Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en

Nyrstar NV

Publié le 07 février 2013

announces 2012 Full Year Results

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Copper | Dollar | Euro | Europe | France | Germanium | Indium | Precious Metals | Report | Zinc |
   

Published: 07:00 CET 07-02-2013 /Thomson Reuters /Source: Nyrstar /XBRU: NYR /ISIN: BE0003876936

Nyrstar announces 2012 Full Year Results

Regulated Information

7 February 2013

HIGHLIGHTS

Contribution from Mining segment continues to grow in line with strategy; group underlying EBITDA and PAT adversely impacted by macro-economic conditions

  • Group underlying EBITDA of EUR 220 million, down (17)% on 2011 (EUR 265 million)
    • Mining EUR 129 million, up 79%, in line with strong production growth
    • Smelting EUR 135 million, down (43)%, impacted by lower treatment charges and reduced contribution from silver bearing material at Port Pirie of EUR 24 million compared to EUR 78 million in 2011
  • Mining underlying EBITDA per tonne[1] EUR 413, up 19% on 2011 (EUR 348)
  • Smelting underlying EBITDA per tonne[2] EUR 125, down 40% on 2011 (EUR 209)
  • EPS of EUR(0.57) (PAT EUR (95) million) impacted by one-off impairments of non-core assets and restructuring expenses
  • Proposed distribution of EUR0.16 per share via a share capital reduction

Growth in production of all metals; full year guidance delivered

  • Mining production of 312kt of zinc in concentrate, up 105kt (51%) on 2011 (207kt)
    • Own mine production (excluding deliveries under Talvivaara zinc stream) of 282kt, up 172kt (64%)
    • Langlois ramp up completed in line with management expectations with production of 39kt
    • Tennessee Mines delivered significantly improved performance with production of 109kt, up 36%
    • Talvivaara deliveries of 30kt, down 5kt (14%)
  • Mining production guidance achieved for lead (16.2kt actual), copper (13.0kt) and silver (5,517ktoz) and all significantly up on 2011, by 108%, 69% and 50% respectively; gold production slightly below guidance (94.6ktoz actual) but again significantly up on 2011 (90%)
  • Zinc metal production of 1,084kt at smelters, in line with guidance

Challenging trading environment with downward movements in commodity prices and treatment charges

  • Commodity prices remained volatile throughout 2012, with zinc, lead, copper and silver prices all down in 2012
  • Zinc price averaged USD 1,946/t, down 11% on 2011 (USD 2,191/t), and 14%, 10% and 11% declines in the average lead, copper and silver prices respectively
  • 2012 zinc benchmark treatment charge (TC) significantly below 2011 terms, with realised TC declining 15%
  • Partly benefited from weaker Euro, however smelting cost base challenged due to strength of the Australian Dollar, averaging 0.81 against the Euro (up 8% compared to 2011)

Improving the Nyrstar cost base and maintaining capital discipline

  • Average zinc mining C1 cash cost[3] of USD 1,154/t of payable zinc in H2 2012 (USD 1,255/t in H1 2012)
    • Tennessee Mines C1 cash cost significantly improved 20% in H2 2012 to USD 1,705/t (USD 2,143/t in H1 2012) due to increased volumes and unit cost reduction following optimisation programme
  • Smelting operating cost per tonne of EUR 577 in 2012 impacted by strength of Australian dollar and production issues in H2 2012 at Port Pirie
  • Implemented comprehensive group wide review of operating costs, Project Lean, identifying to date EUR 50 million in incremental annualised sustainable savings and a reduction in employee and contractor headcount of 15-20% across smelting, mining and corporate; expect full benefit to be realised by end of 2014
    • First phase implemented in Q4 2012 through optimisation of Peruvian operations, with reduction in employee and contractor headcount by approximately 1,000
  • Planned reduction in capital expenditure to EUR 200-230 million in 2013 (including growth spend of EUR 35-55 million), compared to EUR 248 million spent in 2012 which was in line with guidance

Continued roll-out of optimisation programme (Mining for Value) across Mining segment

  • A back-to-basics, systematic analysis of processes and capabilities to develop an optimal, sustainable operating model for each mine, incorporating standardised operating systems, life of mine planning and optimised capital allocation
  • Successful implementation at Tennessee Mines in H1 2012 resulting in increased zinc in concentrate production and significant (20%) improvement in C1 cash cost in H2 2012
  • Implemented at Campo Morado in H2 2012, with tangible benefits expected to start materialising in H1 2013, and to be rolled out at other mines during course of 2013

Strong financial position with a high quality portfolio of long-term debt

  • Successfully refinanced EUR 400 million structured commodity trade finance facility
  • Significant cash inflow from operating activities due to working capital initiatives
  • Net debt of EUR 681 million at the end of 2012, compared to EUR 718 million at the end of 2011
  • Gearing[4] maintained at 37.0% at the end of 2012, compared to 35.0% at the end of 2011

Delivering on Strategy into Action

  • Reached in-principle agreement to transform the Port Pirie smelter into an advanced poly-metallic processing and recovery facility, through an innovative financing and support package, providing an opportunity to strengthen and further diversify group earnings and preserving capacity to continue execution of mining strategy
  • Unlocked untapped value through the successful commissioning of the indium metal plant at Auby smelter, realisation of operational synergies at Clarksville with production of germanium residue from Tennessee Mine zinc concentrates and production of tellurium concentrate at Port Pirie smelter
  • Increased focus on core mining and smelting businesses with divestments of non-core assets; ARA Sydney (Australia) and Galva 45 (France)
  • Commenced Smelting Strategic Review aimed at identifying opportunities to sustainably improve profitability of zinc smelting business
  • Continue to explore value accretive M&A opportunities

 

Commenting on the 2012 full year results, Roland Junck, Chief Executive Officer of Nyrstar, said,

"During 2012 we completed a major step in the long term strategic repositioning of Nyrstar from a pure smelting business to integrated mining and metals company. Through the execution and implementation of our strategy we have transformed the composition of our result, with mining EBITDA surpassing smelting EBITDA in H2 2012; a result achieved with zinc mining volumes approximately three times lower than zinc smelting volumes. This structural shift is further evident in the EBITDA contribution per tonne from the Mining segment which, despite a decline in commodity prices, was up 23% in H2 2012 to EUR 456 compared to H1 2012, while EBITDA per tonne in the Smelting segment continued to come under pressure with a decline of 29% to EUR 104 over the same period. This reinforces our backward integration strategy as mining is proven to be structurally more profitable per tonne than smelting.

The improvement in mining profitability was driven by considerable growth in the production of all metals. Zinc in concentrate production of 312kt in 2012, was 51% higher than in 2011, with own mine production up 64%. Lead, copper, silver and gold production was also significantly up on 2011, by 108%, 69%, 50%, and 90% respectively. Production guidance was achieved for all metals, except for gold which was slightly below due to temporary operational interruptions experienced in H1 2012 at El Toqui and Coricancha.

These improvements were delivered in a challenging trading environment, with zinc, lead, copper and silver prices all down in 2012 and all remained volatile throughout the year. The zinc price averaged USD 1,946/t, down 11% on 2011, while there were 14%, 10% and 11% declines in the average lead, copper and silver prices respectively. This negatively impacted mining C1 cash costs, through the reduction in by-product credits. That said, due to improving the quality of our mining portfolio we still delivered an improvement in the average zinc mining C1 cash cost, down 5% in 2012 compared to 2011. This included a significant improvement in the C1 cash cost at Tennessee Mines to USD 1,705/t in H2 2012, down 20% compared to H1 2012, due to increased volumes and a unit cost reduction following an optimisation programme. The lower price environment also impacted smelting gross profit, which was additionally affected by lower 2012 zinc benchmark treatment charge (TC) terms, with realised TCs down 15% on 2011. Nyrstar did partly benefit from a weaker Euro although this did not offset the decline in commodity prices. The other currency impacting our results in 2012 was the Australian dollar, which continued its strong performance averaging 0.81 against the Euro, up 8% compared to 2011. While the zinc smelters maintained their cost in local currency, given approximately 40% of our smelting costs are denominated in Australian dollars, the average smelting operating cost per tonne in Euro terms increased to EUR 577.

Due to this unfavourable trading environment, in absolute terms our results declined in 2012 compared to 2011. Group underlying EBITDA of EUR 220 million, declined by 17% on 2011, with smelting underlying EBITDA, down 43%, also impacted by the reduced contribution from silver bearing material at Port Pirie (EUR 24 million in 2012 compared to EUR 78 million in 2011). Loss after tax of EUR (95) million was also impacted by increased depreciation and depletion charges in our Mining segment, the latter a non-cash item related to the accounting treatment of the Breakwater Resources and Farallon Mining acquisitions, higher finance expenses, and one-off charges for impairment of EUR 17 million against non-core assets and restructuring expenses of EUR 17 million mainly in relation to our announced cost savings programme, Project Lean.

At our 2012 Half Year results, we announced that we had commenced a group wide review of our corporate offices, mining operations and smelting operations to identify opportunities to sustainably reduce our operating costs, and that we were taking measures to reduce sustaining capital expenditure in H2 2012, whilst retaining our ability to invest in organic growth opportunities. Both initiatives are core elements of our strategy to achieve excellence in everything we do and we are pleased to announce we have made significant progress in both areas. We have identified to date EUR 50 million in incremental annualised sustainable operating cost savings, and have developed a detailed plan to implement this programme, known internally as Project Lean, by the end of 2014. We have already executed a first phase of this project through the optimisation of Peruvian mining operations, reducing employee and contractor headcount by approximately 1,000. With a significant portion of savings expected to be delivered within the Mining segment, we expect Project Lean to enable us to deliver on our medium term average mining C1 cash cost target of less than USD1,000/t. With regards to capital expenditure, we contained spend in H2 2012 and so total spend in 2012 was EUR 248 million, in line with our 2012 guidance and for 2013 we are guiding to a reduced level of full year spend of EUR 200-230 million.

Maintaining the strength of our balance sheet was of critical importance during 2012, as commodity price conditions remained volatile and we continued to invest in organic growth opportunities. A key cornerstone in achieving this aim was our ability to successfully refinance our EUR 400 million structured commodity trade finance facility. In addition, we took a number of measures to improve our management of working capital that enabled us to deliver a year-on-year reduction in our net debt position, and we took the step of writing down a number of non-core businesses.

Entering 2013, Nyrstar is a stronger company, with a larger and more diversified mining and metals footprint. Coupled with our focus on improving the Nyrstar cost base, through the implementation of Project Lean, our targeted reduction in capital expenditure and the development and execution of organic growth opportunities, we will be in a more robust position to deal with the possibility of continued short term volatility in our markets. We continue to plan on a prudent basis to ensure our operations and commercial department maintain a sharp focus on maximising profitability and free cash performance even at constant prices. That said, we remain confident in the medium and long term fundamentals of the zinc and other related commodity markets. We continue to explore value accretive M&A opportunities, and will ensure our, balance sheet continues to support our growth strategy."

 

CONFERENCE CALL

Management will discuss this statement in a conference call with the investment community on 7 February 2012 at 09:00am Central European Time. The presentation will be webcast live on the Nyrstar website, www.nyrstar.com, and will also be available in archive. The webcast can be accessed via: http://www.media-server.com/m/p/3n29rrqa.

 

[1] Mining segment underlying EBITDA per tonne of zinc in concentrate produced
[2] Smelting segment underlying EBITDA per tonne of zinc metal produced
[3] C1 cash costs are defined by Brook Hunt as: the costs of mining, milling and concentrating, on-site administration and general expenses, property and production royalties not related to revenues or profits, metal concentrate treatment charges, and freight and marketing costs less the net value of by-product credits..
[4] Gearing: net debt to net debt plus equity at end of period

 

FORWARD-LOOKING STATEMENTS

This release includes forward-looking statements that reflect Nyrstar's intentions, beliefs or current expectations concerning, among other things: Nyrstar's results of operations, financial condition, liquidity, performance, prospects, growth, strategies and the industry in which Nyrstar operates. These forward-looking statements are subject to risks, uncertainties and assumptions and other factors that could cause Nyrstar's actual results of operations, financial condition, liquidity, performance, prospects or opportunities, as well as those of the markets it serves or intends to serve, to differ materially from those expressed in, or suggested by, these forward-looking statements. Nyrstar cautions you that forward-looking statements are not guarantees of future performance and that its actual results of operations, financial condition and liquidity and the development of the industry in which Nyrstar operates may differ materially from those made in or suggested by the forward-looking statements contained in this news release. In addition, even if Nyrstar's results of operations, financial condition, liquidity and growth and the development of the industry in which Nyrstar operates are consistent with the forward-looking statements contained in this news release, those results or developments may not be indicative of results or developments in future periods. Nyrstar and each of its directors, officers and employees expressly disclaim any obligation or undertaking to review, update or release any update of or revisions to any forward-looking statements in this report or any change in Nyrstar's expectations or any change in events, conditions or circumstances on which these forward-looking statements are based, except as required by applicable law or regulation.

About Nyrstar

Nyrstar is an integrated mining and metals business, with market leading positions in zinc and lead, and growing positions in other base and precious metals; essential resources that are fuelling the rapid urbanisation and industrialisation of our changing world. Nyrstar has mining, smelting, and other operations located in Europe, the Americas, China and Australia and employs over 7,000 people. Nyrstar is incorporated in Belgium and has its corporate office in Switzerland. Nyrstar is listed on NYSE Euronext Brussels under the symbol NYR. For further information please visit the Nyrstar website, www.nyrstar.com

 

For further information contact:
Jaideep Thatai   Manager Investor Relations   T: +41 44 745 8103   M: +41 79 722 3089   jaideep.thatai@nyrstar.com
Geert Lambrechts   Manager Corporate Communications   T: +32 14 449 646   M: +32 473 637 892   geert.lambrechts@nyrstar.com


The full press release can be downloaded from the following link:




Press Release (English)
Press Release (French)
Press Release (Dutch)



To unsubscribe, please click on the following link:


.
Données et statistiques pour les pays mentionnés : France | Tous
Cours de l'or et de l'argent pour les pays mentionnés : France | Tous

Nyrstar NV

PRODUCTEUR
CODE : NYR.BE
ISIN : BE0003876936
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Nyrstar est une société de production minière de zinc et d'argent basée en Belgique.

Nyrstar est productrice de zinc, d'argent, de cuivre, d'or et de plomb au Mexique et au Perou, et détient divers projets d'exploration au Mexique.

Ses principaux projets en production sont CORICANCHA au Perou et G-9 CAMPO MORADO au Mexique et ses principaux projets en exploration sont CAMPO MORADO, EAST TENNESSEE et MIDDLE TENNESSEE au Mexique.

Nyrstar est cotée en Allemagne. Sa capitalisation boursière aujourd'hui est 459,4 millions €UR (588,4 millions US$, 400,0 millions €).

La valeur de son action a atteint son plus haut niveau récent le 24 juin 2005 à 2,70 €UR, et son plus bas niveau récent le 28 novembre 2008 à 0,38 €UR.

Nyrstar possède 935 640 000 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Dans les médias de Nyrstar NV
14/11/2018Nyrstar plunges as analyst warns shares will get wiped out
31/10/2018Belgium's Nyrstar Q3 core profit plunges 74%
31/10/2018Falling zinc price hammers Trafigura-backed Nyrstar in Q3
25/09/2018Nyrstar profit warning highlights zinc's disconnects
04/05/2018Benchmark zinc treatment charges down 15 pct in 2018- Nyrsta...
Financements de Nyrstar NV
30/12/2015announces funding of metal prepay financing
Nominations de Nyrstar NV
23/12/2013Extraordinary and Special General Meeting: Approval of Conve...
Rapports Financiers de Nyrstar NV
08/08/2016announces First Half Results
20/07/2016Announces 2016 Half Year Reporting Date and Webcast
27/04/2016Results of the Annual and Extraordinary General Shareholders...
27/04/2016First Quarter 2016 Interim Management Statement
Projets de Nyrstar NV
06/01/2014LESOP Executive Share Acquisition
01/10/2013enters into European strategic marketing agreement for commo...
18/04/2013Acquisition of own shares
16/04/2013reaches settlement with Glencore on Commodity Grade Off-take...
12/09/2011Acquisition of own shares
01/09/2011Acquisition of own shares
24/08/2011on Nyrstar's friendly Offer to acquire Breakwater Resources ...
11/05/2011Acquisition of own shares
Communiqués de Presse de Nyrstar NV
22/04/2016terminates European marketing agreement for commodity grade ...
06/02/2014announces 2013 Full Year Results
16/01/2014Announces 2013 Full Year Reporting Date and Webcast
15/01/2014Shareholder Notification
20/11/2013Market Update
15/11/2013on Nyrstar's zinc streaming agreement with Talvivaara
14/11/2013Extraordinary General Meeting
29/10/2013Outcome of the Smelting Strategic Review and update on the P...
24/10/20132013 Second Interim Management Statement
11/10/2013announces Second 2013 Interim Management Statement reporting...
14/08/2013adjusts conversion price of its convertible bond
08/08/2013announces details of the payment of the capital reduction
25/07/2013announces 2013 Half Year Results
16/07/2013Announces 2013 Half Year Reporting Date and Webcast
24/06/2013announces Organisational Restructure
23/05/2013Second Extraordinary General Meeting
23/05/2013Port Pirie Transformation Update
24/04/2013Annual and Extraordinary General Meeting
24/04/20132013 First Interim Management Statement
19/04/2013Shareholder Notification
10/04/2013announces First 2013 Interim Management Statement reporting ...
07/02/2013announces 2012 Full Year Results
24/01/2013Announces 2012 Full Year Reporting Date and Webcast
24/10/20122012 Second Interim Management Statement
05/10/2012announces Second 2012 Interim Management Statement reporting...
13/08/2012adjusts conversion price of its convertible bond
07/08/2012announces details of the payment of the capital reduction
27/07/2012announces 2012 Half Year Results
12/07/2012Potential Transformation of the Port Pirie Smelter - Media s...
06/07/2012Announces 2012 Half Year Reporting Date and Webcast
22/05/2012Second Extraordinary General Meeting
02/05/20122012 Second Extraordinary General Meeting
25/04/2012Annual and Extraordinary General Meeting
25/04/20122012 First Interim Management Statement
17/04/2012Shareholder Notification
11/04/2012Announces First 2012 Interim Management Statement Reporting ...
23/03/20122012 Annual and Extraordinary General Meeting
14/03/2012Shareholder Notification
29/02/2012and Sims Metal Management announce the successful completion...
23/02/2012announces 2011 Full Year Results
06/02/2012CORRECTION: Nyrstar Announces 2011 Full Year Reporting Date ...
06/02/2012Announces 2011 Full Year Reporting Date and Webcast
23/01/2012Shareholder Notification
26/10/20112011 Second Interim Management Statement
12/10/2011announces Second 2011 Interim Management Statement reporting...
19/09/2011Shareholder Notification
24/08/2011announces its friendly Offer to acquire Breakwater is now fr...
08/08/2011announces details of the payment of the capital reduction
15/07/2011Announces Half Year 2011 Reporting Date and Webcast
28/06/2011Special General Meeting
27/06/2011Extends Commodity Off-take Agreement with the Glencore Group
31/05/2011NYSE Euronext Brussels announces Nyrstar inclusion in BEL 20...
24/05/2011Extraordinary and Special General Meeting
23/05/2011Shareholder Notification
27/04/2011Annual and Extraordinary General Meeting
27/04/20112011 First Interim Management Statement
13/04/2011Announces First 2011 Interim Management Statement Reporting ...
25/03/2011Shareholder Notification
18/03/2011announces the issue of new shares pursuant to a capital incr...
24/02/2011announces 2010 Full Year Results
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
BERLIN (NYR.BE)
0,4910
BERLIN
€UR 0,491
18/09 08:40 0,032
0%
Cours préc. Ouverture
2,02 1,28
Bas haut
1,28 1,28
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
- -  0,491 -61,64%
Volume var. 1 mois
0 -61,64%
Produit Copper - Gold - Lead - Silver - Zinc
Développe
Recherche Copper - Gold - Lead - Silver - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 21/07/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,82 AU$+1,69%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
11,29 US$+2,30%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,55 GBX+2,59%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,46 CA$-2,38%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
15,85 CA$-1,25%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+0,00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,19 AU$-7,32%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,83 CA$-3,68%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
51,84 US$+0,80%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,03 AU$+0,00%Trend Power :