Announces SEDAR filing of AMEC Technical Report on the Twin Metals Project

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Copper | Nickel | Palladium | Report |

Re:        News Release - Monday, January 21, 2013
Title:     Duluth Metals Announces SEDAR filing of AMEC Technical Report on the Twin Metals Project

TORONTO, Ontario, January 21, 2013 -- Duluth Metals Limited ("Duluth" or "Duluth Metals") (TSX: DM) (TSX:DM.U) today announces that the independent NI 43-101 Technical Report completed by AMEC E&C Services Inc. (AMEC) by a team led by Dr. Harry Parker entitled "Maturi, Birch Lake, and Spruce Road Cu-Ni-PGE Projects, Ely, Minnesota, USA, NI 43-101 Technical Report" with an effective date of 15 September 2012 has now been filed on SEDAR (www.sedar.com). This final study utilizes 867 drill holes and 308 wedge offsets to confirm the Twin Metals Minnesota, LLC ("TMM" or "Twin Metals") project to be one of the largest base and precious metal deposits of this type in the world. The report also highlights the significance of the higher grade S3 subunit for potential early mine sequencing. In addition, the PGM resource estimate confirms the project to be one of the largest palladium and platinum resources outside of South Africa. This filing follows the press release of December 4, 2012 which referenced the summary highlights of the new resource estimate:
  • Amongst the world's largest Cu-Ni-PGM polymetallic sulphide deposits with contained metals (using a 0.3% Cu cut-off) of 13.6 billion lbs copper, 4.4 billion lbs nickel, and 21.4 million ozs palladium+platinum+gold (TPM) in the Indicated category and 11.9 billion lbs copper, 4.1 billion lbs nickel, and 12.8 million ozs TPM1 in the Inferred category, representing an average 19% increase from the June 2012 interim AMEC Report.
  • Using a base case 0.3% Cu cut-off, AMEC estimated an Indicated Mineral Resource of 1.16 billion tons and an Inferred Mineral Resource of 1.26 billion tons on the three deposits (Birch Lake, Maturi and Spruce Road) occurring on approximately 11% of the footprint of the prospective portion of the TMM property block, representing a 60% increase in Indicated Tons and an 8% decrease in Inferred Tons from the June 2012 interim report.
  • The S3 Subunit (which is a subset of the base case mineral resource estimate for the Maturi Deposit) using a higher 0.5% Cu cut-off contains 622 million tons in the Indicated category and 198 million tons in the Inferred category. This material may have potential to provide higher-grade mill feed for the early stages of any planned mining operation.
  • Exploration Target areas include additional potential resources of between 1.4 and 2.2 billion tons contiguous to the boundaries of the three deposits. These Exploration Target areas occur on approximately 12% of the footprint of the prospective portion of the TMM property block.
  • The AMEC updated mineral resource estimate highlights a growing Platinum Group Metal (PGM) and gold resource of 21.4 million ozs Indicated and 12.8 million ozs Inferred in the Maturi and Birch Lake deposits. A decline of 3.0 million ozs contained in the Inferred Resource from the June 2012 interim report is offset by a 9.1 million ozs (75%) increase in the Indicated Resource. The TMM project has one of the world's largest palladium and platinum resources outside of South Africa.
Figure 1 below shows copper values expressed in percent ranging from less than 0.2% Cu (blue) to greater than 0.8% Cu (red) in the S2+S3 subunits of the Maturi Deposit from an oblique south view. Drill holes are projected as the light blue strings and the green outline is the limit of the block model. The grey surface represents the base of the Basal Mineralized Zone.

  1. Values for the Pt, Pd and Au components of TPM are shown in Table 3 and Table 4.
  2. All tonnages are reported as short tons.


Vern Baker, President of Duluth Metals, commenting on the report stated: "The AMEC Technical Report confirms the TMM resource to be one of the largest deposits of its kind in the world. While the resource is very large, the S3 Subunit within the Maturi Deposit hosts a higher-grade area that is a subset of the base case mineral resource estimate. Mine planning will focus on utilizing this higher grade areas for initial mine sequencing, potentially improving the business/ economic model significantly."

The Technical Report includes three deposits for which mineral resources have been estimated. These deposits are in close proximity to one another within the Twin Metals Minnesota Project, and are referred to as the Maturi, Birch Lake and Spruce Road Deposits:
  • Using a base case 0.3% Cu cut-off, the Maturi Deposit** contains 1065 million tons of Indicated Mineral Resources grading 0.59% copper, 0.19% nickel, 0.60 parts per million TPM (TPM = Pt + Pd + Au), plus an additional 542 million tons of Inferred Mineral Resources grading 0.51% copper, 0.17% nickel, 0.53 parts per million TPM. (Maturi Deposit tonnages do not include 139 million tons of mineralized material excluded from the underground resource in a safety pillar)
  • Using a base case 0.3% Cu cut-off, the Birch Lake Deposit** contains 99.7 million tons of Indicated Mineral Resources grading 0.52% copper, 0.16% nickel, 0.86 parts per million TPM, plus an additional 239.2 million tons of Inferred Mineral Resources grading 0.46% copper, 0.15% nickel, 0.64 parts per million TPM
  • Using a base case 0.3% Cu cut-off, the Spruce Road Deposit** contains 480 million tons of Inferred Mineral Resources grading 0.43% copper, 0.16% nickel.*
* Note - The Spruce Road resource was estimated using Inco legacy assay data. Platinum, palladium, and gold were not assayed by Inco, and the core is not available for re-assay.

** Note -- These mineral resource estimates include 100% of the estimated resource in each deposit, and include mineral resources acquired as a part of TMM's acquisition of Franconia Minerals Corporation in 2011. Franconia's principal assets are a 70% interest in the Birch Lake, 'old' Maturi and Spruce Road deposits in northeastern Minnesota through the Birch Lake Joint Venture. Franconia announced in November, 2010 its intention to increase its ownership at the Birch Lake Joint Venture to 82%; see Franconia's company profile at www.SEDAR.com for Technical Reports. TMM's ownership of the resource will be factored by these percentages where applicable.


The S3 Subunit Provides Potential Earlier Economic Mining Opportunities

The current Maturi Deposit resource estimate is based on a refined geological model. One geological subunit within the Maturi Deposit, known as the S3, hosts a higher-grade area that is a subset of the base case mineral resource estimate that may have potential as an early start-up area. AMEC estimated that the S3 Subunit in the Maturi Deposit, using a 0.5% Cu cut-off, contains 622 million tons grading 0.69% Cu, 0.22% Ni and 0.76 ppm TPM of Indicated Mineral Resources and 198 million tons grading 0.65% Cu, 0.21% Ni and 0.82 ppm TPM in the Inferred category. This material is a higher grade sub-set of the global resources estimated for Maturi. Within the Maturi Deposit, the bulk of mineralization is hosted by two subunits of the Basal Mineralized Zone (BMZ). The S2 and S3 subunits are stratiform, with the S3 subunit overlying the S2 subunit. Both subunits are laterally extensive, and are present over the vast majority of the deposit footprint. Within the Indicated Mineral Resource areal footprint, the S3 subunit ranges in vertical thickness from 0 to 355 feet, averaging 108 feet thick (0 to 276 feet, average 91 feet true thickness) and within the Indicated Mineral Resource areal footprint, the S2 subunit ranges in vertical thickness from 0 to 423 feet, averaging 72 feet thick (0 to 329 feet, averaging 59 feet true thickness). Table 1 shows tabulation range of sensitivity cases at different copper cut-off grades for the S3 Subunit of the Maturi Deposit. The base case subset estimate at a 0.3% Cu cut-off grade for the unit is shown in bold, and the 0.5% Cu cut-off grade sensitivity case subset is indicated in italics.

Figure 2 below shows the TPM (platinum+palladium+gold) values expressed in ppm ranging from less from less 0.3 ppm TPM (blue) to greater than 1.2 ppm TPM (red) in the S3 subunit within the Maturi Deposit looking from an oblique view from the south. Drill holes are projected as the light blue strings and the green outline is the limit of the block model. The grey surface represents the base of the Basal Mineralized Zone.


Table 1 -- MATURI DEPOSIT S3 SUBUNIT SENSITIVITY CASE INDICATED AND INFERRED MINERAL RESOURCES
  Maturi Deposit- S3 Subunit
  Indicated Mineral Resource
Cu% Million Cu Ni Pt Pd Au TPM
cut-off Tons % % ppm ppm ppm ppm
0.2 643 0.68 0.22 0.20 0.45 0.11 0.75
0.3 643 0.68 0.22 0.20 0.45 0.11 0.75
0.4 641 0.68 0.22 0.20 0.45 0.11 0.75
0.5 622 0.69 0.22 0.20 0.45 0.11 0.76
0.6 500 0.72 0.23 0.21 0.47 0.11 0.78
0.7 265 0.78 0.25 0.22 0.51 0.12 0.85
  Inferred Mineral Resource
Cu% Million Cu Ni Pt Pd Au TPM
cut-off Tons % % ppm ppm ppm ppm
0.2 234 0.62 0.20 0.21 0.46 0.10 0.77
0.3 232 0.62 0.20 0.21 0.47 0.10 0.78
0.4 225 0.63 0.20 0.21 0.47 0.10 0.78
0.5 198 0.65 0.21 0.22 0.50 0.11 0.82
0.6 129 0.70 0.22 0.25 0.55 0.12 0.92
0.7 53 0.78 0.24 0.28 0.64 0.14 1.06

Contained metals in the new resources are shown in Table 2 below. The updated AMEC resource statement highlights a growing platinum group metals (PGM) and gold resource of 21.4 million ozs. Indicated TPM and 12.8 million ozs. Inferred TPM, which is one of the world's largest palladium and platinum resources outside of South Africa.

Table 2 - CONTAINED METALS IN THE TMM RESOURCE*
METAL INDICATED RESOURCE INFERRED RESOURCE  
Copper 13.6 Billion lbs. 11.9 Billion lbs.
Nickel 4.4 Billion lbs. 4.1 Billion lbs.
     
Platinum 5.6 Million ozs. 3.5 Million ozs.**
Palladium 12.7 Million ozs. 7.6 Million ozs.**
Gold 3.1 Million ozs. 1.7 Million ozs.**
     

* Note - Based on mineral resources estimated at base case 0.3% copper cut-off grade.
** Note - Contained ounces of platinum, palladium, and gold in the Inferred category do not include the Spruce Road deposit.


Updated Mineral Resources

Twin Metals Minnesota, LLC (sometimes herein referred to as "TMM" or "Twin Metals") is the joint venture company between Duluth Metals Limited (60% ownership interest) and Antofagasta plc (40% ownership interest). In 2011, Twin Metals Minnesota, LLC acquired Franconia Minerals Corporation. Franconia's principal assets are a 70% interest in the Birch Lake, "old Maturi" (not including former Nokomis property) and Spruce Road deposits through the Birch Lake Joint Venture, with Beaver Bay Resources owning the remaining 30%. Franconia announced in November, 2010 its intention to increase its ownership at the Birch Lake Joint Venture to 82% upon commencement of production. All of the forgoing Indicated and Inferred Mineral Resources, and Exploration Target tonnages are expressed as a 100% ownership position.

The Mineral Resource estimate for the Maturi deposit incorporates assay data from 444 drill holes and 154 wedge off-set holes totalling 1,328,000 feet drilled on the Maturi deposit between 2006 and 2012, in addition to information from 99 legacy holes also in the geologic data base. The Birch Lake deposit resource estimate incorporates assay data from 97 drill holes and 146 wedge off-set holes totalling 297,000 feet drilled between 2000 and 2012, and information from an additional 17 legacy drill holes and 8 wedge off-set holes. The Spruce Road deposit resource estimate incorporates assay data from 210 legacy holes. The effective date of the mineral resource estimate is 15 September 2012.

Figure 3 below is a map showing the Indicated and Inferred boundaries and the Exploration Target Areas which can be found as part of this press release on the Company website at www.duluthmetals.com.


The December 2012 Resource Estimates for the Maturi, Birch Lake and Spruce Road deposits are based on a 0.3% copper cut-off grade to define the resource model. Based on AMEC's review of metal prices, process recoveries, refining costs and underground mine operating costs likely to apply at the Twin Metals site, the 0.3% copper cut-off grade (highlighted) is considered the base case for the statement of Indicated and Inferred Mineral Resources at this time. The estimates at the cut-off grades higher and lower than the base case are provided to show sensitivity of the estimates to cut-off grade.

Detailed Resource Tabulations

Tables of the updated resource tons and grades for various cut-offs are shown below for each deposit. The base case (0.3% Cu cut-off) is highlighted. The remaining cases are included to show the sensitivity of the estimates to changes in cut-off grades:

Table 3 -- MATURI DEPOSIT INDICATED AND INFERRED MINERAL RESOURCES (effective date 15 September 2012)
 

Maturi Deposit

  Indicated Mineral Resource
Cu % Million Cu Ni Pt Pd Au TPM
cut-off Tons % % ppm ppm ppm ppm
0.2 1137 0.57 0.18 0.15 0.34 0.08 0.58
0.3 1065 0.59 0.19 0.16 0.36 0.09 0.60
0.4 936 0.63 0.20 0.17 0.38 0.09 0.64
0.5 739 0.67 0.21 0.19 0.42 0.10 0.70
0.6 538 0.72 0.23 0.20 0.45 0.11 0.76
  Inferred Mineral Resource
Cu % Million Cu Ni Pt Pd Au TPM
cut-off Tons % % ppm ppm ppm ppm
0.2 782 0.43 0.14 0.12 0.27 0.06 0.44
0.3 542 0.51 0.17 0.14 0.32 0.07 0.53
0.4 383 0.57 0.19 0.16 0.38 0.08 0.62
0.5 256 0.63 0.20 0.20 0.44 0.10 0.74
0.6 141 0.70 0.22 0.24 0.53 0.12 0.88


Table 4 -- BIRCH LAKE DEPOSIT INDICATED AND INFERRED MINERAL RESOURCES (effective date 15 September 2012)
  Birch Lake Deposit
  Indicated Mineral Resource
Cu % Million Cu Ni Pt Pd Au TPM
cut-off Tons % % ppm ppm ppm ppm
0.2 111.9 0.49 0.15 0.22 0.48 0.11 0.80
0.3 99.7 0.52 0.16 0.23 0.51 0.11 0.86
0.4 85.4 0.55 0.17 0.25 0.54 0.12 0.91
0.5 54.9 0.60 0.18 0.27 0.59 0.13 0.99
0.6 22.8 0.67 0.21 0.29 0.63 0.14 1.06
  Inferred Mineral Resource
Cu % Million Cu Ni Pt Pd Au TPM
cut-off Tons % % ppm ppm ppm ppm
0.2 313.1 0.41 0.13 0.16 0.32 0.08 0.55
0.3 239.2 0.46 0.15 0.18 0.37 0.09 0.64
0.4 158.4 0.51 0.16 0.20 0.42 0.10 0.72
0.5 76.8 0.58 0.18 0.23 0.48 0.11 0.82
0.6 23.5 0.66 0.20 0.27 0.57 0.13 0.97

  1. Maturi Deposit tonnages do not include 139 million tons of mineralized material excluded from the underground resource in a safety pillar.
  2. CIM Definition Standards (2010) were followed for Mineral Resource estimation and classification.
  3. TPM is defined as Au + Pt + Pd.

Table 5 -- SPRUCE ROAD DEPOSIT INFERRED MINERAL RESOURCE (effective date 15 September 2012)

 

Spruce Road Deposit

 

Inferred Mineral Resource

Cu %

Million

Cu

Ni

cut-off

Tons

%

%

0.2

674

0.38

0.14

0.3

480

0.43

0.16

0.4

254

0.50

0.18

0.5

101

0.57

0.21

0.6

24

0.66

0.24


Exploration Target Area Tonnage and Grade Ranges

Similar to the June 2012 interim report, AMEC has again highlighted additional potential resources outside of the three mineral resources which occur on an additional 12% of the footprint of the Twin Metals Minnesota property. In addition to the TMM global resource, Exploration Targets have been outlined for four areas surrounding and adjacent to the Maturi and Birch Lake deposits. The grade and tonnage ranges of the four exploration targets are based on limited drill hole results. For the Maturi North and South targets, and the Birch Lake target, the target grade ranges and tonnage ranges were based on estimated blocks within the model above a 0.3% Cu cut-off grade that were not classified as either Indicated or Inferred, and applying a �20% variance to the tonnages and grades to the estimates. The Maturi West exploration target was based on statistical analysis of limited drilling grades and thickness of intercepts at a 0.30% Cu cut-off.

The potential quantity and grade of the Exploration Targets are conceptual in nature, and there has been insufficient exploration to define the target as a mineral resource, and it is uncertain if further exploration will result in the target being delineated as a mineral resource.

Maturi

The area inside the Maturi model perimeter surrounding the boundary of the Mineral Resource estimate was divided into two exploration targets, Maturi North and Maturi South. An additional exploration target, Maturi West, lies outside and to the west of the current model area. The tonnage and grades of the Maturi North exploration target could range from 290 to 435 million tons grading 0.41 to 0.61% Cu, 0.14 to 0.21 %Ni, 0.10 to 0.14 ppm Pt, 0.24 to 0.34 ppm Pd, and 0.07 to 0.07 ppm Au. The tonnage and grades of the Maturi South exploration target could range from 330 to 500 million tons grading 0.42 to 0.62 %Cu, 0.13 to 0.19 %Ni, 0.14 to 0.21 ppm Pt, 0.31 to 0.45 ppm Pd, and 0.07 to 0.10 ppm Au. The tonnage and grades of the Maturi West exploration target could range from 600 to 980 million tons grading 0.41 to 0.52 %Cu, 0.15 to 0.18 %Ni, 0.10 to 0.14 ppm Pt, 0.27 to 0.31 ppm Pd, and 0.07 to 0.07 ppm Au. The ranges of PGE values stated for Maturi West are based on regression formulas.

Birch Lake

The Birch Lake exploration target includes the area inside the Birch Lake model perimeter surrounding the Indicated and Inferred Mineral Resources. The tonnage and grades of the Birch Lake exploration target could range from 222 to 334 million tons grading 0.33 to 0.50 %Cu, 0.11 to 0.16 %Ni, and 0.39 to 0.58 ppm TPM (comprising 0.11 to 0.16 ppm Pt, 0.22 to 0.33 ppm Pd, and 0.05 to 0.8 ppm Au).

About the Resource Estimates

The figures for resources presented herein, including the anticipated tonnages and grades that may be achieved or the indicated level of recovery that may be realized, are estimates, and no assurances can be given that they will be realized during production. Such estimates are, in large part, based on interpretations of geological data obtained from drill holes and other sampling techniques. Actual mineralization or favourable host rock units may be different from those predicted. It may also take many years from the initial phase of drilling before production is possible, and during that time the economic feasibility of exploiting a deposit may change.

The Company's business of mineral exploration has a high level of inherent risk. Although the Company is optimistic about the potential of many of its projects, there is no guarantee that any mineral deposits will be economically feasible and that these deposits will be put into production. The Company's exploration and development activities may also be affected by a number of risks, including environmental, metallurgical, financing, permitting, approval, legislative and other government risks which are normal to the industry and are referenced in greater detail in the Company's Annual Information Form.

For the purposes of assessing reasonable prospects of economic recovery and appropriate cut-off grade, the following assumptions were used:
  • Average mining costs: $16/t (all underground mining; long hole open stoping with backfill)
  • Average process costs: $12/t (flotation concentrate followed hydrometallurgical processing using Teck Resouorces Limited ("Teck") CESL(tm) process6)
  • G&A costs: $2/t
Underground potentially mineable shapes were constrained by geology, and the mine modeling software used was Vulcan(tm). The Maturi resource was estimated using Ordinary Kriging with a maximum block size of 25 x 25 x 15 feet. Indicated Mineral Resources generally extend 250 feet from well-drilled areas showing continuity in NSR values and geological geometry. Areas defined by only legacy drilling are not included within the Indicated Mineral Resource outline. The Inferred Mineral Resource boundary typically extends 500 feet from well-drilled areas showing continuity in NSR values and geological geometry. A variable tonnage factor was used, but the average tonnage factor was 10.5 ft3/t. The metal prices used in the NSR calculation were mutually agreed upon by TMM, Antofagasta and AMEC on December 7, 2011 and have not changed for this estimate. Assumed metal prices and metallurgical recoveries are presented in Tables 6a and 6b.

Table 6a -- NSR calculation parameters, Maturi Deposit
Metal Price (US$) Recovery
Concentrate
Recovery
CESL
Recovery
Global
Payable
Copper $3.00/lb 94.3% 96.3% 90.8% 100.0%
Nickel $9.38/lb 72.0% 95.6% 68.8% 80.0%
Platinum $1840/troy oz 93.0% 59.4% 55.2% 80.0%
Palladium $805/troy oz 90.0% 70.7% 63.6% 80.0%
Gold $1050/troy oz 85.0% 74.5% 63.3% 80.0%

Table 6b -- NSR calculation parameters, Birch Lake Deposit
Metal Price (US$) Recovery
Concentrate
Recovery
CESL
Recovery
Global
Payable
Copper $3.00/lb 94.3% 96.3% 90.8% 100.0%
Nickel $9.38/lb 60.0% 95.6% 57.4% 80.0%
Platinum $1,840/troy oz 93.0% 59.4% 55.2% 80.0%
Palladium $805/troy oz 90.0% 70.7% 63.6% 80.0%
Gold $1,050/troy oz 85.0% 74.5% 63.3% 80.0%

6 Teck has developed a hydrometallurgical process named CESL(tm), that effectively recovers copper, nickel and PGM's from bulk copper-nickel-PGM concentrates, which Duluth and Twin Metals are considering as a concentrate processing alternative. Concentrate from the Maturi group of deposits has been successfully procesed at bench and pilot scale at Teck's hydrometallurgical facility in Richmond, BC with average recovery of metal from concentrate into saleable product form as reported in Table 7a and Table 7b.

For the non-legacy assay data utilized in these resource estimates, half core samples were prepared at ALS Minerals laboratories in Thunder Bay and then shipped to the ALS analytical facilities in Vancouver. Samples were analyzed for Au, Pt, and Pd using a 30g standard fire assay with an ICP-AES finish. An additional 33 elements were analyzed for using a four acid (near total) digestion and a combination of ICP-MS and ICP-AES. ICP over-limits for copper and nickel are re-analyzed using dissolution by four acid (near total) digestion followed by ICP-AES or AAS. The remaining half core samples are being stored in Minnesota. A system of blanks, standards and quarter-core duplicates were added to the sample stream by Twin Metals Minnesota LLC to verify accuracy and precision of assay results, supplementing and verifying a variety of internal QA/QC tests performed by ALS Minerals.

All data verification and quality assurance/quality control procedures of Twin Metals Minnesota LLC were applied specifically to the results contained in this press release, and the data herein has been verified by Phillip Larson, P. Geo., Senior Geologist with Duluth Metals and a Qualified Person under NI 43-101, in accordance with the procedures of the Company. The data verification procedures and quality assurance/control procedures adopted by the Company and applied to the work being reported in this press release can be found in Section 11 of the "NI 43-101 Technical Report on the Maturi, Birch Lake, and Spruce Road Copper-Nickel-PGE Projects, Ely, Minnesota, USA", with an effective date of June 15, 2012, and dated July 27, 2012. The Technical Report was filed on SEDAR under the Company's profile on July 27, 2012 (www.sedar.com).

Dr. Harry Parker, SME, Registered Member, Technical Director of AMEC, is the Independent Qualified Person who prepared the Resource Estimate and is responsible for the mineral resource estimates summarized in this press release. Dr. Parker is a licensed Professional Geologist in the State of Minnesota. Phillip Larson, P. Geo. is the Qualified Person for Duluth Metals and Senior Geologist for Duluth Metals, in accordance with NI 43-101 of the Canadian Securities Administrators, and reviewed and approved the technical content of this press release.

About Duluth Metals Limited

Duluth Metals Limited is committed to acquiring, exploring and developing copper, nickel and platinum group metal (PGM) deposits. Duluth Metals has a joint venture with Antofagasta plc on the Twin Metals Project, located within the rapidly emerging Duluth Complex mining camp in north-eastern Minnesota. The Duluth Complex hosts one of the world's largest undeveloped repositories of copper, nickel and PGMs, including the world's third largest accumulation of nickel sulphides, and one of the world's largest accumulations of polymetallic copper and platinum group metals. Aside from the joint venture, Duluth Metals retains a 100% position on approximately 40,000 acres of mineral interests on exploration properties adjacent to and nearby the Twin Metals Minnesota LLC joint venture.

About Twin Metals Minnesota, LLC

Twin Metals Minnesota, LLC
is a joint venture company, 60 percent owned by Duluth Metals Limited and 40 percent by Antofagasta plc. Twin Metals was formed in 2010 to pursue the development and operation of a copper, nickel and platinum group metals (strategic metals) underground mining project within the Duluth Complex in northeastern Minnesota. Twin Metals holds mineral and land assets of approximately 32,000 acres of leased and permitted land, including mineral resources prepared in compliance with the requirements of NI 43-101.

This press release contains forward-looking statements (including "forward-looking information" within the meaning of applicable Canadian securities legislation and "forward-looking statements" within the meaning of the US Private Securities Litigation Reform Act of 1995) relating to, among other things, the results of drilling operations of Duluth Metals and exploration and mine development. Generally, forward-looking statements can be identified by the use of words such as "plans", "expects" or "does not expect", "is expected", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates" or "does not anticipate", or "believes", or variations of such words and phrases or statements that certain actions, events or results "may", "could", "would", "might" or "will be taken", "occur" or "be achieved". Duluth Metals has relied on a number of assumptions and estimates in making such forward-looking statements, including, without limitation, the prices of copper, nickel and platinum group metals (PGMs) and the costs associated with continuing exploration and mining development. Such assumptions and estimates are made in light of the trends and conditions that are considered to be relevant and reasonable based on information available and the circumstances existing at this time. A number of risk factors may cause actual results, level of activity, performance or outcomes of such exploration and/or mine development to be materially different from those expressed or implied by such forward-looking statements including, without limitation, whether such discoveries will result in commercially viable quantities of such mineralized materials, the possibility of changes to project parameters as plans continue to be refined, the ability to execute planned exploration and future drilling programs, possible variations of copper, nickel and PGM grade or recovery rates, the need for additional funding to continue exploration efforts, changes in general economic, market and business conditions, and those other risks set forth in Duluth Metals' most recent annual information form under the heading "Risk Factors" and in its other public filings. Statements related to "reserves" and "resources" are deemed forward-looking statements as they involve the implied assessment, based on realistically assumed and justifiable technical and economic conditions, that an inventory of mineralization will become economically extractable. Forward-looking statements are not guarantees of future performance and such information is inherently subject to known and unknown risks, uncertainties and other factors that are difficult to predict and may be beyond the control of Duluth Metals. Although Duluth Metals has attempted to identify important risks and factors that could cause actual actions, events or results to differ materially from those described in forward-looking statements, there may be other factors and risks that cause actions, events or results not to be as anticipated, estimated or intended. Consequently, undue reliance should not be placed on such forward-looking statements. In addition, all forward-looking statements in this press release are given as of the date hereof. Duluth Metals disclaims any intention or obligation to update or revise any forward-looking statements, whether as a result of new information, future events or otherwise, save and except as may be required by applicable securities laws. The forward-looking statements contained herein are expressly qualified by this disclaimer.

Cautionary Note to United States Investors Concerning Estimates of Indicated and Inferred Mineral Resources
This press release uses the terms "Indicated Mineral Resources" and "Inferred Mineral Resources" in accordance with the Canadian Institute of Mining, Metallurgy and Petroleum (CIM) Definition Standards. While such terms are recognized under Canadian securities legislation, the United States Securities and Exchange Commission does not recognize these terms. The term "Inferred Mineral Resource" refers to a mineral resource for which quantity and grade or quality can be estimated on the basis of geological evidence and limited sampling and reasonably assumed, but not verified, geological and grade continuity. These estimates are based on limited information and it cannot be assumed that all or any part of an "Inferred Mineral Resource" will be upgraded to a higher classification resource, such as "Indicated" or "Measured", as a result of continued exploration. Accordingly, an estimate relating to an "Inferred Mineral Resource" is insufficient to allow meaningful application of technical and economic parameters or to enable an evaluation of economic viability. Under Canadian securities legislation, estimates of an "Inferred Mineral Resource" may not form the basis of feasibility or other economic studies. Investors are cautioned not to assume that all or any part of an "Inferred Mineral Resource" is economically or legally mineable. Investors are also cautioned not to assume that all or any part of "Indicated" will ever be converted into "Mineral Reserves" (being the economically mineable part of an "Indicated" or "Measured Mineral Resource").


For more information please contact:
Mara Strazdins
Vice President Investor Relations and Corporate Communications
Telephone: (416) 369-1500 ext. 222
Email: mstrazdins@duluthmetals.com

Vern Baker
President
Telephone: (651) 389-9990
Email: vbaker@duluthmetals.com
Webpage: www.duluthmetals.com

Associated File: http://www.duluthmetals.com/i/pdf/NR-Jan-21-2013.pdf
685 KB in size, approx. 2 minutes, 9 seconds to download at 56.6Kbps

Copyright � 2013 DULUTH METALS LIMITED (DM) All rights reserved. For more information visit our website at http://www.duluthmetals.com/ or send email to info@duluthmetals.com ..

Duluth Metals Limited Inc.

EN DÉVELOPPEMENT
CODE : DM.TO
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Duluth Metals est une société d’exploration minière de nickel et de palladium basée au Canada.

Duluth Metals est en développement de projets de nickel, de palladium, de cobalt, de cuivre, d'or, de platine et de plomb en USA, et détient divers projets d'exploration au Canada.

Son principal projet en développement est BIRCH LAKE en USA et son principal projet en exploration est NOKOMIS au Canada.

Duluth Metals est cotée au Canada, aux Etats-Unis D'Amerique et en Allemagne. Sa capitalisation boursière aujourd'hui est 63,1 millions CA$ (50,9 millions US$, 44,8 millions €).

La valeur de son action a atteint son plus haut niveau récent le 31 décembre 2007 à 4,07 CA$, et son plus bas niveau récent le 31 octobre 2014 à 0,06 CA$.

Duluth Metals possède 141 880 000 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Dans les médias de Duluth Metals Limited Inc.
05/07/2008Duluth Complex: A World-Class Value Play
Rapports annuels de Duluth Metals Limited Inc.
Annual Report 2007
Financements de Duluth Metals Limited Inc.
21/10/2014Extends Private Placement Closing Date
18/03/2014Completes First Tranche of Private Placement
10/03/2014Announces Private Placement Offering
01/04/2013Announces CDN $30 Million Convertible Debenture Financing
27/05/2011ANNOUNCES NORMAL COURSE ISSUER BID AND SECURITIES REPURCHASE...
27/08/2008Announces Extension Of Exercise Period For Class A Warrants ...
Nominations de Duluth Metals Limited Inc.
17/05/2011Appoints Lieutenant General John Sattler (USMC Ret.) and Mr....
16/09/2008Appoints Dean M. Peterson, Ph.D. as Senior Vice-President, E...
07/08/2008Appoints Thomas F. Pugsley To Board
Projets de Duluth Metals Limited Inc.
07/01/2014(Minnesota Project)Provides Twin Metals Minnesota Project Pre-feasibility Updat...
18/07/2013(Minnesota Project)Provides Metallurgical Update on Twin Metals Minnesota Proje...
22/05/2013(Minnesota Project)Highlights 70 feet of 0.83% Copper, 0.28% Nickel and 0.876 g...
16/04/2013(Minnesota Project)Highlights 110 feet of 0.94% Copper, 0.31% Nickel and 1.17 g...
12/02/2013Announces that Twin Metals Minnesota has Appointed Kelly J. ...
05/02/2013Identifies Two New Mineralized Areas on Exploration Lands
21/01/2013Announces SEDAR filing of AMEC Technical Report on the Twin ...
09/11/2012(Minnesota Project)Highlights 136 feet of 0.945% Copper, 0.256% Nickel and 0.63...
11/10/2012(Minnesota Project)Highlights 155 feet of 1.371% Copper, 0.281% Nickel and 0.86...
10/10/2012Announces Second Drill Rig Mobilized On The East Shore Prope...
24/09/2012Announces Commencement Of Drilling At Nickel Lake Macrodike
21/09/2012Confirms Receipt Of Prospecting Permits From Bureau Of Land ...
17/09/2012Set To Drill Significant Exploration Properties Outside Of J...
30/05/2012(Minnesota Project)Highlights 209 feet of 2.01% Copper Equivalent at west Matur...
21/09/2011Announces Twin Metals Minnesota Contract with Bechtel for Pr...
07/07/2011(Nokomis)Announces 120 feet of 2.19g/t Total Precious Metals 350 Metr...
05/05/2011Announces $8 Million Drilling and Work Program for Explorati...
28/04/2011Announces Aggressive 2011 Program for Twin Metals Project af...
29/03/2011(Nokomis)Announces Higher Grade Intercepts With New Twin Metals Drill...
21/07/2010(Nokomis)Signs Definitive Participation Agreement With Antofagasta Pl...
23/06/2010(Nokomis)Returns 2.2% Copper Equivalent Over 75 Feet
17/05/2010(Nokomis)Hits 2.6% Copper Equivalent Over 125 Feet at Nokomis
22/04/2010(Nokomis)Expands Higher Grade Area
22/03/2010(Nokomis)Higher Grade Assays In First Hole From Winter Drilling Progr...
04/03/2010(Nokomis)Ramps up Winter Exploration
28/01/2010(Nokomis)Set To Explore Significant Properties Outside Of Nokomis Joi...
11/12/2009Receives NI 43-101 Report and Updated Resource Estimate for ...
26/10/2009(Nokomis)Expands Nokomis Resource to 550 Million Indicated Tonnes and...
12/01/2009(Nokomis)43-101 Preliminary Assessment Report Confirming Positive Eco...
04/12/2008(Nokomis)continues to receive wide significant mineralized intersecti...
25/11/2008New Ni 43-101 Preliminary Economic Assessment Confirms Highe...
22/07/2008(Nokomis)Receives Ni 43-101 Report On Interim Nokomis Deposit Resourc...
02/04/2008(Nokomis)Cuts New High Grade Zone Below Nokomis Deposit
11/03/2008Expands Strategic Land Position by Over 350 Percent
14/02/2008(Nokomis)Continued Drilling Expands Nokomis Deposit
Communiqués de Presse de Duluth Metals Limited Inc.
16/12/2014commences mailout of management information circular for arr...
03/12/2014Granted Interim Order For Arrangement
10/11/2014completes initial tranche of private placement with Antofaga...
03/10/2014(Minnesota Project)Files NI 43-101 Pre-feasibility Study Technical Report on th...
02/06/2014Annual General Meeting to be Held at 10:00 AM EDT June 9th a...
26/02/2014Announces Increased Tonnage, Metal Content and an Upgraded M...
04/09/2013Announces High Grade Nickel Intercepts Indicative of New Con...
06/08/2013Announces Discovery Immediately Southeast of Teck's Mesaba P...
18/06/2013Announces 2013 Annual Shareholders' Meeting Voting Results
07/06/2013Annual General Meeting to be Held at 10:00 AM EDT June 13th ...
10/04/2013Announces Closing of CDN $30 Million Convertible Debenture F...
16/10/2012Announces Mobilization of a Third Drill Rig on Exploration ...
01/10/2012announces closing of US$10 million loan financing with A...
13/06/2012Announces New AMEC NI 43-101 Technical Report Confirming Sig...
14/05/2012(Minnesota Project)Highlights 116.5 feet of 1.32 g/t Total Precious Metals and ...
23/04/2012Announces 30 feet of 2.11 g/t Total Precious Metals and 94 f...
21/03/2012Announces Twin Metals Frame-of-Reference for Bechtel Led Pre...
17/01/2012Announces 40 feet of 2.67 g/t Total Precious Metals on Lates...
31/08/2011Completes Transfer of Franconia Minerals Assets into Twin ...
18/08/2011Information Bulletin Re Dividend of Special Warrants to its ...
02/08/2011Commences Drilling Program on Platinum Targets on the Land ...
28/07/2011Announces Dividend of Special Warrants of Duluth Exploration...
09/06/2011Announces 34.5 feet at 2.82% CuEq from Twin Metals New Drill...
07/06/2011Annual and Special Meeting to be Held June 15th at One King ...
03/03/2011Franconia Minerals Shareholders Approve Arrangement with Dul...
09/08/2010Last Week's Events
08/06/2010Annual And Special Meeting To Be Held At The Toronto Board O...
18/11/2009Nominated for Mining Journal's Exploration Award
30/10/2009Confirms 12 Million Indicated Ounces And 6 Million Inferred ...
18/08/2009Hole Hits Mineralization 900 Meters Southwest Of Defined Bou...
16/06/2009expands exploration land holdings in the Duluth Complex
10/09/2008Progress Report On The Nokomis Deposit
14/08/2008Continues Infill Drilling On The Nokomis Deposit
21/05/2008Announces Early Warrant Exercise
25/03/2008 Presents At John Tumazos Very Independent Research, Llc Met...
04/03/2008 Hits Higher Grade Mineralization In Eastern Area
19/02/2008options key infrastructure land parcel
05/09/2007new drill results confirm increased mineralization to Nokomi...
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TORONTO (DM.TO)FRANKFURT (AZK.F)
0,445+0.00%7,75-2.95%
TORONTO
CA$ 0,445
22/01 15:52 -
0%
Cours préc. Ouverture
0,445 0,445
Bas haut
0,445 0,445
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
- -  0,445 -%
Volume var. 1 mois
8 558 -%
24hGold TrendPower© : -9
Produit
Développe Cobalt - Copper - Nickel - Palladium - Platinum
Recherche Cobalt - Copper - Gold - Nickel - Palladium - Platinum
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 05/11/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,80 AU$+1,17%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
11,11 US$+2,21%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,55 GBX-0,90%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$-8,33%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,47 CA$+3,78%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
15,25 CA$-3,42%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+0,00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,19 AU$+0,00%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,79 CA$-3,76%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
52,57 US$+0,84%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+5,88%Trend Power :