Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en
Forsys Announces: Updated Namibplaas Resource
Published : September 28, 2012

- Consolidation of Valencia and Namibplaas Projects

- Commencement of Updated Consolidated NI 43-101 Technical Report

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Report | Uranium |

TORONTO, ONTARIO--(Marketwire - Sept. 28, 2012) - Forsys Metals Corp. ("Forsys" or the "Company") (News - Market indicators)(FRANKFURT:F2T)(NAMIBIAN:FSY) is pleased to announce that the Company has completed an updated resource estimate, reported in accordance with National Instrument 43-101, for its wholly-owned Namibplaas Uranium Project ("Namibplaas") in Namibia. Forsys is also pleased to announce commencement of an updated Technical Report ("TR") that will consolidate the 100% owned Valencia Uranium Project ("Valencia") with Namibplaas.

HIGHLIGHTS
 
  • At a 100ppm cut-off a Consolidated Measured and Indicated Resource of 93.9 million lbs. of U3O8 grading 175ppm, inclusive of an updated Namibplaas Indicated Resource of 33.4 million lbs. of U3O8 grading 152ppm.
  • From commencement of the Namibplaas exploration program in 2008, the Company has completed a total of 33 diamond drill holes and 529 percussion drill holes; for a total of 120,124 metres (8,220 metres of diamond drilling and 111,904 metres of percussion drilling).
  • Confirmation of two significant Namibplaas high-grade zones that will be the focus of pit design optimization.
  • Confirmation of the suitability to combine the Namibplaas and Valencia deposits, located only 7 km apart as a single feed to an optimized process plant located at Valencia.
  • Commencement of an updated TR to consolidate the Valencia and Namibplaas projects combining the Mineral Resources estimated in Snowden's Valencia Uranium (Pty) Ltd: Addendum to June 2009 Technical Report ("Snowden 2010 TR") with the Namibplaas Mineral Resources. Completion of the TR is expected in the second quarter of 2013.
  • Additional drilling is scheduled to test the extension of the Valencia and Namibplaas resource.
  • The key initiatives outlined in this release for Valencia and Namibplaas are fully funded.

Marcel Hilmer, CEO and Director, commented, "We are very pleased that the updated resource statement at Namibplaas has proven extensive mineralization with a materially increased overall project resource, an upgraded category, and overall grade. The positive results received from the Namibplaas drilling program have encouraged the Company to commence an updated TR that consolidates Namibplaas with Valencia into an expanded combined project. Forsys is able to build upon and optimize the existing process plant from the compliant Snowden Technical Report prepared for the Valencia Project in 2010. We remain confident that the outcome will be a consolidated project with better economics, reduced timeframes to achieve a feasibility study and consequently, a shortened timeframe to commence construction and ultimately reach production."

UPDATED NAMIBPLAAS RESOURCE

The Mineral Resource is reported for a range of cut-off grades. The deposit has a strike length of 1,700 metres and a depth extent of at least 250 metres. The deposit is open to the north, south and east and at depth, providing significant opportunities to further expand the resource with additional drilling.

The Namibplaas project's Selective Mining Unit ("SMU") model Indicated and Inferred Resource estimate as at September 2012 reported at a range of eU3O8 cut-offs is as follows:

  TABLE 1. Namibplaas Mineral Resource Estimate (Sept 2012)  
      Cut-off   Tonnes   Grade   MLbs  
      ppm U3O8   Mt   ppm eU3O8   eU3O8  
                     
  Indicated   60   225.6   111   55.0  
  Inferred   60   80.6   107   19.0  
                     
  Indicated   80   149.9   131   43.4  
  Inferred   80   52.0   127   14.6  
                     
  Indicated   100   99.5   152   33.4  
  Inferred   100   33.6   148   11.0  
                     
  Indicated   120   72.8   169   27.1  
  Inferred   120   24.1   164   8.7  

A categorical model was developed, in which the proportion of leucogranite within a block (20m x 20m x 10m) was estimated, following which the eU3O8 was then estimated into the categorical model. Using a Localised Uniform Conditioning (LUC) change of support technique, an SMU scale block model was developed (10m x 10m x 5m) to more adequately reflect the quality of material that can be extracted at the selectivity of the proposed mining operation. The current drill spacing of 40x40 metres over the area drilled in the Phase 1 and Phase 2 campaigns was able to bring the resources to the Indicated category, suitable for Reserve estimation and proper pit planning. The Inferred material reported exists on the periphery of the drilled area and exhibits significant potential for further expansion of the resource.

The current drilling has identified two substantial high grade zones; one to the south and the other along the eastern edge of the drilled area. Both these areas are open-ended geologically with the shallower, eastern area providing the likely target for a next phase of exploration. The mineralised alaskite continues beyond the current ore-envelope.

Figure 1 below details all drillhole locations. Additional information, including a comprehensive list of all significant assay and probe results and individual detailed drillhole location maps for each of the diamond and percussion drillholes can be found on the Company's website at www.forsysmetals.com. The area of higher grades corresponds to the magnetic high shown in the violet coloured area, trending northeast to southwest.

To view Figure 1, please visit the following link: http://media3.marketwire.com/docs/FSY2809_Figure1.pdf

The resource estimate was completed by Michael Andrew, Principal of Optiro, a Perth-based mining consultancy firm. Mr. Andrew has previously consulted for Forsys in preparing NI 43 -101 resource estimates for Valencia and Namibplaas. The information in this report that relates to Mineral Resources is based on information compiled recently by Forsys geological staff in Namibia including the Company's Chief Geologist and by Mr. Michael Andrew who is a member of the AusIMM and the AIG and a full time employee of Optiro.

CONSOLIDATED VALENCIA AND NAMIBPLAAS RESOURCE STATEMENT

The Company has completed an assessment of the suitability of combining the Valencia and Namibplaas deposits to achieve a consolidated feed to a single process plant. The results of this analysis were positive and confirmed previous work that the two deposits could be combined as a single feed to a process plant. The consolidated project's Measured, Indicated and Inferred Resource estimate as at September 2012 reported at 60 ppm and 100 ppm eU3O8 cut-offs is as follows:

  TABLE 2. Valencia Namibplaas Combined Mineral Resource  
      Cut-off   Tonnes   Grade   MLbs  
      ppm U3O8   Mt   ppm eU3O8   eU3O8  
                     
  Measured   60   21.0   161   7.4  
  Indicated   60   445.2   127   124.8  
  Total M&I   60   466.2   129   132.2  
  Inferred   60   110.6   117   28.5  
                     
  Measured   100   13.8   205   6.2  
  Indicated   100   229.5   173   87.7  
  Total M&I   100   243.3   175   93.9  
  Inferred   100   51.2   163   18.4  

Table 2 combines the estimated Mineral Resources at Valencia and Namibplaas. The Namibplaas contribution to the above combined Mineral Resource table has been extracted from Table 1 above. The Valencia project's SMU model Measured, Indicated and Inferred Resource estimate, as released in January 2010 is as follows:

  TABLE 3. Valencia Mineral Resource  
      Cut-off   Tonnes   Grade   MLbs  
      ppm U3O8   Mt   ppm eU3O8   eU3O8  
                     
  Measured   60   21.0   161   7.4  
  Indicated   60   219.6   144   69.8  
  Total M&I   60   240.7   146   77.2  
  Inferred   60   30.0   144   9.5  
                     
  Measured   100   13.8   203   6.2  
  Indicated   100   130.0   190   54.3  
  Total M&I   100   143.8   191   60.5  
  Inferred   100   17.6   190   7.4  

COMMENCEMENT OF UPDATED TECHNICAL REPORT

The Company has contracted with the Snowden Group in Perth, Australia to conduct the updated TR study for the Valencia and Namibplaas projects in Namibia. This work follows the recent significant expansion of the resource base at Namibplaas (Table 1) which, when consolidated with the previously reported Valencia's Mineral Resources, resulted in an 65% increase in Measured, Indicated and Inferred resources to 112.3Mlbs of uranium (cut-off of 100ppm).

The work will utilize the existing Snowden 2010 TR as the underpinning study to prepare the updated TR. The designed and fully permitted process plant and supporting infrastructure at Valencia will remain as the foundation of a combined mining operation with this process plant. The Company anticipates that the outcome should confirm the technical and financial viability of the consolidated project and reflect improved economics to those stated in the Snowden 2010 Snowden TR.

The study has commenced and the scope includes:

  • a detailed review of the Valencia process plant including an evaluation of the flow-sheet and all inputs;
  • review of available metallurgical test work;
  • comment on various aspects of the design that will assist with optimization;
  • detailed pilot plant testing to confirm ability to pre-concentrate ore by radiometric or X-ray fluorescence (XRF) sorting;
  • a detailed review of the plant water balance and scope for improvement;
  • new optimized mine plans for Valencia and Namibplaas attaining high grade ore feed for the first 5 to 7 years of production; and
  • a review and update of all capital and operating expenditures.

The TR is expected to be completed in the second quarter of 2013.

About the Namibplaas Uranium Project

Forsys owns 100% of Dunefield Mining Company (Pty) Limited which holds the Namibplaas EPL 3638 and covers a total surface area of 1,742ha on the farm "Namibplaas 93". Situated 7 kilometres northeast of Valencia, Namibplaas is accessible by way of a newly constructed industrial grade road from the B2 highway to Valencia and from there on a gravel track.

EPL 3638 is in good standing and all reporting and environmental requirements are up to date. There are no encumbrances existing on the licence and no royalties are payable. There are also no liabilities for any environmental taxes at this stage of exploration. A baseline Environmental Impact Assessment and Environmental Management Plan was carried out by Colin Christian, Independent Consultant, during October 2008 and approved by the Ministry of Environment and Tourism on December 11, 2008. Metallurgical work has been intensified to ensure that process parameters are consistent with Valencia extraction conditions. Pit slope design investigations have also been initiated.

Additional information, including a comprehensive list of all significant assay results and individual detailed drillhole location maps for each of the diamond and percussion drillholes can be found on the Company website at www.forsysmetals.com. The detailed Namibplaas project history together with previous news releases detailing drill results, are also available for download from the Company's website. For further information please refer to the Company's Annual Information Form, dated March 29, 2012, filed on the Company's profile at www.sedar.com.

About the Valencia Uranium Project

The Valencia property is situated on the farm Valencia 122, which is located approximately 80 km NE of the coastal town of Swakopmund. The Valencia property is situated 25 km northeast along strike of the world class Rössing uranium mine and 50 km north of the Langer Heinrich uranium mine. 

The Company, through its wholly owned subsidiary Valencia Uranium (Pty) Ltd., was granted a 25-year renewable Mining Licence (ML149) by the Ministry of Mines and Energy of the Republic of Namibia on June 23, 2008 allowing full development of the Valencia uranium deposit and production to proceed. "ML 149" covers an area of 735.6 ha.

In February 2010, the Company updated its initial feasibility studies, pit optimization, metallurgical environmental and economic studies for the development of Valencia and released an Addendum to the June 2009 Valencia Project Technical Report, which incorporates 2009 Valencia drilling results and reports an 18% increase in reserves to 60.5 million pounds U3O8 grading 156 ppm, with a cut-off of 67 ppm. The project supports a 17-year mine life. For further information please refer to the Company's Annual Information Form, dated March 29, 2012, filed on the Company's profile at www.sedar.com.

NI 43-101 and Qualified Persons

Mr Martin Hirsch, M.Sc in Geology and a member of the British IMMM, Chief Geologist for Forsys Metals Corp., is the designated Qualified Person responsible for the Company's exploration programs. Mr Hirsch, although only recently with the Company has assisted with the verification of the geological database that included review of geological description and interpretation, assays, and acquisition of radiometric data. Mr Hirsch is familiar with the methods for Quality Assurance and Quality Control specifically applicable to uranium. Mr Hirsch has sufficient experience that is relevant to the style and mineralization, type of deposit and the use of radiometrics in resource estimates as well as to the activity he is undertaking to qualify as a qualified person under NI 43-101. Equivalent U3O8 at Namibplaas has been calculated using the correlation established previously by Dr. Laine (now retired) at Namibplaas; that correlation is almost identical to the one already calculated at Valencia.

Mr Andrew is a member of the AusIMM and the AIG and a full time employee of Optiro. Mr Andrew has sufficient experience that is relevant to the style of mineralization and type of deposit and to the activity he is undertaking to qualify as a QP under NI 43-101. Michael Andrew holds no interests in Forsys or its associated companies. As part of the data verification used in the estimate, Mr Andrew visited the Namibplaas uranium deposit in July 2011. Mr Andrew has read and consents to the relevant content of this news release.

About Forsys Metals Corp.

Forsys Metals Corp. is an emerging uranium producer with 100% ownership of the fully permitted Valencia uranium project and the Namibplaas uranium project in Namibia, Africa a politically stable and mining friendly jurisdiction. Information regarding current National Instrument 43-101 compliant Resource and Reserves at Valencia and Namibplaas are available on our website.

On behalf of the Board of Directors of Forsys Metals Corp.

Marcel Hilmer, Chief Executive Officer

For further information visit our website at www.forsysmetals.com.

Sedar Profile #00008536

Forward-Looking Information

This news release contains projections and forward-looking information that involve various risks and uncertainties regarding future events. Such forward-looking information can include without limitation statements based on current expectations involving a number of risks and uncertainties and are not guarantees of future performance of the Company. The following are important factors that could cause Forsys actual results to differ materially from those expressed or implied by such forward looking statements: fluctuations in uranium prices and currency exchange rates; uncertainties relating to interpretation of drill results and the geology; continuity and grade of mineral deposits; uncertainty of estimates of capital and operating costs; recovery rates, production estimates and estimated economic return; general market conditions; the uncertainty of future profitability; and the uncertainty of access to additional capital. Full description of these risks can be found in Forsys Annual Information Form, dated March 29, 2012, available on the Company's profile on the SEDAR website at www.sedar.com. These risks and uncertainties could cause actual results and the Company's plans and objectives to differ materially from those expressed in the forward-looking information. Actual results and future events could differ materially from anticipated in such information. These and all subsequent written and oral forward looking information are based on estimates and opinions of management on the dates they are made and expressed qualified in their entirety by this notice. The Company assumes no obligation to update forward-looking information should circumstances or management's estimates or opinions change.

Shares Outstanding: 109,875,422

The Toronto Stock Exchange has not reviewed and does not accept responsibility for the adequacy or accuracy of this release.

Forsys Metals Corp
Marcel Hilmer
Chief Executive Officer
+61 8 9322 3549
mhilmer@forsysmetals.com
www.forsysmetals.com
or
TMX Equicom
Patrick Piette
+1 416-815-0700 Ext 267
ppiette@equicomgroup.com

Forsys Metals Corp.

EN DÉVELOPPEMENT
CODE : FSY.TO
ISIN : CA34660G1046
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Forsys Metals est une société d’exploration minière de zinc et de cuivre basée au Canada.

Forsys Metals est en développement de projets de zinc, de cuivre et d'uranium en Namibie, et détient divers projets d'exploration en Namibie.

Son principal projet en développement est VALENCIA URANIUM en Namibie et ses principaux projets en exploration sont OMARURU, ELBE PROJECT, ONDUNDU et NAMIBPLAAS en Namibie.

Forsys Metals est cotée au Canada, aux Etats-Unis D'Amerique et en Allemagne. Sa capitalisation boursière aujourd'hui est 124,0 millions CA$ (90,8 millions US$, 84,9 millions €).

La valeur de son action a atteint son plus haut niveau récent le 20 avril 2007 à 9,94 CA$, et son plus bas niveau récent le 30 juin 2016 à 0,05 CA$.

Forsys Metals possède 145 910 000 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Rapports annuels de Forsys Metals Corp.
2008 Annual Report
Annual Report 2007
Financements de Forsys Metals Corp.
28/11/2011Announces Completion of Private Placement
Nominations de Forsys Metals Corp.
15/08/2012Appoints Martin Hirsch as Chief Geologist
11/06/2012Appoints Director Finance and Establishes Office in Perth
28/07/2008Appoints Valencia General Manager
07/03/2008Appoints New Chief Financial Officer
Rapports Financiers de Forsys Metals Corp.
15/08/2011Announces Second Quarter 2011 Financial and Operational Resu...
Projets de Forsys Metals Corp.
28/09/2012(Namibplaas)Announces: Updated Namibplaas Resource
26/03/2012(Namibplaas)Completes Acquisition of Remaining 30% Interest in Namibplaa...
01/02/2012(Ondundu)to Retain Control of The Ondundu Gold Project
24/10/2011(Namibplaas)Announces Agreement to Acquire Remaining 30% of Namibplaas U...
02/02/2011(Namibplaas)Announces Additional Positive Namibplaas Drilling Results an...
31/03/2010(Ondundu)TECHNICAL REPORT ON THE ONDUNDU GOLD PROJECT EPL3195, NAMIB...
21/08/2008(Valencia Uranium)Valencia Uranium Project, Namibia Mining Licence Granted
06/08/2008(Valencia Uranium) Confirms Deeper Uranium Mineralization at Valencia
22/07/2008(Valencia Uranium) Continues Drilling at Valencia Expanding Pit Bottom and Ove...
27/06/2008(Valencia Uranium) Adds Fourth Drill Rig to Test North Anomaly at Valencia
13/06/2008(Valencia Uranium)Mineralization Expansion and Grade Improvement at Valencia-F...
04/06/2008(Valencia Uranium)Receives Environmental Clearance for Valencia
29/04/2008(Valencia Uranium) Expands Uranium Zones at Valencia
01/04/2008(Ondundu)Increases Ownership of Ondundu Gold Project in Namibia to 90...
13/02/2008(Valencia Uranium)Announces Joly Zone Trenching Results
29/01/2008(Valencia Uranium) Provides Joly Zone Update
14/01/2008(Valencia Uranium)Reports Drilling Results and Resumes Drilling at Valencia
26/03/2007(Valencia Uranium)Significant Increase for the Valencia Uranium Resource
Communiqués de Presse de Forsys Metals Corp.
14/09/2015Forsys Metals Announces Non-Brokered Private Placement Updat...
12/08/2015Forsys Metals Announces Non-Brokered Private Placement
18/03/2015Forsys Releases Feasibility Study Results for Norasa Uranium...
26/11/2014Forsys Provides Norasa Uranium Project Feasibility Study Upd...
29/10/2014Forsys Closes $2.4 Million Private Placement
09/10/2014Forsys Provides Update on Private Placement & Progress on th...
07/07/2014Forsys Metals Initiates Feasibility Study for Norasa Uranium...
23/05/2014Forsys Announces Annual and Special Meeting Voting Results
27/03/2014Forsys Files Updated NI 43-101 Technical Report on Norasa Ur...
20/03/2014Forsys Adopts Advance Notice Policy for Director Nominations...
07/10/2013Provides Updated Mineral Resource Estimate for Its Norasa Ur...
02/05/2013(Valencia Uranium)Announces Results of Positive Engineering Cost Study for Its...
19/03/2013Reports Positive Exploration Drilling Results and Confirms H...
23/01/2013Significant New Exploration Results at Recently Discovered V...
26/01/2012(Namibplaas)Announces Additional High Grade Zones from Namibplaas Phase ...
05/10/2011Enters Into Share Subscription Agreement to Raise C$8,000,00...
15/09/2011(Namibplaas)Announces Maiden Resource Statement Namibplaas Project-Namib...
10/08/2011Announces Up to 92% Recoveries from Heap Leach Laboratory Te...
11/07/2011(Namibplaas)Announces Discovery of Extensive High Grade Zones From Ongoi...
15/05/2011Proposed Changes to Namibian Mineral Policy Will Not Affect ...
03/03/2011Announces Settlement Agreement With GFI and George Forrest
11/12/2008Corporate Quarterly Update
14/11/2008George Forrest International Afrique S.P.R.L. to Acquire For...
16/09/2008Corporate Quarterly Update
27/06/2008Clarifying Press Release-Mineral Resource and Mineral Reserv...
16/06/2008Corporate Quarterly Update
23/04/2008Clarifies Uranium Project on Track
11/04/2008Namibia to Build Second Desalination Plant for Uranium Mines
06/03/2008Prepares for Contract Mining at Valencia
25/02/2008Receives Water Permits
06/02/2008Uranium Exploration Licences Renewed
23/03/2007Completes Acquisition of Remaining 10% of Valencia Uranium D...
28/02/2007Completes $47.5 Million Financing
26/02/2007Acquires 70% of Ancash Investments and 5 Additional Uranium ...
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TORONTO (FSY.TO)FRANKFURT (F2T.F)
0,850-2.30%0,568-1.22%
TORONTO
CA$ 0,850
25/04 16:23 -0,020
-2,3%
Cours préc. Ouverture
0,870 0,870
Bas haut
0,830 0,870
Année b/h Var. YTD
0,750 -  1,11 13,33%
52 sem. b/h var. 52 sem.
0,300 -  1,11 102,38%
Volume var. 1 mois
192 418 -12,37%
24hGold TrendPower© : 12
Produit
Développe Uranium
Recherche Copper - Gold - Silver - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 18/06/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
202437,10%
202324,00%0,670,30
2022-39,02%1,010,39
2021173,33%1,300,26
2020114,29%0,330,06
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,69 AU$-0,77%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
11,94 US$+9,34%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,54 GBX-2,55%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,69 CA$+13,03%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
15,60 CA$+1,83%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+0,00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,20 AU$+2,63%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,87 CA$+5,65%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
52,61 US$+0,98%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+5,56%Trend Power :