Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en
Dans la même rubrique
Dundee Precious Metals Announces 2012 Second Quarter Results and Updated 2012 Guidance
Published : August 01, 2012

- Continued solid operating performance at Chelopech

- Weaker metal prices partially offset by hedging and strong US dollar

- Accelerated maintenance and operational enhancements at NCS helped mitigate Q2 impact of Namibian Government's directives and supported July approval to begin increasing production

- Existing expansion, upgrade, development and exploration projects generally on track

- Solid financial position with $140 million in cash to support current capital requirements

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Canada | Copper | Dollar | Precious Metals | Zinc |

TORONTO, ONTARIO--(Marketwire - Aug. 1, 2012) -

(All monetary figures are expressed in U.S. dollars unless otherwise stated)

Dundee Precious Metals Inc. ("DPM" or the "Company") (News - Market indicators)(TSX:DPM.WT.A) today reported second quarter 2012 adjusted net earnings (1) of $9.4 million ($0.08 per share) compared to $6.0 million ($0.05 per share) for the same period in 2011. Reported second quarter 2012 net earnings attributable to common shareholders were $9.6 million ($0.08 per share) compared to $9.1 million ($0.07 per share) for the same period in 2011. Adjusted net earnings in the first six months of 2012 were $40.7 million ($0.33 per share) compared to $15.8 million ($0.13 per share) for the same period in 2011. Net earnings attributable to common shareholders in the first six months of 2012 were $17.8 million ($0.14 per share) compared to $23.2 million ($0.19 per share) for the same period in 2011. 

The quarter over quarter increase in adjusted net earnings was driven by higher volumes of payable gold and copper in concentrate sold, a stronger U.S. dollar and higher gold prices. These favourable variances were partially offset by lower copper prices, the deferral of Deno copper concentrate shipments to the second half of the year, lower volumes of concentrate smelted at NCS as a result of annual maintenance of the Ausmelt furnace, and higher exploration and administrative expenses, mainly related to Avala and Dunav. The increase in gold and copper sold primarily reflected an increase in production at Chelopech with the continued ramp-up of the mine expansion. Net earnings attributable to common shareholders were also impacted by unrealized net gains of $6.9 million (2011 - $0.3 million) on derivative commodity contracts and unrealized mark-to-market losses in respect of the Company's Sabina Gold & Silver Corp. ("Sabina") special warrants of $6.7 million (2011 - unrealized gains of $2.0 million).

The increase in adjusted net earnings in the first six months of 2012 relative to the same period in 2011 was due primarily to the same factors affecting the quarter. Net earnings attributable to common shareholders were also impacted by several items, including unrealized losses on derivative commodity contracts of $7.7 million (2011 - $3.7 million) and unrealized losses related to the Company's Sabina special warrants of $15.2 million (2011 - unrealized gains of $5.8 million).

"Chelopech continues to deliver solid operating and financial results and is doing an excellent job managing its expansion project, which is expected to be completed under budget early in the fourth quarter. With the completion of the lead circuit at Deno Gold in the third quarter, copper concentrate deliveries should return to normal levels," said Jonathan Goodman, President and CEO. "Our strategy to expand and upgrade our NCS facilities remains unchanged. We are continuing to advance our detailed planning as well as our existing capital projects and are pleased with the discussions and support we are receiving from the Namibian Government. Overall, I am pleased with the progress we are making across the organization and, with $140 million in cash and a solid balance sheet, we are in a strong financial position to support our growth initiatives."

Adjusted EBITDA (1) in the second quarter and first six months of 2012 was $19.5 million and $60.3 million, respectively, compared to $14.6 million and $33.8 million in the corresponding periods in 2011. These increases were driven by the same factors affecting adjusted net earnings.

Concentrate production for the three and six months ended June 30, 2012 was 30,479 tonnes and 67,457 tonnes, respectively, representing an 8% and 42% increase relative to the corresponding periods in 2011 due primarily to higher volumes of ore mined and processed at Chelopech as the mine production continues to ramp-up. This was partially offset by lower concentrate production at Deno Gold due primarily to lower copper and zinc grades and reduced loading and haulage equipment availability. Concentrate smelted in the second quarter and first six months of 2012 of 25,822 tonnes and 67,746 tonnes, respectively, was 34% and 13% lower than the corresponding periods in 2011 due primarily to NCS advancing its annual maintenance of the Ausmelt furnace, which was originally scheduled in the third quarter of 2012, to the second quarter, to mitigate the impact of the Namibian Minister of Environment and Tourism's (the "Minister") directive to reduce production by 50%, as announced on April 30, 2012.

Deliveries of concentrates for the three and six months ended June 30, 2012 were 33,584 tonnes and 67,753 tonnes representing a 34% and 39% increase, respectively, relative to the corresponding periods in 2011 due to the ramp-up of the mine expansion at Chelopech, partially offset by lower deliveries of copper concentrate produced at Deno Gold as a result of the majority of its shipments being scheduled for the second half of 2012 following the installation of the new lead circuit. Payable copper and gold in concentrate sold were up between 38% and 50% relative to the corresponding periods in 2011 due primarily to increased production at Chelopech and higher gold grades. Payable zinc and silver in the second quarter and first six months of 2012 were negatively impacted by lower volumes of ore mined and lower grades at Deno Gold.

Consolidated cash cost of sales per ounce of gold sold, net of by-product credits, in the second quarter of 2012 was $176 compared to $65 in the second quarter of 2011. The quarter over quarter increase was due primarily to lower copper prices partially offset by higher aggregate volumes of payable gold and copper in concentrate sold and the favourable impact of a stronger U.S. dollar on operating expenses. Cash cost of sales per ounce of gold sold, net of by-product credits, in the first six months of 2012 was $32 compared to $50 in the same period in 2011. This decrease was due primarily to higher aggregate volumes of payable gold and copper and a stronger U.S. dollar partially offset by lower copper prices.

Cash provided from operating activities, before changes in non-cash working capital, during the second quarter and first six months of 2012 of $7.0 million and $55.1 million, respectively, was $10.0 million lower and $16.2 million higher than the corresponding prior year periods due to the same factors affecting adjusted net earnings and higher income tax payments.

Capital expenditures in the second quarter and first six months of 2012 were $33.2 million and $59.0 million, respectively, compared to $25.6 million and $48.8 million in the corresponding periods in 2011. These increases were due primarily to increased construction activities in connection with NCS' capital program to increase capacity and improve environmental performance and operational efficiency.

The permitting phase of the Krumovgrad Project was significantly advanced in the period with the signing of the Concession Agreement with the Bulgarian Ministry of Economy, Energy and Tourism and the positive final decision of the Bulgarian Supreme Administrative Court on the preemptive execution of the environmental impact assessment.

Exploration programs at and around the Company's existing sites in Bulgaria and Armenia continue to advance the project pipeline, with the goal of delineating additional Mineral Resources and Reserves, for the long-term future of the Company. Exploration programs in Serbia, through DPM's interests in Avala and Dunav, and in Nunavut, through Sabina, continue to look promising.

As at June 30, 2012, DPM maintained a solid financial position with minimal debt, representing 10% of total capitalization, a consolidated cash position of $139.6 million and an investment portfolio valued at $55.3 million.

The feasibility study for the acid plant in Namibia was completed in the second quarter of 2012 and the first phase of this project, comprising basic engineering, site preparation, final costing and detailed scheduling, has been awarded to Outotec, the global leader in sulphuric acid plant design and delivery. The capital cost estimate for the acid plant, based on the Outotec tender, is approximately $170 million, which includes a 30% contingency and excludes offsite infrastructure costs. Based on expected annual smelter production capacity of 240,000 to 310,000 tonnes of concentrate, the acid plant will produce in the range of 270,000 to 340,000 tonnes of sulphuric acid. This project is expected to be financed from DPM's current cash position and free cash flow generation which, even at significantly weaker commodity prices, is sufficient to satisfy its existing operating and capital requirements. Commissioning is currently expected to take place during the third quarter of 2014.

A preliminary economic assessment ("PEA") for the pyrite recovery project at Chelopech, completed in July 2012, has confirmed the potential of both recovering the pyrite as a secondary concentrate, and the on-site treatment of the pyrite. At the expanded annual mine production rate of 2 million tonnes, the PEA has confirmed the potential to recover approximately 400,000 tonnes of pyrite concentrate from the mill feed as a separate concentrate product in addition to the copper concentrate already produced. This pyrite concentrate could contain between 75,000 and 90,000 ounces of gold, 130,000 to 190,000 ounces of silver and 4.5 million to 6.0 million pounds of copper. The pyrite project is expected to be implemented in two stages. The first stage is a pyrite concentrate circuit, which includes a new flotation, thickening and filtration installation in the existing mill facility. The first stage requires minimal capital and permitting and can immediately generate a pyrite concentrate for sale. The second stage would be the construction of a pressure oxidation process facility, which is expected to be done in two phases. Completion of a feasibility study and environmental permitting is expected to take up to two years from initial start in early 2013. Preliminary capital cost estimates are as follows: i) $22 million for the first stage, ii) $93 million for the first phase of the second stage, and iii) $87 million for the second phase of the second stage. 

On July 10, 2012, the Minister approved an immediate increase in production to 75% of the smelter's normal operating capacity over the balance of 2012, up from the 50% rate specified under the Government's directive issued in April 2012. At this level, NCS is capable of processing all current and future concentrate production by Chelopech. Depending on the outcome of a further audit to measure fugitive emissions inside the converter aisle, NCS will either be permitted to return to full production or to remain operating at 75% of its normal operating capacity over the balance of 2012 until further improvements on the fume extraction systems are completed. The Committee will meet on a regular basis with NCS to discuss progress.

Mr. Anthony Walsh joined the board of directors of the Company on July 12, 2012. Mr. Walsh has over 25 years of experience in the mining industry and has held a number of senior positions, including most recently, President and Chief Executive Officer ("CEO") of Sabina, President and CEO of Miramar Mining Corporation and Senior Vice President and Chief Financial Officer of International Corona Corporation. He holds a chartered accountant designation. 

The Company's outlook for 2012 has been updated to reflect the expected production at the smelter based on the existing government directive, lower production at Deno Gold and strong operating results achieved by Chelopech in the first half of 2012.

For 2012, mine output at Chelopech is expected to range between 1.7 million and 1.85 million tonnes of ore, in line with its planned ramp-up to an annualized production rate of two million tonnes of ore. Mine output at Deno Gold is expected to range between 500,000 and 550,000 tonnes. Based on the existing government directive, concentrate smelted at NCS is expected to range between 145,000 and 155,000 tonnes.

The Company's estimated metals contained in concentrate produced for 2012 is set forth in the following table:

Metals contained in concentrate produced: Chelopech Deno Gold Total
       
Gold
(ounces)
110,000 - 120,000 22,000 - 25,000 132,000 - 145,000
Copper
(million pounds)
40.0 - 43.0 2.3 - 2.6 42.3 - 45.6
Zinc
(million pounds)
- 16.0 - 18.0 16.0 - 18.0
Silver
(ounces)
190,000 - 205,000 450,000 - 510,000 640,000 - 715,000

Assuming current exchange rates, 2012 unit cash cost per tonne of ore processed is expected to range between $46 and $50 at Chelopech and between $68 and $73 at Deno Gold. The cash cost per tonne of concentrate smelted at NCS is expected to range between $370 and $390.

For 2012, the Company's approved growth capital expenditures (1) are expected to range between $150 million and $175 million and relate primarily to the mine and mill expansion at Chelopech, the plant upgrade and expansion at NCS, the development work related to the Krumovgrad Gold Project, and exploration or development work being undertaken to enhance underground operations and advance the open pit project at Deno Gold. Sustaining capital expenditures (1) are expected to range between $29 million and $35 million. Further details can be found in the Company's MD&A under the section "2012 Outlook".

(1) Adjusted net earnings, adjusted basic earnings per share and adjusted earnings before interest, taxes, depreciation and amortization ("EBITDA"), and growth and sustaining capital expenditures are not defined under International Financial Reporting Standards ("IFRS"). Presenting these measures from period to period helps management and investors evaluate earnings and cash flow trends more readily in comparison with results from prior periods. Refer to the "Non-GAAP Financial Measures" section of management's discussion and analysis for the three and six months ended June 30, 2012 (the "MD&A") for further discussion of these items, including reconciliations to net earnings attributable to common shareholders and earnings before income taxes.

Key Financial and Operational Highlights
 
  Three Months   Six Months
$ millions, except where noted
Ended June 30,  
2012 2011   2012   2011
Revenue 82.3 69.1   182.3   137.5
Gross profit 28.1 18.8   76.3   40.8
Earnings before income taxes 9.1 9.3   13.5   25.0
Net earnings attributable to common shareholders 9.6 9.1   17.8   23.2
Basic earnings per share 0.08 0.07   0.14   0.19
             
Adjusted EBITDA (1) 19.5 14.6   60.3   33.8
             
Adjusted net earnings (1) 9.4 6.0   40.7   15.8
Adjusted basic earnings per share (1) 0.08 0.05   0.33   0.13
             
Cash flow from operations, before changes in non-cash working capital 7.0 17.0   55.1   38.9
             
Concentrate produced (mt) 30,479 28,263   67,457   47,398
Metals in concentrate produced:            
  Gold (ounces) 34,053 27,907   75,963   47,492
  Copper ('000s pounds) 10,188 8,944   22,422   14,726
  Zinc ('000s pounds) 3,388 5,002   7,831   9,763
  Silver (ounces) 149,058 182,418   336,584   340,084
NCS - concentrate smelted (mt) 25,822 39,274   67,746   77,806
             
Deliveries of concentrates (mt) 33,584 25,059   67,753   48,783
Payable metals in concentrate sold:            
  Gold (ounces) 33,314 22,885   66,899   44,467
  Copper ('000s pounds) 10,215 7,379   20,628   14,104
  Zinc ('000s pounds) 4,117 4,123   7,962   9,154
  Silver (ounces) 96,537 144,630   210,936   279,766
             
Cash cost of sales per ounce of gold sold, net of by-product credits (1)            
  Chelopech 108 80   (50 ) 15
  Deno Gold 1,009 27   826   135
  Consolidated 176 65   32   50
             
(1) Adjusted EBITDA; adjusted net earnings; adjusted basic earnings per share; and cash cost of sales per ounce of gold sold, net of by-product credits are not defined measures under IFRS. Refer to the MD&A for reconciliations to IFRS measures.

A complete set of DPM's condensed interim unaudited consolidated financial statements and the notes thereto, and MD&A for the three and six months ended June 30, 2012, are posted on the Company's website at www.dundeeprecious.com and have been filed on Sedar at www.sedar.com.

An analyst conference call to discuss these results is scheduled for Thursday, August 2, 2012, at 9:00 a.m. (EDT). The call will be webcast live (audio only) at: http://www.gowebcasting.com/3421. Listen only telephone option at 416-340-8061 or North America Toll Free at 1-866-225-0198. Replay available at 905-694-9451 or North America Toll Free at 1-800-408-3053, passcode 6563704. The audio webcast for this conference call will be archived and available on the Company's website at www.dundeeprecious.com.

Dundee Precious Metals Inc. is a well-financed, Canadian based, international gold mining company engaged in the acquisition, exploration, development, mining and processing of precious metals. The Company's principal operating assets include the Chelopech operation, which produces a gold, copper and silver concentrate, located east of Sofia, Bulgaria; the Deno Gold operation, which produces a gold, copper, zinc and silver concentrate, located in southern Armenia; and the Tsumeb smelter, a concentrate processing facility located in Namibia. DPM also holds interests in a number of developing gold properties located in Bulgaria, Serbia, and northern Canada, including interests held through its 51.4% owned subsidiary, Avala Resources Ltd., its 47.3% interest in Dunav Resources Ltd. ("Dunav") and its 10.7% interest in Sabina Gold & Silver Corp. 

Cautionary Note Regarding Forward-Looking Statements

This press release contains "forward-looking statements" that involve a number of risks and uncertainties. Forward-looking statements include, but are not limited to, statements with respect to the future price of gold, copper, zinc and silver, the estimation of mineral reserves and resources, the realization of mineral estimates, the timing and amount of estimated future production and output, costs of production, capital expenditures, costs and timing of the development of new deposits, success of exploration activities, permitting time lines, currency fluctuations, requirements for additional capital, government regulation of mining operations, environmental risks, unanticipated reclamation expenses, title disputes or claims, limitations on insurance coverage and timing and possible outcome of pending litigation. Often, but not always, forward-looking statements can be identified by the use of words such as "plans", "expects", or "does not expect", "is expected", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates", or "does not anticipate", or "believes", or variations of such words and phrases or state that certain actions, events or results "may", "could", "would", "might" or "will" be taken, occur or be achieved.
Forward-looking statements are based on the opinions and estimates of management as of the date such statements are made, and they involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Company to be materially different from any other future results, performance or achievements expressed or implied by the forward-looking statements. Such factors include, among others: the actual results of current exploration activities; actual results of current reclamation activities; conclusions of economic evaluations; changes in project parameters as plans continue to be refined; future prices of gold, copper, zinc and silver; possible variations in ore grade or recovery rates; failure of plant, equipment or processes to operate as anticipated; accidents, labour disputes and other risks of the mining industry; delays in obtaining governmental approvals or financing or in the completion of development or construction activities, fluctuations in metal prices, as well as those risk factors discussed or referred to in Management's Discussion and Analysis under the heading "Risks and Uncertainties" and other documents filed from time to time with the securities regulatory authorities in all provinces and territories of Canada and available at www.sedar.com. Although the Company has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking statements, there may be other factors that cause actions, events or results not to be anticipated, estimated or intended. There can be no assurance that forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Unless required by securities laws, the Company undertakes no obligation to update forward-looking statements if circumstances or management's estimates or opinions should change. Accordingly, readers are cautioned not to place undue reliance on forward-looking statements.



Dundee Precious Metals Inc.
Jonathan Goodman
President and Chief Executive Officer
(416) 365-2408
jgoodman@dundeeprecious.com
or
Dundee Precious Metals Inc.
Hume Kyle
Executive Vice President and Chief Financial Officer
(416) 365-5091
hkyle@dundeeprecious.com
or
Dundee Precious Metals Inc.
Lori Beak
Senior Vice President, Investor & Regulatory Affairs
and Corporate Secretary
(416) 365-5165
lbeak@dundeeprecious.com
Données et statistiques pour les pays mentionnés : Canada | Tous
Cours de l'or et de l'argent pour les pays mentionnés : Canada | Tous

Dundee Precious Metals Inc

PRODUCTEUR
CODE : DPM.TO
ISIN : CA2652692096
CUSIP : 265269-20-9
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Dundee Precious Metals est une société de production minière de zinc et d'or basée au Canada.

Dundee Precious Metals est productrice de zinc, d'or, d'argent et de cuivre en Armenie, en développement de projets d'argent, de cuivre et d'or en Bulgarie.

Son principal projet en production est KAPAN en Armenie, ses principaux projets en développement sont CHELOPECH et KRUMOVGRAD en Bulgarie et son principal projet en exploration est SURDULICA en Bulgarie.

Dundee Precious Metals est cotée au Canada. Sa capitalisation boursière aujourd'hui est 1,9 milliards CA$ (1,4 milliards US$, 1,3 milliards €).

La valeur de son action a atteint son plus bas niveau récent le 22 janvier 2016 à 0,84 CA$, et son plus haut niveau récent le 18 avril 2024 à 10,73 CA$.

Dundee Precious Metals possède 178 440 000 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Dans les médias de Dundee Precious Metals Inc
27/02/2019Exyn introduces robots into Dundee Precious Metals' gold min...
13/04/2010Discovers New Gold Deposits in Bulgaria
Financements de Dundee Precious Metals Inc
09/10/2013Issued Shares and Warrants of Sabina Gold & Silver Corp. on ...
11/06/2013Announces Result of Early Warrant Exercise Program
Nominations de Dundee Precious Metals Inc
21/03/2013DPM Board Announces Executive Transition and Senior Officer ...
14/11/2012DPM Board Announces Senior Appointment
19/09/2012Eira Thomas Joins Dundee Precious Metals' Board of Directors
Rapports Financiers de Dundee Precious Metals Inc
15/10/2013NOTICE: DPM 2013 Third Quarter Financial Results
01/08/2013Announces 2013 Second Quarter Results
10/07/2013NOTICE: DPM 2013 Second Quarter Financial Results
09/05/2013Announces 2013 First Quarter Results
17/04/2013NOTICE: DPM 2013 First Quarter Financial Results
15/02/2013Announces 2012 Fourth Quarter and Annual Results and 2013 Gu...
24/01/2013NOTICE: DPM Fourth Quarter and Year End 2012 Results
07/11/2012Announces 2012 Third Quarter Results
18/10/2012NOTICE: Dundee Precious Metals 2012 Third Quarter Results
01/08/2012Announces 2012 Second Quarter Results and Updated 2012 Guida...
09/07/2012NOTICE: DPM 2012 Second Quarter Results
08/05/2012DPM First Quarter 2012 Financial Results
14/10/2011NOTICE: DPM Third Quarter 2011 Results
11/07/2011NOTICE: DPM Second Quarter 2011 Results
27/04/2011Notice: DPM Annual General Meeting and 2011 First Quarter Re...
23/02/2011DPM Reports Fourth Quarter 2010
Projets de Dundee Precious Metals Inc
16/09/2013s 2013 Production Guidance
16/05/2013(Chelopech)Confirms Fundamentals Unchanged; Chelopech Mine Operating at...
10/09/2012(Chelopech)DPM Files Technical Report on Chelopech Pyrite Recovery Proj...
13/01/2012(Krumovgrad)Files Technical Report on Krumovgrad Gold Project
24/11/2011(Krumovgrad)Bulgarian Government Approves EIA for DPM's Krumovgrad Gold ...
23/02/2011(Chelopech)DPM Reports Fourth Quarter 2010 and Year-End Results and Upd...
Communiqués de Presse de Dundee Precious Metals Inc
28/07/2016Dundee Precious Metals Announces 2016 Second Quarter Results
25/07/2016Dundee Precious Metals Announces Power Blackout in Namibia R...
11/07/2016DPM Announces Closing of C$54.65 Million Bought Deal Financi...
07/07/2016Dundee Precious Metals Announces Second Quarter Production R...
20/06/2016DPM Announces C$50 Million Bought Deal Financing
21/12/2015Dundee Precious Metals Announces 15% Increase to Measured an...
21/12/2015AVALA RESOURCES STARTS DRILLING ON THE LENOVAC PROJECT
30/11/2015AVALA RESOURCES ANNOUNCES EARN-IN AND JOINT VENTURE AGREEMEN...
19/11/2015Dundee Precious Metals Announces Approval of Main Detailed D...
05/11/2015Dundee Precious Metals Announces 2015 Third Quarter Results
04/11/2015Dundee Precious Metals Announces Changes to Board of Directo...
08/10/2015Dundee Precious Metals Announces Third Quarter Production Re...
15/09/2015Dundee Precious Metals Announces Maintenance of the Tsumeb S...
30/07/2015Dundee Precious Metals Announces 2015 Second Quarter Results
09/07/2015Dundee Precious Metals Announces Second Quarter Production R...
14/04/2015Dundee Precious Metals Announces First Quarter Production Re...
14/04/2015Announces First Quarter Production Results and Provides Noti...
31/03/2015Dundee Precious Metals Announces Reserve and Resource Update...
31/03/2015Announces Reserve and Resource Update for 2015
18/03/2015Dundee Precious Metals Announces Commencement of Annual Tsum...
18/03/2015Announces Commencement of Annual Tsumeb Smelter Shutdown
26/02/2015AVALA RESOURCES PROVIDES AN EXPLORATION UPDATE
18/02/2015Tags to Riches: Mining Company Tracks Production With Sensor...
13/02/2015Dundee Precious Metals Announces 2014 Fourth Quarter and Ann...
13/02/2015Dundee Precious Metals Announces 2014 Fourth Quarter and Ann...
22/01/2015NOTICE: Dundee Precious Metals 2014 Fourth Quarter and Year ...
14/01/2015Dundee Precious Metals Announces Record Fourth Quarter Produ...
14/01/2015(Chelopech)Announces Record Fourth Quarter Production at Chelopech and ...
06/11/2014Dundee Precious Metals Announces 2014 Third Quarter Results
05/11/2014Dundee Precious Metals Announces 2014 Third Quarter Results
16/10/2014NOTICE: Dundee Precious Metals 2014 Third Quarter Results
16/10/2014NOTICE: Dundee Precious Metals 2014 Third Quarter Results
08/10/2014Dundee Precious Metals Announces a Favourable Preliminary Ec...
08/10/2014Dundee Precious Metals Provides Third Quarter 2014 Productio...
03/10/2014Dundee Precious Metals Acquires Shares and Warrants of Avala...
30/07/2014Dundee Precious Metals Announces 2014 Second Quarter Results
14/07/2014NOTICE: DPM 2014 Second Quarter Results
10/07/2014Dundee Precious Metals Announces Krumovgrad Municipal Counci...
10/07/2014Dundee Precious Metals Announces Krumovgrad Municipal Counci...
26/06/2014Dundee Precious Metals Increases Revolving Credit Facility b...
20/05/2014Dundee Precious Metals Strengthens Senior Management Team
29/08/2013Announces First Underground Mineral Resource Estimate for th...
24/07/2012Reports on Progress of Acid Plant at Smelter in Namibia
30/04/2012Receives First Contact from Namibian Government on Tsumeb Sm...
23/04/2012DPM Exercises Warrants of Dunav Resources Ltd.
16/02/2012DPM Announces 2011 Deno Gold Open Pit Project and Undergroun...
26/01/2012(Krumovgrad)Bulgarian Court Dismisses Appeal of DPM's Krumovgrad Mining ...
30/11/2011(Krumovgrad)DPM: New Krumovgrad Feasibility Study Confirms Low Cash Cost...
15/09/2011Improves Safety and Operational Efficiency With AeroScout Re...
02/09/2011Dunav Resources and Dundee Precious Metals Complete Transact...
23/08/2011DPM to Acquire Shares and Warrants of Dunav Resources Ltd. o...
10/05/2011(Chelopech)DPM and Chelopech Mining Raise Final US$14.5 Million of Chel...
23/03/2011DPM Exercises Warrants of Avala Resources Ltd.
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TORONTO (DPM.TO)
10,73+0.37%
TORONTO
CA$ 10,73
18/04 17:00 0,040
0,37%
Cours préc. Ouverture
10,69 10,77
Bas haut
10,69 10,94
Année b/h Var. YTD
7,98 -  10,73 27,28%
52 sem. b/h var. 52 sem.
7,98 -  10,73 5,51%
Volume var. 1 mois
369 823 7,95%
24hGold TrendPower© : -11
Produit Copper - Gold - Silver - Zinc
Développe Copper - Gold - Silver
Recherche Molybdenum
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 23/02/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
202426,38%
202330,41%9,9210,00
2022-14,00%8,415,41
2021-17,27%9,956,99
202058,30%9,9610,03
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,82 AU$+1,69%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
11,04 US$+1,38%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,55 GBX+2,22%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,52 CA$+6,78%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
16,05 CA$+2,62%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+2,13%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,19 AU$-7,32%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,90 CA$+1,60%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
51,43 US$-0,46%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,03 AU$+0,00%Trend Power :