Chart eurGOLD   Chart eurSILVER  
 
Matière à reflexion
Il en va toujours de même : chacun ne travaille que pour soi
Sophocle (Ajax)  
Recherche :
DERNIÈRES INFO.  :
SOCIÉTÉ MINIÈRE  :
Abonnez-vous
Ecrivez-nous
Add to Google
Rechercher sur Ebay :
METAUX PRECIEUX (US $)
Gold 1223,10-0,30
Silver 18,48-0,05
Platinum 1349,00-1,80
Palladium 827,50-5,30
MARCHES MONDIAUX
DOWJONES 1715726
NASDAQ 45629
NIKKEI 16013124
ASX 5411-35
CAC 40 443122
DAX 966229
HUI 215-5
XAU 90-2
MONNAIES (€)
AUS $ 1,4346
CAN $ 1,4162
US $ 1,2859
GBP (£) 0,7908
Sw Fr 1,2108
YEN 139,5910
RATIOS & INDEXES
Gold / Silver66,19
Gold / Oil13,02
Dowjones / Gold14,03
MATIERES PREMIERES
Copper 3,14-0,01
WTI Oil 93,95-0,47
Nat. Gas 4,00-0,01
Indices des Marchés
Cours des métaux
Or & Argent industriels
RSS
Precious Metals
Graph Generator
Statistiques par Pays
Statistiques par Métal
Publicité sur 24hGold
Projets sur Google Earth
( 0 vote, 0/5 ) Imprimer l'article
     
Tweet
Mots clés associés :   Mineral Deposits | Mineral Resources | Paramount |

 

 

 

 

Paramount Gold Announces Positive Drill Results From Sleeper Gold Project in Nevada

WINNEMUCCA, NEVADA--(Marketwire - Feb. 15, 2011) - Paramount Gold and Silver Corp. (NYSE Amex:PZG)(TSX:PZG)(FRANKFURT:P6G)(WKN:A0HGKQ) ("Paramount") announced today assay results from the first four core holes drilled on the West Wood target at its 100% owned Sleeper Gold Mine Project in Nevada have returned gold values consistent with past production from the project and confirmed the resource model developed by the previous owner. Assay results from a further 14 holes completed at the Sleeper project are expected shortly.

In September, 2010 Paramount announced a $3 million exploration program designed to expand and upgrade resources at the Sleeper project. The exploration program had three main objectives, they were: (1) definition drilling to up-grade resources at the West Wood deposit and prepare it for a Preliminary Assessment (`PA`) of its economic potential; (2) delineation drilling to expand and evaluate resources at the Facilities deposit for possible inclusion in the PA; and (3) drill evaluation of up to six new priority targets on the property identified by Paramount's geological team. (See property map for targets -
http://www.paramountgold.com/_docs/sleepertargetmap0913.pdf).

Paramount CEO Christopher Crupi noted, "The evidence from the drill program suggests that we are likely to have success upgrading inferred resources to higher categories and increasing the overall size of the West Wood deposit. The first four holes targeted distinct gaps between previous drilling. All four intercepted good grades over excellent widths as predicted by the resource model. We can now proceed with the resource model provided by the previous owner with confidence. In addition, we encountered mineralized intervals in the hanging wall which provide evidence of continuity for several of these adjacent zones, likely enabling them to be classified as resources." (See cross-section -
http://paramountgold.com/_docs/sleeperWWSections.pdf).

Results from the four holes are as follows:

 
 --------------------------------------------------------------------------
                    Total                     Thickness                    
 Hole ID        Depth (m)  From (m)    To (m)       (m)    Au g/T    Ag g/T
 --------------------------------------------------------------------------
 PGC-10-001         351.7     116.8     120.5       3.7      5.32        NA
 --------------------------------------------------------------------------
                              124.4     132.1       7.6      3.04        NA
 --------------------------------------------------------------------------
                              147.3     161.0      13.7      0.73        NA
 --------------------------------------------------------------------------
                              167.1     170.2       3.1      1.29       2.5
 --------------------------------------------------------------------------
                              174.8     179.3       4.6      0.89       1.2
 --------------------------------------------------------------------------
                              183.9     189.3       5.3      1.75        NA
 --------------------------------------------------------------------------
                              203.7     209.8       6.1      1.31       4.0
 --------------------------------------------------------------------------
                              219.0     252.5      33.6      1.52       4.0
 --------------------------------------------------------------------------
                              275.4     280.0       4.6      0.59       3.0
 --------------------------------------------------------------------------
                              284.6     290.7       6.1      1.35       6.8
 --------------------------------------------------------------------------
                              301.3     305.9       4.6      0.52       1.2
 --------------------------------------------------------------------------
                                                                           
 --------------------------------------------------------------------------
 PGC-10-002         230.9      91.2      98.8       7.6      0.85        NA
 --------------------------------------------------------------------------
                              103.5     132.4      28.9      0.95       1.0
 --------------------------------------------------------------------------
                              170.5     173.5       3.1      0.89       1.9
 --------------------------------------------------------------------------
                              181.0     185.3       4.2      1.28       1.4
 --------------------------------------------------------------------------
                              188.8  230.9 TD      42.1      2.72      13.0
 --------------------------------------------------------------------------
                                                                           
 --------------------------------------------------------------------------
 PGC-10-003         335.8     168.7     171.7       3.1      0.84        NA
 --------------------------------------------------------------------------
                              191.5     196.1       4.6      1.02        NA
 --------------------------------------------------------------------------
                              209.8     240.3      30.5      1.57       1.1
 --------------------------------------------------------------------------
                              258.6     275.1      16.5      1.00       2.5
 --------------------------------------------------------------------------
                              283.3     290.7       7.3      0.76       2.4
 --------------------------------------------------------------------------
                              298.0     302.6       4.6      0.68       0.4
 --------------------------------------------------------------------------
                              313.5     329.2      15.7      0.73       2.6
 --------------------------------------------------------------------------
                                                                           
 --------------------------------------------------------------------------
 PGC-10-004         219.0     145.8     150.4       4.6      0.88        NA
 --------------------------------------------------------------------------
                              183.9     205.3      21.4      0.63      13.2
 --------------------------------------------------------------------------
                              215.9     219.0       3.1      1.73       3.2
 --------------------------------------------------------------------------

 

West Wood Vein Target

The West Wood target is on the southwest corner of the Sleeper Pit and has been extensively drilled to reveal a high grade core zone surrounded by lower grade gold concentrations. With characteristics similar to the original Sleeper deposit, this target has NI 43-101 compliant estimated resources of:

 
--  Indicated Resources of 16.96 million tonnes grading 0.98g/t of gold and
    4.6g/t of silver containing 530,000 ounces of gold and 2.5 million
    ounces of silver at a 0.4g/t Au cutoff; 
--  Inferred Resources of 390,000 tonnes grading 0.56g/t of gold and 2.3g/t
    of silver containing 10,000 ounces of gold and 30,000 ounces of silver
    at a 0.4g/t Au cutoff.

 

Six core holes totaling 1,705 meters, and three reverse circulation holes totaling 957 meters have been completed on the West Wood target. Drilling was conducted to determine the northern limits of the West Wood target and to upgrade resources. This work also obtained sample material for metallurgical testing and geotechnical information for conceptual pit planning to enable basic processing and engineering studies required for a PA. The southern limit of the West Wood target remains open under the historical waste dump and will be evaluated in the coming months in conjunction with evaluating the gold-bearing potential of the substantial amount of waste material from the former mine. Further results are expected shortly.

Facilities Target Area

The Facilities Target is on the eastern side of the Sleeper pit and is a broad area of continuous lower grade gold-bearing material. Several drill holes by previous operators encountered bonanza grade intersections but the drill spacing was too wide to define the extent and distribution of the higher grade material. It is anticipated that defining the limits of the higher grade intervals in the Facilities Target should have a positive effect on the grade of this resource. The current NI 43-101 resource estimate is the following:

 
--  Indicated Resources of 10 million tonnes grading 0.69g/t of gold and
    7.8g/t of silver containing 220,000 ounces of gold and 2.5 million
    ounces of silver at a 0.4g/t Au cutoff; 
--  Inferred Resources of 19.6 million tonnes grading 0.60g/t of gold and
    6.7 g/t of silver containing 370,000 ounces of gold and 4.2 million
    ounces of silver at a 0.4g/t Au cutoff.

 

A program of eight reverse circulation drill holes totaling 2,330 meters, and one core hole of 261.8 meters was completed on the Facilities Target. These holes were designed to evaluate the continuity of existing bonanza-grade intersections. Results are expected shortly.

New Targets

Results from work at West Wood and Facilities have identified several new targets not previously considered. Ongoing work is dedicated to prioritizing other targets for drill testing. Originally, a drill campaign of approximately 1,250 meters was established for these target tests, however, the size and depth of identified targets may require expansion of this program.

This news release has been reviewed by Glen van Treek, a Vice President of the Company and William Threlkeld a Qualified Person pursuant to National Instrument 43-101. Although Paramount Gold is a U.S. domiciled corporation and a full SEC registrant, Paramount reports its mineral resources according to the Canadian standard known as National Instrument 43-101 to facilitate comparison with other similar companies that trade on the TSX.

Cautionary Note to U.S. Investors Concerning Estimates of Indicated and Inferred Resources:

This news release uses the terms "indicated resources" and "inferred resources". We advise U.S. investors that while these terms are defined in, and permitted by, Canadian regulations, these terms are not defined terms under SEC Industry Guide 7 and are normally not permitted to be used in reports and registration statements filed with the SEC. "Inferred resources" have a great amount of uncertainty as to their existence, and great uncertainty as to their economic and legal feasibility. It cannot be assumed that all or any part of an inferred mineral resource will ever be upgraded to a higher category. Under Canadian rules, estimates of inferred mineral resources may not form the basis of a feasibility study or prefeasibility studies, except in rare cases. The SEC normally only permits issuers to report mineralization that does not constitute SEC Industry Guide 7 compliant "reserves", as in-place tonnage and grade without reference to unit measures. U.S. investors are cautioned not to assume that any part or all of mineral deposits in this category will ever be converted into reserves. U.S. investors are cautioned not to assume that any part or all of an inferred resource exists or is economically or legally minable.

Safe Harbor for Forward-Looking Statements:

This release and related documents may include "forward-looking statements" including, but not limited to, statements related to the interpretation of drilling results and potential mineralization, future exploration work at the Sleeper Gold Mine Project and the expected results of this work. Forward-looking statements are statements that are not historical fact and are subject to a variety of risks and uncertainties which could cause actual events to differ materially from those reflected in the forward-looking statements including fluctuations in the price of gold, inability to complete drill programs on time and on budget, and future financing ability. Paramount's future expectations, beliefs, goals, plans or prospects constitute forward-looking statements within the meaning of the United States Private Securities Litigation Reform Act of 1995 and other applicable securities laws. Words such as "believes," "plans," "anticipates," "expects," "estimates" and similar expressions should also be considered to be forward-looking statements. There are a number of important factors that could cause actual results or events to differ materially from those indicated by such forward-looking statements, including, but not limited to: uncertainties involving interpretation of drilling results, environmental matters, lack of ability to obtain required permitting, equipment breakdown or disruptions, and the other factors described in Paramount's Annual Report on Form 10-K for the year ended June 30, 2010 and its most recent quarterly reports filed with the SEC available on
www.sec.gov and applicable Canadian securities regulators available on www.sedar.com and X-Cal's filings with the applicable Canadian securities regulators available on www.sedar.com.

Except as required by applicable law, Paramount disclaims any intention or obligation to update any forward-looking statements as a result of developments occurring after the date of this document.

 

CONTACT INFORMATION:

Paramount Gold and Silver Corp.
Christopher Crupi, CEO
Chris Theodossiou, Investor Relations
866-481-2233 / 613-226-9881



Tweet

Paramount Gold & SIlver

EN DÉVELOPPEMENT
CODE : PZG.TO
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Alerte Watchlist Portefeuille Note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie
Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Dans les médias de Paramount Gold & SIlver
08/05/2013Paramount Gold & Silver (PZG) Shares Enter Oversold Territor...
27/12/2007Special Report
Rapports annuels de Paramount Gold & SIlver
2008 Annual Report
Financements de Paramount Gold & SIlver
15/01/2010& Silver Exercise of Warrants and Changes to its Board of
Nominations de Paramount Gold & SIlver
04/01/2011and Silver Appoints VP Exploration
Projets de Paramount Gold & SIlver
19/09/2013(San Miguel)and Silver Discovers A Major New Structure at San Miguel Pro...
16/07/2013(Sleeper)and Silver Reports Another Wide Drill Intercept with Excepti...
09/05/2013(Sleeper)and Silver Reports Exceptional Results From Ongoing Drilling...
15/04/2013(San Miguel)PEA Filed for Paramount Gold and Silver's San Miguel Project...
28/02/2013(San Miguel)PEA Completed for Paramount Gold and Silver's San Miguel Pro...
01/11/2012(San Miguel)and Silver Secures Critical Water Rights for Its 100%-Own Sa...
22/10/2012(San Miguel)Met Test Results Highly Favorable for Paramount Gold and Sil...
22/10/2012(San Miguel)Met Test Results Highly Favorable for Paramount Gold and Sil...
22/10/2012(San Miguel)Met Test Results Highly Favorable for Paramount Gold and Sil...
25/09/2012(Sleeper)New Drilling at Paramount Gold and Silver's Sleeper Project ...
13/09/2012(Sleeper)Files Final PEA Report on Its Sleeper Project in Nevada
21/08/2012(San Miguel)and Silver Reports Additional Assays From Infill Drilling of...
30/07/2012(Sleeper)Preliminary Assessment Completed for Paramount Gold's Sleepe...
24/07/2012(San Miguel)and Silver Reports Additional Assays from the Guazapares Meg...
09/07/2012(Sleeper)and Silver Begins Drilling to Find a Second Sleeper Mine in ...
22/05/2012(Don Ese)and Silver Discovers New High-Grade Gold/Silver Structure Wi...
22/11/2011(Sleeper)and Silver Reports on Growing Economic Potential of its Slee...
16/11/2011(Sleeper)and Silver Continues to Expand its Sleeper Gold Project in N...
20/10/2011(Sleeper)and Silver Finds New Gold Zone at Sleeper Project in Nevada
12/10/2011(San Miguel)Drilling at Paramount Gold and Silver's San Miguel Project C...
06/10/2011(Sleeper)Reports Good Recoveries From Preliminary Met Tests of Nevada...
19/09/2011(Sleeper)Sleeper Project in Nevada Continues to Grow
23/08/2011(Sleeper)Expands Nevada Land Position Along Sleeper-Sandman Trend
17/08/2011(Sleeper)Announces Positive Results from Sleeper Waste Dump Drilling
01/06/2011(Sleeper) Updates Progress on San Miguel and Sleeper Projects
01/06/2011(San Miguel) Updates Progress on San Miguel and Sleeper Projects
27/04/2011(San Miguel)Announces New Positive Metallurgical Results from Its San Mi...
11/04/2011(San Miguel)Announces New Resource Estimation for New Drilling at San Mi...
07/03/2011(Sleeper)Announces More Positive Results from Nevada Project: New Res...
01/03/2011(Don Ese)Confirms Don Ese Drill Hole Locations
15/02/2011(Sleeper)Announces Positive Drill Results From Sleeper Gold Project i...
01/02/2011(San Miguel)Resumes Drilling on Don Ese Corridor to Find Southern Extens...
11/01/2011(San Miguel)New Drill Results Expand Paramount Gold's San Francisco Targ...
21/12/2010(San Miguel)and Silver Plans Larger Program on San Miguel's Don Ese Disc...
04/11/2010(San Miguel)Resource Expansion Likely at Veronica Target on Paramount Go...
20/10/2010(Sleeper)CommencesDrill Program to Advance Their Sleeper Gold
13/09/2010(Sleeper)Announces Plans to Advance Sleeper Project
01/10/2009(San Miguel)Reports Positive Drilling Results at San Miguel Deposit
15/07/2009(San Miguel)Drilling at their San Miguel Project
08/07/2009(San Miguel)Signs Definitive Agreement to Expand its San Miguel Pro
01/12/2008(San Miguel)and Silver Corp.'s San Miguel Project Hosts 2.645 Million Ou...
26/11/2008Corp=2E Reports Drilling Results From its San Miguel Project
14/10/2008(San Miguel)Corp=2E Reports High Grade Gold Assays at Clavo 66
07/10/2008(San Miguel)to Update Resource Estimate
02/10/2008(San Miguel)Closes Deal and Acquires 100% Interest in its San
02/09/2008(Cusi)Discovers New High Grade Gold Body Named Clavo 66
27/08/2008(Cusi)Acquires 100% of the San Miguel Project
22/07/2008Announces Intersection of High Grade =?ISO-8859-1?Q?=20Miner...
07/07/2008(Cusi)Extends Clavo 99 at its San Miguel Project
25/06/2008(Cusi)Reports Substantial Resource Increase at its San Migue
10/06/2008(Cusi)and Silver Corp. Extends San Miguel Clavo 99 to a 400m Depth...
05/06/2008(Cusi)set to redo San Miguel estimate with host of new results
03/06/2008(Cusi)Reports Drill Results From its San Miguel Vein in
30/05/2008(Cusi) Trenching Reveals a New Mineralized Structure at it
09/05/2008(Cusi)Acquires Mining Concession Extending its San Miguel Ve
07/05/2008(Cusi) Prepare Resource Estimate
06/05/2008(Cusi)Announces Drill Results That Extend 'Clavo 99' 100 Meters Al...
30/04/2008(Cusi)Announces Drill Results That Extends 'Clavo 99' to
01/04/2008(Cusi) Report Gold and Silver Assays From the Montecristo Z
20/03/2008(Cusi)Reports 10.4m of 4.5 g/t Gold and Extends Nor
18/03/2008(Cusi) Finds New High Grade Veins and Expands Bulk-Tonnage
17/03/2008(Cusi) Extends Southern Limit of 'Clavo 99' Within the
29/02/2008(Cusi)Expand High Grade Gold and Silver Mineralization to
24/01/2008(Cusi) Announces High Grade Gold and Silver Results from th
06/11/2007(Cusi) Announces Assay Results From the San Miguel Project
22/10/2007(Cusi) Announces Further Drill Results from the San Miguel
17/10/2007(Cusi)Announces Further Drill Results From the San Miguel
03/05/2007(Cusi)Drills Multiple Silver Intersects, Including 606 g/t Silver ...
28/03/2007(Cusi)Drills 569 g/t Silver Across 3.0 meters and 184 g/t Silver A...
Communiqués de Presse de Paramount Gold & SIlver
25/09/2013and Silver Corp. to Present at Denver Gold Forum
20/08/2013(Don Ese)and Silver Finds Further Depth Extensions of Don Ese Deposit...
25/04/2013(Don Ese)and Silver Extends High Grade Gold and Silver Values Down Di...
12/03/2013(Sleeper)and Silver Reports Exceptional Intercept From Wood Zone at S...
04/02/2013(San Miguel)and Silver Provides Update on San Miguel Project Preliminary...
07/01/2013(Sleeper)New Drilling at Paramount Gold and Silver's Sleeper Gold Pro...
28/11/2012(San Miguel)and Silver Extends Mineralized Strike of New San Miguel Targ...
12/11/2012(San Miguel)and Silver Drilling Extends Silver-Rich Zone by 2 Km at San ...
12/11/2012(San Miguel)and Silver Drilling Extends Silver-Rich Zone by 2 Km at San ...
10/10/2012(San Miguel)and Silver Files Final Resource Estimate Report on Sedar for...
03/10/2012(San Miguel)and Silver Reports Exceptional Drill Results From Its San Mi...
05/09/2012d Resource Estimate Reports Substantial Growth in Contained ...
07/08/2012Could Potentially Reach $1,900/oz According to HSBC Analysts
18/06/2012(San Miguel)d Mineral Resource Estimate for Paramount Gold and Silver's ...
01/05/2012(San Miguel)and Silver Adds 500 m. of Strike to High-Grade Southern Exte...
13/03/2012(San Miguel)and Silver Expands La Union High-Grade Gold Discovery at Its...
05/03/2012RETRANSMISSION: Paramount Gold and Silver Reports Gold Grade...
23/02/2012(San Miguel)and Silver Reports Silver Grades Up to 1,896 g/Tonne From Ne...
16/02/2012(San Miguel)and Silver Discovers New High-Grade Gold Zone at Its San Mig...
07/02/2012(Sleeper)Drilling Confirms Resource Potential of Waste Dumps at Param...
31/01/2012(Don Ese)and Silver Reports Significant Intercepts on Don Ese and La ...
23/01/2012(San Miguel)and Silver Reports Significant Intercepts in 10 New Drill Ho...
11/01/2012(San Miguel)and Silver Reports Silver Grades Up to 387 g/Tonne From New ...
28/12/2011(San Miguel)and Silver Releases New Resource Estimates on a Portion of i...
12/12/2011(San Miguel)More High-Grade Drill Results Expand Key Zones at Paramount ...
28/11/2011(San Miguel)and Silver Reports New Drill Results Expand High-Grade Zones...
08/11/2011(San Miguel)and Silver Reports More High-Grade Drill Results From its Sa...
03/11/2011(Sleeper)Files 43-101 Resource Report on Sleeper Nevada Project
27/09/2011(San Miguel)Reports New High Grade Drill Intercepts at Its San Miguel Pr...
13/09/2011(Sleeper)Multi Million Ounce Gold Resource Defined at Paramount Gold'...
26/07/2011(San Miguel)and Silver Reports New Drill Results at Its San Miguel Proje...
15/06/2011and Silver Reports New Drill Results Expand San Francisco De...
06/10/2010Discovers a Third Bulk-Mineable Gold Zone at the San
23/06/2010Acquires X-Cal Resources Ltd.
21/10/2009& Silver Reports Positive Results from Monte Cristo Target
15/10/2009& Silver Closes $23 Million Financing
09/10/2009Pricing of Common Stock Offering
05/10/2009Common Stock Offering
02/10/2009Commences Litigation Against Klondex Mines Ltd=2E
24/09/2009Klondex Advises Paramount of its Decision to Terminate Agree...
25/09/2009Responds to Klondex Termination
11/09/2009A Hollow Victory for Top Investment Newsletters
06/08/2009Executes Agreements with Major Stockholders in Support
24/07/2009and Silver Corp. Provides Update on Business Combination
21/07/2009and Silver Corp. and Klondex Mines Ltd Announce Business Com...
02/07/2009Amends Morelos Option Agreement
26/06/2009and Silver Corp. Added to Russell Indexes
04/05/2009and Silver Corp. listing with Deutsche Borse
23/03/2009Closes $9,000,000 Equity Financing
19/03/2009Corp=2E Closes Acq
17/03/2009Corp=2E Provides U
05/03/2009Arranges $9,000,000 Equity Financing
28/11/2008and Silver Corp. to Trade on the New York Stock Exchange Alt...
19/11/2008Reports Drill Results at Clavo 99 and Advises New Resource E...
10/10/2008Corp=2E Reports Hi =?ISO-8859-1?Q?gh=20Grade=20Gold=20Assays...
06/10/2008Corp=2E Reports 7=2E97 g/t Gold Equivalent Across 5=2E97 met...
24/09/2008Report From Blackmont Capital Analyst Richard Gray Da
16/09/2008Reports 10=2E3 g/t Gold Across 10=2E3 meters at Clav
10/09/2008Remains Positive on Underlying Asset Value of Properti
12/08/2008Expands Clavo 99 to a 600 Meter Width at a Depth
01/08/2008CEO Christopher Crupi to Appear Live on Canada's Business Ne...
28/07/2008Announces Further Assay Results Under the Strategic Alliance...
16/07/2008Expands San Antonio Zone to More Than 300 Meters o
04/07/2008Blackmont Capital Initiates Research Coverage =?ISO-8859-1?Q...
23/06/2008Announces Assay Results Under theStrategic Alliance With Mex...
13/06/2008Extends Clavo 99 to a Width of 650 Meters With 5
28/05/2008Complete Second Phase Exploration at the Andrea Projec
21/05/2008Paramount Announces First Assay Results Under the New Strate...
12/05/2008Update of their Strategic Alliance with Mexoro Minerals
05/05/2008Enters Into Strategic Alliance with Mexoro Minerals Lt
30/04/2008to Resume Trading at 1:00 PM EDT April 30, 2008
25/04/2008Adds a Second Core Drill Rig at its San Miguel Project
11/04/2008Adds Senior Technical Advisor to Team
03/04/2008 Addresses Halt in Trading
28/03/2008Resumes Trading on the American Stock Exchange
27/03/2008Update on SEC Temporary Trading Suspension
13/03/2008 Address Temporary Trading Suspension
02/01/2008 Exploration Program Update
04/12/2007Identify Gold-Silver and Porphyry Copper Targets on its 86,3...
09/10/2007Adds Minin =?ISO-8859-1?Q?g=20Engineer,=20Geologist,=20and=2...
04/10/2007Reports Assay Results of 2.1 Meters of 6.7 g/t Gold and 632 ...
04/09/2007Commence Trading on the Toronto Stock Exchange
10/05/2007Trenching Discovers New Santa Clara zone - 1,380 meters alon...
16/03/2007Exploratory Drilling Program to Commence on the Santos Gold ...
Commenter cet article
Vous devez être connecté pour commenter un article8000 caractères max.
 
Connectez vous
Email : Mot de passe : Login
Inscrivez-vous Mot de passe oublié
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TORONTO (PZG.TO)AMEX (PZG)
1,03+0.00%0,920-1.08%
TORONTO
CA$ 1,03
17/09 15:55 -
0%
Cours préc. Ouverture
1,03 1,06
Bas haut
1,01 1,06
Année b/h Var. YTD
0,870 -  1,57 8,42%
52 sem. b/h var. 52 sem.
0,870 -  1,57 -29,45%
Volume var. 1 mois
17 500 -4,63%
24hGold TrendPower© : -39
Produit
Développe Gold - Silver
Recherche Copper - Gold - Lead - Silver
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Vous devez être connecté pour accéder au portefeuille (gratuit)
TOP NEWSRELEASES
Variation annuelle
DateVariationMaxiMini
20147,29%1,620,85
2013-57,14%2,350,94
20123,70%2,751,98
2011-45,86%4,401,99
2010166,00%4,001,25
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois