Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en
Global Hunter Announces Results of Preliminary Economic Assessment and Updated Resource Estimate for Las Posadas Copper Deposit, La Corona de Cobre Project, Chile
Published : September 25, 2012
( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Copper |

VANCOUVER, BRITISH COLUMBIA--(Marketwire - Sept. 25, 2012) - Global Hunter Corp. (News - Market indicators) ("Global Hunter" or the "Company") is pleased to announce results of a preliminary economic assessment ("PEA") on an updated resource estimate for the Las Posadas copper deposit at its La Corona de Cobre project.

Highlights

  • Base Case NPV (5%) of $79.6 million
  • Base Case IRR of 75.4%
  • Estimated capital costs of $75 million
  • Mining rate of 8,500 tonnes per day
  • Base Case copper production of 105.2 million pounds over mine life of 3.75 years

"We are very pleased with the Preliminary Economic Assessment provided by GeoVector, which is an important milestone for Global Hunter," stated Rudy Brauer, President and CEO of Global Hunter Corp. "The Base Case NPV (5%) of $79.6 million was based on a copper price of $3.25 per pound. At $3.50 per pound copper, the project NPV (5%) increases to $103.7 million. Our goal is to continue progressing towards production with the implementation of feasibility level studies at Las Posadas while we explore additional exploration targets at the La Corona de Cobre project."

Las Posadas Preliminary Economic Assessment

A preliminary evaluation of the potential economic viability of the Las Posadas Deposit has been prepared by GeoVector Management Inc. ("GeoVector") of Ottawa, Ontario. For the purposes of this study, it was assumed that open pit mining at a rate of 8,500 tpd, with processing by heap leaching of soluble copper with the SX-EW process would be employed to exploit the resource. To optimise the Deposit, Gemcom Whittle was used to identify the pit that will maximise the cash flow from the operation.

Results of the Base Case and Sensitivity Analysis Whittle Pit Optimisation Results*

  Base Case   Sensitivity Analysis  
Copper Price per lb $3.25 $3.00 $3.50 $3.75
Pit No. 36 36 36 36
Mine Life (years) 3.75 3.38 4.33 4.66
Strip Ratio 3.23 3.19 2.97 2.88
Total Mined Rock 43,815,197 39,108,501 47,457,772 49,804,121
Waste Mined 33,442,256 29,777,594 35,475,918 36,918,886
Process Tonnes 10,373,117 9,331,064 11,982,056 12,885,441
CuS (%) Insitu 0.575 0.602 0.530 0.501
CuS (%) Recovered 0.460 0.482 0.424 0.401
CuS (lbs) Insitu 131,494,299 123,839,007 140,002,895 142,320,289
CuS (lbs) Recovered 105,195,439 99,071,206 112,002,316 113,856,231
Discounted Cash Flow (Best) $79,648,000.00 $56,601,000.00 $103,784,653.00 $128,822,880.00
Internal Rate of Return % (Best) 75.4 57.5 89.6 104.29

* Mineral resources that are not mineral reserves do not have demonstrated economic viability. The PEA is preliminary in nature, and is based partially on Inferred mineral resources that are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as mineral reserves. There is no certainty that the PEA will be realized.

The base case Whittle pit optimisation was completed at a copper price of $3.25/lb and a recovery rate of 80% of soluble copper. The copper price of $3.25/lb approximates the 3 year trailing average (2009-2011). The recovery rate of 80% CuS is based on recent metallurgical test work completed by Global Hunter. Pit design, and capital and operating costs were provided by Global Hunter and approved by GeoVector.

Based on the resource model and inputs at the time of optimization, including a $3.25/lb copper price an initial $75 million capital expenditure, it was identified that 10.4 Mt at a grade of 0.575 CuS would be extracted from an open pit. A strip ratio is in the order of 3.23 (~3:1). A mine life of 3.75 years is based on an estimated mill rate of 8,500 tpd. The pit results in a discounted cash flow of $79.6 million. All of the material within the pit fell within the oxidized domain, and approximately 94 % of the material within the pit is categorized as Indicated mineral resource.

As a test to the sensitivity of the economic viability of the Deposit to changing copper price, additional Whittle pit runs were completed at copper prices of $3.00, $3.50 and $3.75. As is expected, an increase in the copper price resulted in an increase in the mine life, a decrease in the strip ratio, and an increase in pounds of soluble copper produced, as well as improved discounted cash flow and an improved internal rate of return.

Las Posadas Updated Resource Estimate

Prior to conducting the PEA, GeoVector completed a revised resource estimate at Las Posadas, the details of which are tabulated below:

Oxide Zone

Total Cu (%) Indicated Inferred
Tonnes TCu (%) * SCu (%) ** Tonnes TCu (%) * SCu (%) **
Cut-off Grade lbs Grade lbs Grade lbs Grade Lbs
0.10 % 28,438,896 0.51 317,005,277 0.30 190,302,869 2,937,446 0.34 21,959,603 0.19 12,408,826
0.15 % 26,116,251 0.54 310,545,714 0.33 188,304,539 2,611,971 0.37 21,058,011 0.21 12,145,408
0.20 % 23,157,060 0.59 299,097,620 0.36 183,991,873 2,174,727 0.41 19,417,474 0.24 11,653,387
0.25 % 20,036,240 0.64 283,625,224 0.40 176,959,794 1,524,192 0.48 16,198,588 0.30 10,203,924
0.30 % 17,132,310 0.70 266,076,803 0.45 168,401,437 1,131,129 0.55 13,827,180 0.37 9,236,329
0.35 % 14,696,511 0.77 248,667,128 0.49 159,364,589 721,862 0.69 10,917,818 0.49 7,779,524
0.40 % 12,589,372 0.83 231,289,565 0.54 150,130,852 551,645 0.78 9,493,615 0.57 6,963,960

Sulphide Zone

Total Cu (%) Indicated Inferred
Tonnes TCu (%) * Tonnes TCu (%) *
Cut-off Grade lbs Grade lbs
0.10 % 5,341,114 0.47 55,079,350 16,918,882 0.45 167,682,461
0.15 % 4,819,246 0.51 53,643,194 16,060,182 0.47 165,133,629
0.20 % 4,038,383 0.57 50,676,696 14,274,363 0.50 158,351,221
0.25 % 3,552,109 0.62 48,276,625 10,788,595 0.59 140,443,308
0.30 % 3,112,095 0.67 45,616,671 7,333,713 0.74 120,323,097
0.35 % 2,741,607 0.71 42,964,514 6,688,857 0.78 115,655,285
0.40 % 2,259,212 0.78 38,970,625 6,078,349 0.83 110,631,973

* TCu (%) - Total Copper
** SCu (%) - Soluable Copper

The Las Posadas updated mineral resource estimate is based on 47 Reverse Circulation (RC) and 35 diamond drill holes (NQ) totaling 18,884 metres, with 8,596 assays. Holes were drilled by Global Hunter and others in six drill campaigns conducted between 1994 and 2007. These 82 drill holes are spaced primarily 50 to 100 metres apart along a strike length of approximately 1,700 metres. The drill holes primarily tested to a vertical depth of 150 to 200 metres, with a few holes testing to a vertical depth of 300 metres in the central parts of the deposit.

Geological models were constructed of the copper oxide and copper sulphide mineralized zones. The models were used to constrain the composite values chosen for interpolation, and the ore blocks reported in the mineral resource. A block model with block dimensions of 5 x 5 x 2 metres in the x, y and z directions was placed over resource model solids with only that proportion of each block below the topographic/overburden surface and inside the solid recorded. Grades for Total Copper (TCu %) and Soluble Copper (SCu % )were interpolated into the blocks by the inverse distance squared (ID2) method using a minimum of 4 and maximum of 20 composites (within a minimum of two drill holes) to generate block grades in the Indicated category and a minimum of 2 and maximum of 20 composites to generate block grades in the Inferred category.

Two metre composite samples were used in the resource estimation. An average specific gravity (SG) of 2.77 was used for the copper oxide resource estimate and an SG value of 2.89 was used for the copper sulphide resource estimate. SG values are based on SG testing of representative core from the copper oxide (379 samples) and copper sulphide (160 samples) zones. Gemcom GEMS 6.3 software was used to complete the resource estimate.

The updated Indicated and Inferred mineral resource estimate was prepared by GeoVector and is reported in accordance with Canadian Administrator's 43-101 and was estimated in conformity with generally accepted CIM "Estimation of Mineral Resource and Mineral Reserves Best practices" guidelines, including the critical requirement that all mineral resources "have reasonable prospects for economic extraction".

Allan Armitage, PhD., P.Geol., and Joe Campbell, B.Sc., P. Geo., of GeoVector Management Inc., is responsible for the technical comments related to the resource estimate and PEA and its parameters and is an "independent qualified person" for the purposes of National Instrument 43-101 Standards of Disclosure for Mineral Projects of the Canadian Securities Administrators and has verified the data disclosed in this release.

A technical report in support of the PEA and revised resource estimate will be filed on SEDAR within 45 days.

Las Posadas Future Work Plans

Global Hunter proposes to move forward with pre-feasibility level studies which will include infill drilling in order to bring all leach pad material within the pit boundaries to indicated or measured resource categories. This will also supply samples for further metallurgical testing. Other work will include environmental baseline monitoring, engineering studies of important infrastructure aspects including power supply, water supply and transportation as well as geotechnical and labour and equipment cost studies.

In addition, the Company plans to drill test several nearby shear zones. If successful, these targets could be developed into additional mineral resources.

On Behalf of the Board of Directors

GLOBAL HUNTER CORP.

Rudy Brauer, President and CEO, Global Hunter Corp.

Certain statements contained herein may constitute forward-looking statements and are made pursuant to the "safe harbor" provisions of the United States Private Securities Litigation Reform Act of 1995 and Canadian securities laws. Forward-looking statements are statements that relate to future events. Such statements include estimates, forecasts and statements as to management's expectations with respect to, among other things, business and financial prospects, financial multiples and accretion estimates, future trends, plans, strategies, objectives and expectations, including with respect to production, exploration drilling, reserves and resources, exploitation activities and events or future operations. Information inferred from the interpretation of drilling results and information concerning mineral resource estimates may also be deemed to be forward-looking statements, as it constitutes a prediction of what might be found to be present when, and if, a project is actually developed.

In some cases, you can identify forward-looking statements by terminology such as "may", "should", "expects", "plans, "anticipates", "believes", "estimates", "predicts", "potential", or "continue" or the negative of these terms or other comparable terminology. These statements are only predictions and involve known and unknown risks, uncertainties and other factors that may cause our or our industry's actual results, level of activity, performance or achievements to be materially different from any future results, levels of activity, performance, or achievements expressed or implied by these forward-looking statements.

While these forward-looking statements, and any assumptions upon which they are based, are made in good faith and reflect our current judgment regarding the direction of our business, actual results will almost always vary, sometimes materially, from any estimates, predictions, projections, assumptions or other future performance suggestions herein. Except as required by applicable law, the Company does not intend to update any forward-looking statements to conform these statements to actual results.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Global Hunter Corp.
Investor Relations
(604) 681-4653 or 1-866-282-8398
(604) 568-4902 (FAX)
info@globalhunter.ca
www.globalhunter.ca

Global Hunter Corp.

EXPLORATEUR
CODE : BOB.V
ISIN : CA37945M2004
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Global Hunter est une société d’exploration minière d'argent et d'or basée au Canada.

Global Hunter détient divers projets d'exploration au Canada et au Chili.

Ses principaux projets en exploration sont GOLDEN EAGLE, RABBIT NORTH, RABBIT SOUTH et CASTLE MOUNTAIN au Canada.

Global Hunter est cotée au Canada. Sa capitalisation boursière aujourd'hui est 491 332 CA$ (377 933 US$, 340 404 €).

La valeur de son action a atteint son plus haut niveau récent le 12 novembre 2010 à 3,60 CA$, et son plus bas niveau récent le 04 mars 2016 à 0,01 CA$.

Global Hunter possède 14 038 058 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Projets de Global Hunter Corp.
29/01/2013(La Corona De Cobre)Announces Trench Results for La Corona de Cobre Project, Chi...
Communiqués de Presse de Global Hunter Corp.
23/01/2013(Ar)Share Consolidation to Be Effective January 23, 2013
21/01/2013-Convertible Loan Extended
11/01/2013-Corporate Update
25/09/2012(Ar)Announces Results of Preliminary Economic Assessment and Upd...
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TSX-V (BOB.V)
0,035+40.00%
TSX-V
CA$ 0,035
30/06 11:54 0,010
40%
Cours préc. Ouverture
0,025 0,035
Bas haut
0,035 0,035
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
- -  0,035 -12,50%
Volume var. 1 mois
10 000 -12,50%
24hGold TrendPower© : 8
Produit
Développe
Recherche Gold - Silver
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,73 AU$+0,13%Trend Power :
OceanaGold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
10,69 US$-0,09%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,73 GBX+1,39%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,05 CA$-9,09%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,63 CA$-0,38%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
16,72 CA$-1,59%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+0,00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,22 AU$+2,33%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
2,18 CA$+10,10%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
49,71 US$-0,24%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+0,00%Trend Power :