Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en
Dans la même rubrique

Thompson Creek Metals Co Inc.

Publié le 08 août 2008

Announces Second-Quarter 2008 Financial Results

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Dollar |

Thompson Creek Announces Second-Quarter 2008 Financial Results

Overview (all in U.S. dollars):

  • Operations at both the Thompson Creek Mine and Endako Mine continued to perform well during the second quarter of 2008 with overall production volumes higher and unit costs lower than management�s expectations.
  • Molybdenum production rose 10.7% to 6.2 million pounds in the second quarter from 5.6 million pounds in the first quarter of 2008. Second-quarter production was up 37.7% from 4.5 million pounds in the second quarter of 2007.
  • The Company remains on track to achieve its previously announced production guidance of between 23 and 24.5 million pounds in 2008 and in excess of 34 million pounds in 2009. 
  • Net income in the second quarter rose 29.1% to $60.4 million from $46.8 million in the first quarter and it was above the $56.8 million achieved in the second quarter of 2007.
  • The Company experienced an inventory buildup of approximately one million pounds during the second quarter related to scheduled maintenance shutdowns of the Langeloth and Endako roasters. The Company expects this inventory to be reduced during the third quarter.    
  • Net income in the second quarter was reduced by $11.5 million due to certain expenses not incurred in the first quarter related to the early repayment of the First Lien Credit Facility in June 2008, additional general and administrative expenses accrued for staff incentive and relocation programs, and additional stock-based compensation.
  • Net income per share in the second quarter was $0.52 per basic and $0.45 per diluted common share, compared with $0.41 per basic and $0.37 per diluted common share in the first quarter and $0.51 per basic and $0.45 per diluted share in the second quarter of 2007.
  • In the first half of 2008, net income was $107.2 million or $0.93 per basic and $0.82 per diluted common share.
  • Cash balances were $79.3 million on June 30, 2008. The Company used proceeds from an equity financing during the second quarter to pay off all debt except for $5.4 million in equipment loans. 
  • Average realized price on molybdenum sales was $32.68 per pound in the second quarter, compared with $32.69 per pound in the first quarter and $29.59 per pound in the second quarter of 2007. 
  • The weighted-average cash operating expense related to all molybdenum product line sales recorded in the second quarter was $7.49 per pound, compared with $10.54 per pound in the first quarter of 2008 and $5.66 in the second quarter of 2007.
  • Cash costs for the production of molybdenum oxide are better than or on track with previous guidance of $6.00 to $6.50 per pound at the Thompson Creek Mine and $9.50 to $10.25 per pound at the Endako Mine.

Note: A conference call and webcast for analysts and investors is scheduled for Friday, August 8, 2008 at 8:30 a.m. Eastern.

Toronto, ON - August 7, 2008 - Thompson Creek Metals Company Inc. (TSX: TCM / NYSE: TC) (�the Company�), one of the world�s largest publicly traded, pure molybdenum producers, today announced financial results for the three and six months ended June 30, 2008 prepared in accordance with Canadian generally accepted accounting principles. All dollar amounts are in U.S. dollars unless otherwise indicated.

�Thompson Creek�s mining operations turned in a solid performance in the second quarter of 2008 with molybdenum production higher and unit costs lower than management�s expectations and the Company on track to achieve our previously announced production and cost guidance for the year,� said Kevin Loughrey, Chairman and Chief Executive Officer.   

Molybdenum production rose 10.7% to 6.2 million pounds in the second quarter from 5.6 million pounds in the first quarter � for a total of 11.8 million pounds in the first half of 2008. The Company continues to expect annual molybdenum production of between 23 and 24.5 million pounds for 2008 and in excess of 34 million pounds for 2009.

�While mining costs are higher now than they were a year ago, our per-pound production cost guidance had anticipated a large part of the increase we have seen and our operations have also experienced some offsetting factors including higher-than-expected production and recoveries. As a result, we are confident that 2008 cash costs for the production of molybdenum oxide will be in the previously forecast range of $6.00 to $6.50 per pound at the Thompson Creek Mine and will be at or lower than our previously forecast range of $9.50 to $10.25 per pound at the Endako Mine,� Mr. Loughrey added.

Molybdenum production at the Thompson Creek Mine during the second quarter of 2008 was 4.0 million pounds, up 11.1% from 3.6 million pounds in the first quarter of 2008 and up 73.9% from 2.3 million pounds in the second quarter of 2007. The mine�s production is expected to move higher through the remainder of this year, particularly in the fourth quarter, as higher grade ore is mined. Management continues to expect production this year of between 16.5 and 17 million pounds.

At the Endako Mine, where mining has continued in the Denak West Pit, the Company�s 75% share of molybdenum production rose 10% to 2.2 million pounds in the second quarter from 2.0 million pounds in the first quarter of 2008, putting the mine in a good position to achieve 2008 production guidance of between 6.5 and 7.5 million pounds. Second-quarter 2008 production was up 4.8% from 2.1 million pounds a year earlier.

�Thompson Creek also achieved an expected improvement in financial performance in the second quarter, with net income rising 29.1% to $60.4 million from $46.8 million in the first quarter,� Mr. Loughrey stated.

The rise in net income, which occurred despite stable prices and a slight decline in total sales from 7.7 to 7.3 million pounds between the first and second quarters, was due to a substantial reduction from $166.6 million to $125.7 million in operating expenses, which in turn partly resulted from a decline in the proportion of high-cost third-party molybdenum sales. The Company had previously increased such third-party sales, whereby the Company buys molybdenum concentrate and roasts it for resale to customers, as an offset to the lower production from its own mines in the fourth quarter of 2007. These high-cost third-party sales as a proportion of total sales declined from 46.7% in the first quarter to 34.2% in the second quarter. The proportion is expected to decline further in the second half of 2008.

�Another important factor affecting second-quarter financial performance was an inventory buildup of approximately one million pounds of molybdenum during the quarter primarily related to the scheduled shutdowns of our roasters for routine maintenance. We have already begun reducing this inventory buildup and expect to continue to do so throughout the third quarter, thus yielding a beneficial impact on our profitability in the third quarter,� Mr. Loughrey said.

The Company experiences a delay of up to two and a half months between the time a pound of molybdenum is recorded as produced at the Company�s mines and when the same pound is recorded in the income statement as being sold. As a result of this delay, the molybdenum sales that the Company will record in 2008 will reflect production achieved over a one year period starting early in the fourth quarter of 2007 and ending early in the fourth quarter of 2008. The Company sold 8.9 million pounds of molybdenum from its own mines in the first half of 2008 and currently expects to sell approximately 22 million pounds in all of 2008. In the future, management will give annual forecast guidance on sales as well as production.   

Second-Quarter Financial Results

The Company�s revenues were $243.9 million in the second quarter of 2008, compared with $254.8 million in the first quarter and $247.8 million in the second quarter of 2007. The decline in revenues from the second quarter of 2007 reflected an 11% decline in total sales volumes (third-party and own production) to 7.3 million pounds in the latest quarter from 8.2 million pounds a year earlier primarily due to the build up of inventory during the latest period in anticipation of the scheduled maintenance shutdowns at the Langeloth facility from mid-April to mid-May and at Endako during July. 

The year-over-year decline in sales volume was offset to a degree by a rise in molybdenum prices. The average realized price on the Company�s molybdenum sales was $32.68 per pound in the second quarter, up 10.4% from $29.59 per pound in the second quarter of 2007.

After the deduction of operating, selling, marketing, depreciation, depletion and accretion costs, the Company generated income from mining and processing operations totaling $105.4 million in the second quarter of 2008, compared with $77.3 million in the first quarter and $104.1 million in the second quarter of 2007.

Net income in the second quarter was $60.4 million or $0.52 per basic and $0.45 per diluted common share, compared with $46.8 million or $0.41 per basic and $0.37 per diluted common share in the first quarter and $56.8 million or $0.51 per basic and $0.45 per diluted share in the second quarter of 2007.

The per-share figures are based on a weighted-average number of shares outstanding of 116,902,000 (basic) and 133,867,000 (diluted) in the second quarter of 2008, 113,457,000 (basic) and 127,674,000 (diluted) in the first quarter of 2008, and 111,224,000 (basic) and 126,857,000 (diluted) in the second quarter of 2007. At August 6, 2008, there were 125,045,000 common shares, 24,506,000 warrants and 7,835,000 employee options outstanding.

Net income in the second quarter was reduced by $11.5 million due to certain expenses not incurred in the first quarter amounting to $4.4 million for finance fees related to the early repayment of the First Lien Credit Facility in June 2008, an additional $2.3 million accrued in general and administrative expenses above the first-quarter level due to a staff incentive program and for relocation of the finance department from Vancouver to Denver, and an additional $4.8 million above the first-quarter level in stock-based compensation.

Cash flow from operating activities was $62.9 million in the second quarter, compared with $63.4 million in the first quarter of 2008 and $0.4 million in the second quarter of 2007.

Cash balances were $79.3 million at June 30, 2008, compared with $47.5 million at March 31, 2008 and $113.7 million at December 31, 2007.

During the second quarter of 2008, Thompson Creek used proceeds from an equity issue to fully discharge its First Lien Credit Facility, which had been $219.4 million at March 31, 2008. The Company is now debt free except for $5.4 million in equipment loans.

Since the acquisition of Thompson Creek Metals Company USA in October 2006, the Company has used cash generated from operations and from equity issues to pay off $402 million of acquisition debt and to pay the former owner $61.5 million in December 2006 for certain receivables acquired on the acquisition date and $100 million in January 2008 as part of a contingent purchase price payment linked to the performance of the molybdenum price. If the average price for molybdenum exceeds $15 per pound in 2009, a final $25 million will be owed to the former owner in January 2010. 

The Company�s mines produced 6.2 million pounds of molybdenum in the second quarter, compared with 5.6 million pounds in the first quarter of 2008 and 4.5 million pounds in the second quarter of 2007. The Thompson Creek Mine produced 4.0 million pounds in the second quarter, up from 3.6 million pounds in the first quarter and 2.3 million pounds in the second quarter of 2007. The Company�s 75% share of Endako Mine�s production was 2.2 million pounds in the second quarter, compared with 2.0 million pounds in the first quarter and 2.1 million pounds in the second quarter of 2007.

The production amounts reflect molybdenum produced at the Thompson Creek and Endako mines but do not include molybdenum purchased from third parties, roasted and sold by the Company.

The weighted-average cash operating expense for molybdenum from the Company�s mines that was sold during the period was $7.49 per pound in the second quarter, compared with $10.54 per pound in the first quarter and $5.66 per pound in the second quarter of 2007. At the Thompson Creek Mine, the average cash operating expense related to sales was $7.83 per pound, compared with $11.33 per pound in the first quarter and $5.05 per pound in the second quarter of 2007. The Endako Mine�s average cash operating expense related to sales was $6.99 per pound in the second quarter, compared with $9.41 per pound in the first quarter and $6.92 per pound in the second quarter of 2007.

First-Half Financial Results

The Company�s revenues were $498.7 million in the first six months of 2008, compared with $515.7 million a year earlier. Volume of molybdenum sales in the first half of 2008 was 15 million pounds, down 19.4% from 18.6 million pounds in the first half of 2007. Sales in the 2008 first half were negatively affected by lower production at the Company�s mines in the fourth quarter of 2007 and an inventory buildup in the second quarter of this year due to scheduled roaster shutdowns. At the beginning of 2007, a greater volume of product inventory was available which allowed for greater sales in the first quarter of that year.
 
The decline in sales volume was offset to a degree by a rise in the Company�s average realized price on molybdenum sales to $32.69 per pound in the first half of 2008, up 21.4% from $26.93 per pound in the first half of 2007.

After the deduction of operating, selling, marketing, depreciation, depletion and accretion costs, the Company generated income from mining and processing operations totaling $182.7 million in the first half of 2008, compared with $192.2 million a year earlier.

Net income in the first half was $107.2 million or $0.93 per basic and $0.82 per diluted common share, compared with $104.5 million or $0.97 per basic and $0.88 per diluted share in the first half of 2007. The per-share figures are based on a weighted-average number of shares outstanding of 115,180,000 (basic) and 131,079,000 (diluted) in the first half of 2008 versus 107,258,000 (basic) and 118,789,000 (diluted) in the first half of 2007.

Net income and earnings from mining and processing operations in the first half of 2007 were negatively affected by the inclusion in operating expenses of a non-cash acquisition expense related to the inventory portion of the purchase price adjustment associated with the Company�s purchase of Thompson Creek Metals Company USA in October 2006. This non-cash expense amounted to $29.6 million in the first quarter of 2007. 

Cash flow from operating activities was $126.3 million in the first half of 2008, compared with $105.4 million in the first half of 2007.

The Company�s mines produced 11.8 million pounds of molybdenum in the first half of 2008, up from 9.9 million pounds a year earlier. The Thompson Creek Mine produced 7.6 million pounds in the first half of 2008, compared with 6.2 million pounds a year earlier. The Company�s 75% share of Endako Mine�s production was 4.2 million pounds in the first half of 2008, compared with 3.7 million pounds in the first half of 2007.

The weighted-average cash operating expense for molybdenum from the Company�s mines that was sold during the first half of 2008 was $8.89 per pound, compared with $7.44 per pound in the year earlier period. At the Thompson Creek Mine, the average cash operating expense related to sales was $9.40 per pound in the first half of 2008, compared with $7.43 per pound a year earlier. The Endako Mine�s average cash operating expense related to sales was $8.11 per pound in the first half of 2008, compared with $7.46 per pound a year earlier.

Outlook

Sales prices have remained in excess of $30 per pound during 2008 and are expected to remain at approximately these levels for the remainder of the year.

The Company sold 8.9 million pounds of molybdenum from its own mines in the first half of 2008 and currently expects to sell approximately 22 million pounds in all of 2008. 

Overall, operating expenses per pound have decreased over each of the past three quarters and are expected to decrease further in the last half of 2008 as sales volumes of the Company�s mined material increase. The Thompson Creek Mine is well into Phase 6 and grades continue to increase as mining advances toward the core of the ore body. Both the Thompson Creek Mine and the Endako Mine have acquired new haul trucks in the current year to better ensure that planned production and stripping are realized. The move of the Endako in-pit crusher from the Endako Pit to the Denak West Pit area is on schedule and will be operational in the fourth quarter of 2008.

The Company remains on target for its previously announced planned molybdenum production volumes (Thompson Creek Mine � 16.5 to 17.0 million pounds; Endako Mine (75% share) - 6.5 to 7.5 million pounds) for 2008. In addition, oxide production costs are better than or on track with previous guidance for the year (Thompson Creek Mine - $6.00 to $6.50 per pound; Endako - $9.50 to $10.25 per pound). In the six months ended June 30, 2008, the oxide production costs at Thompson Creek Mine were $7.53 per pound and at the Endako Mine were $8.00 per pound. Oxide production costs include the costs to produce molybdenum oxide at each mine. For Thompson Creek Mine, which only produces sulphide on site, oxide production costs include an allocation of roasting costs incurred at the Langeloth facility to roast Thompson Creek Mine material from sulphide to oxide. Oxide production costs differ from cash operating expenses reported in the preceding paragraphs of this news relea se as they do not include adjustments for opening and closing inventory amounts for the period nor do they include additional costs related to the production of downstream products produced by the Company such as ferromolybdenum.

Thompson Creek and the other joint venture participant in the Endako Mine approved the expansion project during the first quarter of 2008, and the project has commenced with detailed engineering and the ordering of major mill equipment. The Company�s share of expansion capital expenditures is expected to be C$280.0 million over the period 2008 to 2010. Cash flows generated from the sale of planned production and anticipated strong market prices for molybdenum are expected to meet the Company�s cash requirements for operations and capital expenditures.

Mineral reserves were recalculated and increased at both operating mines during 2007 using a long-term price of $10.00 per pound for molybdenum sales. Development drilling and reserve analysis is continuing at the Thompson Creek Mine to complete the second stage of its mineral reserve study which is expected to further increase reserves and mine life. The Company also plans to conduct exploration drilling on the Endako Mine property outside of the existing pits.

The environmental application for the Davidson Project has been submitted to the regulatory authorities. A decision on the application is expected in the first quarter of 2009.

Additional information on the Company�s financial position is available in Thompson Creek�s Financial Statements and Management�s Discussion and Analysis for the period ended June 30, 2008, which will be filed with SEDAR (www.sedar.com) and posted on the Company�s website (www.thompsoncreekmetals.com).

Conference call and webcast

Thompson Creek will hold a conference call for analysts and investors to discuss its second quarter 2008 financial results on Friday, August 8, 2008 at 8:30 a.m. (Eastern).

Kevin Loughrey, Chairman and Chief Executive Officer, and Derek Price, Chief Financial Officer, will be available to answer questions during the call.

To participate in the call, please dial 416-644-3432 or 1-866-250-4665 about five minutes prior to the start of the call.

A live audio webcast of the conference call will be available at www.newswire.ca and www.thompsoncreekmetals.com. An archived recording of the call will be available at 416-640-1917 or 1-877-289-8525 (Passcode 21278956 followed by the number sign) from 10:30 a.m. on August 8 to 11:59 p.m. on August 15. An archived recording of the webcast will also be available at Thompson Creek�s website.

About Thompson Creek Metals Company Inc.

Thompson Creek Metals Company Inc. is one of the largest publicly traded, pure molybdenum producers in the world. The Company owns the Thompson Creek open-pit molybdenum mine and mill in Idaho, a metallurgical roasting facility in Langeloth, Pennsylvania, and a 75% share of the Endako open-pit mine, mill and roasting facility in northern British Columbia. Thompson Creek is also permitting the Davidson Deposit, a high-grade underground molybdenum project near Smithers, B.C. The Company has approximately 800 employees. Its principal executive office is in Denver, Colorado, and it has other executive offices in Toronto, Ontario and Vancouver, British Columbia. More information is available at www.thompsoncreekmetals.com.

Cautionary Note Regarding Forward-Looking Statements

This news release contains �forward-looking information� within the meaning of the United States Private Securities Litigation Reform Act of 1995 and applicable Canadian securities legislation which may include, but is not limited to, statements with respect to the timing and amount of estimated future production.  Often, but not always, forward-looking statements can be identified by the use of words such as �plans�, �expects�, �is expected�, �budget�, �scheduled�, �estimates�, �forecasts�, �intends�, �anticipates�, or �believes� or variations (including negative variations) of such words and phrases, or state that certain actions, events or results �may�, �could�, �would�, �might� or �will� be taken, occur or be achieved.  Forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of Thompson Creek and/or its subsidiaries to be materially different from any future results, performance or achievements expressed or implied by the forward-looking statements.  Such factors include those factors discussed in the section entitled �Risk Factors� in Thompson Creek�s current annual information form which is available on SEDAR at www.sedar.com and is incorporated in its Annual Report on Form 40-F filed with the United States Securities and Exchange Commission which is available at www.sec.gov. Although Thompson Creek has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking statements, there may be other factors that cause actions, events or results to differ from those anticipated, estimated or intended.  Forward-looking statements contained herein are made as of t he date of this news release and Thompson Creek does not undertake to update any such forward-looking statements, except in accordance with applicable securities laws.  There can be no assurance that forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements.  Accordingly, readers are cautioned not to place undue reliance on forward-looking statements.

Readers should refer to Thompson Creek�s current annual information form which is available on SEDAR at www.sedar.com and is incorporated in its Annual Report on Form 40-F filed with the SEC which is available at www.sec.gov and subsequent continuous disclosure documents available at www.sedar.com and www.sec.gov for further information on mineral reserves and mineral resources, which is subject to the qualifications and notes set forth therein.

THIS PRESS RELEASE CONTAINS FINANCIAL STATEMENTS.  CLICK HERE TO VIEW ORIGINAL PDF VERSION OF THIS RELEASE. 

For more information, please contact:

Wayne Cheveldayoff,
Director of Investor Relations
Thompson Creek Metals Company Inc.
Tel: 416-860-1438
Toll free: 1-800-827-0992
wcheveldayoff@tcrk.com 

Renmark Financial Communications Inc.
Dan Symons : dsymons@renmarkfinancial.com
Jeffery Szita : jszita@renmarkfinancial.com
Media � Adam Ross : aross@renmarkfinancial.com
Tel.: (514) 939-3989
Fax : (514) 939-3717
www.renmarkfinancial.com

Thompson Creek Metals Co Inc.

PRODUCTEUR
CODE : TCM.TO
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Thompson Creek est une société de production minière d'or et de cuivre basée au Canada.

Thompson Creek est productrice d'or, de cuivre, de molybdène au Canada, en développement de projets de cuivre, de molybdène et d'or au Canada, et détient divers projets d'exploration au Canada.

Ses principaux projets en production sont ENDAKO et THOMPSON CREEK MINE au Canada, ses principaux projets en développement sont DAVIDSON (YORKE-HARDY) et MOUNT MILLIGAN au Canada et ses principaux projets en exploration sont MAZE LAKE, BERG et HOWARDS PASS au Canada.

Thompson Creek est cotée au Canada et en Allemagne. Sa capitalisation boursière aujourd'hui est 149,3 millions CA$ (111,4 millions US$, 102,3 millions €).

La valeur de son action a atteint son plus haut niveau récent le 15 juillet 2011 à 9,88 CA$, et son plus bas niveau récent le 22 janvier 2016 à 0,16 CA$.

Thompson Creek possède 222 780 000 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Dans les médias de Thompson Creek Metals Co Inc.
29/09/2007War Eagle - Financial Post article - Commodities boom extend...
Financements de Thompson Creek Metals Co Inc.
23/05/2011Announces Closing of its Senior Unsecured Notes Offering
Nominations de Thompson Creek Metals Co Inc.
17/09/2013mpany Announces Start Date for New Chief Executive Officer
08/08/2013mpany Announces Appointment of Jacques Perron as Chief Execu...
25/05/2011Promotes Scott Shellhaas to President
11/08/2010Appointment of General Counsel
11/08/2009Appointment of Chief Operating Officer
08/08/2008Announces Appointment of James L. Freer to Board of Director...
29/07/2008Announces Appointment of Chief Financial Officer
Rapports Financiers de Thompson Creek Metals Co Inc.
21/10/2013mpany Schedules Third Quarter 2013 Financial Results Confere...
11/07/2013mpany Schedules Second Quarter 2013 Financial Results Confer...
08/05/2013mpany Reports First Quarter 2013 Financial Results
17/04/2013mpany Schedules First Quarter 2013 Financial Results Confere...
25/02/2013mpany Reports Fourth Quarter and Full Year 2012 Financial Re...
28/01/2013mpany Schedules 2012 Financial Results Conference Call/Webca...
08/11/2012Reschedules Third Quarter 2012 Financial Results Conference ...
12/10/2011Schedules Third Quarter 2011 Financial Results Conference Ca...
09/08/2011Announces 2011 Second Quarter Revenue Up 28.6% to $190.9 Mil...
15/07/2011Schedules Second Quarter 2011 Financial Results Conference C...
14/07/2011Schedules Second Quarter 2011 Financial Results Conference ...
09/05/2011Announces Offering of Senior Unsecured Notes
06/04/2011Schedules First Quarter 2011 Financial Results Conference Ca...
25/02/2011Announces Record Production and Sales Volumes for Fiscal 201...
06/08/2010Reports significantly improved financial results for second ...
26/07/2010Schedules Conference Call/Webcast to Review Second Quarter 2...
05/05/2010First-Quarter 2010 Financial Results
22/04/2010Schedules First-Quarter 2010 Financial Results Conference Ca...
06/11/2009Third-quarter 2009 financial results and production and cost...
28/10/2009Schedules third-quarter 2009 financial results conference ca...
28/07/2009schedules second-quarter 2009 financial results conference c...
08/08/2008Announces Second-Quarter 2008 Financial Results
14/03/2008Announces 2007 Financial Results
Projets de Thompson Creek Metals Co Inc.
03/10/2012(Thompson Creek Mine)New Mine Plan at the Thompson Creek Mine Expected to Achieve...
15/12/2011Announces Royal Gold Increases Gold Stream Interest to Purch...
08/08/2011(Endako)mpany Inc. - Lawsuit Relating to Endako Expansion Project Di...
04/04/2011(Mount Milligan)Annouces Completion of $132 Million Equipment Financing
27/07/2010(Endako)Union Obtains Certification
19/08/2008Signs Option Agreement to Acquire Up to 75% of High-Grade Mo...
02/04/2008(Davidson (yorke-hardy)) Announces Davidson Deposit Feasibility Study
14/03/2008(Endako)Announces Approval for Endako Expansion
20/02/2008(Endako)Announces Revised 2008 Endako Production Guidance and 2007 P...
14/12/2007(Endako)Announces Changes to Production Estimates for 2007
Communiqués de Presse de Thompson Creek Metals Co Inc.
12/07/2016Thompson Creek Reports Second Quarter and Year-to-Date 2016 ...
05/07/2016Centerra Gold And Thompson Creek Announce Transformational B...
24/06/2016Thompson Creek Metals Company Announces Election of Director...
19/05/2016Thompson Creek Reports First Quarter 2016 Financial Results
14/01/2016Thompson Creek Announces Listing Change
14/01/2016Thompson Creek Reports 2015 Production Results and Announces...
28/11/2015Is Sotherly Hotels Inc (SOHO) A Good Stock To Buy?
15/10/2015Thompson Creek (TC) Posts Q3 Production & Sales Results
13/10/2015Thompson Creek Reports Third Quarter 2015 Production and Sal...
08/10/2015Why Thompson Creek Metals (TC) Could Be Positioned for a Slu...
07/08/2015Edited Transcript of TCM.TO earnings conference call or pres...
06/08/2015Thompson Creek misses Street 2Q forecasts
06/08/2015Thompson Creek Reports Second Quarter 2015 Financial Results
05/08/2015Why Thompson Creek Metals (TC) Might Surprise This Earnings ...
04/08/2015Will Thompson Creek (TC) Beat Earnings Estimates in Q2? - An...
16/07/2015Thompson Creek Schedules Second Quarter 2015 Financial Resul...
14/07/2015Thompson Creek Repurchases $34M of Senior Secured Notes - An...
13/07/2015Thompson Creek Announces Repurchase of $34 Million of 9.75% ...
13/07/2015Announces Repurchase of $34 Million of 9.75% Senior Secured ...
08/07/2015Thompson Creek Reports Second Quarter 2015 Production and Sa...
07/07/2015Thompson Creek Receives Continued Listing Standard Notice fr...
20/04/2015Royal Gold (RGLD) Issues Update on Mt. Milligan Mine - Analy...
13/04/2015Thompson Creek Schedules First Quarter 2015 Financial Result...
19/02/2015Thompson Creek Reports Significantly Improved 2014 Financial...
19/02/2015Reports Significantly Improved 2014 Financial Results Revenu...
06/02/2015Thompson Creek Schedules 2014 Financial Results Conference C...
19/01/2015Thompson Creek reports 2014 production results and announces...
12/01/2015Thompson Creek Schedules Conference Call/Webcast on January ...
10/12/2014Thompson Creek Metals Company to Place Endako Molybdenum Min...
09/12/2014Thompson Creek Metals Company Announces Change in Senior Man...
10/11/2014Thompson Creek Reports Significantly Improved Third Quarter ...
20/10/2014Thompson Creek Metals Company Schedules Third Quarter 2014 F...
14/10/2014Thompson Creek Metals Company Announces Third Quarter 2014 O...
05/08/2014Thompson Creek Metals Company Reports Increase in Second Qua...
21/07/2014Thompson Creek Metals Company Schedules Second Quarter 2014 ...
10/07/2014Thompson Creek Metals Company Announces Second Quarter 2014 ...
25/06/2014Thompson Creek Announces Results of Its Previously Announced...
23/06/2014Thompson Creek Announces Pricing Terms for Its Previously An...
11/06/2014Thompson Creek Announces Extension and Amendment of Pricing ...
11/06/2014Thompson Creek Announces Extension and Amendment of Pricing ...
11/06/2014Thompson Creek Announces Extension and Amendment of Pricing ...
27/05/2014Thompson Creek Metals Company Announces Appointment of Anne ...
07/10/2013mpany Celebrates the Opening of Mt. Milligan With Dedication...
24/09/2013mpany Announces Copper-Gold Concentrate Production at Mt. Mi...
16/08/2013mpany Processes First Feed at Mt. Milligan Copper and Gold M...
22/01/2013mpany Approval of Deposition of Tailings at the Mt. Milligan...
13/09/2011(Endako)Announces Increased Reserves and Extended Mine Life for the ...
15/08/2011Announces Executive Promotions
09/05/2011Announces First Quarter 2011 Record Production of 10.3 Milli...
31/03/2011ANNOUNCES COMPLETION OF $132 MILLION EQUIPMENT FINANCING
15/07/2010Enters into agreement to acquire Terrane Metals Corp.
10/05/2010Election Of Carol T. Banducci To Board Of Directors
06/05/2010Annual General Meeting Webcast Notification - May 6, 2010
25/01/2010Confirms move to U.S. generally accepted accounting principl...
24/06/2009completion of stock option cancellation program
08/06/2009Changes to 2009 Operating Plans
05/06/2009Resignation of Chief Operating Officer
18/02/2009provides update on 2009 operating plans
27/01/2009Changes Production Guidance for 2009
05/12/2008Provides Update on Capital Expenditure Plans
25/09/2008announces normal course issuer bid
27/06/2008Completes Over-Allotment Option
05/06/2008Completes C$215,000,000 Financing
05/05/2008webcast Annual and Special Meeting of Shareholders on May 8 ...
11/12/2007Announces Changes to Board of Directors
26/11/2007Announces Revised Reserves and New 10-Year Mine Plan for Tho...
14/11/2007 Reports Slide at Endako Mine Affects Operations
15/10/2007(angl) Posts New Report On Expanded Uses Of Molybdenum In T...
10/08/2007Reports Net Income of US$56.8 Million or 51 Cents Per Share ...
10/07/2007Announces Revised Mine Life of 27 Years at Endako Molybdenum...
11/05/2007Elects Two New Directors And Changes Name To Thompson Creek ...
10/05/2007Reports Cash Flow From Operating Activities of US$105.1 Mill...
16/04/2007A New Measured And Indicated Resource Of 464 Million Pounds
11/04/2007New Report on 'Structural Changes in Molybdenum Demand'
27/03/2007Reports Cash Flow From Operating Activities Of US$75.4 Milli...
13/04/2006Reports grades up to 0,797% MoS2 from Davidson drilling:…
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TORONTO (TCM.TO)FRANKFURT (A6R.F)
0,670+3.08%0,433-0.69%
TORONTO
CA$ 0,670
21/10 14:59 0,020
3,08%
Cours préc. Ouverture
0,650 0,650
Bas haut
0,650 0,670
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
- -  0,670 -%
Volume var. 1 mois
192 028 -%
24hGold TrendPower© : 20
Produit Molybdenum
Développe Copper - Gold - Molybdenum
Recherche Copper - Gold - Molybdenum - Silver
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 30/01/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,75 AU$+0,52%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
11,11 US$+2,21%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,55 GBX-0,90%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$-8,33%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,47 CA$+3,78%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
15,25 CA$-3,42%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+0,00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,19 AU$+0,00%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,79 CA$-3,76%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
52,57 US$+0,84%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+0,00%Trend Power :