Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en
Argonaut Gold Announces 2012 Project Initiatives
Published : February 27, 2012

Gold Production has Begun at La Colorada

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   G Mexico |

TORONTO, ONTARIO--(Marketwire - Feb. 27, 2012) - Argonaut Gold Inc. (News - Market indicators) ("Argonaut" or the "Company") is pleased to announce its plans for 2012 project initiatives for both of the Company's operating mines in Mexico. The El Castillo mine is located 100 km north of the capital city of Durango in Durango, Mexico, and the La Colorada mine is located 50 km southeast of the capital city of Hermosillo in Sonora, Mexico.

El Castillo 2012 Initiatives:

  • Mining Fleet
    • In Q1, the haulage fleet will increase to a total of 18, one hundred ton capacity trucks.
  • Expanding heap leach capacity
    • In Q2, west leach pad #7A will be commissioned, providing an additional 2.6 million tonnes capacity.
  • Reducing truck haulage requirements
    • In Q3, a new crushing, conveying and stacking system will be in place reducing truck haulage requirements.
  • Future Pad expansions
    • In Q4, construction to begin on pad #8 on the west side land which was acquired at the end of 2011.

Pete Dougherty, Argonaut President and CEO, stated: "These initiatives will be implemented in a stepped phase throughout the year, and are designed to create a more efficient mining environment at El Castillo. At the end of last year as we extended operations to the east pads and plant, El Castillo experienced higher cash operating costs. We feel these initiatives will mitigate these costs. We believe El Castillo will be in a position to take the next steps in advancing production by year end with the addition of the new west pad #8."

La Colorada 2012 Initiatives:

  • Production in Q1
    • The Company began stacking and leaching material early in the first quarter.
  • Completion of desorption plant and refinery
    • Expected to be completed in Q2, this new plant will provide refining capacity for all Mexican operations allowing for faster metal recovery and sales.
  • Expanding Mine Footprint
    • In Q2, the phase two permit for expansion is expected to be received and mining is to begin at the La Colorada pit.

Mr. Dougherty commented: "The Company is happy to announce that gold production has begun at the La Colorada mine. We are currently reprocessing material from the existing leach pads. Construction is well underway on the new desorption and recovery plant, as well as the refinery. When completed in the second quarter, it will have the capacity to handle material from all of the Company's Mexican operations. The enhancement of the desorption and refining circuit will allow the Company to process all loaded carbon at a single site, therein reducing costs, and expediting our sales process. It is satisfying to see the La Colorada mine begin ahead of schedule and continue to expand." 

Total Capital Expansion Program for 2012

El Castillo   $ 8-10 million
La Colorada   $ 15-20 million
San Antonio (1)   $ 3-4 million
Exploration (2)   $ 7-8 million
Note:   (1) Subject to permitting process timeline
    (2) Subject to exploration success

Mr. Dougherty commented: "The Company is pleased to add a second producing mine to the Company's portfolio. The initiatives underway at both mines will allow for greater efficiencies and enhancements to production. Gold production at El Castillo is expected to be between 17,000 and 18,000 ounces for Q1 and is budgeted to increase each quarter. Q4 production is expected to reach 21,000 - 22,000 ounces, finishing the year for a total of 75,000 and 80,000 ounces at an average cash cost for the year of $625 to $650 per ounce. Gold production at La Colorada is expected to be between 2,000 and 2,500 ounces of gold for Q1 with gradual increases anticipated each quarter;. Q4 production is expected to be between 4,500 - 5,500 ounces at an average cash cost for the year of $625 to $650 per ounce. Full year La Colorada production is expected to be 13,500 to 17,000 ounces."

About Argonaut Gold

Argonaut is a Canadian gold company engaged in exploration, mine development and production activities. Its primary assets are the production-stage El Castillo Mine in the State of Durango, Mexico, the La Colorada Mine in the State of Sonora, Mexico, the advanced exploration stage San Antonio project in the State of Baja California Sur, Mexico, and several exploration stage projects, all of which are located in Mexico.

Creating Value Beyond Gold

Cautionary Language Regarding Forward-Looking Information

This news release contains and refers to forward-looking information based on current expectations. All other statements other than statements of historical fact included in this release are forward-looking statements (or forward-looking information). The Company's plans involve various estimates and assumptions and its business and operations are subject to various risks and uncertainties. For more details on these estimates, assumptions, risks and uncertainties, see the Company's most recent Annual Information Form and most recent Management Discussion and Analysis on file with the Canadian securities regulatory authorities on SEDAR at www.sedar.com. These forward-looking statements are made as of the date hereof and there can be no assurance that such statements will prove to be accurate, such statements are subject to significant risks and uncertainties, and actual results and future events could differ materially from those anticipated in such statements. The Company assumes no obligation to update the forward-looking information contained in this news release. Accordingly, readers should not place undue reliance on forward-looking statements that are included herein. The release should also reference La Colorada as being brought into production without a feasibility study demonstrating economic and technical viability and that there may be increased uncertainty and certain risks (identify if possible) of failure associated with the production decision. 

Qualified Persons

Preparation of this press release was supervised by Mr. Thomas Burkhart, Argonaut's Vice President of Exploration and a "Qualified Persons" as defined by NI 43-101. Mr. Alberto Orozco, Argonaut's Mexico Exploration Manager, also supervised the drill programs and on-site sample preparation procedures at La Colorada.

For more information, please refer to the appropriate project's technical report available on the Company's website as well as www.sedar.com:

La Colorada   NI 43-101 Preliminary Economic Assessment La Colorada Project Sonora, Mexico (October 15, 2011)
     
El Castillo   NI 43-101 Technical Report on Resources and Reserves Argonaut Gold Inc. El Castillo Mine Durango State, Mexico (November 6, 2010)


Argonaut Gold Inc.
Nichole Cowles
Investor Relations Manager
(775) 284-4422 x 101
nichole.cowles@argonautgoldinc.com
www.argonautgoldinc.com

Argonaut Gold Inc.

PRODUCTEUR
CODE : AR.TO
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Argonaut Gold est une société de production minière d'or basée aux Etats-Unis D'Amerique.

Argonaut Gold détient divers projets d'exploration au Mexique.

Ses principaux projets en production sont EL SASTRE GOLD MINE, EL SASTRE, EL SASTRE - EL ARENAL, EL SASTRE BRIDGE ZONE et EL SASTRE - LUPITA ZONE au Guatemala et EL CASTILLO au Mexique et son principal projet en exploration est SAN ANTIONIO au Mexique.

Argonaut Gold est cotée au Canada. Sa capitalisation boursière aujourd'hui est 72,5 millions CA$ (52,7 millions US$, 49,4 millions €).

La valeur de son action a atteint son plus haut niveau récent le 25 janvier 2013 à 9,99 CA$, et son plus bas niveau récent le 18 novembre 2022 à 0,33 CA$.

Argonaut Gold possède 176 940 000 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Nominations de Argonaut Gold Inc.
15/11/2013Announces New Chief Financial Officer
15/12/2011Announces New Chief Operating Officer
Rapports Financiers de Argonaut Gold Inc.
16/03/2015Announces 2014 Revenue of $166.3M, $42.5M in Cash Flow from ...
06/08/2013Provides Notice of Second Quarter Financial Results on Augus...
25/07/2012Provides Notice of Second Quarter Financial Results on Augus...
19/03/2012Provides Notice of Fourth Quarter and Year End Financial Res...
05/08/2011Provides Notice of Second Quarter Financial Results on Augus...
Projets de Argonaut Gold Inc.
31/01/2014Confirms Filing of Prefeasibility Study for the Magino Proje...
20/01/2014CORRECTION FROM SOURCE - Argonaut Gold Announces Full Year 2...
20/01/2014Announces Full Year 2013 Gold Production of 120,224 gold equ...
31/12/2013Announces Completion of the San Agust=EDn project purchase f...
06/11/2013Announces Purchase of San Agust=EDn project from Silver Stan...
16/10/2013Announces Q3 Gold Production of 26,690 Ounces
15/07/2013Announces Record Q2 Gold Production of 33,586 Ounces
15/04/2013Announces Q1 Gold Production of 28,907 Ounces
25/02/2013Announces 2013 Production Guidance of 120-140,000 Ounces
17/01/2013Exceeds 2012 Guidance with Gold Production of 108,081 Ounces
17/01/2013Exceeds 2012 Guidance with Gold Production of 108,081 Ounces
18/07/2012Announces Q2 Gold Production of 24,123 Ounces
17/04/2012Announces Q1 Gold Production of 21,084 Ounces
15/07/2011Announces Q2 Gold Production of 17,453 Ounces
14/04/2011Announces Q1 Gold Production of 18,005 0unces
22/03/2011(San Antionio)Reports on Resource Expansion Drilling at San Antonio
14/02/2011(El Castillo)Provides 2011 Guidance on El Castillo Production of 70-75,00...
Communiqués de Presse de Argonaut Gold Inc.
25/05/2016Argonaut Gold Raises C$4.5M via Private Placement of Flow-Th...
04/05/2016Argonaut Gold Announces Results of Annual and Special Meetin...
03/05/2016Argonaut Gold Announces First Quarter 2016 Earnings per Shar...
29/04/2016Argonaut Gold Announces $30 Million Revolving Credit Facilit...
14/04/2016Argonaut Gold Announces First Quarter 2016 Production of 32,...
06/04/2016Argonaut Gold Further Strengthens Board and Management Team
18/01/2016Argonaut Gold Announces Updated Pre-Feasibility Study Result...
30/11/2015Mexus Gold is Pleased to Announce That Argonaut Gold Has Com...
24/11/2015Argonaut Gold Chairman Brian Kennedy Retiring; Jim Kofman to...
03/11/2015Argonaut Gold Announces Third Quarter 2015 Revenue of $32M; ...
02/11/2015Argonaut Gold El Castillo Update
22/10/2015Argonaut Gold El Castillo Update
19/10/2015Mexus Commences Drill Pad Construction for Argonaut
15/10/2015Argonaut Gold Announces Third Quarter 2015 Production of 28,...
17/09/2015Argonaut Gold Announces Updated Economic Parameters to the D...
14/09/2015Mexus Gold US Julio/Santa Elena Update
09/09/2015Mexus Gold US Press Release Correction
17/08/2015Argonaut Gold Updates Mexus Gold US on the Julio property
14/08/2015Argonaut Gold Announces Second Quarter 2015 Revenue of $44M;...
15/04/2015Announces First Quarter 2015 Production of 43,255 Gold Equiv...
16/03/2015Argonaut Gold Announces 2014 Revenue of $166.3M, $42.5M in C...
20/02/2015Argonaut Gold Confirms Filing of Technical Report and Prelim...
26/01/2015Argonaut Gold Receives TSX Acceptance of Shareholder Rights ...
20/01/2015Argonaut Gold Adopts Shareholder Rights Plan
13/01/2015Argonaut Gold Announces Full Year 2014 Gold Production of 13...
13/01/2015Argonaut Gold Announces Updates on the Magino and San Agusti...
12/01/2015Argonaut Gold Announces Updates on the Magino and San Agusti...
07/01/2015Argonaut Gold Announces Full Year 2014 Gold Production of 13...
06/11/2014Argonaut Gold Announces Third Quarter 2014 Revenue of $37.3M...
15/10/2014Argonaut Gold Announces Q3 Production of 32,122 Gold Equival...
03/10/2014Argonaut Gold Confirms Filing of National Instrument 43-101 ...
29/08/2014IIROC Trade Resumption - AR
12/11/2013Announces 3rd Quarter 2013 Revenue of $42.4M and Net Income ...
13/08/2013Announces 2nd Quarter 2013 Revenue of $44.9M and Net Income ...
14/05/2013Announces 1st Quarter 2013 Revenue of $43.1M and Net Income ...
26/04/2013Amends Annual Meeting Business in Response to ISS Comments
26/03/2013Announces 2012 Revenue of $187.1 Million and Net Income of $...
14/11/2012Announces Third Quarter 2012 Revenue of $72.9 Million and Ne...
15/10/2012and Prodigy Agree to Friendly Business Combination
15/10/2012and Prodigy Agree to Friendly Business Combination
15/10/2012and Prodigy Agree to Friendly Business Combination
04/09/2012Announces Updated PEA for the San Antonio Project, Projected...
15/08/2012Announces Record Production, Record Revenue and Record Earni...
15/05/2012Announces First Quarter 2012 Revenue of $24.4 Million and Ne...
08/05/2012Provides Exploration Update on San Antonio and La Colorada
25/04/2012for Annual and Special Meeting of Shareholders
30/03/2012Announces 2011 Revenue of $105 Million and Net Income of $26...
14/03/2012Added to the S&P/TSX Composite Index
27/02/2012Announces 2012 Project Initiatives
09/01/2012Announces the La Colorada Project on Track for Production in...
28/11/2011(El Castillo)Reports on Metallurgical Test Work for El Castillo Sulphide
24/10/2011Increases Measured and Indicated Resource at La Colorada to ...
14/09/2011to be Included in the S&P TSX SmallCap Index
15/08/2011Reports Q2 2011 Revenue of $21.6 Million Net Income of $5.2 ...
15/06/2011Provides Update on 2011 Drilling at La Colorada; Board Appro...
06/06/2011Reports Q1 2011 Revenue of $25.7 Million
20/05/2011Announces Intent to Terminate Registration Under U.S. Securi...
09/05/2011s Resource for San Antonio
07/04/2011Begins Resource Expansion Drilling at the La Colorada Projec...
31/03/2011Announces Q4 Revenue of $19.9 Million as Part of Year End Fi...
16/03/2011to Begin Trading on the S&P Canadian Index Operations
25/01/2011Shareholders and Pediment Gold Corp Shareholders Approve Bus...
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TORONTO (AR.TO)
0,410+0.00%
TORONTO
CA$ 0,410
18/04 17:00 -
0%
Cours préc. Ouverture
0,410 0,410
Bas haut
0,405 0,415
Année b/h Var. YTD
0,230 -  0,430 -2,38%
52 sem. b/h var. 52 sem.
0,230 -  0,720 -32,79%
Volume var. 1 mois
2 718 820 32,26%
24hGold TrendPower© : -44
Produit Gold
Développe
Recherche
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 15/02/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
2024-32,79%
202317,31%0,770,42
2022-77,19%2,760,33
2021-16,79%4,091,90
202048,11%3,420,76
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,62 AU$-0,91%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
11,04 US$+1,38%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,54 GBX-2,53%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,52 CA$+6,78%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
16,05 CA$+2,62%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+2,13%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,20 AU$+7,89%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,90 CA$+1,60%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
51,43 US$-0,46%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,03 AU$+0,00%Trend Power :