Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en
Sabina Gold & Silver Announces First Results From 2013 Back River Drilling
Published : April 30, 2013

Llama hole 13GSE271 returns 9.66g/t Au over 25.0 m and hole 13GSE269 returns 1572g/t over 0.90m and 8.29g/t over 24.40m in the proposed pit

Advance Notice Policy Adopted by Board of Directors

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Canada | K Street | Report | Zinc |

VANCOUVER, BRITISH COLUMBIA--(Marketwired - April 30, 2013) - Sabina Gold & Silver Corp (News - Market indicators) ("Sabina" or the "Company") is pleased to announce initial drilling results from its 2013 exploration program on its 100% owned Back River project in Nunavut and announces the adoption of an Advance Notice Policy (the "Advance Notice Policy"). 

"Drilling is going very well at our Back River Gold Project and we are off to a good start with some impressive results at Llama and George," said Rob Pease, President & CEO "To facilitate our commitment to aggressively advance the development of Back River, our 2013 program is focussed on work to complete the on-going pre-feasibility study (PFS) and to support a potential subsequent feasibility study (FS) and completion and filing of a draft environmental impact statement ("EIS") by year end. We believe in the long term outlook of our assets and our sector and will keep working to create shareholder value despite a challenging market sentiment. The Board of Directors has also adopted an advance notice polity to ensure that all shareholders are provided with adequate notice of board nominees. We look forward to providing further updates throughout the year."

Back River

After an early seasonal start up in mid-February drilling at Back River is proceeding as planned with five drill rigs running at the Goose project area and three at George.

In the Goose project area, drilling at Llama is currently focussed on converting resources to the measured and indicated category in the proposed pit. Drilling at Llama is progressing well and continues to demonstrate confidence in supporting strong zones of shallow high grade gold mineralization amenable to open pit extraction. 

A total of 30 out of 33 holes are now complete with the intention of converting a significant portion of the mineralization to the measured category. Highlights supporting this process includes holes 13GSE263 returning 19.65g/t over 5.13m, 13GSE269 returning 1572g/t over 0.90m and 8.29g/t over 24.40m, and hole 13GSE271 returning 9.66g/t over 25.00m. 

Two priority exploration targets at the Goose project area include; Boomerang, a shallower target located southwest of the Goose Main deposit where indications of favorable structure and alteration indicate potential for mineralization, and the Wing zone, located close to the Llama deposit, where drilling from 2012 intersected encouraging gold values from a number of drill holes including drill hole 12GSE226 which returned 12.68 g/t over 15.45 m. Drilling on the Wing zone is underway and Boomerang target drilling will commence once infill drilling is complete.

George Extension Drilling Success

At the George project area, seven drill holes have been completed. Drilling is planned to focus on exploration of new mineral zones, extensions to existing mineralized zones and completion of a geo-mechanical drill program at the Locale 1, 2 and LCP deposit areas.

Drilling at George is currently focused on better defining mineralized extensions at the Local 2 deposit and is testing high potential extension gold targets close to the existing resources. Initial success in extensional drilling is now confirmed with the return of positive gold results at both the Locale 2 Gap and the Locale 2 Hinge targets. Highlights from this portion of the program include the first hole at the Locale 2 Hinge target, 13GRL095, returning 7.43g/t over 9.00m and an additional 9.35g/t over 7.75m further down hole. Success at the Locale 2 Gap target includes holes 13GRL097 returning 5.53g/t over 5.10m and 13GRL098 returning 9.00g/t over 3.80m. Drilling continues with three diamond drill rigs at the George property on priority targets with further preparations being made for a near term transition to brownfields exploration target follow up from significant successes in 2012.

Exploration drilling later in the year is planned at the Fold Forest target area where previous drilling results, for example 2.29 g/t over 13.0 m in hole 12GRL047 and 5.92 g/t over 5.0 m in hole 12GRL046, indicate the potential in the target area for expanding open pit mineralization over a broader area.

Pre-Feasibility Update

To further support the development of the Back River project, significant engineering and environmental studies are underway. 

  • Ongoing metallurgical, geo-technical and geo-mechanical investigations are underway to provide higher confidence in the deposits and to better define mine sequencing.
  • Pre-feasibility open pit and underground mine designs have been completed and are being reviewed and incorporated into an initial mining schedule, focus of the mining schedule is on open pit mine development and stockpile management.
  • Process plant flow sheets, layouts and preliminary design criteria are complete, equipment specifications and engineering for the process plant and other site infrastructure (tailings storage facility, truck shop, administration building, camp, etc.) are underway.
  • Trade off studies on alternative lay down/port areas are underway and substantially completed.
  • Extensive environmental baseline monitoring and data collection, which started in 2010, is ongoing and expected to satisfy all requirements for the draft EIS. This information will enable the Company to form a framework for an environmental management system to minimize the projects impacts on employee health and safety, water and air quality, waste management and reclamation.

A number of camp improvement projects are also currently underway on site. A quarry has been established and a mobile crushing plant commissioned in close proximity to the Goose camp to provide crushed rock/gravel for the construction of an all-weather airstrip at Goose Camp. Crushed rock/gravel will also be used to facilitate longer term fuel storage and additional improvements to camp safety.

Community engagement will also continue with plans for multiple visits to all involved communities in 2013. Sabina has launched www.backriverproject.com to support its goal of working closely with the Kitikmeot residents, communities and stakeholders.

Advance Notice Policy

Sabina is committed to: (i) facilitating an orderly and efficient annual general or, where the need arises, special meeting, process; (ii) ensuring that all shareholders receive adequate notice of the director nominations and sufficient information with respect to all nominees; and (iii) allowing shareholders to register an informed vote having been afforded reasonable time for appropriate deliberation. To this end, the Board of Directors has adopted the Advance Notice Policy.

The purpose of this Policy is to provide shareholders, directors and management of the Corporation with a clear framework for nominating directors. This Policy fixes a deadline by which holders of record of common shares of the Corporation must submit director nominations to the Corporation prior to any annual or special meeting of shareholders and sets forth the information that a shareholder must include in the notice to the Corporation for the notice to be in proper written form in order for any director nominee to be eligible for election at any annual or special meeting of shareholders. No person will be eligible to be elected as a director unless nominated in accordance with the policy.

The Company believes that this Policy is in the best interests of the Company, its shareholders and other stakeholders. This policy will be subject to an annual review, and will reflect changes as required by securities regulatory agencies or stock exchanges, or so as to meet industry standards. The Company will be seeking shareholder ratification for this policy at the next annual general meeting of shareholders to be held at the Metropolitan Hotel in Vancouver on June 13, 2013.

The full policy can be found on the Company's website and at www.sedar.com.

Qualified Persons

The Qualified Person as defined by NI 43-101 as pertains to the Back River Project, is Angus Campbell, P. Geo, Vice-President Exploration for the Company.

True widths for the intercepts reported in this news release have not yet been determined.

Diamond drill core was sent to TSL Laboratories in Saskatoon, Sask. Quality control is monitored on a continual basis and utilizes a system of standards, blanks and duplicates to ensure analytical accuracy. The protocols and procedures used in 2013 are the same as those used in earlier campaigns by Sabina Gold & Silver Corp. and have been deemed appropriate in the Company's 43-101 compliant resource reports.

SABINA GOLD & SILVER CORP.

Sabina Gold & Silver Corp. is an emerging gold developer with district scale, world class assets in one of the world's newest, most politically stable mining jurisdictions: Nunavut, Canada.

Sabina's primary assets, all located in Nunavut, consist of: the Back River Gold Project, currently in the pre-feasibility and permitting phase; the Wishbone Claims, a vastly prospective grass roots project; and the Hackett River Silver Royalty, a silver production royalty on Xstrata Zinc's Hackett River project comprising 22.5% of the first 190 million ounces produced and 12.5% of all the silver produced thereafter. The company ended December 31, 2012 with approximately $116 million in cash.

All news releases and further information can be found on the Company's website at www.sabinagoldsilver.com or on SEDAR at www.sedar.com.

Forward Looking Statements

Statements relating to future operations at the Back River Project and the Hackett River Project and the expected results of this work are forward-looking statements within the meaning of securities legislation of certain Provinces in Canada. Forward looking statements are statements that are not historical facts and are generally, but not always, identified by the words "expects," "plans," "anticipates," "believes," "intends," "estimates," 'projects," "potential" and similar expressions, or that events or conditions "will," "would," "may," "could" or "should" occur. Information inferred from the interpretation of drilling results may also be deemed to be forward looking statements, as it constitutes a prediction of what might be found to be present when and if a project is actually developed. These forward-looking statements are subject to a variety of risks and uncertainties which could cause actual events or results to differ materially from those reflected in the forward-looking statements, including, without limitation: risks related to fluctuations in metal prices; uncertainties related to raising sufficient financing to fund the planned work in a timely manner and on acceptable terms; changes in planned work resulting from weather, logistical, technical or other factors; the possibility that results of work will not fulfill expectations and realize the perceived potential of the Company's properties; risk of accidents, equipment breakdowns and labour disputes or other unanticipated difficulties or interruptions; the possibility of cost overruns or unanticipated expenses in the work program; the risk of environmental contamination or damage resulting from Sabina's operations and other risks and uncertainties, including those described in Sabina's Annual Report for the year ended December 31, 2012.

Forward-looking statements are based on the beliefs, estimates and opinions of Sabina's management on the date the statements are made. Sabina undertakes no obligation to update these forward-looking statements should management's beliefs, estimates or opinions, or other factors, should change.

This news release has been authorized by the undersigned on behalf of Sabina Gold & Silver Corp.

Rob Pease, President & CEO
930 West 1st Street, Suite 202
North Vancouver, BC V7P 3N4

 
Llama infill Assays
Hole Id   Area Section Easting Northing Depth From
 (m)
To
 (m)
Length
 (m)
Au
 (g/t)
  Zone
Name
13GSE263   LL 5125 428769 7272313 71.0 19.00 20.00 1.00 4.08   undefined
              43.00 48.13 5.13 19.65   Main East
including             47.00 47.50 0.50 120.70   Main East
              54.00 56.00 2.00 1.24   Main East
              58.25 59.10 0.85 4.29   Main East
13GSE266   LL 5125 428754 7272304 89.0 40.50 44.64 4.14 5.41   Undefined
including             43.12 43.62 0.50 37.41   Undefined
              75.00 78.00 3.00 1.58   Main East
13GSE267   LL 5125 428753 7272303 122.0 81.00 83.00 2.00 3.16   Main East
              92.50 94.40 1.90 1.57   Main East
              97.43 108.00 10.57 1.53   Main East
13GSE269   LL 5125 428705 7272285 125.0 69.00 69.50 0.50 12.28   Undefined
              87.10 88.00 0.90 1572.00   Undefined
              89.00 90.00 1.00 1.47   Undefined
              93.30 117.70 24.40 8.29   East Limb
including             94.00 102.30 8.30 19.01   East Limb
and             116.80 117.70 0.92 18.72   East Limb
13GSE271   LL 5125 428676 7272265 160.5 117.65 118.30 0.65 4.05   East Limb
              122.00 147.00 25.00 9.66   East Limb
including             122.00 125.00 3.00 16.13   East Limb
and             129.00 137.00 8.00 20.55   East Limb
 
George Assays - Locale 2
                         
Hole Id   Area Section Easting Northing Depth From
 (m)
To
 (m)
Length
 (m)
Au
 (g/t)
  Zone
Name
13GRL093   Locale 2 Gap 3860 388237 7312615 197 12.50 13.50 1.00 15.09   L2 Gap
              26.30 28.50 2.20 4.14   L2 Gap
              41.05 41.55 0.50 5.16   L2 Gap
              80.50 81.00 0.50 1.25   L2 Gap
              85.75 88.55 2.80 1.42   L2 Gap
              95.60 96.40 0.80 1.47   L2 Gap
              127.40 128.30 0.90 1.75   L2 Gap
13GRL094   Locale 2 Gap 3890 388219 7312638 176 19.80 20.80 1.00 3.21   L2 Gap
              30.10 31.10 1.00 2.38   L2 Gap
              42.25 43.30 1.85 1.48   L2 Gap
              98.50 99.50 1.00 6.19   L2 Gap
13GRL095   Locale 2 Hinge 4280 387748 7312746 649 511.80 520.80 9.00 7.43   L2 Hinge
              584.65 592.40 7.75 9.35   L2 Hinge
              614.50 622.05 7.55 3.07   L2 Hinge
              635.95 639.05 3.10 5.91   L2 Hinge
including             635.95 636.55 0.60 23.22   L2 Hinge
              640.55 641.55 1.00 1.06   L2 Hinge
              645.40 648.00 2.60 1.22   L2 Hinge
13GRL096   Locale 2 Gap 3860 388218 7312596 278 126.20 132.70 6.50 1.50   L2 Gap
              126.20 126.75 0.55 6.17   L2 Gap
              159.00 160.00 1.00 9.24   L2 Gap
              162.00 163.00 1.00 1.32   L2 Gap
              172.00 173.00 1.00 4.73   L2 Gap
              177.00 178.00 1.00 1.13   L2 Gap
              180.00 181.00 1.00 1.35   L2 Gap
              183.00 184.00 1.00 1.30   L2 Gap
              188.00 189.00 1.00 3.53   L2 Gap
              196.00 197.00 1.00 1.59   L2 Gap
13GRL097   Locale 2 Gap 3890 388199 7312620 251 53.40 56.70 3.30 2.10   L2 Gap
              73.60 74.60 1.00 2.90   L2 Gap
              84.30 85.30 1.00 1.13   L2 Gap
              124.70 125.70 1.00 1.06   L2 Gap
              128.70 133.80 5.10 5.53   L2 Gap
including             130.70 132.00 1.30 18.43   L2 Gap
              142.00 143.00 1.00 2.04   L2 Gap
              162.30 164.00 1.70 1.50   L2 Gap
13GRL098   Locale 2 Gap 3860 388155 7312544 195 89.00 90.00 1.00 2.28   L2 Gap
              140.00 144.80 4.80 9.00   L2 Gap
              176.00 177.00 1.00 5.37   L2 Gap

To view the maps accompanying this press release please click on the following link: http://media3.marketwire.com/docs/SBB0430.pdf



Sabina Gold & Silver Corp.
Nicole Hoeller
Vice-President, IR
1 888 648-4218
nhoeller@sabinagoldsilver.com
www.sabinagoldsilver.com
Données et statistiques pour les pays mentionnés : Canada | Tous
Cours de l'or et de l'argent pour les pays mentionnés : Canada | Tous

Sabina Gold & Silver Corp

EN DÉVELOPPEMENT
CODE : SBB.TO
ISIN : CA7852461093
CUSIP : 785271 10 7
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Sabina est une société développant des projet miniers d'or et d'argent basée au Canada.

Sabina est en développement de projets d'or, d'argent, de cuivre, de plomb et de zinc au Canada, et détient divers projets d'exploration au Canada.

Son principal projet en développement est HACKETT RIVER au Canada et ses principaux projets en exploration sont DEL NORTE, ROCKSTONE, GOLDEN SIDEWALK, SKINNER, BACK RIVER - GOOSE LAKE, BACK RIVER, BACK RIVER - GEORGE LAKE, NEWMAN-MADSEN et WISHBONE au Canada.

Sabina est cotée au Canada, aux Etats-Unis D'Amerique et en Allemagne. Sa capitalisation boursière aujourd'hui est 482,9 millions CA$ (386,1 millions US$, 338,2 millions €).

La valeur de son action a atteint son plus bas niveau récent le 12 juillet 2002 à 0,05 CA$, et son plus haut niveau récent le 21 avril 2011 à 7,63 CA$.

Sabina possède 223 580 000 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Dans les médias de Sabina Gold & Silver Corp
22/04/2010Sabina Silver Corp. Business Summary
21/04/2010Emerging Precious Metals Stock Analysis
Rapports annuels de Sabina Gold & Silver Corp
2007 Annual report
Financements de Sabina Gold & Silver Corp
01/03/2011Completes $97.5 Million Financing
Nominations de Sabina Gold & Silver Corp
24/10/2011Appoints Rob Pease as New President and CEO and Director of ...
06/04/2011Appoints John Wakeford to Board of Directors
Rapports Financiers de Sabina Gold & Silver Corp
20/03/2015Announces Financial Results for the Year Ended 2014
09/08/2013Reports Q2 Financial Results
09/08/2013Reports Q2 Financial Results
02/04/2013Announces 2012 Year End Financial Results
09/11/2012Announces Q3 2012 Financial Results
14/08/2012Announces Q2 2012 Financial Results
14/05/2012Announces Q1, 2012 Financial Results
30/03/2012Announces 2011 Year End Financial Results
20/11/2008ANNOUNCES Q3FINANCIAL RESULTS
03/09/2008Q2 Financial Results
Projets de Sabina Gold & Silver Corp
13/10/2015Sabina Gold & Silver announces assays from Back River confir...
04/11/2013(Back River)Announces Positive Results From Echo Zone at Back River Proj...
22/10/2013(Back River)Announces Continued Positive Results from the Umwelt Deposit...
09/10/2013(Back River)Announces Positive Preliminary Feasibility Study on Back Riv...
22/08/2013(Back River)Announces Positive Results From the George Project at Back R...
24/07/2013(Back River)drills 18.6m of 19.27 g/t Gold at Back River
24/07/2013(Back River)Announces Positive Results from Umwelt Deposit at Back River...
04/07/2013(Back River)Announces Positive Results from George Property at Back Rive...
23/05/2013(Back River)Announces More Significant Assays From Llama Deposit at Back...
09/05/2013(Hackett River)Reports Glencore Xstrata Discloses New Hackett River Resourc...
30/04/2013(Back River)Announces First Results From 2013 Back River Drilling
14/02/2013(Back River)Announces Significant 2013 Back River Work Program
18/10/2012(Back River)Drilling Continues to Demonstrate Confidence at Back River P...
05/03/2012(Back River)Starts Drilling at Back River Gold Project, Nunavut Canada
14/02/2012(Back River)Mobilizes Back River Camps, Drilling Campaign to Commence Ea...
13/02/2012(Back River)Mobilizes Back River Camps, Drilling Campaign to Commence Ea...
12/01/2012(Back River)Completes Technical Report of Resource Estimate for Back Riv...
13/09/2011(Back River)Reports Continued Expansion at Umwelt & Llama Deposits, Back...
31/08/2011(Back River)Reports More Positive Results at Umwelt on the Back River Go...
25/08/2011(Back River)Reports Continued Positive Results at Back River and Wishbon...
22/07/2011(Back River)Reports Continued Positive Results at Back River Gold Projec...
28/06/2011(Back River - Goose Lake)Reports Umwelt Mineralization Now Extended Over a Strike Len...
31/05/2011(Back River)Announces Buy Back of the R.A. Olson Consulting Ltd. Royalti...
22/05/2011(Hackett River)Reports Positive Results from Early 2011 Drilling at the Hac...
27/04/2011(Back River)Reports Positive Results From Early 2011 Drilling at the Bac...
13/03/2011(Back River)Announces Updated Resource Estimate for Back River Gold Proj...
15/02/2011(Back River)Sabina Gold & Silver Files Updated Technical Report on Back ...
03/02/2011(Back River - Goose Lake)amp; Silver Opens Nunavut Camp for Aggressive 2011 Explorati...
15/09/2008(Hackett River)Hackett River Permitting Process Moves Forward
14/07/2008(Hackett River)Announces Interim Update on Corporate Initiatives on Hackett...
08/01/2008(Hackett River)Sabina drills 3.7 m of 40.28% Zn at Hacket River
Communiqués de Presse de Sabina Gold & Silver Corp
16/06/2016Sabina Gold & Silver Statement On The Nunavut Impact Review ...
10/06/2016Sabina Gold & Silver Announces AGM Voting Results
09/06/2016Sabina Gold & Silver Discovers New Gold Zone and Advanced Hi...
25/05/2016Sabina Gold & Silver Reports Encouraging Metallurgical Optim...
20/05/2016Sabina Closes $32 Million Bought Deal Financing: Enables Con...
02/05/2016Sabina Gold & Silver Corp. Announces C$30 Million Bought Dea...
31/03/2016Sabina Gold & Silver Announces Anna Stylianides Appointed To...
24/03/2016Sabina Gold & Silver Announces Financial Results for the Yea...
20/01/2016Sabina Gold & Silver announces 2016 Budget and Work Plans
25/11/2015Sabina Gold & Silver Corp Completes $2.2 Million Financing
13/10/2015Sabina Gold & Silver Announces Assays from Back River Confir...
14/09/2015Sabina Gold & Silver Announces Positive Initial Project Feas...
13/08/2015Sabina Gold & Silver Announces Q2 Financial Results
29/07/2015Sabina Gold & Silver Commences Feasibility Study Assessing L...
14/07/2015Sabina Completes $1.3 Million Financing
23/06/2015Sabina Gold & Silver Files NI 43-101 Technical Report for Fe...
18/06/2015Sabina Gold & Silver Announces John Wakeford Joins As Adviso...
04/02/2015Sabina Gold & Silver Reports Change in Management
12/01/2015Sabina Gold & Silver Reports On Important Back River Permitt...
12/01/2015Sabina Gold & Silver Reports on Important Back River Permitt...
14/11/2014SABINA GOLD & SILVER ANNOUNCES Q3 2014 FINANCIAL RESULTS $38...
14/11/2014Sabina Gold & Silver Announces Q3 2014 Financial Results
07/10/2014Sabina Gold & Silver Reports on Back River Feasibility Study...
07/08/2014Sabina Gold & Silver Announces Q2 2014 Financial Results
31/07/2014Sabina Gold & Silver Reports Completion of Drilling at Echo ...
25/06/2014Sabina Gold & Silver Completes Sale of Newman-Madsen, Ontari...
14/05/2014Sabina Gold & Silver Announces Q1 2014 Financial Results
13/05/2014Sabina Gold & Silver Announces Sale of Newman-Madsen, Ontari...
28/04/2014Sabina Gold & Silver & Kitikmeot Inuit Association Announce ...
22/04/2014Sabina Gold & Silver Reports Significant Estimated Improveme...
07/04/2014Sabina Gold & Silver Announces 2014 Back River Work Program ...
27/03/2014Sabina Gold & Silver Announces 2013 Year End Financial Resul...
13/03/2014Sabina Gold & Silver Reports Completion Of Hackett River 201...
12/03/2014Sabina Gold & Silver Reports Completion of Hackett River 201...
11/06/2013Completes $20.6 Million Financing
02/10/2012(Back River)Reports Drilling Confirms Thickness and Grade at Back River ...
17/09/2012(Back River)Announces New Shallow High Grade Discovery at Back River Pro...
09/08/2012(Back River)Announces High Grade Drill Results from Umwelt Deposit at th...
19/07/2012(Back River)Announces Continued Positive Drill Results From 2012 Drillin...
09/07/2012(Back River)Initiates Permitting Process at Back River Project, Nunavut;...
26/06/2012Completes $34.5 Million Financing
04/06/2012(Back River)Announces More Positive Drill Results from 2012 Drilling at ...
29/05/2012(Back River)Announces Positive Preliminary Economic Assessment at Back R...
26/04/2012(Back River)Announces High Grade Drill Results from 2012 Drilling at Lla...
23/01/2012Announces Aggressive 2012 Nunavut Work Program
04/10/2011to Set Up Development Trust for the Kitikmeot Region of Nuna...
20/09/2011(Back River)Reports Updated Resource Estimate for the Goose Deposit, Bac...
24/03/2011Announces Memorandum of Understanding With the Nunavut Resou...
03/11/2008New Address
26/08/200825 August 2008
21/08/2008ADDS TO ?NORTHERN? MANAGEMENT TEAM
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TORONTO (SBB.TO)Other OTC (SBBFF)
2,16+0.93%0,760-2.56%
TORONTO
CA$ 2,16
21/04 17:00 0,020
0,93%
Cours préc. Ouverture
2,14 2,12
Bas haut
2,11 2,16
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
2,14 -  2,16 2,37%
Volume var. 1 mois
1 177 929 -%
24hGold TrendPower© : 27
Produit
Développe Copper - Gold - Lead - Silver - Zinc
Recherche Gold - Silver - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 23/01/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
20240,00%
202362,41%2,261,31
2022-8,90%1,830,93
2021-55,62%3,541,23
202070,47%3,380,71
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,82 AU$+1,69%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
11,21 US$+1,54%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,55 GBX+2,59%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,46 CA$-2,38%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
15,84 CA$-1,31%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+0,00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,19 AU$-7,32%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,82 CA$-4,21%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
51,80 US$+0,72%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,03 AU$+0,00%Trend Power :