ materially from current expectations expressed or implied by the forward-looking statements include, but are not limited to, factors associated with fluctuations in the market price of precious metals, mining industry risks, risks associated with foreign operations, the state of the capital markets, environmental risks and hazards, uncertainty as to calculation of mineral reserves and other risks. We refer readers to the risk factors and uncertainties described in the Company’s continuous disclosure record, a copy of which is available under the Company’s profile at www.sedar.com. Minera Andes’ joint venture partner, a subsidiary of Hochschild Mining plc, and its affiliates do not accept responsibility for the use of project data or the adequacy or accuracy of this release.

Cautionary Note to U.S. Investors:
The United States Securities and Exchange Commission (the "SEC") permits mining companies, in their filings with the SEC, to disclose only those mineral deposits with “mineral reserves” that a company can economically and legally extract or produce. We use certain terms in this press release, such as "mineral resources", that the SEC guidelines strictly prohibit us from including in our filings with the SEC, because these terms are common usage in Canada and form part of our Canadian filing requirements.


THE TSX HAS NOT REVIEWED AND DOES NOT ACCEPT RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THIS RELEASE.

 

Forward email

This email was sent to .com, by ircanada@minandes.com
Update Profile/Email Address | Instant removal with ™ | Privacy Policy.

Minera Andes Inc. | S. 911 - 470 Granville Street | Vancouver | British Columbia | V6C 1V5 | Canada

Données et statistiques pour les pays mentionnés : Canada | Tous
Cours de l'or et de l'argent pour les pays mentionnés : Canada | Tous

Minera Andes Inc

CODE : MAI.TO
ISIN : CA6029101012
CUSIP : 602910101
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Minera Andes est une société de production minière d'argent basée au Canada.

Minera Andes est cotée au Canada et aux Etats-Unis D'Amerique. Sa capitalisation boursière aujourd'hui est 730,0 millions CA$ (728,7 millions US$, 555,9 millions €).

La valeur de son action a atteint son plus bas niveau récent le 06 février 2009 à 0,32 CA$, et son plus haut niveau récent le 15 avril 2011 à 3,39 CA$.

Minera Andes possède 282 959 000 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Dans les médias de Minera Andes Inc
23/03/2006New Analysis
16/10/2006Learning from the Iconoclast
Rapports annuels de Minera Andes Inc
2008 Annual report
2006 Annual Report
Financements de Minera Andes Inc
26/02/2009COMPLETES SECOND TRANCHE OF PRIVATE PLACEMENT WITH ROB McEWE...
17/02/2009revised C$40.0 million private placement with Robert R. McEw...
Rapports Financiers de Minera Andes Inc
11/08/2011Announces Second Quarter 2011 Financial Results
06/06/2011Announces First Quarter 2011 Financial Results and Restated ...
30/03/2011Announces 2010 Full Year Financial Results and Record Earnin...
17/07/2009(San Jose Argentina)second quarter 2009 San José Production
16/05/2009REPORTS FIRST QUARTER 2009 FINANCIAL RESULTS
23/01/2009(San Jose Argentina)ANNOUNCES FOURTH QUARTER GOLD/SILVER PRODUCTION INCREASES AT...
14/11/2008REPORTS THIRD QUARTER 2008 RESULTS
11/11/2008(San Jose Argentina)ANNOUNCES THIRD QUARTER GOLD/SILVER SALES AT THE SAN JOSE MI...
15/08/2008REPORTS NET INCOME FOR SECOND QUARTER OF $0.05 PER SHARE
30/07/2008ANNOUNCES SECOND QUARTER GOLD/SILVER SALES AT THE SAN JOSE M...
09/05/2008(San Jose Argentina)ANNOUNCES FIRST QUARTER 2008 PRODUCTION FOR SAN JOSE MINE TO...
Projets de Minera Andes Inc
07/12/2011(San Jose Argentina)Provides Update On Exploration Drilling at the San Jose Mine
30/08/2011(San Jose Argentina)Provides Update on Exploration Drilling at the San Jose Mine
27/06/2011(Los Azules Argentina)Reports Drill Results and Development Update for the Los Azu...
17/05/2011(Los Azules Argentina)on Litigation With TNR Gold Corp.
04/05/2011(San Jose Argentina)Announces Work Resumption at San Jose Mine
13/03/2011(San Jose Argentina)Announces Outstanding 2010 Exploration Drill Results at the ...
05/10/2009(San Jose Argentina) Production Has Resumed At TheSan Jos=E9 Mine
02/10/2009(Los Azules Argentina)Provides Confirmation of its 100% Earn-In on the Los Azules ...
06/06/2009(San Jose Argentina) Announces completion of NI 43-101 Technical report on the J...
06/06/2009(Los Azules Argentina) Announces delivery of Earn-in notice under option agreement...
16/01/2009(San Jose Argentina)ANNOUNCES INCREASE IN FORECAST PRODUCTION AT THE SAN JOSE GO...
10/01/2009(San Jose Argentina)Announces Remaining Results From 2008 San Jose Drilling
25/09/2008(Los Azules Argentina)ANNOUNCES EXCELLENT METALLURGICAL TESTING RESULTS FOR LOS AZ...
08/09/2008(Los Azules Argentina)announces a mineral resource estimate of 922 million tonnes ...
13/08/2008(San Jose Argentina)REPORTS SAN JOSE PRODUCTION CASH COSTS AT $322/oz GOLD AND $...
27/06/2008(Los Azules Argentina)Exploration Program Increases The Size Of The Los Azules Por...
16/04/2008(Los Azules Argentina)DRILLING CUTS 132 METERS (433FT) OF 1.11 PERCENT COPPER AT L...
28/03/2008(San Jose Argentina) PROVIDES SAN JOSE MINE UPDATE
12/03/2008(Los Azules Argentina)ANNOUNCES 113 METERS OF +1 PERCENT COPPER IN DRILLING AT LOS...
07/03/2008(San Jose Argentina)ANNOUNCES 1.69 OZ/TON GOLD AND 37 OZ/TON SILVER FROM SAN JOS...
11/12/2007(Los Azules Argentina) ANNOUNCES DRILLING COMMENCES AT LOS AZULES COPPER PROJECT
26/10/2007(San Jose Argentina) ENGAGES MACQUARIE BANK LIMITED FOR DEBT FINANCING FOR SAN J...
15/08/2007(San Jose Argentina)ANNOUNCES PROGRESS AND PLANS AT SAN JOSE MINE
31/05/2007(Los Azules Argentina)drills significant copper at Los Azules Project, Argentina
Communiqués de Presse de Minera Andes Inc
22/03/2012Files Annual 2011 Financial Statements and MD&A and Project ...
18/01/2012Announces Fourth Quarter and Full Year 2011 San Jose Mine Pr...
13/01/2012(Los Azules Argentina).: Response to TNR Gold Corp. News Release Regarding Los Azu...
21/12/2011Rob McEwen Letter to Shareholders of US Gold and Minera Ande...
03/10/2011(San Jose Argentina)Announces Full Repayment of Loans From San Jose Mine
22/09/2011US Gold and Minera Andes Enter Into Arrangement Agreement to...
20/07/2011Announces Second Quarter 2011 San Jose Mine Production
20/04/2011Announces First Quarter 2011 San Jose Mine Production
07/02/2011' Treasury Increases by $19 Million
24/01/2011Reminds Warrant Holders of Accelerated Expiry on January 31,...
03/07/2009'AGM Presentation On Video
23/02/2009Rob McEwen becomes Executive Chairman of Minera Andes - Two ...
06/02/2009Announces Results Of Preliminary Assessment At Los Azules Co...
01/10/2008Recent Media Coverage on Minera Andes Inc.
02/09/2008ANNOUNCES 2.05 OZ/TON GOLD AND 37 OZ/TON SILVER FROM ONGOING...
06/08/2008ADDS ROB MCEWEN AND OTHER MINING INDUSTRY EXECUTIVES TO ITS ...
30/07/2008Welcomes Lundin Mining Executive To Board
22/12/2007ANNOUNCES 1st CLOSING ON FINANCING
19/12/2007 ANNOUNCES PROPOSED FINANCING
27/11/2007 ANNOUNCES THE SAN JOSE MINE INCREASES SILVER AND GOLD MINE...
15/11/2007SIGNS DEFINITIVE AGREEMENT AT LOS AZULES COPPER PROJECT WITH...
09/11/2007 ANNOUNCES SAN JOSE UPDATE
12/10/2007SAN JOSE PROJECT DRILLING HITS 3.22 OUNCES PER TON GOLD AND ...
18/09/2007ANNOUNCES THE SAN JOSE MINE INCREASES SILVER AND GOLD RESOUR...
06/09/2007SAN JOSE PROJECT DRILLING HITS 1.86 OUNCES PER TON GOLD AND ...
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TORONTO (MAI.TO)OTC BB (MNEAF.OB)
2,58-2.64%2,54-3.05%
Dernières informations avant suppression de la cote
Cours préc. Ouverture
2,65 2,71
Bas haut
2,48 2,73
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
- -  2,58 -%
Volume var. 1 mois
2 733 962 -%
Produit
Développe
Recherche
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 07/09/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,70 AU$-0,65%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
11,94 US$+9,34%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,54 GBX-2,55%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,69 CA$+13,03%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
15,60 CA$+1,83%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+0,00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,20 AU$+2,63%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,87 CA$+5,65%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
52,61 US$+0,98%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+5,56%Trend Power :