Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en
Aurizon Mines Ltd.: New Drill Results Expand the Heva Area and the Hosco West Extension and Include 55.4 Grams of Gold per Tonne Over 3.0 Metres
Published : July 09, 2012
( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Canada | Dollar | Report |

VANCOUVER, BRITISH COLUMBIA--(Marketwire - July 9, 2012) - Aurizon Mines Ltd. (News - Market indicators)(NYSE MKT:AZK)(NYSE Amex:AZK) is pleased to announce results from the ongoing 2012 exploration program on the Heva and Hosco West Extension areas of the Joanna property, located 20 kilometres from Rouyn-Noranda, in north-western, Quebec.

This phase of the drill program focuses on the Heva area of the Joanna property as well as the area immediately west of the proposed Hosco pit. It includes 48 new holes. The Heva deposit resource inventory includes 270,000 ounces at 1.9 grams of gold per tonne in the measured and indicated mineral resource category and 421,000 ounces at 1.7 grams of gold per tonne in the inferred mineral resource category using a cut off grade of 0.5 grams of gold per tonne over a minimum width of 5 metres (see Aurizon news release dated June 5, 2012).

The best results received to date are 55.4 grams of gold per tonne over 3.0 metres in hole JA-12-994 at a vertical depth of 275 metres, and 10.2 grams of gold per tonne over 5.0 metres in hole JA-12-1032 at a vertical depth of 400 metres (all results represent true widths), and confirm the following:

  • Continuity of the mineralized system along a strike length of 2.5 kilometres westward from the Hosco proposed pit to the Heva area.
  • Distinct mineralogy between Hosco and Heva indicating a transition from a higher to a lower arsenic concentration on the Heva side.
  • Higher grade mineralization at several locations along the property.

Twenty-four (24) of the forty-eight holes (48) returned between one and five mineralized intersections, calculated with a minimum cut off of 0.5 grams of gold per tonne over 5 meters above a vertical depth of 200 metres. Eleven (11) holes returned one to three positive intervals down to a maximum depth of 400 metres, using a cut-off grade of 3 grams of gold per tonne over a minimum thickness of 3 metres.

The best results from the 2012 drilling program are shown below by area: (See sketch attached for location).

Zone/area Hole Section
(metres)
From
(metres)
To
(metres)
True
width
(metres)
Grade
(grams
of gold
per
tonne)
             
Hosco West Extension JA-12-1015 6,850 261 268 6 5.6
  JA-12-1029 6,900 303 307.6 6.7 4.2
  Inc.   305.9 307.6 1.6 14
Heva East JA-12-994 6,600 250 265.5 3 55.4
  Inc.   262 263.5 1.3 115
             
Heva West JA-12-1007 4,550 33.2 40.5 5 6.9
  JA-12-1032 4,750 81 88 5 10.2

Hosco West Extension

The program continues to extend the shallow dipping mineralization identified immediately west of the Hosco pit shell (see Aurizon news release dated April 16, 2012) using a 50 metre spacing between holes.

The drilling program has intersected, with sixteen (16) additional holes, a mineralized structure south of the Cadillac fault, composed of stacked metric layers that are characterized by an increasing level of biotite-quartz-albite-sericite alteration with minor quartz veining. Gold grades are visually correlated to finely disseminated arsenopyrite and pyrrhotite concentrations.

The Hosco West Extension corresponds to wide continuous alteration halos, dipping 55 degrees north, returning mineralized intervals between 3 and 9 grams of gold per tonne over 3 to 9 metres when a cut off grade of 3 grams of gold per tonne is used with a 3 metre minimum width. Mineralization is recognized along a strike length of 600 metres from section 7,250 metres East (corresponding to Hosco pit limit of the feasibility study released June 5 2012) to section 6,650 metres. Drilling focused on following the mineralization's lateral plunge with a limited vertical span of about 150 metres. The down dip mineralization remains open below 300 metres and open laterally.

Heva East

The transition between the Hosco and Heva mineralization is marked by a strongly altered and mineralized intrusion located 35 metres South of the Cadillac Fault. In this area, hole  JA-12-994 returned 55.4 grams of gold per tonne over a width of 3 metres, including 115 grams per tonne over 1.3 metres.

Mineralization is mainly composed of pyrite and pyrrhotite disseminated in intrusion and associated to quartz-tourmaline veins stockwork. Veins are developed near the contact with sediments with free gold observed in association with sulphides.

Heva West

Eight (8) of thirteen (13) holes returned an average grade of 6 grams of gold per tonne over an average width of 4.3 metres in the western extension of the Heva deposit. The drilled area covers 500 metres laterally between section 4,500 metres East and 5,000 metres East, from surface down to 400 metres.

In contrast to the Heva area where multiple zone stacking is observed, Heva West mineralization corresponds to only one mineralized structure developed immediately south of the Cadillac Fault, in a distinct massive amphibolite replacement zone dipping 60 degrees north. Gold mineralization is mostly related to <5% of disseminated pyrrhotite. The discreet nature of mineralization and the apparent lack of quartz veining had probably prevented its identification from a historical sampling. This zone, interpreted as a continuous panel, remains open down dip and laterally.

"This series of drill results represents a positive test of the Joanna down dip potential. The results that have been received to date confirm the higher gold grade consistency and mineralization continuity at Joanna. The improved understanding of the plunging effect of mineralization along the fault, should increase the expected success of our deep exploration program. Our objective is to reproduce other historic discoveries along the Cadillac Fault that have led to recently opened operating mines," said Martin Demers, General Manager of Exploration.

Outlook

Four drills are currently active with the addition of a $4.2 million, 2012 second phase exploration program. Based on the encouraging results obtained to date, deeper holes to follow the continuity of the mineralization down dip to 600 metres will commence shortly.

The reconnaissance drilling on the Heva deposit is nearing completion. An in-pit resource update will be performed during the year. In addition, the interpretation of the higher grade trends show a well-defined plunge, and have the potential to move the project toward a combination of surface and underground production targets.

Quality Control and Qualified Persons

Core assays are performed on core sawed in half, with standard ALS Chemex preparation and fire assay on 30-gram preparation followed by atomic absorption finish. All assays above 10 grams of gold per tonne are replicated on the same pulp preparation using a gravity finish. Certified reference material, duplicate and blanks are inserted in the sample sequence for quality control and controlled at assay's reception. Assay checking on pulp and coarse rejects are carried out on approximately 15% of samples. For additional information on Quality Assurance and Quality control, refer to the current technical report on the property titled, "NI 43-101 Technical Report Mineral Resource Estimation Joanna Gold Project, Rouyn Noranda, Quebec, Aurizon Mines Ltd. September 2011 Updated", filed on Sedar at www.sedar.com. Primary assaying is performed by ALS Chemex and check assays were carried out by Laboratoire d'Analyse Bourlamaque of Val d'Or.

Drill hole planning, implementation and the quality control program is supervised by Martin Demers P.Geo., General Manager of Exploration, a qualified person as defined by National Instrument 43-101. Mr. Demers is also responsible for the scientific and technical information in this news release.

Additional Information

One sketch is attached showing the Heva area of the Joanna property. Detailed results from the additional holes are reported in the tables attached. All other information previously released on the Joanna Project is available on the Aurizon website at www.aurizon.com.

To view accompanying sketch, visit the following link: http://media3.marketwire.com/docs/Issue18_Sketch.pdf

About Aurizon

Aurizon is a gold producer with a growth strategy focused on developing its existing projects in the Abitibi region of north-western Quebec, one of the world's most favourable mining jurisdictions and prolific gold and base metal regions, and by increasing its asset base through accretive transactions. Aurizon shares trade on the Toronto Stock Exchange under the symbol "ARZ" and on the NYSE MKT under the symbol "AZK". Additional information on Aurizon and its properties is available on Aurizon's website at www.aurizon.com.

FORWARD LOOKING STATEMENTS AND INFORMATION

This news release contains "forward-looking statements" and "forward-looking information" within the meaning of applicable securities regulations in Canada and the United States (collectively, "forward-looking information"). The forward-looking information contained in this news release is made as of the date of this news release. Except as required under applicable securities legislation, the Company does not intend, and does not assume any obligation, to update this forward-looking information. Forward-looking information includes, but is not limited to, statements with respect to estimated mineral resources, anticipated effect of the completed drill results on the Joanna project, the interpretation of those results, the timing and expectations of future work programs. Often, but not always, forward-looking information can be identified by the use of words such as "plans", "expects, "is expected", "budget", "scheduled", "estimates", forecasts", "intends", "anticipates", or "believes", "has the potential" or the negatives thereof or variations of such words and phrases or statements that certain actions, events or results "may", "could", "would", "might", or "will" be taken, occur or be achieved.

The forward-looking information contained in this news release is based on certain assumptions that the Company believes are reasonable, including, with respect to mineral resource estimates, the key assumptions and parameters on which such estimates are based, as set out in this news release and the technical report for the property, that the current price of and demand for gold will be sustained or will improve, the supply of gold will remain stable, that the general business and economic conditions will not change in a material adverse manner, that financing will be available if and when needed on reasonable terms and that the Company will not experience any material accident, labor dispute, or failure of plant or equipment.

However, forward-looking information involves known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Company to be materially different from any future results, performance or achievements expressed or implied by the forward-looking information. Such factors include, among others, conclusions of economic evaluations, the risk that actual results of exploration activities will be different than anticipated, that cost of labour, equipment or materials will increase more than expected, that the future price of gold will decline, that the Canadian dollar will strengthen against the U.S. dollar, that mineral resources and reserves are not as estimated, that actual costs or actual results of reclamation activities are greater than expected; that changes in project parameters as plans continue to be refined may result in increased costs, of unexpected variations in mineral resources and reserves, grade or recovery rates, of failure of plant, equipment or processes to operate as anticipated, of accidents, labour disputes and other risks generally associated with mining, unanticipated delays in obtaining governmental approvals or financing or in the completion of development or construction activities, as well as those factors and other risks more fully described in Aurizon's Annual Information Form filed with the securities commission of all of the provinces and territories of Canada and in Aurizon's Annual Report on Form 40-F filed with the United States Securities and Exchange Commission, which are available on the Company's website at www.aurizon.com and on Sedar at www.sedar.com and on Edgar at www.sec.gov/. Although the Company has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking information, there may be other factors that cause actions, events or results to not be as anticipated, estimated or intended. There can be no assurance that forward-looking information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Readers are cautioned not to place undue reliance on forward-looking information due to the inherent uncertainty thereof.

CAUTIONARY NOTE TO US READERS

As a Canadian reporting issuer, the Company is subject to rules, policies and regulations issued by Canadian regulatory authorities and is required to provide detailed information regarding its properties including mineralization, drilling, sampling and analysis, security of samples and mineral resource and mineral reserve estimates. In addition, as a Canadian reporting issuer, the Company is required to describe mineral resources associated with its properties utilizing Canadian Institute of Mining, Metallurgy and Petroleum ("CIM") definitions of "indicated" or "inferred", which categories of resources are recognized by Canadian regulations but are not recognized by the United States Securities and Exchange Commission ("SEC").

The SEC allows mining companies, in their filings with the SEC to disclose only those mineral deposits they can economically and legally extract or produce. Accordingly, information contained in this News Release regarding our mineral deposits may not be comparable to similar information made public by U.S. companies subject to the reporting and disclosure requirements under the United States federal securities laws and the rules and regulations of the Commission thereunder.

In particular, this News Release uses the term "indicated" resources. U.S. readers are cautioned that while that term is recognized and required by Canadian regulations, the SEC does not recognize it. U.S. investors are cautioned not to assume that any part or all of mineral deposits in this category will ever be converted into mineral reserves.

This News Release also uses the term "inferred" resources. U.S readers are cautioned that while this term is recognized and required by Canadian regulations, the SEC does not recognize it. "Inferred resources" have a great amount of uncertainty as to their existence, and great uncertainty as to their economic and legal feasibility. It cannot be assumed that all or any part of an inferred mineral resource will ever be upgraded to a higher category. Under Canadian rules, estimates of inferred mineral resources may not form the basis of feasibility or pre-feasibility studies, except in rare cases. U.S. readers are cautioned not to assume that part or all of an inferred resource exists, or is economically or legally mineable.

Hosco West Extension        
From surface down to 200 metres - cut-off grade of 0.5 g/t over minimum width of 5 metres
Hole E (m) From To Hole
length
(metres)
True
width
(metres)
Grade
(grams
per
tonne
gold)
JA-12-982 7050 156.0 161.1 5.1 5.0 2.5
  inc. 157.4 160.5 3.1 3.0 4.0
    166.0 178.5 12.5 12.2 1.9
    211.5 219.0 7.5 7.3 1.1
    240.0 245.1 5.1 5.0 1.3
JA-12-1000 7099 NS        
JA-12-1004 7050 NS        
JA-12-1012 6951 172.5 178.1 5.6 5.0 1.1
    184.5 190.0 5.5 5.0 1.0
    201.0 204.2 3.2 3.0 4.7
JA-12-1014 6900 195.0 208.5 13.5 11.6 1.0
JA-12-1018 6800 NS        
JA-12-1019 7150 256.0 264.0 8.0 7.7 1.3
JA-12-1026 7049 208.5 220.5 12.0 9.6 1.0
Under 200 metres - cut-off grade of 3 g/t over a minimum width of 3 metres.
Hole E (m) From To Hole
length
(metres)
True
width
(metres)
Grade
 (grams
per
tonne
gold)
JA-12-1001 7101 266.7 270.0 3.3 3.0 3.4
    294.7 298.0 3.3 3.0 4.0
JA-12-1014 6900 261.0 268.0 7.0 6.0 5.6
    262.0 264.0 2.0 1.7 10.0
JA-12-1015 6850 301.0 309.0 8.0 6.9 5.0
    306.0 307.0 1.0 0.9 10.0
JA-12-1016 6849 NS        
JA-12-1017 6800 258.4 262.0 3.6 3.0 3.2
    321.9 325.5 3.6 3.0 4.7
JA-12-1019 7150 287.9 291.0 3.1 3.0 6.0
    289.0 290.0 1.0 1.0 11.7
JA-12-1026 7049 289.0 292.7 3.7 3.0 3.5
JA-12-1027 7150 NS        
JA-12-1028 6975 221.0 226.0 5.0 4.4 3.3
    247.5 252.0 4.5 3.9 4.3
    273.0 276.4 3.4 3.0 3.4
JA-12-1029 6900 303.0 307.6 4.6 4.2 6.7
    305.9 307.6 1.7 1.6 14.0
JA-12-1036 6748 320.1 323.6 3.5 3.0 4.5
    321.7 322.5 0.8 0.6 10.0
Heva East
From surface down to 200 metres - cut-off grade of 0.5 g/t over a minimum width of 5 metres
Hole E (m) From To Hole
length
(metres)
True
width
(metres)
Grade
 (grams
per
tonne
gold)
JA-12-948 6501 135.0 142.0 7.0 5.0 1.1
JA-12-959 5750 217.5 223.9 6.4 5.0 1.1
JA-12-971 6650 NS        
JA-12-974 6300 NS        
JA-12-985 5950 NS        
JA-12-989 6149 NS        
JA-12-990 6450 25.5 36.0 10.5 9.9 1.5
    42.0 49.5 7.5 7.1 0.7
JA-12-992 6550 NS        
JA-12-993 6551 119.2 125.1 5.9 5.0 3.2
  inc. 123.0 124.0 1.0 0.8 11.8
    154.6 160.5 5.9 5.0 1.1
    180.1 186.0 5.9 5.0 1.0
    198.0 203.9 5.9 5.0 1.5
    219.0 228.0 9.0 7.6 0.6
JA-12-996 6100 NS        
JA-12-997 5900 NS        
JA-12-998 5900 24.7 30.0 5.3 5.0 1.5
    26.3 29.5 3.2 3.0 2.4
    62.2 67.5 5.3 5.0 0.9
JA-12-999 5800 144.0 156.0 12.0 11.3 0.7
    172.5 178.5 6.0 5.7 3.0
JA-12-1005 6650 36.8 42.0 5.2 5.0 1.1
JA-12-1010 5701 126.0 132.0 6.0 5.8 1.0
JA-12-1011 5699 131.0 149.0 18.0 12.6 2.2
    136.0 142.0 6.0 4.2 3.8
JA-12-1030 6700 NS        
Under 200 metres - cut-off grade of 3 g/t over a minimum width of 3 metres.  
Hole E (m) From To Hole
length
(metres)
True
width
(metres)
Grade
(grams
per
tonne
gold)
JA-12-959 5750 NS        
JA-12-994 6602 250.5 265.5 15.0 13.3 12.9
  inc. 260.8 264.2 3.4 3.0 55.4
  inc. 262.0 263.5 1.5 1.3 115.0
JA-02-1037 6700 NS        
Heva West
From surface down to 200 metres - cut-off grade of 0.5 g/t over a minimum width of 5 metres
Hole E (m) From To Hole
length
(metres)
True
width
(metres)
Grade
(grams
per
tonne
gold)
JA-12-1006 4650 22.5 34.5 12.0 10.2 2.8
  inc. 22.5 31.3 8.8 7.5 3.6
JA-12-1007 4557 33.2 40.5 7.3 5.0 6.9
  inc. 37.5 38.0 0.5 0.3 98.1
    46.5 53.8 7.3 5.0 1.4
JA-12-1008 4550 226.5 231.8 5.3 5.0 1.4
JA-12-1009 4650 36.8 42.0 5.2 5.0 1.6
    192.8 198.0 5.2 5.0 0.9
JA-12-1020 4750 94.8 100.5 5.7 5.0 0.9
    207.0 221.0 14.0 12.5 1.5
  inc. 213.0 216.4 3.4 3.0 3.6
JA-12-1021 4750 85.5 91.5 6.0 5.6 1.8
JA-12-1022 4850 265.3 270.7 5.4 5.1 4.4
  inc. 267.5 270.7 3.2 3.0 6.9
  inc. 269.7 270.7 1.0 0.9 18.9
JA-12-1024 4950 156 161.43 5.43 5.0 5.6
  inc. 156 157.5 1.5 1.38 17.6
JA-12-1031 4650 16.5 23.0 6.5 5.0 1.8
  inc. 17.1 21.0 3.9 3.0 3.0
    190.5 196.7 6.2 5.0 0.9
JA-12-1032 4750 81.0 88.0 7.0 5.0 10.2
  inc. 84.0 85.0 1.0 0.7 47.7
Under 200 metres, cut-off grade of 3 g/t over a minimum width of 3 metres.
Hole E (m) From To Hole
length
(metres)
True
width
(metres)
Grade
(grams
per
tonne
gold)
JA-12-1023 4850 NS        
JA-12-1025 4950 NS        
JA-12-1033 4753 476.3 480.0 3.7 3.0 9.7
  inc. 478.0 479.0 1.1 0.9 23.4

U.S. Registration (File 001-31893)

News Release Issue No. 18 - 2012



Aurizon Mines Ltd.
George Paspalas
President & CEO
604-687-6600
or
Aurizon Mines Ltd.
Martin Bergeron
Vice President Operations
819-874-4511
or
Aurizon Mines Ltd.
Investor Relations
604-687-6600 or Toll Free: 1-800-411-GOLD (4653)
604-687-3932 (FAX)
jennifer.north@aurizon.com or info@aurizon.com
www.aurizon.com
Données et statistiques pour les pays mentionnés : Canada | Tous
Cours de l'or et de l'argent pour les pays mentionnés : Canada | Tous

Aurizon Mines Ltd

PRODUCTEUR
CODE : ARZ.TO
ISIN : CA05155P1062
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Aurizon Mines est une société de production minière d'or basée au Canada.

Aurizon Mines détient divers projets d'exploration au Canada.

Son principal projet en production est CASA BERARDI au Canada, son principal projet en développement est JOANNA au Canada et ses principaux projets en exploration sont DUVERNY, PATRIS, OPINACA, REX SOUTH, MARBAN MINE, KIPAWA, FAYOLLE et JOANNES au Canada.

Aurizon Mines est cotée au Canada, aux Etats-Unis D'Amerique et en Allemagne. Sa capitalisation boursière aujourd'hui est 27,5 millions CA$ (21,1 millions US$, 18,3 millions €).

La valeur de son action a atteint son plus bas niveau récent le 31 décembre 2001 à 0,21 CA$, et son plus haut niveau récent le 16 septembre 2016 à 8,75 CA$.

Aurizon Mines possède 63 960 000 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Rapports annuels de Aurizon Mines Ltd
2008 Annual Report
2007 Annual Report
2005 Annual report
Financements de Aurizon Mines Ltd
02/02/2011AURIZON ANNOUNCES US$50 MILLION REVOLVING CREDIT FACILITY
Attributions d'options de Aurizon Mines Ltd
15/08/2011Grant of 600,000 options at 6,38
Nominations de Aurizon Mines Ltd
18/01/2013Aurizon Appoints a Special Committee to Evaluate Offer
26/08/2011Announces Vice President, Corporate Development Resignation
15/08/2011George Paspalas Joins Aurizon as Chief Executive Officer; Da...
27/06/2011Aurizon Announces Appointment of George Paspalas as Chief Ex...
Rapports Financiers de Aurizon Mines Ltd
15/05/2013Aurizon Reports First Quarter 2013 Financial Results
14/03/2013Aurizon Reports 2012 Financial Results
08/11/2012Aurizon Reports Third Quarter 2012 Financial Results
09/08/2012Aurizon Reports Second Quarter 2012 Financial Results
10/05/2012Aurizon Reports First Quarter 2012 Financial Results
15/03/2012Aurizon Reports 2011 Financial Results
11/08/2011Aurizon Reports Second Quarter 2011 Results
16/05/2011AURIZON REPORTS FIRST QUARTER 2011 RESULTS
14/08/2009reports record revenues and cash flow in second quarter 2009
13/05/2009Reports Highlights Of First Quarter 2009 Results
11/03/2009Reports 2008 Financial Results
06/11/2008Third Quarter 2008 Results
06/11/2008Reports Highlights Of Third Quarter 2008 Results
08/08/2008Reports Highlights Of Second Quarter 2008 Results
07/05/2008Reports Highlights Of First Quarter 2008 Results
19/03/2008 Reports 2007 Financial Results
Projets de Aurizon Mines Ltd
03/05/2013(Casa Berardi)Aurizon Reports Status Update on Minor Discharge at Tailings...
02/05/2013(Casa Berardi)Aurizon Reports Minor Discharge at Tailings Facility at Casa...
25/03/2013(Casa Berardi)Aurizon Reports Accident at Casa Berardi Mine
15/02/2013(Casa Berardi)Aurizon Mines Ltd.: New Drill Results Highlight the Potentia...
12/12/2012New Discovery at Aurizon's Heva West Area Returns 1.7 Grams ...
06/09/2012Aurizon Mines Ltd.: New Drill Results Confirm High Grade Pot...
06/09/2012(Fayolle)Aurizon Announces an Updated Mineral Resource Estimate for F...
16/08/2012(Marban Mine)Aurizon Announces the Completion of the Marban Block Phase T...
30/07/2012(Casa Berardi)Aurizon Mines Ltd.: New Drill Results Confirm Continuity and...
20/07/2012(Joanna)Aurizon Files Feasibility Study of the Hosco Deposit
09/07/2012(Joanna)Aurizon Mines Ltd.: New Drill Results Expand the Heva Area a...
12/06/2012Aurizon Mines Ltd.: Marban's Phase Two Drill Program Results...
11/06/2012Aurizon Acquires Common Shares of Typhoon Exploration Inc.
06/06/2012(Joanna)Aurizon Receives Results of Feasibility Study for Joanna's H...
15/05/2012(Casa Berardi)Aurizon Mines Ltd.: New Drill Results Highlight the Potentia...
26/04/2012(Marban Mine)Aurizon Mines Ltd.: New Results at Marban Highlight Potentia...
20/04/2012(Joanna).: Higher Grade Mineralization Discovered on the Heva and Ho...
04/04/2012(Rex South)Aurizon Announces Results from the 2011 Exploration Program ...
01/03/2012(Casa Berardi)Reports Mineral Reserve Replenishment and Mineral Resource U...
01/03/2012(Marban Mine)Aurizon Mines Ltd.: Marban Eastern Down Dip Zone Returns 6.4...
22/09/2011(Marban Mine) Two New High Grade Gold Zones Discovered at Marban
09/09/2011(Casa Berardi)Aurizon Mines Ltd.: Drilling Confirms the Continuity and the...
31/08/2011(Fayolle)Aurizon Reports New High Grade Values at Fayolle
11/08/2011(Joanna)Aurizon Reports Joanna Feasibility Study Delayed, However Dr...
09/08/2011(Fayolle)Aurizon Reports Discovery of New Gold Bearing Trends Outside...
22/06/2011(Marban Mine) Deeper Drilling at Marban Reveals Added Upside With 5
13/06/2011(Joanna)Aurizon Increases the Hosco In-Pit Measured and Indicated Mi...
25/05/2011(Marban Mine)AURIZON REPORTS FURTHER RESULTS FROM MARBAN BLOCK
14/04/2011(Marban Mine)AURIZON REPORTS FURTHER DRILL RESULTS FROM MARBAN
13/03/2011(Casa Berardi)AURIZON REPORTS A 44% INCREASE IN MINERAL RESERVES FOR THE C...
15/02/2011(Rex South)AURIZON AND AZIMUT RE-EVALUATE TUNGSTEN VALUES ON THE COPPER...
21/01/2011(Marban Mine)AURIZON ANNOUNCES 9=2E06 GRAMS OF GOLD PER TONNE OVER 7=2E3 ...
11/01/2011AURIZON ANNOUNCES 2010 PRODUCTION RESULTS AND 2011 PLANS
01/09/2009Aurizon Intersects 18.9 Grams of Gold per Tonne Over 4.0 Met...
11/03/2009(Joanna) Infill Drilling Increases Mineral Resources at Joanna
20/02/2009(Casa Berardi)Reports Mineral Reserve Renewal And Mineral Resource Update ...
26/01/2009(Joanna): Grade and Thickness Confirmed Along the North Zone at Joan...
11/12/2008(Joanna)Infill Drilling Program Completed At Joanna 116 Grams Of Gol...
13/06/2008(Kipawa)Reports Additional Rare Earth And Uranium Results At Kipawa ...
12/05/2008(Joanna) Commissions Pre-Feasibility Study At Joanna
23/04/2008(Joanna) Reports Further Results From Its Joanna Property Including ...
02/04/2008(Casa Berardi)Provides Mineral Reserves And Resources Update
Communiqués de Presse de Aurizon Mines Ltd
30/05/2013Aurizon Announces Results of Hecla Arrangement Consideration...
28/05/2013Aurizon Announces Receipt of Investment Canada Act Approval
22/05/2013Aurizon Announces Change to Election Deadline to May 29, 201...
21/05/2013Aurizon Announces Extension of Election Deadline
10/05/2013Aurizon Receives Final Court Approval of Plan of Arrangement
09/05/2013Aurizon Securityholders Approve Plan of Arrangement
08/05/2013Aurizon Announces Preliminary Results of Hecla Arrangement C...
06/05/2013Aurizon Reminds Shareholders of Election Deadline
01/05/2013Aurizon Reminds Shareholders of Important Vote Deadline of M...
01/05/2013Reminds Shareholders of Important Vote Deadline of May 7, 20...
24/04/2013Announces That Leading Independent Proxy Advisory Firm Insti...
12/04/2013Aurizon Announces Special Meeting of Securityholders and Mai...
26/03/2013(Casa Berardi)Aurizon Mines Ltd.: Regular Operations Resume at Casa Berard...
20/03/2013Aurizon Comments on Expiry of Alamos Offer
19/03/2013Aurizon Responds to BCSC Decision to Cease Trade New Shareho...
18/03/2013Aurizon Reiterates Rejection of the Financially Inadequate A...
12/03/2013Aurizon Announces Hearing on New Shareholder Rights Plan
11/03/2013Aurizon Takes Steps to Ensure Equal Treatment of All Shareho...
15/02/2013(Casa Berardi)Aurizon Reports Mineral Reserve Replenishment and an Increas...
12/02/2013Aurizon Announces Hearing on Shareholder Rights Plan
08/02/2013Aurizon Mails Shareholder Rights Plan Materials
30/01/2013Aurizon Provides Update on Shareholder Rights Plan
15/01/2013Aurizon Responds to Unsolicited Offer
14/01/2013Alamos Gold Acquires Common Shares of Aurizon Mines
30/10/2012. Announces Third Quarter 2012 Conference Call & Webcast
07/09/2012Aurizon Announces an Updated Mineral Resource Estimate for t...
01/05/2012. Announces First Quarter 2012 Conference Call & Webcast
24/04/2012Aurizon Mines Ltd.: Preliminary Metallurgical Testwork at Ma...
31/03/2012Aurizon Releases Annual Disclosure Documents
09/03/2012. Announces 2011 Financial Results Conference Call & Webcast
11/01/2012Aurizon Announces Record 2011 Gold Production and 2012 Plans
08/12/2011Aurizon Grants Stock Options
08/12/2011Grants Stock Options
02/08/2011. Announces Second Quarter 2011 Conference Call & Webcast
30/11/2010Receives Award From Aemq
26/05/2010Options Azimut's Rex South Property
13/06/2008defines Gold Targets and Commences Exploration Program at Ki...
15/05/2008Andre Falzon Joins Aurizon's Board
15/03/2008deeply regrets
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TORONTO (ARZ.TO)FRANKFURT (AUE.F)
0,430+10.26%2,95+5.85%
TORONTO
CA$ 0,430
09/08 16:50 0,040
10,26%
Cours préc. Ouverture
0,390 0,395
Bas haut
0,395 0,510
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
- -  0,430 -%
Volume var. 1 mois
274 400 -%
24hGold TrendPower© : -44
Produit Gold
Développe Gold
Recherche Gold
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 11/01/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,76 AU$-1,52%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
11,04 US$-1,95%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,56 GBX-3,12%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,44 CA$-2,01%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
15,23 CA$-1,17%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,23 CA$-4,17%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,20 AU$-7,14%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,76 CA$+2,03%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
52,18 US$-0,95%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,03 AU$+0,00%Trend Power :