| | Publié le 10 janvier 2012 | announces New Gold Discovery at Cache Creek (Harlan) Project, Yukon, Canada |
|
Article
|
Commentaires
|
Commenter
|
Notation
|
♥
Suivre la société
|
|
|
|
|
|
|
NEWS RELEASE TSX:GPD January 10, 2012 NR 12-03 www.goldenpredator.com
|
Golden Predator announces New Gold Discovery at Cache Creek (Harlan) Project, Yukon, Canada
Vancouver, British Columbia, January 10th, 2012: Golden Predator Corp. (TSX: GPD) (the �Company�) is pleased to announce a new gold discovery at the Company�s previously undrilled Cache Creek Project (formerly known as the Harlan Project) in the central Selwyn Basin, Yukon, Canada. The initial six hole, 2,029 m diamond drilling program completed in 2011 encountered significant gold mineralization in four of six drill holes with all drill holes intersecting extensive intervals of hydrothermal alteration. Mineralization is not constrained by current drilling and remains open along strike and at depth. Significant results include:
- HAR11-005 with 57.0 m of 0.53 g/t gold from a depth of 3.1 m, plus a second zone of anomalous gold with 39.9 m of 0.49 g/t gold from a depth of 315.2 m; and
- HAR11-006 with 77.4 m of 0.51 g/t gold from a depth of 3.6 m, including 35.63 m of 0.77 g/t gold from a depth of 3.6 m, plus a second intersection with 16.66 m of 2.10 g/t gold from a depth of 117.3 m, including 4.51 m of 6.85 g/t gold.
The Project area consists of 740 quartz claims covering approximately 150 km2 and lying approximately 90 km south of the Osiris discovery of ATAC Resources Ltd. (TSXV: ATC), and presents at least two major drill-ready gold targets: the Vortex and West Porphyry Zones. All drilling to date has been limited to the Vortex Zone. �We are extremely encouraged by the results from Cache Creek,� said Chairman William M. Sheriff. �This is our third discovery from the 2011 drill campaign, following on our 2-headframe finds at the Bohemian-Schooner and Sleeman Zones at our Brewery Creek Project. The wide-spaced nature of the initial 6 holes, coupled with the multiple intercepts in the last two holes and mineralized intervals in excess of 50 m in both, is cause for excitement. We look forward to additional drilling in 2012 on the newly discovered Vortex Zone, as well as initial drill testing of the neighbouring West Porphyry Zone.�Cache Creek Project, Selwyn Basin Yukon The Cache Creek property is located 60 km off the North Canol Road in the Yukon�s central Selwyn Basin and is comprised of 740 quartz claims covering 154.6 km2. In January 2011, Golden Predator optioned 75 claims, covering the area of drilling, from Alexco Resource Corp. with the opportunity to earn a 75% interest in these claims over a 5 year period. Quartz claims covering exposures of silicified and gold mineralized Devonian Earn Group siliciclastics were originally staked in 1997 by Viceroy Minerals following up anomalous gold and arsenic values in stream sediment samples and rock chip and soil geochemical sampling defined two significant gold mineralized zones, Vortex and West Porphyry. Golden Predator�s 2011 exploration program focused solely on the Vortex zone. Drilling is planned to continue on the newly discovered Vortex Zone as well as the untested West Porphyry Zone during 2012.
Cache Creek Project Geology Two zones of mineralization are known to exist on the Project area: the Vortex Zone and the West Porphyry Zone.
Vortex Zone The northwesterly trending Vortex Zone is a 700+ by 200 m target area defined by intense silicification, quartz veining and hydrothermal breccias hosted in northwesterly striking, moderately dipping bedded chert-pebble conglomerate, lithic sandstones and siltstones of the Devonian Earn Group. Northerly and northwesterly trending, multi-phase quartz monzonite and quartz monzonite porphyry dikes and associated hydrothermal breccias intrude the Late Paleozoic sequence and are spatially associated with gold mineralization. The intrusions are thought to be mid-Cretaceous in age related to the regionally important Tombstone Plutonic Suite.
Gold mineralization in the Vortex Zone is spatially associated with igneous dikes, adjacent breccias and sedimentary rocks. Hydrothermal alteration consists of pervasive silicification as fine-grained replacement of both siliciclastic and igneous lithologies and also as quartz stockworks and planar quartz-sulfide veinlets and veins. Mineralization consists of both disseminated and quartz vein hosted pyrite, arsenopyrite, with gold and minor associated base metals. The hydrothermal system is strongly enriched in arsenic, antimony and mercury with average concentrations of +900 ppm, +45 ppm and +1.5 ppm respectively in the 2011 drill holes.
West Porphyry Zone The West Porphyry Zone consists of a series of east-southeast trending, steeply south-southwest dipping altered quartz monzonite dykes similar in composition to those of the Vortex Zone. Rock chip sampling returned values up to 0.86 g/t gold over 20.8 m. Anomalous values to 1.26 g/t gold were returned from dykes across 2.5 km2. The Company plans to drill test the West Porphyry Zone in 2012.
Sampling Methodology, Quality Control and Assurance The diamond drill holes were drilled by a skid mounted drill utilizing NTW core sizes (5.6 cm/2.2�). Core was cut or split on site and one half was sampled and transported to the lab for analysis and the other half retained on site.
Core samples were sent to both ALS Minerals� and Acme Labs� ISO 9001 certified preparation facilities Whitehorse, Yukon. Pulps were analyzed at ALS�s and Acme�s ISO 9001 certified laboratories in Vancouver, British Columbia using a 30 gram FA/AA analysis. At both labs, assay values over 10 g/t gold were re-assayed by fire assay followed by a gravimetric finish.
Commercial standards, blanks and duplicate samples were systematically inserted in every drill core sample batch. Approximately 5% of the original pulps are sent for check assays by the lab that did not receive the original sample.
Other elements, including silver, were analyzed using ICP-AES (ALS Minerals) and ICP-MS (Acme Labs) whereby the sample is dissolved in an aqua regia acid solution and then analyzed by ICP methods.
Drilling Sampling Protocol / Chain of Custody / Data Verification Golden Predator employs high standards of protocol with respect to the handling and chain of custody of its samples. All sampling is conducted under the supervision of the Company�s project geologist, and the chain of custody from the drill to the logging facility and sample preparation is continually monitored by the project geologist. Samples are shipped to the lab by qualified couriers or Company personnel under locked bags with independent identification lock numbers. Data verification of the analytical results includes a statistical analysis of the duplicates, standards and blanks that must pass certain set parameters for acceptance to insure accurate and verifiable results. All assays are reported as drilled intervals and are not to be interpreted as true widths.
The technical content of this news release has been reviewed and approved by Michael Maslowski, BSc, CPG, the Company's Chief Operating Officer and a Qualified Person as defined by National Instrument 43-101.
About Golden Predator Corp.
Golden Predator Corp., Yukon�s Gold Company, is a well-funded exploration company mandated to become a mid-tier gold producer. Golden Predator�s road-accessible advanced properties include its flagship Brewery Creek Project at which the Company is moving aggressively to a near term production decision, as well as its Grew Creek and Clear Creek Projects.
Golden Predator has the largest controlled land position in the Yukon, with exploration holdings in excess of 1,400,000 acres (over 5,700 km2), and is committed to strong relationships with Yukon First Nations and communities. Golden Predator�s management and technical teams continue to lead aggressive exploration programs in the underexplored regions of the Yukon, and are driven to bring value to shareholders and leave a positive legacy.
No stock exchange, securities commission or other regulatory authority has approved or disapproved the information contained herein. This press release contains projections and forward-looking information that involve various risks and uncertainties regarding future events. Such forward-looking information can include without limitation statements based on current expectations involving a number of risks and uncertainties and are not guarantees of future performance. There are numerous risks and uncertainties that could cause actual results and Golden Predator's plans and objectives to differ materially from those expressed in the forward-looking information. Actual results and future events could differ materially from those anticipated in such information. These and all subsequent written and oral forward-looking information are based on estimates and opinions of management on the dates they are made and are expressly qualified in their entirety by this notice. Except as required by law, Golden Predator assumes no obligation to update forward-looking information should circumstances or management's estimates or opinions change. |
|
to modify your message preferences or to unsubscribe from any future mailings. We will respect all unsubscribe requests.
Données et statistiques pour les pays mentionnés : Canada | Tous Cours de l'or et de l'argent pour les pays mentionnés : Canada | Tous
|
Golden Predator.
|
|
PRODUCTEUR |
CODE : GPY.V |
ISIN : CA38116P1053 |
|
| |
ProfilIndicateurs de MarchéVALEUR : Projets & res.Communiqués de PresseRapport annuelRISQUE : Profile actifsContactez la cie |
Golden Predator. est une société développant des projet miniers d'or basée au Canada. Golden Predator. est en développement de projets d'or et d'argent en USA, et détient divers projets d'exploration au Canada. Son principal projet en production est BALD MOUNTAIN en USA, son principal projet en développement est TAYLOR MINE en USA et ses principaux projets en exploration sont BREWERY CREEK, CLEAR CREEK, LANTERN DEPOSIT, ST. ELMO, BUENA VISTA/FRENCH BOY, CEDAR (NEVADA), BOND, OGOPOGO, DEL, AGATE, MEL, DAD, LED, CHOPIN, MCCONNEL, DOME HILL, GOLD (SCHEELITE) DOME, HARLAN, PHOENIX JV, ANTIMONY MOUNTAIN, WINDFALL LAKE, ALBERTA SUN, TUSCARORA, AFGAN, GREW CREEK, ADELAIDE, WILLOUGHBY, ALKALIC, ANGEL'S CAMP, GOLDEN RIDGE ( NEVADA), PAN, TONKIN PROJECT, SONORA GULCH, MARG, BRUIN CREEK et BROWNS CREEK au Canada et GUIJOSO et MAGISTRAL I au Mexique. Golden Predator. est cotée au Canada. Sa capitalisation boursière aujourd'hui est 14,7 millions CA$ (11,6 millions US$, 9,8 millions €). La valeur de son action a atteint son plus haut niveau récent le 19 novembre 2010 à 9,80 CA$, et son plus bas niveau récent le 25 avril 2014 à 0,03 CA$. Golden Predator. possède 91 570 000 actions en circulation. |
Présentations des Compagnies de Golden Predator. |
Dans les médias de Golden Predator. |
Rapports annuels de Golden Predator. |
Financements de Golden Predator. |
Nominations de Golden Predator. |
Projets de Golden Predator. |
18/08/2016 | (3ace Property)Predator Pours First Gold from Bulk Sample |
15/08/2016 | (3ace Property)Predator Discovers Coarse Visible Gold in New Vein at 3 Aces... |
27/09/2012 | (Brewery Creek)arranges USD $35,000,000 Loan Facility with RK Mine Finance;... |
16/07/2012 | (Brewery Creek)and Tr'ondek Hwech'in First Nation Update Brewery Creek Proj... |
10/07/2012 | (Brewery Creek)Drilling extends Brewery Creek\222s Bohemian Zone... |
05/03/2012 | (Brewery Creek)Drills Third Major Brewery Creek Discovery; Classic Zone Hos... |
05/01/2012 | (Pan)continues to expand North Slope Zone at its Brewery Creek Pr... |
05/12/2011 | (Pan)Calculates NPV of Royalty Interest in Pan Project at USD $32... |
01/09/2011 | Acquires Livingstone District; Now Controls Largest Land Pos... |
11/08/2011 | (Brewery Creek)Continues Easterly Extension of Bohemian-Schooner Zone at Br... |
11/08/2011 | (Brewery Creek)Continues Easterly Extension of Bohemian-Schooner Zone at
... |
26/07/2011 | (Harlan)Commences Drill Program on its Enticing Harlan Project in
... |
18/07/2011 | (Brewery Creek)Investigates Gold Recovery from Existing Heap Leach Pad at
... |
05/07/2011 | (Grew Creek)drills 92.0 m of 2.02 g/t Gold; Commences Resource
Calcu... |
01/06/2011 | (Brewery Creek)Triples 2011 Budget, Adds Second Drill, and Plans for Third
... |
26/05/2011 | (Grew Creek)Intersects 98.3 m of 1.83 g/t Gold at Carlos Zone, Grew Cree... |
26/04/2011 | (Brewery Creek)Intersects 74 m of 7.08 g/t Gold 250m East of Bohemian Zone,... |
21/04/2011 | (Harlan)Increases Land Position in the Yukon's Selwyn Basin to 7,800... |
14/04/2011 | (Swede Dome)Stakes 4 Project Areas in Historic Yukon Placer Headwaters |
08/04/2011 | (Brewery Creek)Intercepts 28 m of 5.06 g/t Gold at Brewery Creek's Bohemian... |
24/03/2011 | (Brewery Creek)expands Bohemian Discovery with 32.9 m of 3.01 g/t Gold at
... |
22/02/2011 | (Brewery Creek)COMMENCES 2011 YUKON DRILL PROGRAM |
24/01/2011 | (Harlan)Acquires Harlan Property, Yukon |
06/01/2011 | (Mcconnel)Acquires McConnell Property, Yukon |
30/11/2010 | (Gold (scheelite) Dome)Intercepts 21.95 m of 1.00 g/t Gold from Hawthorne Ridge Zon... |
10/12/2009 | (Brewery Creek)Intersects 20.17 gpt Gold over 1.90 m and 4.72 gpt Gold over... |
16/11/2009 | (Gold (scheelite) Dome)Intersects 11.12 gpt Gold over 25.40 m including 52.35 gpt G... |
05/11/2009 | (Antimony Mountain)Intersects 12.45 gpt Gold over 4.88 m including 28.81 gpt Go... |
10/08/2009 | (Adelaide)completes Technical Report on the Adelaide Project, Nevada |
08/06/2009 | (Brewery Creek)GOLDEN PREDATOR ACQUIRES BREWERY CREEK PROJECT, YT |
11/02/2009 | (High Grade Gp) Reports on Initial Exploration at High Grade Project |
|
Communiqués de Presse de Golden Predator. |
02/08/2016 | Golden Predator Increases Previously Announced Offering to C... |
26/07/2016 | Golden Predator Closes C$16.36 Million Financing; Includes C... |
13/07/2016 | Golden Predator Commences Geotechnical and Metallurgical Dri... |
06/07/2016 | Golden Predator Increases Previously Announced Offering to C... |
27/06/2016 | Golden Predator and Tr’ondëk Hwëch’in Amend Brewery Creek Pr... |
27/06/2016 | Golden Predator Announces $7,300,000 Investment By Eric Spro... |
20/06/2016 | Golden Predator Intersects 11.43m of 31.82 g/t Gold at 3 Ace... |
16/06/2016 | Golden Predator Retires 10,312,154 Common Shares |
13/06/2016 | Tony Lesiak Appointed to Golden Predator’s Board of Director... |
10/06/2016 | Golden Predator Exercises Option to Acquire Shares |
08/06/2016 | Till Capital Receives $1,546,823 CDN From Sale of Golden Pre... |
07/06/2016 | McEwen Mining’s Stefan Spears Appointed to Golden Predator’s... |
06/06/2016 | Golden Predator Reports Initial Gold Gravity Recoveries of 8... |
25/01/2016 | Golden Predator Recovers 79.9 to 90.8% Gold from 3 Aces Prel... |
04/01/2016 | Golden Predator Announces TSXV Approval of Castle West Prope... |
06/10/2015 | Golden Predator Chairman Increases Holdings |
02/10/2015 | Golden Predator Announces Stock Option Grant |
30/09/2015 | Golden Predator Arranges CDN $300,000 Line of Credit |
30/09/2015 | Golden Predator Arranges CDN$300,000 Line of Credit |
14/09/2015 | Golden Predator Confirms Continuity of High Grade Gold from ... |
14/09/2015 | IIROC Trading Resumption - GPY |
14/09/2015 | IIROC Trading Halt - GPY |
11/09/2015 | Golden Predator announces re-election of board at Annual Gen... |
03/09/2015 | Golden Predator Announces Board and Management Appointments;... |
03/09/2015 | IIROC Trading Resumption - GPY |
02/09/2015 | Golden Predator Announces Board and Management Appointments;... |
02/09/2015 | Till Capital Announces Board and Executive Changes |
24/08/2015 | Till Capital Reports on Golden Predator Annual General Meeti... |
21/08/2015 | IIROC Trading Halt - GPY |
30/07/2015 | Golden Predator Adopts Advance Notice Policy |
16/07/2015 | Golden Predator Announces Convertible Debenture Financing |
22/06/2015 | Golden Predator Receives 3 Aces Permit |
21/04/2015 | Golden Predator Completes First Note Payable Payment |
30/03/2015 | Golden Predator Announces Joint Venture and Option Agreement... |
16/03/2015 | Golden Predator Announces Joint Venture and Option Agreement... |
02/12/2014 | Metallurgical Tests Indicate 93.5% to 98.3% Overall Gold Rec... |
20/11/2014 | Golden Predator Files Preliminary Economic Assessment Result... |
12/11/2014 | Golden Predator Announces Positive Preliminary Economic Asse... |
22/10/2014 | Golden Predator Appoints Janet Lee-Sheriff as Chief Executiv... |
04/09/2014 | Gravity Tests Indicate 87% to 96% Gold Recovery at Golden Pr... |
25/08/2014 | Golden Predator Leases the Castle West Property, Nevada |
05/08/2014 | Preliminary Economic Assessment on Brewery Creek Project, Yu... |
15/07/2014 | Golden Predator Commences Preliminary Metallurgical Characte... |
10/07/2014 | Golden Predator Announces Former Yukon Premier Dennis Fentie... |
21/02/2013 | to start trading as Americas Bullion Royalty Corp. (TSX:AMB)... |
19/02/2013 | and Tr\222ondek Hwech\222in ... |
19/02/2013 | and Tr'ondek Hwech'in Disagree with YESAB |
07/02/2013 | Approves Creation of Shareholder Rights Plan, Finalizes Name... |
30/01/2013 | Silver Predator and Redtail Metals Sign Exploration Agreemen... |
24/01/2013 | (Rogue)Discovers High-grade Gold Mineralization on Rogue B Property... |
18/01/2013 | Announces Name Change to Gold Bullion Royalty Corp. |
08/01/2013 | Tr'ondek Hwech'in and Golden Predator Continue to Work Toget... |
08/01/2013 | Tr'ondëk Hwëch'in and Golden Predator Continue to Work Toget... |
05/11/2012 | (Brewery Creek)- Classic Zone Drilling Intersects 41.2 m of 1.04 g/t
Go... |
12/10/2012 | William Sheriff, Chairman & CEO, Interviewed on BNN's Commod... |
11/10/2012 | (Alkalic)Announces New Brewery Creek Discovery; Open-Ended Lone Star ... |
11/10/2012 | (Alkalic)Announces New Brewery Creek Discovery: Open-Ended Lone Star
... |
04/10/2012 | (Brewery Creek)Lower Fosters Zone Drilling Intersects 29.0 m of 1.86 g/t Go... |
19/07/2012 | New Mineralization Encountered at Moosehead Pit, Brewery Cre... |
16/07/2012 | and Tr\222ond\353k Hw\353ch\222in ... |
28/06/2012 | JOINT NEWS RELEASE: Golden Predator Corp. and Seabridge Gold... |
07/06/2012 | Joint News Release: Golden Predator Corp. and Seabridge Gold... |
01/05/2012 | Announces Resource Estimate at Brewery Creek Project of 580,... |
22/03/2012 | (Brewery Creek)Sleeman Zone Drilling Intersects 40.9 m of 1.81 g/t Gold and... |
15/03/2012 | (Brewery Creek)Bohemian-Schooner Zone Drilling Intersects 24.0 m of 1.47 g/... |
23/02/2012 | (Grew Creek)Intersects 68 m of 5.96 g/t Gold at Carlos Zone, Grew Creek ... |
22/02/2012 | (Brewery Creek)East Big Rock Zone Drilling Intersects 15.2 m of 1.93 g/t Go... |
20/01/2012 | Upcoming Events |
12/01/2012 | (Brewery Creek)intersects 30.5 m of 1.97 g/t Gold at its Brewery Creek Proj... |
10/01/2012 | (Harlan)announces New Gold Discovery at Cache Creek (Harlan) Project... |
09/01/2012 | (Brewery Creek)Encounters 35.1 m of 1.63 g/t Gold and 136.72 g/t Silver at ... |
12/09/2011 | 100%\240OF\240EXPIRING\240WAR... |
29/08/2011 | (Pan)Brewery Creek\222s Expanding Sle... |
05/08/2011 | and Ross River Dena Council Sign Traditional Knowledge
P... |
30/06/2011 | (Pan)Continues to Expand Brewery Creek's Bohemian-Schooner Zone |
21/06/2011 | (Grew Creek)Intersects 46.7m of 3.78 g/t Gold at Carlos Zone, Grew Creek... |
17/03/2011 | RECEIVES 5,000,000 SHARES OF SILVER PREDATOR CORP. |
29/09/2009 | Provides Update on Yukon Projects |
28/07/2009 | Drilling Commences at Gold Dome Project, Yukon Territory |
07/03/2009 | Completes Spin-Out |
05/03/2009 | Announces Voting Results of Special Meeting |
03/03/2009 | Timing of Shareholders Meeting To be Held On March 4, 2009 |
26/02/2009 | to Retire Convertible Debentures of Subsidiary |
13/02/2009 | Confirms Date of Shareholder Meeting |
Publication de commentaires terminée |
|
|