Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en
Lake Shore Gold Announces Results of Preliminary Economic Assessment for Timmins West Mine, PEA Highlights Potential for Positive Economics, Substantial Cash Flow and Attractive Returns
Published : February 28, 2012
( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Canada | Dollar |

TORONTO, ONTARIO--(Marketwire - Feb. 28, 2012) - Lake Shore Gold Corp. (News - Market indicators)(NYSE Amex:LSG) ("Lake Shore Gold" or the "Company")

  • PEA shows potential for over $60 million of free cash flow1 in Year 2, and over $100 million of annual free cash flow starting in Year 3 (based on current gold prices)

  • Potential 10 years of production based on current resources, with annual production in Years 3 to 9 averaging 160,000 ounces recovered, peaking at 175,000 ounces   

  • Average annual cash operating costs of US$625 per ounce, US$590 per ounce in Years 3 to 9 (based on a Canadian dollar at par with U.S. dollar)

  • At current market prices2, potential for total undiscounted cash flow of $1.14 billion, pre-tax net present value ("NPV") of $880 million (5% discount rate) and a payback period of 1.25 years

  • At analyst consensus pricing3, potential undiscounted cash flow of $730 million, a pre-tax NPV of $570 million (5% discount rate), with payback period of 1.25 years

  • Significant opportunities exist to enhance project economics through improved operating cost performance, capital optimization, resource growth and increased throughput.

Lake Shore Gold Corp. today announced results from a preliminary economic assessment ("PEA") for the Company's Timmins West Mine located 18 kilometres west of Timmins, Ontario. Timmins West Mine is envisioned as an underground mining operation targeting the extraction of material from two adjacent deposits, the Timmins Deposit and Thunder Creek Deposit. The PEA takes into consideration the initial resource at Thunder Creek, released on November 16, 2011, and the updated resource at Timmins Deposit, released on February 15, 2012, and represents the first time the resources at the Timmins and Thunder Creek deposits have been evaluated as a fully integrated, long-term mining operation. Prior evaluations, including a pre-feasibility study released in 2007, considered only the Timmins Deposit and are no longer considered valid. The PEA does not consider potential production, costs or economics from the Company's Bell Creek Mine Project. This PEA is preliminary in nature. It includes inferred mineral resources that are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as mineral reserves, and there is no certainty that the preliminary economic assessment will be realized. 

Tony Makuch, President and CEO of Lake Shore Gold, commented: "With the establishment of a large resource at Thunder Creek, updated resources at Timmins Deposit and the combination of the two deposits into a single mining operation, the project has changed considerably since we released the initial pre-feasibility study. The purpose of the PEA is to assist us in long-term planning for the development and exploitation of the Timmins West Mine deposits, and to demonstrate, on a preliminary basis, the economic potential of the Timmins West Mine. The work performed will also support further studies to complete an updated reserve statement. An in-depth review of the resources, including inferred resources, was completed for conversion into a potential mining plan using conservative production and capital and operating cost assumptions. The study sets a benchmark for the Timmins West Mine and there are many opportunities to improve the economics. Overall, the PEA indicates that Timmins West Mine has the potential to generate substantial cash flow and attractive returns for shareholders."

This PEA was developed through the combined efforts of the Company's internal Projects Team and independent consultants at Stantec. Operational input and experience gained from mining and exploration development at both the Timmins and Thunder Creek deposits over the last year has been reflected in this work.

A National Instrument ("NI") 43-101 technical report incorporating the results of the PEA will be filed on SEDAR at www.sedar.com before the end of March 2012.

The PEA assumes the extraction of approximately 1.4 million ounces of gold over 10 years at an average grade of 5.2 grams per tonne ("gpt"). The ounces to be extracted include the majority of Indicated resources at the two deposits as well as a portion of the Inferred resources.  Current National Instrument ("NI") resources at Timmins West Mine include 1,122,500 ounces (5,826,000 tonnes at an average grade of 5.99 grams per tonne ("gpt")) in the Indicated category and 791,500 ounces (4,272,000 tonnes at an average grade of 5.76 gpt) in the inferred category. The PEA study does not take into consideration the significant exploration potential of both the Timmins and Thunder Creek land positions.

Highlights of the PEA

  • Potential to produce approximately 1.4 million ounces over 10 years
  • Assumed average head grade to mill of 5.2 gpt
  • Anticipated annual production averaging 140,000 ounces, with average production in Years 3 to 9 of 160,000 ounces and peak production of 175,000 ounces
  • Anticipated annual cash operating costs averaging US$625 per ounce, with cash operating costs during Years 3 to 9 averaging US$590 per ounce (assumes exchange rate at par) (royalties to add US$30 to US$50 per ounce of costs)
  • Based on current market conditions: undiscounted cash flow of $1.14 billion, a pre-tax NPV of $880 million (5% discount rate), an IRR of 115% and a payback period of 1.25 years (Current prices include a gold price of US$1,775 per ounce and an exchange rate at par)
  • Based on analyst consensus pricing: undiscounted cash flow of $730 million, a pre-tax NPV of $570 million, an internal rate of return of 100% and an estimated payback period of 1.25 years (Analyst consensus prices include gold prices starting at $US 1,744/oz in 2012, declining to a long-term price of $US 1,200/oz in 2018, and an average exchange rate of $US 1.00 = $CDN 1.07)
  • Growth capital of $160 million, including $67 million for a 50% expansion of the Bell Creek Mill and other mill infrastructure
  • Sustaining and other capital of $225 million.

Mr. Makuch added: "We believe there is significant upside to the results provided in the PEA. One key area for improvement involves costs, where we expect to improve on the operating and capital cost assumptions included in the study. Also, underground gold mines in the Abitibi Greenstone Belt have a very strong track record of growing their ounces considerably once in production and we fully expect to continue to build our resource base at Timmins West Mine going forward. We will also continue to work towards growing our throughput levels beyond 3,000 tonnes per day at both the mine and mill."

Table 1 - Timmins West Mine - Operating Summary
  Years
  Tonnes
  Grade (gpt)
  Recovered
Ozs
  Cash Operating
Costs (US$/oz)*
 
  1   586,000   4.5   82,000   840  
  2   800,000   5.2   130,000   695  
  3   1,015,000   5.2   160,000   615  
  4   1,050,000   5.0   165,000   600  
  5   1,050,000   5.0   160,000   600  
  6   1,050,000   5.4   175,000   555  
  7   1,050,000   5.3   175,000   565  
  8   970,000   5.3   160,000   590  
  9   680,000   5.6   115,000   610  
  10   390,000   5.3   65,000   840  
Assumes Canadian dollar at par to U.S. dollar
 
 
Table 2 - Timmins West Mine - Sensitivities*
  Case Average Annual
Cash Flow ($M)
(Full Production)
Total Cash
Flow ($M)
(undiscounted)
NPV @ 5%
($M)
  IRR   Payback
(years)
 
  Current prices2 $ 165 $ 1,140 $ 880   115 % 1.25  
  Analyst Consensus3 $ 110 $ 730 $ 570   100 % 1.25  
  $1500 US$/Oz Gold $ 120 $ 770 $ 580   70 % 2.00  
  $2000 US$/Oz Gold $ 200 $ 1,443 $ 1,130   175 % 0.75  
All numbers are before income taxes

In providing the initial evaluation of the fully-integrated Timmins West Mine, the PEA leverages existing infrastructure. Much of the site infrastructure at Timmins West Mine was completed prior to 2012 and work envisioned in the PEA effectively represents extensions to the existing operations. The production shaft, all surface infrastructure, utilities, and the ventilation system are all in place and fully operational.   

The PEA envisions year-on-year production increases towards a steady state production rate of 3,000 tpd (from 2012 levels of 1600 t/d). Roughly 60% of the planned production comes from longhole bulk mining operations at Thunder Creek, with the remaining tonnage coming from a mixture of longhole bulk and mechanized cut and fill operations at Timmins Deposit. Backfill will be primarily a mixture of pastefill augmented with rockfill as available. Access to each of these deposits is planned through continued development of internal ramps and raises. Mine utilities and the ventilation system will be extended from the existing infrastructure.

Mining methods were assigned to regions of the block models depending on overall geometry and expected grade continuity. A cut off grade of 3.0 gpt was used to guide the mine design process. Generalized mining shapes were then applied to each of the mineralized shapes to determine the recoverable tonnage and grade from mining by each method. A full accounting of internal dilution was included in the mining blocks. Internal dilution was applied for each area depending on specific stope geometries, mining methods, exposure to backfilled stopes, and expected continuity. External dilution ranged from 10% to 20% depending on the specifics of the mining plan for that area. A final recovery factor of 90% was then applied to the mineable tonnes.

Production, mine development, and construction activities have been identified for the entire 10 years of operation and have been linked through schedules based on current performance parameters. 

The PEA envisions that all material will be hauled to, and processed at, the Company's milling facility at the Bell Creek site, which is located approximately 42 kilometres from Timmins West Mine. This mill is currently being upgraded and expanded to a capacity of 3,000 tpd from its current capacity of 2,000 tpd. This project was initiated in mid-2011 and is on track for completion in the fourth quarter of 2012. Costs in 2012 to complete the mill expansion and for other mill infrastructure are estimated at $67 million, including contingency, with all costs being allocated to the Timmins West Mine. Gold recoveries have been excellent for all the mineralization in the Company's portfolio and significant historical data supports a recovery of 96.5%. Recoveries have been verified by significant laboratory analysis and reconciliations of actual plant performance throughout 2011. The plant uses a conventional and well understood crushing, grinding, gravity and Carbon-In-Pulp ("CIP") process. Dore bars are poured at the Bell Creek facility.  

Both the Timmins West Complex and the Bell Creek facilities are permitted for current activities and all adjustments to permits required for continued operation are in process. Tailings and water management facilities are presently being expanded to allow increased throughput and disposal capacity. The Company has agreements in place with First Nations groups at all sites and continues to build its working relationships with these groups. 

Mineral Resources

An updated NI 43-101 resource estimate for the Company's Timmins West Mine was released on February 15, 2012. The updated resource includes 1,122,500 ounces Au (5,826,000 tonnes grading 5.99 gpt in the Indicated category) and 791,500 ounces Au (4,272,000 tonnes at an average grade of 5.76 gpt) in the Inferred category. The new resource statement includes updated resources for the Timmins Deposit from the previous estimates issued in September 2009, as well as the initial resource for the Thunder Creek Deposit that was first released on November 16, 2011. For more information about the current resource estimate please see the press release entitled, "Lake Shore Gold Confirms Large-Scale Resource For Timmins West Mine" available at www.lsgold.com.

Mineral Reserves

This Preliminary Economic Assessment does not include any reserves. The Company expects to release a new NI 43-101 reserve estimate for Timmins West Mine before the end of the first quarter of 2012.

Qualified Persons

The PEA was prepared by the Company's Projects Team with support from Stantec. Stantec's involvement included providing the mining designs, production and development schedules, capital and operating cost estimates and also integrated the work of the Company's Projects Team. The Projects Team prepared the specific mine designs for Thunder Creek, provided all budget/plan information and completed the detailed work on geological resource modeling. All work for the PEA was performed under the direct supervision of Brian W Buss, P. Eng. Mr. Buss is Vice-President, Projects and is an employee of Lake Shore Gold. Mr. Buss is a qualified person as defined by NI 43-101 and has reviewed the technical information included in this press release.

In addition, mineral resources included in the PEA were announced in a press release issued on February 15, 2012. As stated in that release, the Company's overall Qualified Person ("QP") for geology at Timmins West Mine is Dean Crick, P. Geo, Director of Geology, while the QPs for the updated resource estimate are Bob Kusins, P. Geo, Chief Resource Geologist and Ralph Koch, P. Geo, Chief Mine Resource Geologist. Dean Crick, Bob Kusins and Ralph Koch are all considered Qualified Persons according to the definitions of NI 43-101 and are all employees of Lake Shore Gold. As QPs, they prepared or supervised the preparation of the scientific or technical information in the resource estimate and have verified the data disclosed in the February 15, 2012 press release and the resource information included in this press release. The resource estimate was also been reviewed by Michel Dagbert, P. Eng of SGS Canada Inc. Mr. Dagbert is independent of Lake Shore Gold.

About Lake Shore Gold

Lake Shore Gold is a rapidly growing mining company with a vision to become a mid-tier gold producer through the successful exploration, development and operation of its properties in and around the century-old Timmins Gold Camp. The Company is in commercial production at the Timmins West Mine, comprising the Timmins and Thunder Creek deposits, and is progressing with an underground advanced exploration program at its Bell Creek Mine. Mine production is delivered to the Company's wholly owned mill (located on the Bell Creek Property east of Timmins) which is operational at a capacity of 2,000 tonnes per day and is currently being expanded to a 3,000 tonne per day with completion targeted for late 2012. The Company continues to invest aggressively in exploration at its multiple properties in and around the Timmins Camp. Cash resources as at January 1, 2012, pro forma for a royalty and equity investment agreement with Franco-Nevada Corporation, expected to close on or about February 29, 2012, totaled approximately $115 million. The Company's common shares trade on the TSX and NYSE Amex under the symbol LSG.

CAUTIONARY NOTE TO U.S. INVESTORS REGARDING RESOURCE AND RESERVE ESTIMATES

The mineral resource estimates contained in this press release have been prepared in accordance with the requirements of the securities laws in effect in Canada, which differ from the requirements of United States securities laws. The terms "mineral resource," "measured mineral resource," "indicated mineral resource" and "inferred mineral resource" are defined in and required to be disclosed by NI 43-101; however, these terms are not defined terms under SEC Industry Guide 7 and are normally not permitted to be used in reports and registration statements filed with the SEC. Investors are cautioned not to assume that any part or all of mineral deposits in these categories will ever be converted into reserves. "Inferred mineral resources" have a great amount of uncertainty as to their existence, and great uncertainty as to their economic and legal feasibility. It cannot be assumed that all or any part of an inferred mineral resource will ever be upgraded to a higher category. Under Canadian rules, estimates of inferred mineral resources may not form the basis of feasibility or pre-feasibility studies, except in rare cases. Investors are cautioned not to assume that all or any part of an inferred mineral resource exists or is economically or legally mineable. Disclosure of "contained ounces" in a resource is permitted disclosure under Canadian regulations; however, the SEC normally only permits issuers to report mineralization that does not constitute "reserves" by SEC standards as in place tonnage and grade without reference to unit measures.

Accordingly, information contained in this press release of mineral deposits may not be comparable to similar information made public by U.S. companies subject to the reporting and disclosure requirements under the United States federal securities laws and the rules and regulations thereunder.

FORWARD-LOOKING STATEMENTS

Certain statements in this press release relating to the Company's expected production levels, production growth, exploration activities, potential for increasing resources, project expenditures and business plans are "forward-looking statements" or "forward-looking information" within the meaning of certain securities laws, including under the provisions of Canadian provincial securities laws and under the United States Private Securities Litigation Reform Act of 1995 and are referred to herein as "forward-looking statements." The Company does not intend, and does not assume any obligation, to update these forward-looking statements. These forward-looking statements represent management's best judgment based on current facts and assumptions that management considers reasonable, including that operating and capital plans will not be disrupted by issues such as mechanical failure, unavailability of parts, labour disturbances, interruption in transportation or utilities, or adverse weather conditions, that there are no material unanticipated variations in budgeted costs, that contractors will complete projects according to schedule, and that actual mineralization on properties will not be less than identified mineral reserves. The Company makes no representation that reasonable business people in possession of the same information would reach the same conclusions. Forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Company to be materially different from any future results, performance or achievements expressed or implied by the forward-looking statements. In particular, fluctuations in the price of gold or in currency markets could prevent the Company from achieving its targets. Readers should not place undue reliance on forward-looking statements. More information about risks and uncertainties affecting the Company and its business is available in the Company's most recent Annual Information Form and other regulatory filings with the Canadian Securities Administrators, which are posted on sedar at www.sedar.com, or the Company's most recent Annual Report on Form 40-F and other regulatory filings with the Securities and Exchange Commission.

Note 1. All references to cash flows are before income taxes. The Company had total tax shelters of $540 million at December 31, 2011.

Note 2. Current prices include a gold price of US$1,775 per ounce and an exchange rate at par.

Note 3. Analyst consensus prices include gold prices starting at $US 1,744/oz in 2012, declining to a long-term price of $US 1,200/oz in 2018, and an average exchange rate of $US 1.00 = $CDN 1.07.

To view Figure 1 - Timmins West Mine Development - please visit the following link: http://media3.marketwire.com/docs/LSG2702figure1.pdf.

To view Figure 2 - Thunder Creek Development - please visit the following link: http://media3.marketwire.com/docs/LSG2702figure2.pdf 



Lake Shore Gold Corp.
Tony Makuch
President & CEO
(416) 703-6298
info@lsgold.com
or
Lake Shore Gold Corp.
Mark Utting
Vice-President, Investor Relations
(416) 703-6298
info@lsgold.com
www.lsgold.com
Données et statistiques pour les pays mentionnés : Canada | Tous
Cours de l'or et de l'argent pour les pays mentionnés : Canada | Tous

Lake Shore Gold Corporation

PRODUCTEUR
CODE : LSG.TO
ISIN : CA5107281084
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Lake Shore Gold est une société de production minière d'or basée au Canada.

Lake Shore Gold détient divers projets d'exploration au Canada.

Son principal projet en production est TIMMINS MINE au Canada et ses principaux projets en exploration sont BELL CREEK, BLAKELOOK, THORNE, THUNDER CREEK, WEST TIMMINS et BAND ORE au Canada et LA BUFA, UNIVERSO, MONTAÑA DE ORO et LLUVIA DE ORO au Mexique.

Lake Shore Gold est cotée au Canada, aux Etats-Unis D'Amerique et en Allemagne. Sa capitalisation boursière aujourd'hui est 956,5 millions CA$ (734,7 millions US$, 646,6 millions €).

La valeur de son action a atteint son plus bas niveau récent le 01 février 2002 à 0,02 CA$, et son plus haut niveau récent le 11 mars 2011 à 4,42 CA$.

Lake Shore Gold possède 463 220 000 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Financements de Lake Shore Gold Corporation
28/02/2011Completes US$50 Million Corporate Revolving Credit Facility
28/07/2010Signs Term Sheet for Corporate Revolving Credit Facility of ...
16/02/2010Closing of Second Tranche of Flow-Through Financing
31/12/2009Announces Closing of First Tranche of Flow-Through Financing
04/12/2009Announces Closing of Private Placement Financing
19/02/2008 Announces Private Placement of $64.5 Million at 30% Premium...
Nominations de Lake Shore Gold Corporation
06/11/2013Lake Shore Gold Appoints Diane Francis to Board of Directors
19/03/2013Lake Shore Gold Announces Appointment of Philip C. Yee as Vi...
30/05/2008Announces Management Appointments
27/02/2007Appoints Hannu Virtanen as VP, Project Development
Rapports Financiers de Lake Shore Gold Corporation
03/12/2013Lake Shore Gold Produces 16,700 Ounces in November, Company ...
06/11/2013Lake Shore Gold Reports Lower Costs, Improved Grades and Hig...
24/06/2013Lake Shore Gold Reports Improving Operating Performance, Com...
15/05/2013Lake Shore Gold Reports First Quarter 2013 Results
09/08/2012Lake Shore Gold Reports Strong Second Quarter Results
12/01/2012Reports 2011 Operating Results, Pours 26,550 Ounces in Fourt...
10/08/2011Announces Second Quarter 201 =?ISO-8859-1?Q?1=20Financial=20...
26/05/2011Announces First Quarter 2011 =?ISO-8859-1?Q?=20Results,=20In...
04/05/2011Announces First Quarter 2011 =?ISO-8859-1?Q?=20Production=20...
11/08/2010Continued Progress During Second Quarter 2010
15/05/2008Announces First Quarter 2008 Results
Projets de Lake Shore Gold Corporation
10/12/2013Lake Shore Gold Increases 2014 Production Guidance
19/03/2013Lake Shore Gold Reports Solid Progress in 2012, Company Near...
30/01/2013Lake Shore Gold Reaches Agreement to Sell Mexican Properties...
21/01/2013(Thunder Creek)Lake Shore Gold Discovers New Mineralization 850 Metres Sout...
26/07/2012Lake Shore Gold and Revolution Resources Amend Option Agreem...
14/06/2012Lake Shore Gold Completes Credit Facility Agreement for Up t...
07/06/2012Lake Shore Gold Announces Significant Extension of High-Grad...
28/05/2012Lake Shore Gold Resumes Mining Operations at Timmins West Mi...
12/04/2012Lake Shore Gold Enters Agreement for Credit Facility of Up t...
04/04/2012Lake Shore Gold Provides Update on Incident at Timmins West ...
03/04/2012Lake Shore Gold Corp. Reports on Incident at Timmins West Mi...
31/03/2012Lake Shore Gold Files Technical Report for Timmins West Mine
22/02/2012Lake Shore Gold Announces Large Increase in Resources at Gol...
14/10/2011(Timmins Mine)Reports Higher Commercial Production from Timmins Mine in Th...
22/08/2011Completes Acquisition of Fen =?ISO-8859-1?Q?n-Gib=20Project=...
16/08/2011(Bell Creek)Reports 400 Metre Extension of Gold Mineralization at Bell C...
30/06/2011(Band Ore)en Share Mining Corporation Acquires Band Ore Gold Property ...
05/05/2011to Acquire Fenn-Gib Project from Barrick Gold in Exchange fo...
02/05/2011Announces New Resources at =?ISO-8859-1?Q?=20Marlhill=20and=...
29/03/2011(Band Ore)to Acquire 19% of Golden Share Through Sale of 100% Interest
28/02/2011(Timmins Mine)Lake Shore Gold Discovers Significant New Gold Zone at 144 P...
24/02/2011(Timmins Mine)Intersects Wide, High-Grade Mineralization at Timmins Mine, ...
25/01/2011(Timmins Mine)Lake Shore Gold to Nearly Triple Gold Production in 2011
25/01/2011(Thunder Creek)Confirms Broad Mineralized Envelope With High-Grade Sections...
06/01/2011(Timmins Mine)Declares Commercial Production =?ISO-8859-1?Q?=20at=20Timmin...
01/12/2010(Bell Creek)Announces Initial Resource a Bell Creek Mine, Large Deposit ...
29/06/2010(Thunder Creek)Ramp Reaches & Intersects High-Grade Gold Mineralization
23/06/2010Intersects High-Grade Mineralization at Thorne...
04/05/2010(West Timmins)Advances Third Major Gold Target
01/04/2010(Ti-pa-haa-kaa-ning (tpk))Agrees to Sell 50% Interest in Ti-pa-haa-kaa-ning Gold Prope...
18/02/2010(Timmins Mine)Major Extensions to Timmins Mine Mineralization, Thunder Cre...
17/02/2010(Timmins Mine)Reports Results of Underground Exploration at 650-Level Test...
17/02/2010(Casa Berardi)Extends Casa Berardi "G Zone"
26/01/2010(Thunder Creek)Extends Thunder Creek to Depth, Confirms High-Grade Core and...
18/01/2010(Bell Creek)Continues to Define and Extend Large New Gold System at Bell...
06/11/2009(Bell Creek)Confirms Presence of Large New Gold System
29/10/2009(Timmins Mine)Results of Underground Drilling and Development at Timmins M...
07/10/2009Releases Updated National Instrument 43-101 Report for Timmi...
01/10/2009(Bell Creek)Reports Extension to High grade mineralization at Bell Creek
25/08/2009(Thunder Creek)Continues to Establish Large Gold System at Thunder Creek
24/08/2009Reports High-Grade Intercepts From Underground Drilling at T...
21/07/2009(Bell Creek)Discovers Substantial New High-Grade Extension at Bell Creek
07/07/2009(Bell Creek)Confirms Deep Extensions of Gold Mineralization at Bell Cree...
16/12/2008Significantly Extends Rusk Zone and Announces New High-Grade...
10/12/2008(Bell Creek)Significantly Extends Bell Creek Mineralization
10/07/2008(Bell Creek)Intersects New Gold Zone and Extends Mineralization at Bell ...
31/03/2008(Thunder Creek)Intersects 8.57 Grams Gold Per Tonne Over 9.00 Metres at the...
Communiqués de Presse de Lake Shore Gold Corporation
28/07/2016Lake Shore Bancorp posts 2Q profit
27/04/2016Lake Shore Bancorp posts 1Q profit
01/04/2016Tahoe Resources Inc. and Lake Shore Gold Corp. Complete Busi...
31/03/2016Lake Shore Gold Announces Shareholder Approval of Plan of Ar...
31/03/2016Lake Shore Gold Announces Filing of Annual Information Form ...
24/02/2016Lake Shore Gold reports 4Q loss
19/01/2016Lake Shore Gold Reports Strong 2015 Operating Cost Performan...
08/01/2016Lake Shore Gold Reports Full Year and Fourth Quarter 2015 Pr...
07/01/2016Lake Shore Gold (LSG) Jumps: Stock surges 10.1%
14/12/2015Is Oriental Financial Group Inc. (OFG) A Good Stock To Buy?
27/11/2015Lake Shore Gold Corp Ordinary Shares (Canada) (LSG): Are Hed...
29/10/2015Lake Shore Gold posts 3Q loss
16/10/2015Lake Shore Gold Announces Details of Nine Month and Third Qu...
14/10/2015Lake Shore Gold Produces 136,200 Ounces in First Nine Months...
18/09/2015Lake Shore Gold Completes Acquisition of Temex Resources Cor...
16/09/2015Lake Shore Gold Reports High-Grade Intersections From Initia...
14/09/2015Temex Shareholders Overwhelmingly Approve Arrangement Agreem...
14/08/2015Lake Shore Gold Acquires Additional Equity Interest in IDM M...
04/08/2015Lake Shore Gold Acquires Significant Equity Interest in IDM ...
31/07/2015Lake Shore Gold Enters Into Arrangement Agreement With Temex...
30/07/2015Lake Shore Gold posts 2Q profit
30/07/2015Lake Shore Gold Reports First Half and Second Quarter 2015 F...
28/07/2015Lake Shore Bancorp posts 2Q profit
17/07/2015Lake Shore Gold Announces Details of First Half and Second Q...
16/07/2015Lake Shore Gold Proposes to Acquire Temex Resources Corporat...
14/07/2015Lake Shore Gold Announces First Half and Second Quarter 2015...
08/07/2015Lake Shore Gold Produces 95,600 Ounces in First Half of 2015...
25/06/2015IIROC Trade Resumption - LSG
27/04/2015Lake Shore Gold Continues to Intersect Significant Gold Mine...
08/04/2015Lake Shore Gold Announces Details of Annual General Meeting ...
26/03/2015Lake Shore Gold posts 4Q loss
16/03/2015Lake Shore Gold Announces Details of Year-End and Fourth Qua...
14/03/2015Lake Shore Gold Announces 29% Increase in Ore Reserves
13/03/2015Lake Shore Gold Announces Details of Year-End and Fourth Qua...
03/03/2015Lake Shore Gold Identifies Thick, High-Grade Core of Gold Mi...
24/01/2014Lake Shore Gold's Preliminary 2013 Operating Cost Per Ounce ...
07/01/2014Lake Shore Gold Achieves Record Production of 134,600 Ounces...
16/12/2013Lake Shore Gold Extends Maturity of Standby Line of Credit a...
24/10/2013Announces Details of Third Quarter 2013 Conference Call and ...
09/10/2013Lake Shore Gold Reports Solid Third Quarter 2013 Operating R...
13/08/2013Lake Shore Gold Reports Record Production and Lower Operatin...
29/07/2013Announces Details of Second Quarter 2013 Conference Call and...
05/07/2013Lake Shore Gold Reports Record Production in Second Quarter ...
16/05/2013Lake Shore Gold Announces Results of Shareholders' Meeting
10/05/2013Lake Shore Gold Announces Amendments to Shareholder Meeting ...
09/05/2013Lake Shore Gold Completes Sale of Mexican Portfolio to Revol...
07/05/2013Announces Details of First Quarter 2013 Conference Call and ...
22/04/2013Lake Shore Gold to Hold Annual Meeting in Toronto on May 15,...
08/04/2013Lake Shore Gold Reports First Quarter 2013 Production of 23,...
28/03/2013(Bell Creek)Lake Shore Gold Files Bell Creek Mine Reserve Technical Repo...
12/03/2013Announces Details of Full Year and Fourth Quarter 2012 Confe...
25/02/2013Lake Shore Gold to Reduce Carrying Value of Assets
06/02/2013Lake Shore Gold Announces Management Change
01/02/2013Lake Shore Gold to Draw $35 Million Standby Line of Credit
28/01/2013Lake Shore Gold Announces Launch of Investor Webinar Series
11/01/2013Lake Shore Gold Announces Adoption of Corporate Governance M...
10/01/2013Achieves 2012 Production Target, Company Poised for Sharply ...
11/12/2012on Track for Strong Finish to 2012, Processing Capacity Incr...
08/11/2012Lake Shore Gold Reports Third Quarter 2012 Results, Company ...
25/10/2012Announces Details of Third Quarter 2012 Conference Call and ...
10/10/2012Lake Shore Gold Reports Third Quarter 2012 Production of 20,...
18/09/2012Announces Exercise of Underwriters' Over-Allotment Option fo...
11/09/2012Lake Shore Gold Announces Management Change
07/09/2012Completes C$90 Million Convertible Senior Unsecured Debentur...
16/08/2012Announces C$75 Million Convertible Senior Unsecured Debentur...
10/08/2012GoldPennyStars.com Profiles Alerted Penny Gold and Metals St...
13/07/2012Announces Details of Second Quarter 2012 Conference Call and...
04/07/2012Reports Strong Second Quarter Production of 24,426 Ounces of...
13/06/2012Lake Shore Gold Forecasts 2012 Cost Savings While Remaining ...
25/05/2012Lake Shore Gold Reports Smoke from Forest Fire Results in Pr...
18/05/2012Files Timmins West Mine Reserve Technical Report
10/05/2012Exceeds Targets and Achieves Continued Operating Improvement...
01/05/2012Lake Shore Gold Reports Significant New Drill Intercepts at ...
01/05/2012Reports Significant New Drill Intercepts at Fenn-Gib Open-Pi...
05/04/2012Lake Shore Gold announces filing of Gold River Trend Technic...
05/04/2012Lake Shore Gold Announces First Quarter 2012 Operating Resul...
02/04/2012Lake Shore Gold Announces Reserve Estimate for Timmins West ...
30/03/2012(Bell Creek)Lake Shore Gold Announces Large Increase in Measured and Ind...
26/03/2012Lake Shore Gold Announces Fourth Quarter and Full-Year 2011 ...
23/03/2012Announces Details of Fourth Quarter and Full-Year 2011 Confe...
08/03/2012Lake Shore Gold and Franco-Nevada Complete $50 Million Royal...
28/02/2012Lake Shore Gold Announces Results of Preliminary Economic As...
28/02/2012Announces Results of Preliminary Economic Assessment for Tim...
15/02/2012Lake Shore Gold Confirms Large-Scale Resource for Timmins We...
08/02/2012and Franco-Nevada Enter Agreement for $50 Million Royalty an...
17/01/2012(Thorne)Lake Shore Gold Announces New Extension at Thorne Property, ...
04/01/2012Lake Shore Gold Announces Filing of Fenn-Gib Technical Repor...
29/12/2011(Thunder Creek)Announces Filing of Thunder Creek Technical Report
14/12/2011Signs Formal Agreement for Option on Company's Mexican Explo...
28/11/2011Completes Sale of Land to Golden Share Mining for Significan...
15/09/2011Enters Into Letter Agreement for Option on Company's Mexican...
30/08/2011Reports Extensions of Gold Mineralization Along Strike and t...
05/08/2011Announces Details of Second Quarter 2011 Conference Call and...
29/07/2011U=2ES=2E Listing on NYSE A =?ISO-8859-1?Q?mex=20Approved,=20...
26/07/2011Continues to Define and Ex =?ISO-8859-1?Q?tend=20Mineralizat...
19/07/2011Releases Production Resultsfor Second Quarter and First Six-...
16/06/2011Reports Wide, High-Grade Intercepts from Near-Surface Drilli...
08/06/2011Announces Management Appointme =?ISO-8859-1?Q?nts,=20Creates...
14/03/2011Lake Shore Gold Achieves Major Milestones in 2010, on Track ...
01/02/2011Increases Interest in Northern Superior Resources Inc.
22/07/2010Confirms & Expands Mineral
27/05/2010Completes Sale of 50% Interest in Ti-pa-haa-kaa-ning JV
12/05/2010Changes to Board of Directors
05/05/2010Announces Continued Progress
27/04/2010Expands Resource Potential at Timmins Mine
11/03/20102009 Year End Results
17/12/2009Completes Acquisition of "Bell Creek West" Properties
15/12/2009Announces Management Changes
15/12/2009Added to S&P/TSX Composite Index
24/11/2009Announces Changes to Board of Directors
06/11/2009and West Timmins Mining Complete Business Combination
27/08/2009and West Timmins Agree to Business Combination
06/08/2009Advances Projects on Schedule and Budget and Achieves Explor...
24/06/2009Reports 12.75 Grams Per Tonne Over 83.40 Metres at Thunder C...
16/05/2008Announces Approval of Special Resolutions at Annual and Spec...
05/05/2008Comments on May 15, 2008 Shareholder Vote
16/04/2008Announces Revised Agreement With Hochschild Mining; Second P...
16/04/2008 Announces Management Changes
28/03/2008Announces 2007 Year End Results and Provides 2008 Outlook
24/03/2008Announces Management Changes
18/03/2008Announces Annual Meeting and Revised Date for Special Meetin...
25/02/2008 Completes Financing and Enters Into Strategic Alliance With...
17/07/2007Commences Drilling at Blakelock and Expands its Property Pos...
23/04/2007Completes Due Diligence on Bell Creek Acquisition
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TORONTO (LSG.TO)Other OTC (LSGGF)
2,07+4.29%2,29-0.87%
TORONTO
CA$ 2,07
07/04 15:32 0,090
4,29%
Cours préc. Ouverture
1,92 2,01
Bas haut
2,00 2,07
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
- -  2,07 -0,481%
Volume var. 1 mois
10 132 648 -0,481%
24hGold TrendPower© : 41
Produit Gold
Développe
Recherche Copper - Gold - Lead - Silver - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 19/11/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,69 AU$-0,39%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
11,04 US$+1,38%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,54 GBX-2,53%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,52 CA$+6,78%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
16,05 CA$+2,62%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+2,13%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,20 AU$+7,89%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,90 CA$+1,60%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
51,43 US$-0,46%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,03 AU$+0,00%Trend Power :