Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en

Lithium One Inc.

Publié le 07 mars 2011

Announces Resource Estimate for Sal de Vida

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Canada | K Street | Lithium |
� 
If you're having trouble viewing this email, click here.
� 
Lithium One Inc.
� 

Lithium One Delineates Resource of 5.4 Million Tonnes Lithium Carbonate Equivalent and 21.3 Million Tonnes Potash Equivalent at

Sal de Vida Brine Project, Argentina

 

Vancouver, Canada� �  March 7, 2011� � � � � � � � � � � � � � NEWS RELEASE: 11-04

Highlights

·� � � � � � � �  Among the largest and highest grade lithium-potassium brine resources in the world[1]� 

·� � � � � � � �  Fully independent inferred resource estimate includes:

o� � � � � � �  5,440,000 tonnes lithium carbonate equivalent

o� � � � � � �  21,300,000 tonnes potash equivalent

o� � � � � � �  Average Li grade 695 mg/L

o� � � � � � �  Average K grade 7,590 mg/L

·� � � � � � � �  Near-surface deposit has significant potential for expansion:

o� � � � � � �  Resource covers only 65% of the project area containing known high-grade lithium and potassium brine

o� � � � � � �  Resource to only 140 metres depth and deposit is open below

·� � � � � � � �  Since June of 2010, the Korean Consortium has funded US $6.3 million of an estimated US $15.0 million budget through feasibility.

Lithium One Inc. (the "Company") (TSX-V: LI), is pleased to report its first independent lithium (“Li”) and potassium (“K”) resource statement for its Sal de Vida brine project at Salar del Hombre Muerto, in Salta and Catamarca provinces of Argentina.�  The inferred resource estimate, prepared by E.L. Montgomery and Associates, is summarized in Table 1 below and includes 5,440,000 tonnes of lithium carbonate (“Li2CO3”) equivalent and 21,300,000 tonnes of potash (“KCl”) equivalent.�  These values represent contained lithium expressed as lithium carbonate and contained potassium expressed as potash.�  The Sal de Vida deposit has emerged in this initial resource estimate as one of the largest and highest grade undeveloped lithium brine deposits in the world1 with significant expansion potential.� 

 

 

Patrick Highsmith, the President & CEO of Lithium One, commented on the maiden resource for the Sal de Vida Project, “We are very pleased that after just 18 months we have established a large and extremely high quality lithium and potash brine resource that ranks amongst the largest in the world.. This work clearly confirms the significance and quality of the Sal de Vida deposit, while the on-going production of lithium carbonate and potash from our pilot recovery plant demonstrates the robustness of our simple and low cost processing system. These excellent developments are major steps towards bringing Sal de Vida into commercial production.”

 

 

Table 1. Sal de Vida Brine Resource Statement

 

Brine Volume

(m3)

Avg. Li

(mg/l)

In situ Li (tonnes)

Li2CO3

Equivalent

(tonnes)

Avg. K

(mg/l)

In situ K

(tonnes)

KCl Equivalent (tonnes)

Phase I Resource

1,470,000,000

695

1,020,000

5,440,000

7,590

11,200,000

21,300,000

The reader is cautioned that mineral resources are not mineral reserves and do not have demonstrated economic viability.

 

The resource estimate was prepared in accordance with the guidelines of National Instrument 43-101 and uses best practice methods specific to brine resources, including a reliance on core drilling and sampling methods that yield depth-specific chemistry and effective (drainable) porosity measurements.�  The resource calculations were also confirmed using three different resource models.�  The work was completed by independent qualified person Mr. Michael Rosko of the international specialist hydrogeology firm E.L. Montgomery & Associates (M&A).

 

 

All resources are reported at a 500 mg/L lithium cut-off, meaning any blocks of brine in the model containing less than 500 mg/L lithium were excluded from the inferred resource estimation.�  In addition, the resource was calculated only to the depth of each exploration well, even though almost every well bottomed in an aquifer containing lithium and potassium rich brine.

 

 

The resource is defined entirely with core drilling and it lies within 140 metres of the surface.�  It is open at depth, as well as laterally to the south and northwest. The core drilling program continues with both infill drilling and step-out holes into areas known to contain near surface brine rich in lithium and potassium.�  The footprint of the initial resource is approximately 16,900 hectares, whereas sampling of surface brines has identified high lithium and potassium values over more than 26,000 hectares.

 

 

The consistently favorable low magnesium and sulfate content of the resource confirm that the chemistry of the Sal de Vida brine is very similar to that produced by FMC Corporation at its adjacent Fénix Project.�  Some important parameters of the brine composition are:

·� � � � � � � �  Average density of the brine: 1.19 g/cm3

·� � � � � � � �  Average Magnesium/Lithium ratio: 2.19

·� � � � � � � �  Average Sulphate/Lithium ratio: 10.76

 

 

Based on current stratigraphic information, approximately 65% of the brine volume in this resource is hosted by predominantly sandy aquifers and 13% by at least one large halite (common salt) body.�  The balance is hosted in silt, travertine, gravel, or clay dominated units.

 

 

The total contained lithium and potassium values are based on measurements of effective (drainable) porosity distributed throughout the aquifer volume that defines this resource. This method of porosity determination is designed to estimate the portion of the total porosity that can reasonably be expected to be drained by pumping; however, these in situ estimates may differ from total extractable quantities.�  The porosity of the resource volume varies with geology but to date effective porosity has been predictable by hydrostratigraphic units; and the average for the entire database is approximately 7.9%. These porosity values compare favourably to other commercial lithium brine operations, such as FMC’s Fénix Project that adjoins Sal de Vida on the west.�  The average effective porosity in the Fénix reserve is approximately 7%[2].

 

 

Maps, sections, and additional information about this resource will be available on the Sal de Vida Project page of the Company's website http://www.lithium1.com/sv-explorations.php .

 

 

Resource Estimation Methodology

A total of 1232 metres of drilling from 10 holes was evaluated for this resource calculation.�  The total number of drainable porosity results used in the computations was 122, and the total number of brine samples used in this resource calculation was 119 (not including QA/QC samples).�  The average spacing of vertical samples for both drainable porosity and chemistry is approximately 10 metres. � Of the 10 holes used for the resource analysis, only one reached the base of the basinal sediments; all others were terminated after reaching target depth or due to drill limitations. � The total thickness of the basin, and the total thickness of saturated sediments, is unknown for most of the basin.

 

 

In order to confirm the results, the consultants chose to estimate the resource using three different methodologies: two variations of a modified polygonal technique (“Methods 1 and 2”) and Kriging using a linear variogram (“Method 3”).�  The inferred resource reported here was calculated from the standard polygonal method, Method 1.�  Hydrostratigraphic units have variable thickness and were determined by the consultants based on anticipated similar hydraulic properties.�  The values for drainable porosity and grade (lithium and potassium values) for each hydrostratigraphic unit were derived from direct measured values from the well. The unit thicknesses combined with the areas yield a volume. The volumes combined with the drainable porosity values, representing the amount of fluid available from the formation, yield the tonnage of brine. Applying the grade, represented as lithium carbonate and potassium chloride equivalents then provides the estimated resource for each block, which are then summed.

 

 

The resource tonnages from Methods 2 and 3 confirm and validate the reported results as a rigorous and conservative estimate of the contained lithium and potassium resources.�  The results from all three models will be described in the NI 43-101 Technical Report to be filed on SEDAR and posted on the Company’s website (www.lithium1.com).

 

 

The primary analytical laboratory for the data used in this resource is Alex Stewart Assayers of Mendoza, Argentina. Alex Stewart’s Mendoza lab is accredited to ISO 9001:2008 and ISO14001:2004 for its geochemical and environmental labs for the preparation and analysis of numerous sample types, including waters.�  The details of analytical methodologies and quality assurance protocols were reported in the Company’s first NI 43-101 Technical Report, which was filed on SEDAR in 2010.

 

 

The porosity determinations were made by Core Laboratories of Houston, Texas.�  Core Laboratories is a leading provider of proprietary and patented reservoir description, production enhancement and reservoir management services.�  Core Laboratories has demonstrated that its Quality Management System is in compliance with certification to� ISO 9000:2008. � The scope of this registration is:�  providing state of the art petrophysical and geological analysis and interpretation of core samples from rock.� � 

 

 

Qualified Person

The resource evaluation work was completed by Mr. Michael Rosko of E.L.. Montgomery and Associates.�  Mr. Rosko is a Registered Geologist in Arizona, California, and Texas and a qualified person (QP) as defined in NI 43-101.�  Hydrologists from M&A are on site at Sal de Vida during all drilling and sampling operations; and the team has experience at 17 salars in the Americas, including Salar de Atacama and other lithium bearing salars.�  Portions of the resource work pertaining to quality control and analytical methodology were completed by Dr. Jeffrey A. Jaacks, a member of the American Institute of Professional Geologists and a qualified person (QP) as defined in NI 43-101.�  Mr. Rosko, M&A, and Dr. Jaacks are completely independent of Lithium One.�  These qualified persons have read and approved the content of this news release.�  A Technical Report prepared under the guidelines of NI 43-101 standards describing the resource estimation will be filed on SEDAR within 45 days of this release.

 

 

About Lithium One:

Lithium One Inc. is a Canadian-based explorer and developer of mineral properties with a specific focus on lithium.�  The Company has two major lithium projects funded through feasibility by earn-in partners: the brownfields Sal de Vida lithium brine project in Argentina, in which KORES, LG International and GS Caltex are earning a maximum of 30% project equity; and the James Bay bulk tonnage spodumene project in Quebec, in which Galaxy Resources is earning up to 70% project equity. The Sal de Vida option agreement also includes a provision for a project completion guarantee in regards to debt financing and an off-take agreement for up to 50% of the lithium production. The Company’s strategy is to draw upon its quality team and employ best-practice to develop its projects into leading suppliers of low-cost, high quality lithium products to the global battery market.

 

 

ON BEHALF OF THE BOARD OF DIRECTORS,

Patrick Highsmith, M.Sc.

 

President and Chief Executive Officer

 

Lithium One Inc.

 

2700-130 Adelaide Street West,

Toronto, ON M5H 3P5 Canada

Email: info@lithium1.com

 

Website: www.lithium1.com

 

FOR FURTHER INFORMATION, PLEASE CONTACT

 

 

Investor Inquiries:� � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � 

Robert Orr� � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � 

Telephone: 604-805-2126� � � � � � � � � � � � � � � � � � � � � � � � � � � � � � 

� � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � 

Email: ro@lithium1.com� � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � 

 

 

 

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.� 

The reader is cautioned that mineral resources are not mineral reserves and do not have demonstrated economic viability.

Forward-Looking Statements

This document may contain “forward-looking information” within the meaning of Canadian securities legislation (hereinafter referred to as "forward-looking statements"). All statements, other than statements of historical fact, included herein including, without limitation statements relating to; the completion of a Feasibility Study, securing of debt for future project construction, purchase of future mine production, the timing for completion of an NI 43-101 compliant resource and other matters related to the exploration and development of the Project, are forward-looking statements.�  These forward-looking statements are made as of the date of this document and the Company does not intend, and does not assume any obligation, to update these forward-looking statements. Forward-looking statements relate to future events or future performance and reflect management’s expectations or beliefs regarding future events.�  By their very nature forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Company to be materially different from any future results, performance or achievements expressed or implied by the forward-looking statements.�  Factors that could cause actual results to differ materially from those in forward-looking statements include unsuccessful exploration results, changes in metals prices, changes in the availability of funding for mineral exploration, unanticipated changes in key management personnel and general economic conditions, title disputes as well as those factors detailed from time to time in the Company’s interim and annual financial statements and management’s discussion and analysis of those statements, all of which are filed and available for review on SEDAR at www.sedar.com.�  In certain cases, forward-looking statements can be identified by the use of words such as “plans”, “expects” or “does not expect”, “is expected”, “budget”, “scheduled”, “estimates”, “forecasts”, “intends”, “anticipates” or “does not anticipate”, or “believes”, or variations of such words and phrases or statements that certain actions, events or results “may”, “could”, “would”, “might” or “will be taken”, “occur” or “be achieved” or the negative of these terms or comparable terminology.�  Although the Company has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking statements, there may be other factors that cause actions, events or results not to be as anticipated, estimated or intended. There can be no assurance that forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements.�  Accordingly, readers should not place undue reliance on forward looking statements.



[1] Data from SEDAR, EDGAR and The Economics of Lithium, Eleventh Edition, Roskill Infomation Services, 2009.

[2] Lithium One NI 43-101 Technical Report on the Sal de Vida Project, April 2010. Filed on SEDAR.


 

SnapMail is a Service of:
www.RMC.mobi
Lithium One Inc.
2700-130 Adelaide Street West
Toronto, ON M5H 3P5

Tel: 416-361-2830
Fax: 416-364-5400

info@lithium1.com
www.lithium1.com
� 
If you DO NOT want to receive emails from us, click here.
� 
.
Données et statistiques pour les pays mentionnés : Canada | Tous
Cours de l'or et de l'argent pour les pays mentionnés : Canada | Tous

Lithium One Inc.

CODE : LI.V
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Lithium One est une société d’exploration minière basée au Canada.

Lithium One est productrice de lithium en Argentine, et détient divers projets d'exploration au Canada et au Mexique.

Son principal projet en production est SAL DE VIDA BRINE en Argentine et ses principaux projets en exploration sont GARRISON CREEK JV - GOLDEN REWARD et FERN ELIZABETH au Canada et PINOS au Mexique.

Lithium One est cotée au Canada. Sa capitalisation boursière aujourd'hui est 41,8 millions CA$ (30,6 millions US$, 28,6 millions €).

La valeur de son action a atteint son plus bas niveau récent le 25 août 2017 à 0,04 CA$, et son plus haut niveau récent le 18 novembre 2021 à 6,25 CA$.

Lithium One possède 58 050 000 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Financements de Lithium One Inc.
12/04/2012Announces Completion of Financing by Galaxy Resources Limite...
Nominations de Lithium One Inc.
12/04/2011Appoints Matysek as CEO
Projets de Lithium One Inc.
09/05/2012Obtains Interim Court Order For Merger With Galaxy Resource...
19/04/2012Board Maintains Recommendation to Approve Merger with Galaxy...
30/03/2012Announces Merger With Galaxy Resources Limited Valued At A...
01/03/2012announces successful short term pumping tests at the Sal de ...
14/09/2011Galaxy Commences Feasibility Study at Lithium One's James Ba...
31/08/2011Defines New Zone of High Grade Lithium-Potash Brine at Sal d...
07/03/2011Announces Resource Estimate for Sal de Vida
17/02/2011(Sal De Vida Brine)Reports First Production of Lithium Carbonate at Sal de Vida...
Communiqués de Presse de Lithium One Inc.
22/06/2016American Lithium in the Thick of the White Gold Rush of Lith...
04/07/2012and Galaxy Complete Plan of Arrangement
26/06/2012Receives Final Court Approval for Arrangement with Galaxy Li...
19/06/2012Securityholders And Galaxy Shareholders Approve Plan Of Arra...
07/06/2012and Galaxy Agree to Extend Redemption Date on Exchangeable S...
17/05/2012Alcoa Groundbreaking Launches $90 million Aluminum Lithium O...
05/10/2011Announces Positive Preliminary Economic Assessment for the S...
02/09/2011Announces Change of Auditors
22/06/2011to Complete PEA at Sal de Vida
15/06/2011Commences Pumping Tests
17/02/2011News Release
15/02/2011Lithium One Finalizes James Bay Earn-In
06/01/2011January 6, 2010
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TSX-V (LI.V)
0,720-2.70%
TSX-V
CA$ 0,720
26/04 16:59 -0,020
-2,7%
Cours préc. Ouverture
0,740 0,740
Bas haut
0,720 0,760
Année b/h Var. YTD
0,690 -  1,56 -53,25%
52 sem. b/h var. 52 sem.
0,690 -  2,98 -75,17%
Volume var. 1 mois
155 518 -21,74%
24hGold TrendPower© : -13
Produit
Développe
Recherche
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
2024-64,71%
2023-27,53%4,881,55
2022-34,99%4,581,56
2021254,92%6,251,21
2020876,00%2,980,13
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,70 AU$-0,65%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
12,26 US$+2,68%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,53 GBX-1,87%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,64 CA$-1,86%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
16,23 CA$+4,04%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+4,26%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,20 AU$+2,63%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,88 CA$+0,53%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
52,71 US$+0,19%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+5,56%Trend Power :