Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en

First Point Minerals Corp

Publié le 06 février 2013

Announces Substantial Increases in Nickel Resources at Decar Project

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Canada | Nickel | Report |

First Point Minerals Corp



February 06, 2013

First Point Minerals Announces Substantial Increases in Nickel Resources at Decar Project


Vancouver, February 6, 2013 -- First Point Minerals Corp. (FPX-TSX) ("First Point" or the "Company") is pleased to report an updated independent National Instrument 43-101 compliant mineral resource estimate for the Decar nickel-iron alloy project in central British Columbia. The updated resource estimate will be incorporated into the Preliminary Economic Assessment ("PEA") currently being completed for the Decar project, which is managed and operated by Cliffs Natural Resources Exploration Canada Inc., an affiliate of Cliffs Natural Resources Inc. (NYSE: CLF) (Paris: CLF) ("Cliffs").

Updated Baptiste Deposit Mineral Resource Estimate* (Caracle Creek International Consulting Inc., January 23, 2013):

Category
Tonnes
Davis Tube Recoverable Nickel Content
(% Ni)
(Tonnes)
(Pounds)
Indicated
1,159,510,000
0.124
1,437,800
3,169,700,000
Inferred
870,400,000
0.125
1,088,000
2,398,600,000

*Note: Reported at a cut-off grade of 0.06% DTR nickel. Mineral resources are not mineral reserves and do not have demonstrated economic viability. Tonnes have been rounded to the nearest 10,000. Grade has been rounded to three significant digits .The mineral resources are constrained by a GEMCOM Whittle pit, based on the reported cut-off grade.

The resource definition drilling and expansion program undertaken on the Baptiste deposit in 2012 has yielded substantially more tonnes and higher average grades, resulting in 1.159 billion tonnes being classified as an indicated resource at an improved grade of 0.124% Davis Tube magnetically-recovered ("DTR") nickel. Inferred resources now total 870 million tonnes grading 0.125% DTR nickel. This updated resource estimation compares very favourably to the initial inferred resource estimate reported in First Point's April 16, 2012 news release, which is shown below.

Initial Mineral Resource Estimate* (Caracle Creek, April 16, 2012):

Category
Tonnes
Davis Tube Recoverable Nickel Content
(% Ni)
(Tonnes)
(Pounds)
Inferred
1,197,000,000
0.113
1,352,610
2,981,900,000

*Note: Reported at a cut-off grade of 0.06% DTR nickel. Mineral resources are not mineral reserves and do not have demonstrated economic viability. Tonnes have been rounded to the nearest 10,000. Grade has been rounded to three significant digits.

"We are very pleased with the significant year-on-year growth of nickel resources at Decar," said First Point President and CEO Jim Gilbert. "The impressive increases reported in both overall tonnage and contained metal inventories, together with a material improvement in magnetically recoverable nickel grades, will enable Cliffs to incorporate an upgraded and enlarged resource in the PEA, which is due to be completed in March 2013."

The updated National Instrument 43-101 ("NI 43-101") compliant mineral resource estimate was prepared by Caracle Creek International Consulting Inc. ("Caracle Creek"), which also prepared the April 2012 initial resource estimate. Caracle Creek supervised and managed the 2012 and 2011 drilling programs at Decar on behalf of Cliffs. The updated resource estimate adds an additional 32 core holes (16,347 metres) completed during the summer of 2012 to the initial resource estimate, bringing the total number of core holes in the data base to 74, representing 28,917 metres of drilling.

The average drill hole spacing in the Baptiste deposit is 200 metres. A total of 7,852 drill samples of core were used for the resource estimation.

Resource Estimate Details

The block model tonnage and grade for each of the indicated and inferred resource categories were calculated at various cut-off grades as shown in Table 1 and 2:

Table 1: Indicated Block Model tonnage and grades reported at various cut-off grades.*

Cut-off Grade (%)
Tonnes
Davis Tube Recoverable Nickel Grade (%)
0.02
1,170,510,000
0.124
0.04
1,169,130,000
0.124
0.06
1,159,510,000
0.124
0.08
1,121,810,000
0.126
0.10
999,440,000
0.130
0.12
691,870,000
0.139

*Note: Tonnes have been rounded to the nearest 10,000. Grade has been rounded to three significant digits. The base-case mineral resource was estimated at a cut-off of 0.06 % DTR nickel. These figures are not to be misconstrued as mineral resources as they are intended for the sole purpose of demonstrating the sensitivity of the resource estimate with respect to reporting cut-off grade. The mineral resources were also constrained with a Whittle pit.

Table 2: Inferred Block Model tonnage and grades reported at various cut-off grades.*

Cut-off Grade (%)
Tonnes
Davis Tube Recoverable Nickel Grade (%)
0.02
881,260,000
0.124
0.04
877,900,000
0.124
0.06
870,400,000
0.125
0.08
842,610,000
0.126
0.10
733,160,000
0.132
0.12
503,790,000
0.141

*Note: Tonnes have been rounded to the nearest 10,000. Grade has been rounded to three significant digits. The base-case mineral resource was estimated at a cut-off of 0.06 % DTR nickel. These figures are not to be misconstrued as mineral resources as they are intended for the sole purpose of demonstrating the sensitivity of the resource estimate with respect to reporting cut-off grade. The mineral resources were also constrained with a Whittle pit.

The geological resource model was constructed by Caracle Creek using composited drill hole data, drill core logs and down-hole survey data. The mineral resource estimation was evaluated using geostatistical block modeling methods constrained by mineralized wireframe. The mineral resources have been estimated in conformity with the Canadian Institute of Mining, Metallurgy and Petroleum ("CIM") "Estimation of Mineral Resources and Mineral Reserves Best Practises" guidelines and were classified according to the CIM Standard Definition for Mineral Resources and Mineral Reserves (November 2010) guidelines. The mineral resources are reported in accordance with the Canadian Securities Administrators NI 43-101.

The geological resource model consists of a large, curved volume, which is 3.0 kilometres long, 150 to more than 1,080 metres wide and extends up to 540 metres deep. The Baptiste deposit remains open along strike in both directions, to the southeast in the higher-grade central area and at depth over the entire system. It is covered by an average of 12 metres of overburden.

The mineralized serpentinized peridotite host rock at Baptiste is cut by several steeply-dipping, non-mineralized dykes, which in total comprise just ~4% of the rock mass in the mineralized domain. These dykes, mostly in the range of 2 to 5 metres thick, were incorporated by Caracle Creek in a zero grade domain. The dyke domain was subtracted from the mineralized domain in order to eliminate the zero grade assays from the mineralized domain.

Block models measuring 40 metres x 40 metres x 10 metres were interpolated for evenly distribution of 1,649 specific gravity ("SG") composites based on SG measurements on drill core pulp using the inverse distance method of interpolation.

The grade of the mineral resource was based on ordinary kriging using two passes, which was verified using the inverse distance squared method.

Davis Tube magnetically-recovered ("DTR") nickel is the nickel content recovered by magnetic separation using a Davis Tube, followed by standard assaying procedures to determine the nickel assay of the concentrate; in effect a mini-scale metallurgical test. Cliffs employs large scale magnetic separation methods in several of its operating iron ore mines, and the Davis Tube method is used to provide a more accurate measure of variability in recoverable nickel. The Davis Tube method is the global, industry standard geometallurgical test for magnetic recovery operations and exploration projects. Final recoveries of nickel using both magnetic and gravity separation processes are subject to confirmation in the PEA currently underway.

The mineral resource estimate for the Baptiste deposit was completed by Jason Baker, P. Eng., of Caracle Creek, an independent qualified person as defined by NI 43-101 Standards of Disclosure for Mineral Projects. An updated NI 43-101 Technical Report describing the details of the updated mineral resource estimate will be filed on SEDAR within 45 days of this news release.

Cliffs is advancing the Decar nickel project under an option/ joint venture agreement with First Point that was signed in November 2009. Under the original agreement, Cliffs could earn an initial 51% interest in Decar by spending US$4.5 million over a period of four years. In September 2011, Cliffs was deemed to have earned a 51% stake, more than two years ahead of schedule. Cliffs has the right to increase its ownership (i) to 60% by completing a NI 43-101 compliant PEA by March 2013, (ii) to 65% by completing a NI 43-101 prefeasibility study, and (iii) ultimately to 75% by completing a bankable feasibility study. Should Cliffs earn a 75% interest in Decar, First Point would hold a 25% participating interest, plus a 1% net smelter return royalty interest.

Dr. Ron Britten, P. Eng., First Point's Qualified Person under NI 43-101, has reviewed and approved the technical content of this news release

About First Point
First Point Minerals Corp. is a Canadian base metal exploration company operating worldwide. For more information, please view the Company's website at www.firstpointminerals.com or contact Jim Gilbert, President and CEO, or Rob Robertson, VP Corporate Development, at (604) 681-8600.

On behalf of First Point Minerals Corp.

"Jim Gilbert"
Jim Gilbert, President and CEO

Forward-Looking Statements
Certain of the statements made and information contained herein is considered "forward-looking information" within the meaning of applicable Canadian securities laws. These statements address future events and conditions and so involve inherent risks and uncertainties, as disclosed in the Company's periodic filings with Canadian securities regulators. Actual results could differ from those currently projected. The Company does not assume the obligation to update any forward-looking statement.

Cautionary Note to U.S. Readers

Information concerning the properties and operations discussed in this press release has been prepared in accordance with Canadian standards under applicable Canadian securities laws, and may not be comparable to similar information for United States companies. The terms "Mineral Resource", "Indicated Mineral Resource" and" Inferred Mineral Resource" used in this press release are Canadian mining terms as defined in accordance with NI 43-101 guidelines set out in the Canadian Institute of Mining, Metallurgy and Petroleum ("CIM") Standards on Mineral Resources and Mineral Reserves adopted by the CIM Council on December 11, 2005. While the terms "Mineral Resource", "Indicated Mineral Resource" and "Inferred Mineral Resource" are recognized and required by Canadian regulations, they are not defined terms under standards of the United States Securities and Exchange Commission ("SEC"). Under United States standards, mineralization may not be classified as a "reserve" unless the determination has been made that the mineralization could be economically and legally produced or extracted at the time the reserve calculation is made. As such, certain information contained in this press release concerning descriptions of mineralization and resources under Canadian standards is not comparable to similar information made public by United States companies subject to the reporting and disclosure requirements of the SEC. An "Inferred Mineral Resource" has a great amount of uncertainty as to its existence and as to its economic and legal feasibility. It cannot be assumed that all or any part of an "Inferred Mineral Resource" will ever be upgraded to a higher category. Under Canadian rules, estimates of "Inferred Mineral Resources" may not form the basis of feasibility or prefeasibility studies. Readers are cautioned not to assume that all or any part of "Indicated Mineral Resources" will ever be converted into Mineral Reserves. Readers are also cautioned not to assume that all or any part of an "Inferred Mineral Resource" exists, or is economically or legally mineable. None of First Point's securities have been registered under the United States Securities Act of 1933, as amended.


Neither the TSX Exchange nor its Regulation Services Provider accepts responsibility for the adequacy or accuracy of this release.

You can also view this News Release on our website at:
http://www.firstpointminerals.com/s/NewsReleases.asp?ReportID=569706
 


 
Données et statistiques pour les pays mentionnés : Canada | Tous
Cours de l'or et de l'argent pour les pays mentionnés : Canada | Tous

First Point Minerals Corp

EXPLORATEUR
CODE : FPX.T
ISIN : CA3359371083
CUSIP : 335937108
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

First Point Min. est une société d’exploration minière d'or et d'argent basée au Canada.

First Point Min. détient divers projets d'exploration au Honduras.

Ses principaux projets en exploration sont CORRALITOS au Mexique, DECAR et JOE au Canada et TULE et CAMPORO au Honduras.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Présentations des Compagnies de First Point Minerals Corp
13/03/2008Featured in Mineral Exploration Magazine
Financements de First Point Minerals Corp
20/04/2016Announces $570,000 Financing
27/11/2013Closes $1,583,790 Financing
19/11/2013Closes $895,540 First Tranche of Non-Brokered Private Placem...
12/11/2013Announces $1,000,000 Financing
02/08/2012Completes Previously Announced Follow-on Private Placement
19/07/2012Announces Follow-on Private Placement Financing
29/06/2012Closes Previously Announced Private Placement Financing of F...
18/06/2012Announces a $2.0 Million Private Placement Financing of Flow...
04/05/2011Confirms First Year Exercise of Warrants by Cliffs and 20 Ot...
26/04/2010Closes $7,500,000 Non-brokered Private Placement
06/04/2010Announces 50% Increase in Private Placement
29/03/2010Proposes a $5 Million Private Placement Financing
15/12/2009Closes Private Placement Financing with Cliffs
02/12/2009Announces Revisions to the terms of the Private Placement of...
26/02/2009Arranges $250,000 Private Placement Financing
19/03/2008Expands Work in Nickel Properties on Completion of a Private...
27/02/2008 Arranges Flow-Through Private Placement for Expanded Work o...
18/07/2007Non-Brokered Flow-Through Private Placement Closes
29/06/2007Arranges Flow-Through Private Placement for Work on Nickel P...
Attributions d'options de First Point Minerals Corp
23/12/2009Grants Stock Options
06/01/2009Expands Advisory Committee, Revises the Cedros Agreement and...
15/03/2007Grants Stock Options
Nominations de First Point Minerals Corp
29/09/2012Announces Appointment of Chief Financial Officer
15/02/2011Appoints Rob Robertson Vice President Corporate Development
03/06/2010Announces Appointment of Vice President Corporate Developmen...
Projets de First Point Minerals Corp
02/12/2013Upgrades Nickel-Iron Alloy Drill Target at Mich in Yukon
09/09/2013(Decar)' Decar Nickel Project to Proceed to Prefeasibility Study Ph...
14/08/2013Provides Exploration and Metallurgical Testing Update
26/06/2013Provides Exploration Update on its 100%-Owned Nickel-Iron Al...
15/05/2013Provides Metallurgical Update for Wale Property in Northern ...
24/01/2013(Decar)Reports 2012 Decar Drilling Extends NW End of Baptiste by 58...
14/01/2013Provides Exploration Update
04/10/2012Intersects 316 metres of 0.1% Nickel-In-Alloy at Klow
02/10/2012Completes Widely-Spaced Exploration Drill Program at Wale
31/07/2012(Decar)and Cliffs Settle Arbitration Action on Decar Project
12/07/2012(Decar)s Drilling Progress at Decar
07/06/2012Begins Field Exploration on its 100%-Owned Properties in Bri...
16/12/2011(Decar)Reports Long Intersections of Magnetically-Recovered Nickel ...
07/10/2011(Decar)Cliffs rev up Decar nickel-iron project in BC.
13/09/2011(Decar)Cliffs Commits to Scoping Study and Adds Third and Fourth Dr...
04/07/2011(Decar)Announces Positive Metallurgical Test Results for the Decar ...
21/06/2011(Decar)Announces Cliffs to Assume Management of 2011 Exploration Pr...
25/03/2011featured in Resource World Magazine
21/03/2011(Decar)Announces a Drill Program on the Decar Nickel-Iron Alloy Pro...
03/08/2010(Decar)Drilling Commences on First Point's Decar Nickel-Iron Alloy ...
08/07/2010(Corralitos)Commences Drilling on the Corralitos Gold Property
16/06/2010(Decar)Provides Update for Exploration on the Decar Nickel-Iron All...
18/02/2010(Decar)Discovers Nickel-Iron Alloy on the Klow Property, Central BC
04/03/2010(Decar)Stakes Nickel-Iron Alloy Occurrences on the Letain Property,...
14/01/2010(Decar)Doubles the Size of Baptiste Target
20/07/2009(Decar)Expands Nickel-Iron Alloy Target and Discovers Coarser Alloy...
15/07/2009(Bhp / First Point Jv Properties)Palladium and Platinum Results in Nickel-Iron Alloy in First...
08/07/2009(Corralitos)One Year Extension Granted to First Point on the Corralitos ...
08/06/2009(Decar)Discovers New Large Mineralized Zone at the Decar Nickel Pro...
02/06/2009(Decar)Doubles the Size of Decar Nickel Project to 132 Square Kilom...
21/05/2009(Decar)Adds to Claim Holdings at Decar Nickel Project
28/05/2008(Corralitos) Announces Results of 24.3 g/t Gold over 1.8 meters at the N...
26/03/2008(Corralitos) Expands Ground Position and Updates Work on the Corralitos ...
31/05/2006(Rio Luna)1st results from current drill program at Rio Luna property ...
Communiqués de Presse de First Point Minerals Corp
16/12/2013Responds to BCSC Clarification Request
10/10/2013(Decar)' Decar Project Successfully Produces High-Grade Ferronickel...
06/08/2013and Cliffs Extend Option Agreement Deadline by 30 Days
07/05/2013(Decar)Files NI 43-101 Compliant Preliminary Economic Assessment fo...
25/03/2013(Decar)Files NI 43-101 Resource Update Technical Report for Decar N...
22/03/2013(Decar)Receives Positive Preliminary Economic Assessment for Decar ...
06/02/2013(Decar)Announces Substantial Increases in Nickel Resources at Decar...
31/10/2012Lists on TSX Senior Board
25/10/2012(Decar)Reports 2012 Decar Drilling Intersects 563 Metres of 0.156% ...
11/10/2012Defines New Drill Target at Orca Property in Northern B.C.
21/09/2012(Decar)s Progress at Decar
20/08/2012Begins Drilling Wale Nickel Alloy Target
05/07/2012Stakes Nickel-Iron Alloy Occurrences in Norway
06/06/2012Tl'azt'en Nation Signs Exploration Memorandum Of Understandi...
05/05/2012Cliffs Refuses to Provide First Point with Key Data
23/04/2012Extends Expiry Date of Warrants
16/04/2012(Decar)Reports a 1.2-Billion-Tonne Inferred Mineral Resource Gradin...
05/04/2012Applies to Extend Expiry Date of Warrants
15/02/2012Grants Stock Options
09/02/2012Receives Conditional Approval To List On The Toronto Stock E...
24/01/2012Expands its Executive Team
19/01/2012Discovers New District-Scale Nickel-Iron Alloy Mineralizatio...
16/01/2012Reports Baptiste Target is at Least 2.3 Kilometres Long and ...
30/09/2011(Decar)Cliff affirmation of Decar
22/08/2011(Decar)Announces Expanded Drilling Program to Define Resource at th...
26/07/2011Defines Nickel-Iron Alloy Drill Target on its 100%-Owned Klo...
22/07/2011(Decar)Positive Results for First Point's Decar
15/04/2011Grants Stock Options
21/01/2011Status Update on First Point's Seven Nickel-Iron Alloy Prope...
11/05/2010Announces Adoption of Shareholder Rights Plan
13/11/2009Options to Cliffs Natural Resources Exploration Inc.
01/07/2009Nickel is Golden - Money Report
30/06/2009Two Directors Added to First Point Minerals Board at the AGM...
24/06/2009Acquires Four New Nickel Properties in Central British Colum...
03/06/2009President's Letter
25/02/2009Booth Presentation in Toronto
19/01/2009President's Message
27/11/2008Canaccord comment on First Point Nickel Project
12/11/2008Nickel Alloy Exploration/Metallurgical Results from the Deca...
30/04/2008Announces Board Change
13/02/2008and University of British Columbia sign Collaborative Agreem...
11/02/2008 Acquires Significant New Nickel Property
06/02/2008 forms Technical Group to Advance Nickel Exploration/Metallu...
23/01/2008Article on First Point Minerals in the recent issue of the N...
10/01/2008 Acquires Two More Large Nickel Properties in British Columb...
05/01/2008 President update
03/01/2008Announces New Board Member
24/09/2007First Point reports encouraging results from Corralitos Gold...
01/08/2007Proposes Warrant Extension
23/07/2007Property Expanded and Field Work Commenced at the Corralitos...
29/05/2007Options Gold/Silver Property in Mexico
14/05/2007Acquires Nickel Properties
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TORONTO (FPX.T)Other OTC (FPOCF)
0,370+0.00%0,234-5.65%
TORONTO
CA$ 0,370
29/11 10:24 -
0%
Cours préc. Ouverture
0,370 -
Bas haut
0,370 0,370
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
- -  0,370 -%
Volume var. 1 mois
0 -%
24hGold TrendPower© : -31
Produit
Développe
Recherche Copper - Gold - Iron - Lead - Nickel - Silver - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 29/04/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,68 AU$+0,33%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
12,22 US$-0,33%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,52 GBX-0,76%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,64 CA$+0,00%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
16,48 CA$+1,54%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,26 CA$+4,08%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,23 AU$+0,00%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,90 CA$+1,06%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
53,08 US$+0,70%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+5,56%Trend Power :