Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en
Dundee Precious Metals Announces Reserve and Resource Update for 2015
Published : March 31, 2015
( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Canada | Copper | Precious Metals | Report | Zinc |

TORONTO, ONTARIO--(Marketwired - March 31, 2015) - Dundee Precious Metals Inc. (News - Market indicators)(TSX:DPM.WT.A) (the "Company" or "DPM") today announced its updated Mineral Reserve and Resource as of December 31, 2014.

On a consolidated basis, Proven and Probable Mineral Reserves decreased by 1.1 million tonnes of ore (-3.5%), 204,000 ounces of gold (-6.1%), 515,000 ounces of silver (-8.4%) and 57 million pounds of copper (-11.0%) from those at the end of 2013 (see Appendix). Measured and Indicated Mineral Resource tonnage is unchanged, containing a decrease of 181,000 ounces of gold (-3.7%), a decrease in contained copper of 57 million pounds (-7.0%), and an increase in contained silver of 1,647,000 ounces (+11.9%).

"The Kapan Mineral Resource reflects drilling completed over the past year, which has resulted in a significant increase. We are optimistic that we will continue to add to our Mineral Reserves and Resources at Chelopech. Chelopech has demonstrated a strong track record of replacing Mineral Reserves in previous years," says Rick Howes President and CEO.

Mineral Reserve and Resource as of December 31, 2014:

Tonnes
M
Au
Grade
g/t
Au Ounces
M
Ag
Grade
g/t
Ag
Ounces
M
Cu
Grade
%
Cu
Pounds
M
Zn
Grade
%
Zn
Pounds
M
MINERAL RESERVE
Proven 14.9 3.57 1.706 7.32 3.501 - 289 - -
Chelopech 12.3 3.19 1.257 8.28 3.266 1.07 289 - -
Krumovgrad (Upper Zone) 1.1 3.46 0.124 1.91 0.068 - - - -
Krumovgrad (Wall) 1.5 6.83 0.325 3.50 0.166 - - - -
Kapan - - - - - - - - -
Probable 14.2 3.09 1.408 4.61 2.101 - 177 - -
Chelopech 10.6 3.10 1.051 5.58 1.893 0.76 177 - -
Krumovgrad (Upper Zone) 3.5 3.00 0.337 1.75 0.197 - - - -
Krumovgrad (Wall) 0.1 5.54 0.020 2.93 0.011 - - - -
Kapan - - - - - - - - -
Proven and Probable 29.0 3.34 3.114 6.00 5.602 - 467 - -
Chelopech 22.8 3.14 2.308 7.03 5.160 0.93 467 - -
Krumovgrad (Upper Zone) 4.6 3.11 0.461 1.79 0.266 - - - -
Krumovgrad (Wall) 1.6 6.74 0.345 3.46 0.177 - - - -
Kapan - - - - - - - - -
MINERAL RESOURCE
Measured 21.1 4.13 2.806 8.46 5.750 - 513 - -
Chelopech 18.3 3.96 2.328 9.35 5.498 1.27 513 - -
Krumovgrad (Upper Zone) 1.1 3.46 0.125 1.91 0.069 - - - -
Krumovgrad (Wall) 1.7 6.32 0.353 3.27 0.183 - - - -
Kapan - - - - - - - - -
Indicated 17.5 3.39 1.908 17.38 9.772 - 249 - 199
Chelopech 8.9 3.86 1.109 8.28 2.382 1.02 201 - -
Krumovgrad (Upper Zone) 3.9 2.86 0.357 1.70 0.212 - - - -
Krumovgrad (Wall) 0.2 4.28 0.024 2.38 0.014 - - - -
Kapan 4.5 2.90 0.418 49.77 7.165 0.49 49 2.01 199
Measured and Indicated 38.6 3.80 4.714 12.50 15.522 - 763 - 199
Chelopech 27.2 3.93 3.437 9.00 7.880 1.19 714 - -
Krumovgrad (Upper Zone) 5.0 2.99 0.482 1.75 0.281 - - - -
Krumovgrad (Wall) 1.9 6.13 0.377 3.19 0.196 - - - -
Kapan 4.5 2.90 0.418 49.77 7.165 0.49 49 2.01 199
Inferred 20.0 2.57 1.659 31.47 20.285 - 294 - 409
Chelopech 8.3 2.66 0.712 11.27 3.021 0.91 167 - -
Krumovgrad (Upper Zone) 0.3 1.31 0.013 1.06 0.011 - - - -
Krumovgrad (Wall) 0.0 0.87 0.000 0.88 0.000 - - - -
Kapan 11.4 2.55 0.934 47.10 17.253 0.50 127 1.63 409
  1. The rounding of tonnage and grade figures has resulted in some columns showing relatively minor discrepancies in sum totals;
  2. Mineral Reserves, Measured, Indicated and Inferred Mineral Resources have been reported in accordance with NI 43-101 and the classification adopted by the CIM;
  3. Measured and Indicated Mineral Resources are inclusive of those Mineral Resources modified to produce the Mineral Reserves;
  4. Mineral Reserves and Resources may be subject to legal, political, environmental and other risks and uncertainties. Refer to the most recent annual information form of the Company filed on the SEDAR website at www.sedar.com and the Company's Technical Reports for more information with respect to key assumptions, parameters and risks relating to the above estimates;
  5. Mineral Reserves and Resources estimates have been reviewed and prepared by CSA, that provides multi-disciplinary services to the global resources industry and is independent of the Company;
  6. Mineral Reserves and Resources estimates are based on long term metals prices of USD 1,250/oz Au, USD 23/oz Ag, USD 2.75/lb Cu and USD 0.85/lb Zn, and as of December 31, 2014;
  7. Chelopech Mineral Resources are based on a gold equivalent cut-off 3.0 g/t (Au + Cu*2.06) and a greater than USD 0 profit/tonne test using NSR analysis;
  8. Chelopech Mineral Reserves are based on a gold equivalent cut-off of 3.0 g/t (Au + Cu*2.06) and a cut-off of USD 10 profit/tonne using NSR analysis;
  9. Krumovgrad Mineral Reserves and Resources are based on a gold cut-off grade of 0.6 g/t for the Upper Zone and Overburden and of 0.8 g/t for the Wall;
  10. Kapan Mineral Resources are based on a gold equivalent cut-off of 2.24 g/t (Au + Cu*1.34 + Ag*0.02 + Zn*0.42) and a greater than USD 0 profit/tonne test using net smelter royalty ("NSR") analysis; and,
  11. A Mineral Resource is an inventory of mineralization that under realistically assumed and justifiable technical and economic conditions might become economically extractable, while a Mineral Reserve includes diluting materials and allowances for losses that are expected to occur when the material is mined.

Chelopech

While the operation replaced depleted tonnes in 2014 in the Mineral Reserve and Resource categories, this was partially offset by a revision in void model estimates completed by Chelopech survey crews during the year. This revision affected both, tonnes and grades, contributing to lower contained metals after depletion when compared to the previous year's Mineral Reserve and Resource estimates.

For the Mineral Reserves, the net result is a reduction of 1.1 million tonnes (-4.5%), 204,000 ounces of gold (-8.1%), 514,000 ounces of silver (-9.1%) and 57 million pounds of copper (-11.0%), compared with the 2013 Mineral Reserve estimate.

Compared to the previous Mineral Resource statement, tonnage in the Measured and Indicated categories has decreased by 1.5 million tonnes of ore (-5.1%), 287,000 ounces of gold (-7.7%), 670,000 ounces of silver (-7.8%) and 77 million pounds of copper (-9.8%).

Kapan

Compared to the previous Resource estimate, tonnage increased by 1.5 million tonnes (+49.3%) in the Indicated category and 1.9 million tonnes (+19.9%) in the Inferred category.

Also, metals in the Indicated category increased by 106,000 ounces of gold (+33.9%), 2.3 million ounces of silver (+47.8%), 20 million pounds of copper (+68.2%), and 81 million pounds of zinc (+68.4%).

Metals in the Inferred category increased by 71,000 ounces of gold (+8.2%), 4.0 million ounces of silver (+30.6%), 37 million pounds of copper (+40.6%), and 156 million pounds of zinc (+61.6%).

The increase in Indicated Mineral Resource tonnes is attributable to more material being at a higher confidence, which has resulted from further drilling and development. The increase in Inferred Mineral Resource tonnes is mainly attributable to more favourable technical-economic parameters used in the evaluation with regard to treatment terms of concentrates, the addition of new vein extensions, veins that were previously modelled using probability methods, and changes to the estimation methodology.

The changes in grade can largely be attributed to a change in estimation methodology, whereby the current Mineral Resource estimate initially estimates mineralization in the vein, with dilution being added as a secondary step rather than estimating combined vein and dilution as was done previously. The grade of zinc has increased due to the application of more realistic top cuts.

Krumovgrad

There is no update to the Mineral Reserve estimate for Krumovgrad in 2014. However, just over half a million tonnes of Measured and Indicated Mineral Resources were excluded after further review of the potential for economic extraction following the proposed mining of Mineral Reserves.

Change of Reporting of Measured and Indicated Mineral Resources

Going forward, DPM is adopting a new method for the reporting of Measured and Indicated Mineral Resources, which will now be reported exclusive of those Mineral Resources modified to produce the Mineral Reserves. The new method intends to more clearly present what potentially can be added to the life of each project/operation.

"It is intended that this new method of reporting of DPM's Measured and Indicated Mineral Resources will lead to greater clarity around the potential that exists to continue to extend the life of our existing properties," said Rick Howes, President and CEO.

Mineral Reserve and Resource as of December 31, 2014:

Tonnes
M
Au
Grade
g/t
Au Ounces
M
Ag
Grade
g/t
Ag
Ounces
M
Cu
Grade
%
Cu
Pounds
M
Zn
Grade
%
Zn
Pounds
M
MINERAL RESERVE
Proven 14.9 3.57 1.706 7.32 3.501 - 289 - -
Chelopech 12.3 3.19 1.257 8.28 3.266 1.07 289 - -
Krumovgrad (Upper Zone) 1.1 3.46 0.124 1.91 0.068 - - - -
Krumovgrad (Wall) 1.5 6.83 0.325 3.50 0.166 - - - -
Kapan - - - - - - - - -
Probable 14.2 3.09 1.408 4.61 2.101 - 177 - -
Chelopech 10.6 3.10 1.051 5.58 1.893 0.76 177 - -
Krumovgrad (Upper Zone) 3.5 3.00 0.337 1.75 0.197 - - - -
Krumovgrad (Wall) 0.1 5.54 0.020 2.93 0.011 - - - -
Kapan - - - - - - - - -
Proven and Probable 29.0 3.34 3.114 6.00 5.602 - 467 - -
Chelopech 22.8 3.14 2.308 7.03 5.160 0.93 467 - -
Krumovgrad (Upper Zone) 4.6 3.11 0.461 1.79 0.266 - - - -
Krumovgrad (Wall) 1.6 6.74 0.345 3.46 0.177 - - - -
Kapan - - - - - - - - -
MINERAL RESOURCE
Measured 6.0 3.79 0.727 9.47 1.818 1.25 165 - -
Chelopech 6.0 3.79 0.727 9.48 1.818 1.25 165 - -
Krumovgrad (Upper Zone) - - - - - - - - -
Krumovgrad (Wall) - - - - - - - - -
Kapan - - - - - - - - -
Indicated 9.8 3.14 0.991 27.43 8.644 0.76 165 - 199
Chelopech 5.3 3.35 0.573 8.64 1.479 0.99 116 - -
Krumovgrad (Upper Zone) - - - - - - - - -
Krumovgrad (Wall) - - - - - - - - -
Kapan 4.5 2.90 0.418 49.77 7.165 0.49 49 2.01 199
Measured and Indicated 15.8 3.39 1.717 20.63 10.462 0.95 330 - 199
Chelopech 11.3 3.58 1.299 9.08 3.297 1.13 281 - -
Krumovgrad (Upper Zone) - - - - - - - - -
Krumovgrad (Wall) - - - - - - - - -
Kapan 4.5 2.90 0.418 49.77 7.165 0.49 49 2.01 199
Inferred 20.0 2.57 1.659 31.47 20.285 - 294 - 409
Chelopech 8.3 2.66 0.712 11.27 3.021 0.91 167 - -
Krumovgrad (Upper Zone) 0.3 1.31 0.013 1.06 0.011 - - - -
Krumovgrad (Wall) 0.0 0.87 0.000 0.88 0.000 - - - -
Kapan 11.4 2.55 0.934 47.10 17.253 0.50 127 1.63 409
  1. The rounding of tonnage and grade figures has resulted in some columns showing relatively minor discrepancies in sum totals;
  2. Mineral Reserves, Measured, Indicated and Inferred Mineral Resources have been reported in accordance with NI 43-101 and the classification adopted by the CIM;
  3. Measured and Indicated Mineral Resources are additional to Mineral Reserves;
  4. Mineral Reserves and Resources may be subject to legal, political, environmental and other risks and uncertainties. Refer to the most recent annual information form of the Company filed on the SEDAR website at www.sedar.com and the Company's Technical Reports for more information with respect to key assumptions, parameters and risks relating to the above estimates;
  5. Mineral Reserves and Resources estimates have been reviewed and prepared by CSA, that provides multi-disciplinary services to the global resources industry and is independent of the Company;
  6. Mineral Reserves and Resources estimates are based on long term metals prices of USD 1,250/oz Au, USD 23/oz Ag, USD 2.75/lb Cu and USD 0.85/lb Zn, and as of December 31, 2014;
  7. Chelopech Mineral Resources are based on a gold equivalent cut-off 3.0 g/t (Au + Cu*2.06) and a greater than USD 0 profit/tonne test using NSR analysis;
  8. Chelopech Mineral Reserves are based on a gold equivalent cut-off of 3.0 g/t (Au + Cu*2.06) and a cut-off of USD 10 profit/tonne using NSR analysis;
  9. Krumovgrad Mineral Reserves and Resources are based on a gold cut-off grade of 0.6 g/t for the Upper Zone and Overburden and of 0.8 g/t for the Wall;
  10. Kapan Mineral Resources are based on a gold equivalent cut-off of 2.24 g/t (Au + Cu*1.34 + Ag*0.02 + Zn*0.42) and a greater than USD 0 profit/tonne test using NSR analysis; and,
  11. A Mineral Resource is an inventory of mineralization that under realistically assumed and justifiable technical and economic conditions might become economically extractable, while a Mineral Reserve includes diluting materials and allowances for losses that are expected to occur when the material is mined. Under the previous method, when Mineral Reserves are reported as part of Measured and Indicated Resources, these diluting materials and allowances are excluded from the estimate of Resources.

The new method applies when reporting both Mineral Reserves and Resources. As suggested in the May 10, 2014 Definition Standards on Mineral Resources and Reserves by the Canadian Institute of Mining, Metallurgy and Petroleum ("CIM") in its guidance for reporting section, a clarifying statement, such as "The Measured and Indicated Mineral Resources are additional to the Mineral Reserves" will replace "Measured and Indicated Mineral Resources are inclusive of Proven and Probable Mineral Reserves".

The sum of Mineral Reserves and Resources under the new method is not directly comparable to Mineral Resources (inclusive of those Mineral Resources modified to produce the Mineral Reserves) under the previous method. When converting from Measured and Indicated Mineral Resources to Mineral Reserves, a profitability test of USD 10/t is applied as opposed to USD 0/t, and other modifying factors, such as adjusting for mineral losses and dilution. Planned dilution for Chelopech comes primarily from the silica envelope and is mineralized.

Technical Information

Mineral Resource and Reserve estimates and other scientific and technical information contained in this news release were prepared by CSA Global (UK) Ltd. ("CSA"), in accordance with Canadian regulatory requirements set out in National Instrument 43-101 Standards of Disclosure for Mineral Projects ("NI 43-101"), and has been reviewed and approved by Galen White, B.Sc(Hons), FAusIMM, FGS, Managing Director and Principal Consultant of CSA, an independent Qualified Person ("QP"), as defined under NI 43-101. The NI 43-101 technical report entitled "NI 43-101 Technical Report, Shahumyan Project, Kapan, Republic of Armenia" dated March 23, 2015, in respect of the updated Mineral Resource Estimate disclosed herein, is being filed today on SEDAR at www.sedar.com. Edgar Urbaez, Corporate Director, Technical Services, of DPM, who is a QP and not independent of the Company, has also reviewed and approved the contents of this release.

The Mineral Resource estimates contained herein may be subject to legal, political, environmental or other risks that could materially affect the potential development of such Mineral Resources. Refer to the Risk Factors contained in the most recent annual information form of the Corporation and the related Technical Reports, all of which have been filed on the Sedar website at www.sedar.com, for more information with respect to the key assumptions, parameters, methods and risks of determination associated with the foregoing Mineral Resource estimates.

Cautionary note to U.S. Investors concerning estimates of Mineral Resources.

These estimates have been prepared in accordance with the requirements of Canadian securities laws, which differ from the requirements of U.S. securities laws. The terms "mineral resource", "measured mineral resource", "indicated mineral resource" and "inferred mineral resource" are defined in NI 43-101 and recognized by Canadian securities laws but are not defined terms under the U.S. Securities and Exchange Commission ("SEC") Guide 7 ("SEC Guide 7") or recognized under U.S. securities laws. U.S. investors are cautioned not to assume that any part or all of mineral deposits in these categories will ever be upgraded to mineral reserves. "Inferred mineral resources" have a great amount of uncertainty as to their existence, and great uncertainty as to their economic and legal feasibility. It cannot be assumed that all or any part of an "inferred mineral resource" will ever by upgraded to a higher category. Under Canadian securities laws, estimates of "inferred mineral resources" may not form the basis of feasibility or pre-feasibility studies. U.S. investors are cautioned not to assume that all or any part of an inferred mineral resource exists or is economically or legally mineable. Accordingly, these mineral resource estimates and related information may not be comparable to similar information made public by U.S. companies subject to the reporting and disclosure requirements under the U.S. federal securities laws and the rules and regulations thereunder, including SEC Guide 7.

ABOUT DPM

Dundee Precious Metals Inc. is a Canadian based, international gold mining company engaged in the acquisition, exploration, development, mining and processing of precious metals. The Company's principal operating assets include the Chelopech operation, which produces a copper concentrate containing gold and silver, located east of Sofia, Bulgaria; the Kapan operation, which produces a copper concentrate and a zinc concentrate, both containing gold and silver, located in southern Armenia; and the Tsumeb smelter, a concentrate processing facility located in Namibia. DPM also holds interests in a number of developing gold properties located in Bulgaria, Serbia, and northern Canada, including interests held through its 50.1% owned subsidiary, Avala Resources Ltd., and its 12.1% interest in Sabina Gold & Silver Corp.

FORWARD LOOKING STATEMENTS

This news release contains "forward looking statements" that involve a number of risks and uncertainties. Forward looking statements include, but are not limited to, statements with respect to future growth opportunities, the future price of gold and silver, the estimation of mineral reserves and resources, the realization of mineral estimates, the timing and amount of estimated future production and output, costs of production, capital expenditures, costs and timing of the development of new deposits, success of exploration activities, permitting time lines, currency fluctuations, requirements for additional capital, government regulation of mining operations, environmental risks, unanticipated reclamation expenses, title disputes or claims, limitations on insurance coverage and timing and possible outcome of pending litigation. Often, but not always, forward looking statements can be identified by the use of words such as "plans", "expects", or "does not expect", "is expected", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates", or "does not anticipate", or "believes", or variations of such words and phrases or state that certain actions, events or results "may", "could", "would", "might" or "will" be taken, occur or be achieved. Forward looking statements are based on the opinions and estimates of management and certain professionals as of the date such statements are made, and on certain assumptions, and they involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Corporation to be materially different from any other future results, performance or achievements expressed or implied by the forward looking statements.
Such factors include, among others: the availability of future growth opportunities, the actual results of current exploration activities; actual results of current reclamation activities; conclusions of economic evaluations; changes in project parameters as plans continue to be refined; future prices of gold, copper, zinc and silver; possible variations in ore grade or recovery rates; failure of plant, equipment or processes to operate as anticipated; accidents, labour disputes and other risks of the mining industry; delays in obtaining governmental approvals or financing or in the completion of development or construction activities, fluctuations in metal prices, as well as those risk factors discussed or referred to in the Technical Report and other documents filed from time to time with the securities regulatory authorities in all provinces and territories of Canada and available at www.sedar.com. Although the Corporation has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward looking statements, there may be other factors that cause actions, events or results not to be anticipated, estimated or intended. There can be no assurance that forward looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Unless required by securities laws, the Corporation undertakes no obligation to update forward looking statements if circumstances or management's estimates or opinions should change. Accordingly, readers are cautioned not to place undue reliance on forward looking statements.

Appendix

Mineral Reserve and Resource (inclusive of those Mineral Resources modified to produce the Mineral Reserves) as of 31 December 2013:

Tonnes
M
Au
Grade
g/t
Au Ounces
M
Ag
Grade
g/t
Ag
Ounces
M
Cu
Grade
%
Cu
Pounds
M
Zn
Grade
%
Zn
Pounds
M
MINERAL RESERVE
Proven 13.2 3.71 1.577 8.54 3.63 - 284 - -
Chelopech 10.6 3.3 1.128 9.93 3.395 1.21 284 - -
Krumovgrad (Upper Zone) 1.1 3.46 0.124 1.91 0.068 - - - -
Krumovgrad (Wall) 1.5 6.83 0.325 3.5 0.166 - - - -
Kapan - - - - - - - - -
Probable 16.9 3.2 1.742 4.57 2.487 - 240 - -
Chelopech 13.3 3.24 1.384 5.33 2.279 0.82 240 - -
Krumovgrad (Upper Zone) 3.5 3 0.337 1.75 0.197 - - - -
Krumovgrad (Wall) 0.1 5.54 0.02 2.93 0.011 - - - -
Kapan - - - - - - - - -
Proven and Probable 30.1 3.42 3.318 6.31 6.116 - 524 - -
Chelopech 23.9 3.26 2.512 7.37 5.674 0.99 524 - -
Krumovgrad (Upper Zone) 4.6 3.11 0.461 1.79 0.266 - - - -
Krumovgrad (Wall) 1.6 6.74 0.345 3.46 0.177 - -
Kapan - - - - - - - - -
MINERAL RESOURCE
Measured 21.4 4.22 2.909 8.79 6.060 - 553 - -
Chelopech 18.6 4.07 2.431 9.72 5.808 1.35 553 - -
Krumovgrad (Upper Zone) 1.1 3.46 0.125 1.91 0.069 - - - -
Krumovgrad (Wall) 1.7 6.32 0.353 3.27 0.183 - - - -
Kapan - - - - - - - - -
Indicated 17.3 3.57 1.986 14.05 7.816 - 266 - 118
Chelopech 10.2 3.95 1.293 8.39 2.742 1.06 237 - -
Krumovgrad (Upper Zone) 3.9 2.86 0.357 1.7 0.212 - - - -
Krumovgrad (Wall) 0.2 4.28 0.024 2.38 0.014 - - - -
Kapan 3 3.21 0.312 49.88 4.848 0.44 29 1.77 118
Measured and Indicated 38.6 3.93 4.895 11.14 13.875 - 819 - 118
Chelopech 28.7 4.03 3.724 9.25 8.550 1.25 791 - -
Krumovgrad (Upper Zone) 5.0 2.99 0.482 1.75 0.281 - - - -
Krumovgrad (Wall) 1.9 6.13 0.377 3.19 0.196 - - - -
Kapan 3.0 3.21 0.312 49.88 4.848 0.44 29 1.77 118
Inferred 18.0 2.75 1.588 28.01 16.173 - 256 - 253
Chelopech 8.2 2.71 0.712 11.23 2.952 0.92 166 - -
Krumovgrad (Upper Zone) 0.3 1.31 0.013 1.06 0.011 - - - -
Krumovgrad (Wall) 0.0 0.87 0.000 0.88 0.000 - - - -
Kapan 9.5 2.83 0.863 43.34 13.210 0.43 90 1.21 253
  1. The rounding of tonnage and grade figures has resulted in some columns showing relatively minor discrepancies in sum totals;
  2. Mineral Reserves, Measured, Indicated and Inferred Mineral Resources have been reported in accordance with NI 43-101 and the classification adopted by the CIM;
  3. Measured and Indicated Mineral Resources are inclusive of those Mineral Resources modified to produce the Mineral Reserves;
  4. Mineral Reserves and Resources may be subject to legal, political, environmental and other risks and uncertainties. Refer to the Company's Technical Reports for more information with respect to key assumptions, parameters and risks relating to the above estimates;
  5. Mineral Reserves and Resources estimates have been reviewed and prepared by CSA, that provides multi-disciplinary services to the global resources industry and is independent of the Company;
  6. Mineral Resources and Mineral Reserves estimates are based on long term metals prices of USD 1,250/oz Au, USD 23/oz Ag, USD 2.75/lb Cu and USD 0.85/lb Zn, and as of 31 December 2013;
  7. Chelopech Mineral Resources are based on a gold equivalent cut-off 3.0 g/t (Au + Cu*2.06) and a greater than USD 0 profit/tonne test using NSR analysis;
  8. Chelopech Mineral Reserves are based on a gold equivalent cut-off of 3.0 g/t (Au + Cu*2.06) and a cut-off of USD 10 profit/tonne using NSR analysis;
  9. Krumovgrad Mineral Reserves and Resources are based on a gold cut-off grade of 0.6 g/t for the Upper Zone and Overburden and of 0.8 g/t for the Wall; and,
  10. Kapan Mineral Resources are based on a gold equivalent cut-off of 2.24 g/t (Au + Cu*1.34 + Ag*0.023 + Zn*0.42) and a greater than USD 0 profit/tonne test using NSR analysis.
Données et statistiques pour les pays mentionnés : Canada | Tous
Cours de l'or et de l'argent pour les pays mentionnés : Canada | Tous

Dundee Precious Metals Inc

PRODUCTEUR
CODE : DPM.TO
ISIN : CA2652692096
CUSIP : 265269-20-9
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Dundee Precious Metals est une société de production minière de zinc et d'or basée au Canada.

Dundee Precious Metals est productrice de zinc, d'or, d'argent et de cuivre en Armenie, en développement de projets d'argent, de cuivre et d'or en Bulgarie.

Son principal projet en production est KAPAN en Armenie, ses principaux projets en développement sont CHELOPECH et KRUMOVGRAD en Bulgarie et son principal projet en exploration est SURDULICA en Bulgarie.

Dundee Precious Metals est cotée au Canada. Sa capitalisation boursière aujourd'hui est 1,9 milliards CA$ (1,4 milliards US$, 1,3 milliards €).

La valeur de son action a atteint son plus bas niveau récent le 22 janvier 2016 à 0,84 CA$, et son plus haut niveau récent le 18 avril 2024 à 10,78 CA$.

Dundee Precious Metals possède 178 440 000 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Dans les médias de Dundee Precious Metals Inc
27/02/2019Exyn introduces robots into Dundee Precious Metals' gold min...
13/04/2010Discovers New Gold Deposits in Bulgaria
Financements de Dundee Precious Metals Inc
09/10/2013Issued Shares and Warrants of Sabina Gold & Silver Corp. on ...
11/06/2013Announces Result of Early Warrant Exercise Program
Nominations de Dundee Precious Metals Inc
21/03/2013DPM Board Announces Executive Transition and Senior Officer ...
14/11/2012DPM Board Announces Senior Appointment
19/09/2012Eira Thomas Joins Dundee Precious Metals' Board of Directors
Rapports Financiers de Dundee Precious Metals Inc
15/10/2013NOTICE: DPM 2013 Third Quarter Financial Results
01/08/2013Announces 2013 Second Quarter Results
10/07/2013NOTICE: DPM 2013 Second Quarter Financial Results
09/05/2013Announces 2013 First Quarter Results
17/04/2013NOTICE: DPM 2013 First Quarter Financial Results
15/02/2013Announces 2012 Fourth Quarter and Annual Results and 2013 Gu...
24/01/2013NOTICE: DPM Fourth Quarter and Year End 2012 Results
07/11/2012Announces 2012 Third Quarter Results
18/10/2012NOTICE: Dundee Precious Metals 2012 Third Quarter Results
01/08/2012Announces 2012 Second Quarter Results and Updated 2012 Guida...
09/07/2012NOTICE: DPM 2012 Second Quarter Results
08/05/2012DPM First Quarter 2012 Financial Results
14/10/2011NOTICE: DPM Third Quarter 2011 Results
11/07/2011NOTICE: DPM Second Quarter 2011 Results
27/04/2011Notice: DPM Annual General Meeting and 2011 First Quarter Re...
23/02/2011DPM Reports Fourth Quarter 2010
Projets de Dundee Precious Metals Inc
16/09/2013s 2013 Production Guidance
16/05/2013(Chelopech)Confirms Fundamentals Unchanged; Chelopech Mine Operating at...
10/09/2012(Chelopech)DPM Files Technical Report on Chelopech Pyrite Recovery Proj...
13/01/2012(Krumovgrad)Files Technical Report on Krumovgrad Gold Project
24/11/2011(Krumovgrad)Bulgarian Government Approves EIA for DPM's Krumovgrad Gold ...
23/02/2011(Chelopech)DPM Reports Fourth Quarter 2010 and Year-End Results and Upd...
Communiqués de Presse de Dundee Precious Metals Inc
28/07/2016Dundee Precious Metals Announces 2016 Second Quarter Results
25/07/2016Dundee Precious Metals Announces Power Blackout in Namibia R...
11/07/2016DPM Announces Closing of C$54.65 Million Bought Deal Financi...
07/07/2016Dundee Precious Metals Announces Second Quarter Production R...
20/06/2016DPM Announces C$50 Million Bought Deal Financing
21/12/2015Dundee Precious Metals Announces 15% Increase to Measured an...
21/12/2015AVALA RESOURCES STARTS DRILLING ON THE LENOVAC PROJECT
30/11/2015AVALA RESOURCES ANNOUNCES EARN-IN AND JOINT VENTURE AGREEMEN...
19/11/2015Dundee Precious Metals Announces Approval of Main Detailed D...
05/11/2015Dundee Precious Metals Announces 2015 Third Quarter Results
04/11/2015Dundee Precious Metals Announces Changes to Board of Directo...
08/10/2015Dundee Precious Metals Announces Third Quarter Production Re...
15/09/2015Dundee Precious Metals Announces Maintenance of the Tsumeb S...
30/07/2015Dundee Precious Metals Announces 2015 Second Quarter Results
09/07/2015Dundee Precious Metals Announces Second Quarter Production R...
14/04/2015Dundee Precious Metals Announces First Quarter Production Re...
14/04/2015Announces First Quarter Production Results and Provides Noti...
31/03/2015Dundee Precious Metals Announces Reserve and Resource Update...
31/03/2015Announces Reserve and Resource Update for 2015
18/03/2015Dundee Precious Metals Announces Commencement of Annual Tsum...
18/03/2015Announces Commencement of Annual Tsumeb Smelter Shutdown
26/02/2015AVALA RESOURCES PROVIDES AN EXPLORATION UPDATE
18/02/2015Tags to Riches: Mining Company Tracks Production With Sensor...
13/02/2015Dundee Precious Metals Announces 2014 Fourth Quarter and Ann...
13/02/2015Dundee Precious Metals Announces 2014 Fourth Quarter and Ann...
22/01/2015NOTICE: Dundee Precious Metals 2014 Fourth Quarter and Year ...
14/01/2015(Chelopech)Announces Record Fourth Quarter Production at Chelopech and ...
14/01/2015Dundee Precious Metals Announces Record Fourth Quarter Produ...
06/11/2014Dundee Precious Metals Announces 2014 Third Quarter Results
05/11/2014Dundee Precious Metals Announces 2014 Third Quarter Results
16/10/2014NOTICE: Dundee Precious Metals 2014 Third Quarter Results
16/10/2014NOTICE: Dundee Precious Metals 2014 Third Quarter Results
08/10/2014Dundee Precious Metals Announces a Favourable Preliminary Ec...
08/10/2014Dundee Precious Metals Provides Third Quarter 2014 Productio...
03/10/2014Dundee Precious Metals Acquires Shares and Warrants of Avala...
30/07/2014Dundee Precious Metals Announces 2014 Second Quarter Results
14/07/2014NOTICE: DPM 2014 Second Quarter Results
10/07/2014Dundee Precious Metals Announces Krumovgrad Municipal Counci...
10/07/2014Dundee Precious Metals Announces Krumovgrad Municipal Counci...
26/06/2014Dundee Precious Metals Increases Revolving Credit Facility b...
20/05/2014Dundee Precious Metals Strengthens Senior Management Team
29/08/2013Announces First Underground Mineral Resource Estimate for th...
24/07/2012Reports on Progress of Acid Plant at Smelter in Namibia
30/04/2012Receives First Contact from Namibian Government on Tsumeb Sm...
23/04/2012DPM Exercises Warrants of Dunav Resources Ltd.
16/02/2012DPM Announces 2011 Deno Gold Open Pit Project and Undergroun...
26/01/2012(Krumovgrad)Bulgarian Court Dismisses Appeal of DPM's Krumovgrad Mining ...
30/11/2011(Krumovgrad)DPM: New Krumovgrad Feasibility Study Confirms Low Cash Cost...
15/09/2011Improves Safety and Operational Efficiency With AeroScout Re...
02/09/2011Dunav Resources and Dundee Precious Metals Complete Transact...
23/08/2011DPM to Acquire Shares and Warrants of Dunav Resources Ltd. o...
10/05/2011(Chelopech)DPM and Chelopech Mining Raise Final US$14.5 Million of Chel...
23/03/2011DPM Exercises Warrants of Avala Resources Ltd.
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TORONTO (DPM.TO)
10,78+0.84%
TORONTO
CA$ 10,78
18/04 14:56 0,090
0,84%
Cours préc. Ouverture
10,69 10,77
Bas haut
10,71 10,94
Année b/h Var. YTD
7,98 -  10,78 27,88%
52 sem. b/h var. 52 sem.
7,98 -  10,78 4,56%
Volume var. 1 mois
207 053 7,26%
24hGold TrendPower© : -11
Produit Copper - Gold - Silver - Zinc
Développe Copper - Gold - Silver
Recherche Molybdenum
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 23/02/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
202426,97%
202330,41%9,9210,00
2022-14,00%8,415,41
2021-17,27%9,956,99
202058,30%9,9610,03
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,68 AU$-0,52%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
11,19 US$+2,75%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,54 GBX-2,53%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,50 CA$+5,93%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
16,00 CA$+2,27%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+4,26%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,20 AU$+7,89%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,94 CA$+3,74%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
51,60 US$-0,13%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,03 AU$-2,94%Trend Power :