Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en

Argonaut Gold Inc.

Publié le 15 octobre 2014

Argonaut Gold Announces Q3 Production of 32,122 Gold Equivalent Ounces

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Canada | Copper | G Mexico |

Argonaut Gold Announces Q3 Production of 32,122 Gold Equivalent Ounces

Argonaut Gold Announces Q3 Production of 32,122 Gold Equivalent Ounces

Toronto, Ontario - (October 15, 2014) Argonaut Gold Inc. ("Argonaut", "Argonaut Gold" or the "Company"; TSX: AR), announced today that the Company produced 32,122 gold equivalent ounces ("GEOs" or "GEO") during the third quarter ("Q3") ended September 30, 2014. This included 22,980 GEOs at its 100% owned El Castillo Mine ("El Castillo") located in Durango, Mexico and 9,142 GEOs at its 100% owned La Colorada Mine ("La Colorada") located near Hermosillo, Mexico. Additionally, the Company reported record GEOs loaded to the pads in Q3, which will be reflected in the fourth quarter ("Q4") production numbers.

3rd Quarter

Change

2014

2013

Total Gold Equivalent Ounce Production:

 GEOs loaded to the pads1

69,777

46,086

↑51%

 GEOs projected recoverable ounces1,2

41,296

26,590

↑55%

 GEOs produced1

32,122

27,893

↑15%

 GEOs sold1

29,917

32,044

↓7%

1 GEOs are based on conversion ratio of 55:1 for silver to gold and is the referenced ratio throughout this release.
2 Recoverable ounces - see tables titled Third Quarter 2014 El Castillo Operating Statistics and Third Quarter 2014 La Colorada Operating Statistics.

THIRD QUARTER 2014 HIGHLIGHTS:
At both mines, operational improvements resulted in record GEOs being loaded to the pads. These improvements made in the third quarter are expected to result in significantly increased gold and silver production being realized in the fourth quarter, which has been demonstrated in first days of October. Tonnes mined and processed continue to show steady improvement year over year. However, seasonal rains during the third quarter caused dilution of the leaching solutions, thereby reducing the recovered ounces. Due to these seasonal effects, the Company is adjusting full year production guidance to 130,000 to 135,000 GEOs, from previous guidance which was at the lower end of the range of 135,000 to 150,000 GEOs. Management anticipates higher production in the fourth quarter, as the Company begins to recover the record ounces loaded during the third quarter coupled with drier weather.

El Castillo

  • GEO production of 22,980 ounces consisting of 22,807 gold ounces and 9,541 silver ounces. Production for the third quarter was affected by the rainy season which caused dilution of solution grades.
  • A record 44,031 gold ounces loaded on the leach pads, equating to 27,214 projected recoverable gold ounces. Solution grades have steadily increased in October as a result of drier weather, which is expected to result in production improvements during Q4.
  • Mining:
    • 7,714,185 total tonnes mined, an 18% improvement year over year.
    • The gold grade of 0.34 grams per tonne ("g/t"), was a 9% improvement over the previous quarter and slightly better than the mine plan.
    • Strip ratio decreased to 0.9:1 for the quarter, consistent with the mine plan expectations.
    • Oxidized ore mined in the quarter was 89% of the total ore mined.
  • Processing: Operation of the east and west crushing and conveying systems continued to improve with approximately 1.5 million tonnes moved on both circuits individually.
  • Construction: West side leach pad cell 3b construction was finalized.

La Colorada

  • GEO production of 9,142 ounces, consisting of 8,870 gold ounces and 14,958 silver ounces.
  • A record 21,195 gold ounces and 250,322 silver ounces were loaded to the leach pad, equating to 25,746 GEOs loaded to the pad. This represents a 35% increase in gold ounces loaded to the pad versus the previous quarter.
  • Crushing/Processing:
    • Another quarterly record was set with 1,067,946 tonnes placed on the pad, a 21% improvement over the previous quarter.
    • During September, a record of over 13,700 tonnes of crushed ore per day was loaded to the leach pad, exceeding the anticipated 12,000 tonnes per day.
    • During October, the Company has seen a steady improvement in the grade of the solution from the pad yielding gold production of more than 150 ounces per day since the beginning of the month.
    • The strip ratio of 4.6:1 was in line with the previous quarter and expectations.

Magino

  • New targets for future exploration have been identified on ground related to the recently finalized transaction with Richmont Mines Inc.
  • Permitting documentation and studies continue to advance on the project; permit applications are expected to be submitted around the end of the year.

San Antonio

  • The Company continues to pursue activities to move forward a project that is mutually beneficial to all stakeholders by engaging in dialogue with the local communities, local and federal agencies, as well as reviewing its legal options.

San Agustín

  • Phase II drill program of approximately 13,000 metres to be positioned on 200 metre spacing has begun. The area defined for exploration at San Agustín follows the trend of mineralization for upwards of two kilometres from east to west and is approximately 0.5 kilometres wide from north to south.
  • The Company released a National Instrument ("NI") 43-101 Technical Report on the current resource on October 3, 2014 and anticipates issuing a Preliminary Economic Assessment ("PEA") by year end.
  • Metallurgical test work conducted internally by Argonaut was completed. Initial results from external tests completed at Kappes, Cassiday & Associates ("KCA") were reported previously in the Press Release dated August 22, 2014. Below are the results of the remaining tests. These additional tests were conducted at Argonaut's El Castillo mine metallurgical testing facilities under the guidance of KCA. In addition, there are two duplicate columns reported that were conducted by KCA in their facilities in Reno, Nevada.

Summary Table of San Agustín Test Results provided by KCA

Crush Size, millimetre("mm"),
100% Passing

Average Results of Test Work
Previously Reported in Press Release
Dated August 22, 2014 (1)

Average Results of Test Work
Reported In This Press Release

Overall Average of All Argonaut
Test Work (2)

Gold ("Au")

Silver ("Ag")

Au

Ag

Au

Ag

ROM(3)

56%

11%

56%

11%

50

65%

16%

66%

17%

65%

16%

12.5

70%

24%

72%

28%

71%

26%

Note (1) - See Argonaut San Agustin Press Release dated August 22, 2014 for previously reported test work results.
Note (2) - Overall average is weighted by the number of tests in each group.
Note (3) - Run-of-Mine ("ROM")

Detailed Table of San Agustín Test Results provided by KCA

Sample Description

Crush Size,
mm 100% Passing

Head Grade

Recovery Percentage

Leach Time

Hydrated Lime Consumption 

Cyanide Consumption

Au g/t

Ag g/t

Au

Ag

Days

kg/t(1)

kg/t

SAT 1 - Intrusive

ROM

0.445

20.31

68%

13%

105

3.2

0.66

SAT 2 - Intrusive

ROM

0.236

10.00

44%

2%

98

3.1

0.56

SAT 3 - Intrusive

ROM

0.452

9.41

58%

15%

98

3.2

0.58

SAT 4 - Sediments

ROM

0.620

3.90

55%

14%

78

3.0

0.56

Average All

56%

11%

3.1

0.59

Note (1) -kilograms per tonne ("kg/t")

Sample Description

Crush Size,
mm 100% Passing

Head Grade

Recovery Percentage

Leach Time

Hydrated Lime Consumption 

Cyanide Consumption

Au g/t

Ag g/t

Au

Ag

Days

kg/t

kg/t

SAT 1 - Intrusive

50

0.394

22.20

84%

20%

105

3.8

1.54

SAT 2 - Intrusive

50

0.284

8.85

63%

5%

98

3.6

0.87

SAT 3 - Intrusive

50

0.410

9.07

45%

13%

90

3.7

1.23

SAT 4 - Sediments

50

0.644

4.41

72%

28%

72

3.1

1.19

Average All

66%

17%

3.6

1.21

Sample Description

Crush Size,
mm 100% Passing

Head Grade

Recovery Percentage

Leach Time

Hydrated Lime Consumption 

Cyanide Consumption

Au g/t

Ag g/t

Au

Ag

Days

kg/t

kg/t

SAT 1 - Intrusive

12.5

0.422

25.14

82%

28%

113

4.0

1.49

SAT 1 - Intrusive (KCA Duplicate)

12.5

0.477

18.46

83%

35%

69

3.0

0.70

SAT 2 - Intrusive

12.5

0.247

9.99

61%

8%

106

3.9

1.05

SAT 3 - Intrusive

12.5

0.691

11.29

76%

28%

98

4.0

1.32

SAT 3 - Intrusive (KCA Duplicate)

12.5

0.473

5.80

61%

34%

69

3.1

1.02

SAT 4 - Sediments

12.5

0.645

3.90

71%

36%

80

3.3

1.27

Average All

72%

28%

3.6

1.14

CEO Commentary
Pete Dougherty, President and CEO for Argonaut Gold commented, "At both mines, we continue to demonstrate improvements in all aspects of our operations. In spite of challenges related to seasonal rains, these operational improvements have set new records of GEOs loaded to the pads and laid the groundwork for robust fourth quarter production results. While operational improvements have been noteworthy, we expect that full year production will be in the range of 130,000 to 135,000 GEOs.

At El Castillo, we completed the construction of west cell 3b pad and are hitting targets for mining and crushing throughputs with a new record being set in September for the west overland crusher/conveyor. At La Colorada, we continue to make improvements with new record GEOs being loaded to the pad. During September, crushing throughput exceeded expectations at La Colorada averaging over 13,700 tonnes per day.   

The fourth quarter production is expected to significantly increase at both locations as we begin to recover the ounces loaded during the third quarter.  

The San Agustín project has not disappointed with the release of our recent NI 43-101 indicated resource results of nearly 1.3 million gold equivalent ounces (82.2 million tonnes of material at a grade of 0.32 g/t gold and 10.7 g/t silver with gold equivalent ounces calculated at a ratio of 65:1 silver to gold ounces) and we are quite pleased. We have initiated additional drilling to test the limits of the deposit and started to work on a PEA for the project, which we anticipate will be complete by year end. 

We continue to work toward permitting at both San Antonio and Magino. We have begun further test work to understand the potential of heap leaching at the Magino project as well as advancing the permitting efforts. At the San Antonio project, we continue to make efforts to advance this project, as we believe it has near term potential to unlock significant value to all stakeholders of this project."

THIRD QUARTER 2014 EL CASTILLO OPERATING STATISTICS

3 Months Ended
September 30

9 Months Ended
September 30

2014

2013

% Change

2014

2013

% Change

Mining

Tonnes ore (000s)

4,059

3,406

↑19%

11,492

9,857

↑17%

Tonnes waste (000s)

3,655

3,136

↑17%

12,343

9,567

↑29%

Tonnes mined (000s)

7,714

6,542

↑18%

23,835

19,424

↑23%

Tonnes per day (000s)

84

71

↑18%

87

71

↑23%

Waste/ore ratio

0.90

0.92

↓2%

1.07

0.97

↑10%

Heap Leach Pad

Tonnes ore direct to leach pad (000s)

1,063

1,867

↓43%

2,569

5,307

↓52%

Tonnes crushed (000s)

1,499

1,318

↑14%

4,612

4,314

↑7%

Tonnes overland conveyor (000s)

1,497

221

↑577%

4,311

221

↑1,851%

Total Tonnes Placed

4,059

3,406

↑19%

11,492

9,842

↑17%

Production

Gold grade (g/t)1

0.34

0.36

↓6%

0.33

0.36

↓8%

Gold loaded to leach pad (oz)2

44,031

39,120

↑13%

121,307

115,312

↑5%

Projected recoverable gold ounces (oz)3

27,214

22,829

↑19%

70,916

67,766

↑5%

Gold produced (oz)

22,807

22,756

↑0%

64,824

73,957

↓12%

Gold sold (oz)

20,527

25,840

↓21%

63,725

72,054

↓12%

1 "g/t" refers to grams per tonne
2 "oz" refers to troy ounce 
3 Expected recovery rates:  ROM oxide 50%, crushed oxide 70%, ROM transition 40%, crushed transition 60%, crushed sulphides argillic 30%, crushed sulphides silicic 17%.

Richard Rhoades, Chief Operating Officer for the Company, commented, "We are pleased to have another quarter of continued improvement at El Castillo. Ore tonnes mined increased, along with tonnes and ounces loaded to the pad, despite the effects of the summer rains. The availabilities of the mining and crushing equipment increased and the operation is poised to deliver a strong finish to the year. With these improvements, along with the completion of west side heap leach pad 3b, we are in a position to increase our production run rates and deliver on the guidance at this project of 90,000 to 100,000 ounces of production this year. "

THIRD QUARTER 2014 LA COLORADA OPERATING STATISTICS

3 Months Ended
September 30

9 Months Ended
September 30

2014

2013

% Change

2014

2013

% Change

Mining

Tonnes ore (000s)

757

415

↑82%

2,017

1,313

↑54%

Tonnes waste (000s)

3,486

2,885

↑21%

10,674

10,485

↑2%

Total tonnes (000s)

4,243

3,300

↑29%

12,691

11,798

↑8%

Waste/ore ratio

4.61

6.96

↓34%

5.29

7.99

↓34%

Tonnes rehandled (000s)

301

118

↑155%

616

118

↑422%

Heap Leach Pad

Tonnes ore direct to leach pad (000s)

1,068

550

↑94%

2,583

1,435

↑80%

Production

Gold grade mined (g/t)1

0.70

0.35

↑100%

0.66

0.30

↑120%

Gold loaded to leach pad (oz)2

21,195

5,571

↑280%

47,658

13,509

↑253%

Projected recoverable GEOs loaded (oz)3

14,082

3,761

↑274%

31,555

9,173

↑244%

Gold produced (oz)

8,870

4,234

↑109%

24,853

15,527

↑60%

Silver produced (oz)

14,958

31,717

↓53%

111,761

121,914

↓8%

GEOs produced (oz)

9,142

4,811

↑90%

26,885

17,744

↑52%

Gold sold (oz)

8,883

4,952

↑79%

25,146

15,935

↑58%

Silver sold (oz)

18,313

50,881

↓64%

123,607

132,951

↓7%

GEOs sold

9,217

5,878

↑57%

27,394

18,353

↑49%

1 "g/t" refers to grams per tonne 
2 "oz" refers to troy ounce 
3 Expected recovery rates:  Gold 60% and Silver 30%

Richard Rhoades commented, "Following the completion of the expansion of the crushing circuit at La Colorada, we set record highs with September crushed production over 13,700 tonnes per day. The grade processed also improved slightly over last quarter and is slightly above the resource grade. All of this contributed to a significant increase in ounces loaded to the pad. We expect strong fourth quarter production results."  

Argonaut Gold Q3 Financial Results Conference Call and Webcast:
The Q3 financial results conference call and webcast is scheduled to take place on November 6, 2014 at 8:30 am EST.

Q3 Conference Call Information
Toll Free (North America): 1-877-223-4471
International: 1-647-788-4922
Conference ID: 87196199
Webcast: www.gowebcasting.com/5640

Q3 Conference Call Replay:
Toll Free Replay Call (North America): 1-416-621-4642
International Replay Call: 1-800-585-8367

The conference call replay will be available from 11:30 am EST on November 6, 2014 until November 20, 2014.

Technical Information and Mineral Properties Reports
The technical information contained in this document has been prepared under the supervision of, and has been reviewed and approved by, Mr. Thomas H. Burkhart, Argonaut's Vice President of Exploration, and a qualified person as defined by NI 43-101. For further information on the Company's properties please see the reports as listed below on the Company's website or on www.sedar.com:

El Castillo Mine

NI 43-101 Technical Report on Resources and Reserves, Argonaut Gold Inc., El Castillo Mine, Durango State, Mexico dated February 24, 2011.

La Colorada Mine

NI 43-101 Preliminary Economic Assessment La Colorada Project, Sonora, Mexico dated December 30, 2011.

Magino Gold Project

NI 43-101 Technical Report and Mineral Resource Estimate on the Magino Gold Project, Wawa, Ontario, Canada dated January 30, 2014.

San Agustín Project

NI 43-101 Technical Report and Mineral Resource Estimate on the San Agustín Gold Project, Durango, Mexico dated October 3, 2014.

San Antonio Gold Project

NI 43-101 Technical Report and Mineral Resource Estimate on the San Antonio Gold Project, Baja California Sur, Mexico dated October 10, 2012.

Qualified Person Comments/Quality Control Procedures
Mineral resources do not constitute mineral reserves and do not have demonstrated economic viability.

About Argonaut Gold
Argonaut Gold is a Canadian gold company engaged in exploration, mine development and production activities. Its primary assets are the production stage El Castillo mine in Durango, Mexico, and the La Colorada mine in Sonora, Mexico. Advanced exploration stage projects include the San Antonio project in Baja California Sur, Mexico, the San Agustín project in Durango, Mexico and the Magino project in Ontario, Canada. The recently acquired San Agustín project is the primary exploration target for Argonaut in 2014. The Company also has several exploration stage projects, all of which are located in North America.

Creating Value Beyond Gold

Cautionary Note Regarding Forward-looking Statements
This preliminary announcement of production results will be followed with a report of financial results in connection with the publication of quarterly financial information. This press release contains certain "forward-looking statements" and "forward-looking information" under applicable Canadian securities laws concerning the proposed transaction and the business, operations and financial performance and condition of Argonaut Gold Inc. ("Argonaut" or "Argonaut Gold"). Forward-looking statements and forward-looking information include, but are not limited to, statements with respect to estimated production and mine life of the various mineral projects of Argonaut; the benefits of the development potential of the properties of Argonaut; the future price of gold, copper, and silver; the estimation of mineral reserves and resources; the realization of mineral reserve estimates; the timing and amount of estimated future production; economics of production; synergies and financial impact of completed acquisitions; success of exploration activities; and currency exchange rate fluctuations. Except for statements of historical fact relating to Argonaut, certain information contained herein constitutes forward-looking statements. Forward-looking statements are frequently characterized by words such as "plan," "expect," "project," "intend," "believe," "anticipate," "estimate" and other similar words, or statements that certain events or conditions "may" or "will" occur. Forward-looking statements are based on the opinions and estimates of management at the date the statements are made, and are based on a number of assumptions and subject to a variety of risks and uncertainties and other factors that could cause actual events or results to differ materially from those projected in the forward-looking statements. Many of these assumptions are based on factors and events that are not within the control of Argonaut and there is no assurance they will prove to be correct.

Factors that could cause actual results to vary materially from results anticipated by such forward-looking statements include variations in ore grade or recovery rates, failure of plant, equipment or processes to operate as anticipated, changes in market conditions, risks relating to international operations, fluctuating metal prices and currency exchange rates, changes in project parametres, the possibility of project cost overruns or unanticipated costs and expenses, labour disputes and other risks of the mining industry.

These factors are discussed in greater detail in Argonaut's most recent Annual Information Form and in the most recent Management Discussion and Analysis filed on SEDAR, which also provide additional general assumptions in connection with these statements. Argonaut cautions that the foregoing list of important factors is not exhaustive. Investors and others who base themselves on forward-looking statements should carefully consider the above factors as well as the uncertainties they represent and the risk they entail. Argonaut believes that the expectations reflected in those forward-looking statements are reasonable, but no assurance can be given that these expectations will prove to be correct and such forward-looking statements included in this press release should not be unduly relied upon. These statements speak only as of the date of this press release.

Although Argonaut has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking statements, there may be other factors that cause actions, events or results not to be anticipated, estimated or intended. There can be no assurance that forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Argonaut undertakes no obligation to update forward-looking statements if circumstances or management's estimates or opinions should change except as required by applicable securities laws. The reader is cautioned not to place undue reliance on forward-looking statements. Statements concerning mineral reserve and resource estimates may also be deemed to constitute forward-looking statements to the extent they involve estimates of the mineralization that will be encountered if the property is developed. Comparative market information is as of a date prior to the date of this document.

Lire la suite de l'article sur www.noodls.com
Données et statistiques pour les pays mentionnés : Canada | Tous
Cours de l'or et de l'argent pour les pays mentionnés : Canada | Tous

Argonaut Gold Inc.

PRODUCTEUR
CODE : AR.TO
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Argonaut Gold est une société de production minière d'or basée aux Etats-Unis D'Amerique.

Argonaut Gold détient divers projets d'exploration au Mexique.

Ses principaux projets en production sont EL SASTRE GOLD MINE, EL SASTRE, EL SASTRE - EL ARENAL, EL SASTRE BRIDGE ZONE et EL SASTRE - LUPITA ZONE au Guatemala et EL CASTILLO au Mexique et son principal projet en exploration est SAN ANTIONIO au Mexique.

Argonaut Gold est cotée au Canada. Sa capitalisation boursière aujourd'hui est 70,8 millions CA$ (51,6 millions US$, 48,4 millions €).

La valeur de son action a atteint son plus haut niveau récent le 25 janvier 2013 à 9,99 CA$, et son plus bas niveau récent le 18 novembre 2022 à 0,33 CA$.

Argonaut Gold possède 176 940 000 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Nominations de Argonaut Gold Inc.
15/11/2013Announces New Chief Financial Officer
15/12/2011Announces New Chief Operating Officer
Rapports Financiers de Argonaut Gold Inc.
16/03/2015Announces 2014 Revenue of $166.3M, $42.5M in Cash Flow from ...
06/08/2013Provides Notice of Second Quarter Financial Results on Augus...
25/07/2012Provides Notice of Second Quarter Financial Results on Augus...
19/03/2012Provides Notice of Fourth Quarter and Year End Financial Res...
05/08/2011Provides Notice of Second Quarter Financial Results on Augus...
Projets de Argonaut Gold Inc.
31/01/2014Confirms Filing of Prefeasibility Study for the Magino Proje...
20/01/2014CORRECTION FROM SOURCE - Argonaut Gold Announces Full Year 2...
20/01/2014Announces Full Year 2013 Gold Production of 120,224 gold equ...
31/12/2013Announces Completion of the San Agust=EDn project purchase f...
06/11/2013Announces Purchase of San Agust=EDn project from Silver Stan...
16/10/2013Announces Q3 Gold Production of 26,690 Ounces
15/07/2013Announces Record Q2 Gold Production of 33,586 Ounces
15/04/2013Announces Q1 Gold Production of 28,907 Ounces
25/02/2013Announces 2013 Production Guidance of 120-140,000 Ounces
17/01/2013Exceeds 2012 Guidance with Gold Production of 108,081 Ounces
17/01/2013Exceeds 2012 Guidance with Gold Production of 108,081 Ounces
18/07/2012Announces Q2 Gold Production of 24,123 Ounces
17/04/2012Announces Q1 Gold Production of 21,084 Ounces
15/07/2011Announces Q2 Gold Production of 17,453 Ounces
14/04/2011Announces Q1 Gold Production of 18,005 0unces
22/03/2011(San Antionio)Reports on Resource Expansion Drilling at San Antonio
14/02/2011(El Castillo)Provides 2011 Guidance on El Castillo Production of 70-75,00...
Communiqués de Presse de Argonaut Gold Inc.
25/05/2016Argonaut Gold Raises C$4.5M via Private Placement of Flow-Th...
04/05/2016Argonaut Gold Announces Results of Annual and Special Meetin...
03/05/2016Argonaut Gold Announces First Quarter 2016 Earnings per Shar...
29/04/2016Argonaut Gold Announces $30 Million Revolving Credit Facilit...
14/04/2016Argonaut Gold Announces First Quarter 2016 Production of 32,...
06/04/2016Argonaut Gold Further Strengthens Board and Management Team
18/01/2016Argonaut Gold Announces Updated Pre-Feasibility Study Result...
30/11/2015Mexus Gold is Pleased to Announce That Argonaut Gold Has Com...
24/11/2015Argonaut Gold Chairman Brian Kennedy Retiring; Jim Kofman to...
03/11/2015Argonaut Gold Announces Third Quarter 2015 Revenue of $32M; ...
02/11/2015Argonaut Gold El Castillo Update
22/10/2015Argonaut Gold El Castillo Update
19/10/2015Mexus Commences Drill Pad Construction for Argonaut
15/10/2015Argonaut Gold Announces Third Quarter 2015 Production of 28,...
17/09/2015Argonaut Gold Announces Updated Economic Parameters to the D...
14/09/2015Mexus Gold US Julio/Santa Elena Update
09/09/2015Mexus Gold US Press Release Correction
17/08/2015Argonaut Gold Updates Mexus Gold US on the Julio property
14/08/2015Argonaut Gold Announces Second Quarter 2015 Revenue of $44M;...
15/04/2015Announces First Quarter 2015 Production of 43,255 Gold Equiv...
16/03/2015Argonaut Gold Announces 2014 Revenue of $166.3M, $42.5M in C...
20/02/2015Argonaut Gold Confirms Filing of Technical Report and Prelim...
26/01/2015Argonaut Gold Receives TSX Acceptance of Shareholder Rights ...
20/01/2015Argonaut Gold Adopts Shareholder Rights Plan
13/01/2015Argonaut Gold Announces Full Year 2014 Gold Production of 13...
13/01/2015Argonaut Gold Announces Updates on the Magino and San Agusti...
12/01/2015Argonaut Gold Announces Updates on the Magino and San Agusti...
07/01/2015Argonaut Gold Announces Full Year 2014 Gold Production of 13...
06/11/2014Argonaut Gold Announces Third Quarter 2014 Revenue of $37.3M...
15/10/2014Argonaut Gold Announces Q3 Production of 32,122 Gold Equival...
03/10/2014Argonaut Gold Confirms Filing of National Instrument 43-101 ...
29/08/2014IIROC Trade Resumption - AR
12/11/2013Announces 3rd Quarter 2013 Revenue of $42.4M and Net Income ...
13/08/2013Announces 2nd Quarter 2013 Revenue of $44.9M and Net Income ...
14/05/2013Announces 1st Quarter 2013 Revenue of $43.1M and Net Income ...
26/04/2013Amends Annual Meeting Business in Response to ISS Comments
26/03/2013Announces 2012 Revenue of $187.1 Million and Net Income of $...
14/11/2012Announces Third Quarter 2012 Revenue of $72.9 Million and Ne...
15/10/2012and Prodigy Agree to Friendly Business Combination
15/10/2012and Prodigy Agree to Friendly Business Combination
15/10/2012and Prodigy Agree to Friendly Business Combination
04/09/2012Announces Updated PEA for the San Antonio Project, Projected...
15/08/2012Announces Record Production, Record Revenue and Record Earni...
15/05/2012Announces First Quarter 2012 Revenue of $24.4 Million and Ne...
08/05/2012Provides Exploration Update on San Antonio and La Colorada
25/04/2012for Annual and Special Meeting of Shareholders
30/03/2012Announces 2011 Revenue of $105 Million and Net Income of $26...
14/03/2012Added to the S&P/TSX Composite Index
27/02/2012Announces 2012 Project Initiatives
09/01/2012Announces the La Colorada Project on Track for Production in...
28/11/2011(El Castillo)Reports on Metallurgical Test Work for El Castillo Sulphide
24/10/2011Increases Measured and Indicated Resource at La Colorada to ...
14/09/2011to be Included in the S&P TSX SmallCap Index
15/08/2011Reports Q2 2011 Revenue of $21.6 Million Net Income of $5.2 ...
15/06/2011Provides Update on 2011 Drilling at La Colorada; Board Appro...
06/06/2011Reports Q1 2011 Revenue of $25.7 Million
20/05/2011Announces Intent to Terminate Registration Under U.S. Securi...
09/05/2011s Resource for San Antonio
07/04/2011Begins Resource Expansion Drilling at the La Colorada Projec...
31/03/2011Announces Q4 Revenue of $19.9 Million as Part of Year End Fi...
16/03/2011to Begin Trading on the S&P Canadian Index Operations
25/01/2011Shareholders and Pediment Gold Corp Shareholders Approve Bus...
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TORONTO (AR.TO)
0,400-3.61%
TORONTO
CA$ 0,400
22/04 17:00 -0,020
-3,61%
Cours préc. Ouverture
0,415 0,405
Bas haut
0,400 0,415
Année b/h Var. YTD
0,230 -  0,430 -4,76%
52 sem. b/h var. 52 sem.
0,230 -  0,720 -32,20%
Volume var. 1 mois
2 573 420 29,03%
24hGold TrendPower© : -44
Produit Gold
Développe
Recherche
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 15/02/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
2024-34,43%
202317,31%0,770,42
2022-77,19%2,760,33
2021-16,79%4,091,90
202048,11%3,420,76
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,72 AU$-0,19%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
10,87 US$-3,12%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,56 GBX+0,18%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$-8,33%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,38 CA$-4,03%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
15,79 CA$-0,32%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+0,00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,19 AU$+0,00%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,86 CA$+0,54%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
52,13 US$+0,58%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+5,88%Trend Power :