Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en

Belo Sun Mining Corp.

Publié le 31 août 2011

Belo Sun Intersects 30.75 Meters Grading 11.14 g/t Gold in New High Grade Extension of the Grota Sec

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Belo Sun Mining Corp. has added a new press release to its web site. For full details please visit the Belo Sun Mining web site at:

Belo Sun Intersects 30.75 Meters Grading 11.14 g/t Gold in New High Grade Extension of the Grota Seca Deposit, Volta Grande Project, Brazil

TORONTO, ONTARIO -- (MARKET WIRE) -- 08/31/11 -- Belo Sun Mining Corp. (TSX VENTURE: BSX) (the "Company" or "Belo Sun") is pleased to announce assay results for 22 additional drill holes from the diamond drilling program at its Volta Grande Gold Project located in Para State, Brazil, including the discovery of a new high grade extension at the Grota Seca Deposit. The results include assays from 14 drill holes from the Grota Seca deposit, seven drill holes from the Ouro Verde deposit and one from the South Block target. The complete results and cross sections are presented in Table 1 below.

Highlights include:

--  Hole VVGD-137 (Grota Seca Cross Section 825 W), which is located at the
    Eastern part of the Grota Seca deposit, has intersected a new
    structurally controlled high grade gold mineralization zone. High grade
    gold mineralization of 11.14 g/t Au occurs over a 30.75 meter interval
    (see above and Table 1) in this drill hole.

--  Hole VVGD-109 (Grota Seca Cross Section 1900 W), which is located at the
    Central part of the Grota Seca deposit, has intersected high grade gold
    mineralization near surface with significant true thickness and
    continuity along strike and down dip. VVGD-109 (Grota Seca Cross Section
    1900 W) with 37.47 meters grading 4.38 g/t Au (from 61.20 m depth)
    including 13.15 meters grading 10.00 g/t Au

--  Hole VVGD-127 (Grota Seca Cross Section 775 W), which is part of the
    infill drilling, is located at the eastern part of this deposit and
    indicates the potential to find another high grade zone (similar to the
    Central part of the deposit) at depth. VVGD-127 (Grota Seca Cross
    Section 775 W) with 35.35 meters grading 3.33 g/t Au (from 200.35 m
    depth) including 10.30 meters grading 7.08 g/t Au

--  Hole VVGD-111 (Ouro Verde Cross Section 475 NW) intercepted multiple
    high grade mineralized zones near surface showing, as expected,
    significant continuity along strike and down dip. VVGD-111 (Ouro Verde
    Cross Section 475 NW) intersected 27.00 meters grading 2.36 g/t Au (from
    112.75 m depth) including 8.89 meters grading 5.09 g/t Au.

As part of the ongoing drill program at Volta Grande, Belo Sun has completed a total of 187 drill holes (48,167m), of which assays remain pending for 56 holes. The current drilling program is designed to upgrade and expand the existing mineral resource estimate and further results will be released as they become available.

The geological map of the Volta Grande Gold Project, with diagrams setting out the main deposit locations, is included below.

Mark Eaton, the President and CEO for Belo Sun, stated, "With ten diamond drill rigs operating we expect that we will complete the infill drilling program by the end of September. Once the infill drilling is complete, we will then focus all 10 diamond drill rigs on expanding the deposits. At present the Ouro Verde Deposit remains open along strike to the northwest and the Grota Seca Deposit is open along strike to the East, both deposits continue at depth. We are particularly excited to drill additional holes in the area of the newly identified high grade mineralization on the east side of the Grota Seca deposit."

TABLE 1 - DIAMOND DRILLING ASSAY RESULTS

The widths reported below represent the core width of the intercepts; true widths are expected to range between 85-95% of the core width.

----------------------------------------------------
                Grota Seca target
----------------------------------------------------
Hole #        From (m)    To (m) Width (m)    Au g/t
----------------------------------------------------
VVGD-108        164.00    192.65     28.65      0.67
----------------------------------------------------
         and    205.00    248.36     43.36      1.08
----------------------------------------------------
         and    269.70    273.70      4.00      2.80
----------------------------------------------------
         and    304.90    308.40      3.50      0.90
----------------------------------------------------
         and    321.00    325.70      4.70      2.22
----------------------------------------------------
VVGD-109         20.48     34.00     13.52      0.71
----------------------------------------------------
         and     61.20     98.67     37.47      4.38
----------------------------------------------------
   including     85.52     98.67     13.15     10.00
----------------------------------------------------
         and    133.61    137.00      3.39      4.18
----------------------------------------------------
         and    173.55    183.90     10.35      1.53
----------------------------------------------------
         and    195.90    210.90     15.00      3.85
----------------------------------------------------
VVGD-110         78.42     89.18     10.76      0.52
----------------------------------------------------
         and    102.17    115.00     12.83      1.17
----------------------------------------------------
         and    120.85    137.38     16.53      0.88
----------------------------------------------------
         and    187.42    193.21      5.79      1.34
----------------------------------------------------
         and    208.95    213.06      4.11      0.63
----------------------------------------------------
         and    226..96    230.37      3.41      1.52
----------------------------------------------------
         and    251.36    254.84      3.48      0.72
----------------------------------------------------
VVGD-114         85.30     97.35     12.05      0.84
----------------------------------------------------
         and    114.20    121.65      7.45      0.74
----------------------------------------------------
         and    127.60    135.70      8.10      0.62
----------------------------------------------------
VVGD-116         81.30     88.30      7.00      0.86
----------------------------------------------------
         and     94.10    138.05     43.95      0.69
----------------------------------------------------
         and    171.85    176.55      4.70      3.35
----------------------------------------------------
VVGD-117         34.00     37.85      3.85      0.52
----------------------------------------------------
         and     50.90     72.60     21.70      0.79
----------------------------------------------------
         and     99.70    104.70      5.00      8.03
----------------------------------------------------
VVGD-118        104.00    110.00      6.00      1.05
----------------------------------------------------
         and    123.70    141.00     17.30      0.61
----------------------------------------------------
         and    157.76    183.84     26.08      0.94
----------------------------------------------------
   including    169.29    175.05      5.76      2.73
----------------------------------------------------
         and    211.80    219.20      7.40      0.58
----------------------------------------------------
         and    234.26    245.43     11.17      0.59
----------------------------------------------------
VVGD-120         93.25    106.45     13.20      0.53
----------------------------------------------------
         and    115.80    125.70      9.90      0.69
----------------------------------------------------
         and    138.50    142.35      3.85      0.80
----------------------------------------------------
         and    147.55    161.25     13.70      0.61
----------------------------------------------------
VVGD-121         22.60     28.70      6.10      3.13
----------------------------------------------------
         and     36.90     99.11     62.21      0.74
----------------------------------------------------
   including     64.00     73.33      9.33      1.22
----------------------------------------------------
VVGD-122         88.60    104.45     15.85      1.13
----------------------------------------------------
         and    110.50    117.50      7.00      0.50
----------------------------------------------------
         and    124.50    145.65     21.15      0.73
----------------------------------------------------
VVGD-123         34.85     45.45     10.60      0.74
----------------------------------------------------
         and     51.15     87.50     36.35      1.39
----------------------------------------------------
   including     54.95     66.00     11.05      2.90
----------------------------------------------------
         and    118.50    124.67      6.17      1.27
----------------------------------------------------
VVGD-126         65.15     71.65      6.50      1.32
----------------------------------------------------
         and     92.00     96.00      4.00      0.81
----------------------------------------------------
         and    153.00    160.55      7.55      0.91
----------------------------------------------------
         and    179.00    189.56     10.56      0.76
----------------------------------------------------
         and    197.80    209.20     11.40      4.30
----------------------------------------------------
VVGD-127        122.45    125.15      2.70      1.26
----------------------------------------------------
         and    145.35    161.30     15.95      0.73
----------------------------------------------------
         and    168.15    179.50     11.35      4.34
----------------------------------------------------
         and    185.50    188.50      3.00      1.18
----------------------------------------------------
         and    200.35    235.70     35.35      3.33
----------------------------------------------------
   including    222.90    233.20     10.30      7.08
----------------------------------------------------
         and    244.70    249.30      4.60      0.65
----------------------------------------------------
VVGD-130        158.00    193.70     35.70      1.07
----------------------------------------------------
   including    181.10    192.70     11.60      2.20
----------------------------------------------------
VVGD-137          0.00     10.95     10.95      0.80
----------------------------------------------------
         and    132.75    163.50     30.75     11.14
----------------------------------------------------
   including    136.35    149.41     13.06     23.84
----------------------------------------------------
         and    168.63    171.70      3.07      0.79
----------------------------------------------------
         and    177.32    188.30     10.98      0.84
----------------------------------------------------
         and    199.25    221.20     21.95      2.15
----------------------------------------------------
   including    209.25    219.35     10.10      4.07
----------------------------------------------------

----------------------------------------------------
                  Ouro Verde target
----------------------------------------------------
Hole #        From (m)    To (m) Width (m)    Au g/t
----------------------------------------------------
VVGD-111         10.30     22.15     11.85      2..13
----------------------------------------------------
       and       42.79     48.00      5.21      0.97
----------------------------------------------------
       and       54.60     66.45     11.85      1.31
----------------------------------------------------
       and       78.00     82.15      4.15      4.37
----------------------------------------------------
       and      112.75    139.75     27.00      2.36
----------------------------------------------------
 including      112.75    121.64      8.89      5.09
----------------------------------------------------
       and      170.34    188.47     18.13      1.25
----------------------------------------------------
 including      173.44    178.59      5.15      2.11
----------------------------------------------------
       and      194.27    200.60      6.33      0.79
----------------------------------------------------
VVGD-113          0.00      9.15      9.15      0.80
----------------------------------------------------
       and      110.50    113.50      3.00      1.04
----------------------------------------------------
       and      124.40    131.90      7.50      1.85
----------------------------------------------------
       and      170.10    191.80     21.70      1.04
----------------------------------------------------
VVGD-115          0.00      3.70      3.70      0.92
----------------------------------------------------
       and       19.70     33.00     13.30      0.65
----------------------------------------------------
       and       48.00     61.00     13.00      0.57
----------------------------------------------------
       and       81.85    101.05     19.20      1.67
----------------------------------------------------
 including       84.25     89.45      5.20      4.07
----------------------------------------------------
       and      108.60    121.00     12.40      0.86
----------------------------------------------------
       and      188.00    196.15      8.15      1.01
----------------------------------------------------
       and      206.64    252.60     45..96      0.64
----------------------------------------------------
       and      272.08    275.60      3.52      2.17
----------------------------------------------------
       and      307.85    311.08      3.23      0.80
----------------------------------------------------
VVGD-119          0.00     10.60     10.60      1.03
----------------------------------------------------
       and       21.60     28.60      7.00      0.54
----------------------------------------------------
       and      104.25    108.00      3.75      0.75
----------------------------------------------------
       and      166.00    169.00      3.00      1.02
----------------------------------------------------
VVGD-124        135.45    139.00      3.55      0.55
----------------------------------------------------
       and      150.00    153.75      3.75      0.74
----------------------------------------------------
VVGD-125          0.00      6.00      6.00      0.96
----------------------------------------------------
       and       83.00     91.00      8.00      1.45
----------------------------------------------------
       and      134.90    141.12      6.22      0.53
----------------------------------------------------
VVGD-131        118.30    125.55      7.25      0.62
----------------------------------------------------
       and      156.00    159.00      3.00      0.55
----------------------------------------------------
       and      178.58    209.96     31.38      1.00
----------------------------------------------------
       and      253.95    303.05     49.10      0.88
----------------------------------------------------
 including      265.00    276.43     11.43      1.73
----------------------------------------------------
       and      310.18    318.80      8.62      0.77
----------------------------------------------------
       and      345.75    359.45     13.70      0.69
----------------------------------------------------

----------------------------------------------------
                   South Block
----------------------------------------------------
Hole #        From (m)    To (m) Width (m)    Au g/t
----------------------------------------------------
VVGD-112                    NSR
----------------------------------------------------


Quality Assurance and Quality Control

The scientific and technical information in this press release has been reviewed and approved by David Gower, P. Geo., an advisor to Belo Sun and a Qualified Person as defined by National Instrument 43-101. The exploration program is directly supervised by Mr. Carlos Cravo, P. Geo., Belo Sun's exploration manager. Belo Sun's procedures for handling drill core comprise initial description and logging into a Microsoft Access database. Mineralized, suspected mineralized or not intervals in the drill holes are described in detail and marked for sampling. Core is then cut in half with the right-hand portion of the core put into plastic sample bags and sealed. The left-hand portion is returned to the core box and is stored for future reference or study. Assay standard and "Blank" samples are inserted every 20th sample. These samples are then delivered to ACME Labs sample preparation facility at the Volta Grande Gold Project site. The assay samples are then fine-crushed to better than 85% passing 10 mesh screens, with an assay pulp split of up to 1000 grams pulverized to better than 80% passing 200 mesh screen. Samples are assayed at ACME Labs in Santiago, Chile, using a 50 gram fire assay with AAS finish. These QA/QC procedures provide several measures of data quality and assure the Company that the assay data is representative of the original sample.

About the Company

Belo Sun Mining Corp. is a Canadian-based mineral exploration company with a portfolio of properties focused on gold in Brazil. Belo Sun's primary focus is on advancing and expanding its 100% owned Volta Grande Gold Project, located in Para State. Belo Sun trades on the TSX Venture Exchange under the symbol "BSX". For more information about Belo Sun please visit www.belosun.com.

Cautionary Statement on Forward Looking Information

This press release contains "forward-looking information" within the meaning of applicable Canadian securities legislation. Forward-looking information includes, without limitation, statements regarding the impact of these drill results on the Company and its understanding of the project; statements with respect to the development potential and timetable of the project; the estimation of mineral resources; realization of mineral resource estimates; the timing and amount of estimated future exploration; costs of future activities; capital and operating expenditures; success of exploration activities; currency exchange rates; government regulation of mining operations; and environmental risks. Generally, forward-looking information can be identified by the use of forward-looking terminology such as "plans", "expects" or "does not expect", "is expected", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates" or "does not anticipate", or "believes", or variations of such words and phrases or state that certain actions, events or results "may", "could", "would", "might" or "will be taken", "occur" or "be achieved". Forward-looking information is subject to known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity, performance or achievements of the Company to be materially different from those expressed or implied by such forward-looking information, including risks inherent in the mining industry and risks described in the public disclosure of the Company which is available under the profile of the Company on SEDAR at www.sedar.com and on the Company's website at www.belosun.com. Although the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking information, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that such information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking information. The Company does not undertake to update any forward-looking information, except in accordance with applicable securities laws.

To view the Figure 1, please visit the following link: http://file.marketwire.com/release/BeloFigure1.pdf

NEITHER TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER (AS THAT TERM IS DEFINED IN THE POLICIES OF THE TSX VENTURE EXCHANGE) ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THIS RELEASE.

Contacts:
Belo Sun Mining Corp.
Mark Eaton
President and CEO
(416) 309-2137
www.belosun.com

Source: Belo Sun Mining



Click Here for a complete listing of Belo Sun Mining press releases.

-------------------
To unsubscribe from this list please visit the email alert section of the Belo Sun Mining site.


Date Sent: 8/31/2011 4:22:10 PM Powered by Q4 Web Systems

Belo Sun Mining Corp.

EXPLORATEUR
CODE : BSX.V
CUSIP : 922931
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Belo Sun est une société d’exploration minière d'or et de cuivre basée au Canada.

Belo Sun détient divers projets d'exploration au Bresil.

Ses principaux projets en exploration sont CONCEICAO, PATROCINIO, MONTE DO CARMO, VOLTA GRANDE, PORTO NACIONAL, LAVRINHA et BARRA GRANDE / RIO GRANDE au Bresil.

Belo Sun est cotée au Canada et aux Etats-Unis D'Amerique. Sa capitalisation boursière aujourd'hui est 402,0 millions CA$ (404,7 millions US$, 310,5 millions €).

La valeur de son action a atteint son plus bas niveau récent le 22 janvier 2010 à 0,19 CA$, et son plus haut niveau récent le 08 avril 2011 à 1,54 CA$.

Belo Sun possède 382 822 915 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Dans les médias de Belo Sun Mining Corp.
12/09/2018Belo Sun license should be reviewed by Brazil federal Gov't,...
Financements de Belo Sun Mining Corp.
06/07/2016Announces $75 Million Bought Deal Financing
14/03/2016Belo Sun Increases Size of Private Placement Financing as Su...
20/09/2012Belo Sun Mining Corp. Announces C$50 Million Bought Deal Fin...
Projets de Belo Sun Mining Corp.
02/12/2013(Volta Grande)Belo Sun Receives Environmental Approval for the Development...
18/11/2013(Volta Grande)Belo Sun Provides Update on License Process for Its Volta Gr...
03/10/2013Belo Sun Increases Measured and Indicated Resources to 5.1 M...
24/07/2013(Volta Grande)Belo Sun Releases Results for 74 Additional Drill Holes at I...
15/04/2013Belo Sun Increases Measured and Indicated Resources to 4.7 M...
21/02/2013Belo Sun Mining - Belo Sun Reports Positive Results from the...
05/11/2012(Volta Grande)Belo Sun Releases Results for 85 Additional Drill Holes at I...
19/06/2012(Volta Grande)Belo Sun Discovers New Mineralized Zone at Its Volta Grande ...
11/06/2012(Volta Grande)Belo Sun Announces Inferred Resource Estimate of 356,600 Oun...
28/05/2012(Volta Grande)Belo Sun Completes Acquisition of Surface Rights at its Volt...
20/03/2012Belo Sun Releases Results from 65 Drill Holes Further Extend...
12/03/2012(Volta Grande)Belo Sun Completes the Environmental Impact Assessment ("EIA...
05/07/2011Belo Sun Drills New Mineralized Zones at the Ouro Verde Depo...
16/05/2011Belo Sun Drills 28=2E19 m Grading 8=2E76 g/t Gold Including ...
11/04/2011Belo Sun Intersects 46=2E10 Meters Grading 2=2E05 g/t Au and...
04/04/2011(Volta Grande)Belo Sun Mining Expands Mineral Resources at the Volta Grand...
15/02/2011(Volta Grande)Belo Sun Mobilizes a Sixth Drill Rig and Initiates Drilling ...
Communiqués de Presse de Belo Sun Mining Corp.
20/02/2014(Volta Grande)Belo Sun Announces a Preliminary Economic Assessment on a St...
27/11/2013Belo Sun Announces Brazilian Court Repeals Injunction
21/11/2013Belo Sun to Appeal Decision in Respect of the Licensing Proc...
21/06/2013Belo Sun Announces Filing of Technical Report
23/05/2013Belo Sun Mining - Belo Sun Reports Positive Results From Pre...
06/05/2013Belo Sun Mining Completes Pre-Feasibility Study
15/02/2013(Volta Grande)Belo Sun Volta Grande Environmental Licensing Process Contin...
01/02/2013Belo Sun Announces Filing of Technical Report
28/01/2013Belo Sun Intersects New High Grade Zone at Grota Seca and Ex...
19/09/2012Belo Sun Clarifies News Articles Regarding Licensing Process
04/09/2012(Volta Grande)Belo Sun Completes Additional 292 Drill Holes in 2012 to Upg...
09/08/2012Belo Sun Mining - Belo Sun Strengthens Its Management Team W...
27/07/2012Belo Sun Announces Filing of Technical Report
28/06/2012Belo Sun Intersects 55.50 Meters Grading 2.16 g/t Gold at th...
25/04/2012(Volta Grande)Belo Sun Increases Measured and Indicated Mineral Resources ...
23/04/2012Belo Sun Adopts Shareholders Rights Plan
05/04/2012Belo Sun Drills 49.50 Meters Grading 5.04 g/t Au at Northwes...
15/02/2012Belo Sun to Commence Trading on the Toronto Stock Exchange (...
01/02/2012Belo Sun Announces New Chair and VP, Engineering
23/01/2012(Volta Grande)Belo Sun Provides Updated Audited Resource Estimate for Its ...
04/01/2012(Volta Grande)Belo Sun Continues to Extend Mineralization at the Ouro Verd...
29/11/2011Belo Sun Expands High Grade Mineralization Down Dip and Alon...
12/10/2011(Volta Grande)Belo Sun Discovers Significant Gold Mineralization at the So...
31/08/2011(Volta Grande)Belo Sun Intersects 30.75 Meters Grading 11.14 g/t Gold in N...
25/07/2011Belo Sun Intersects 62.50 Meters Grading 3.81 G/T Gold at th...
18/07/2011Belo Sun Mining Advances =?ISO-8859-1?Q?=20Volta=20Grande=20...
07/06/2011Belo Sun Expands Mineral Rights from 195 Square km to 1,305 ...
30/05/2011Belo Sun Increases Numbe =?ISO-8859-1?Q?r=20of=20Drills=20to...
28/04/2011Belo Sun Announces More Positive Drilling Results From 11 Ho...
25/03/2011Belo Sun Announces Closi
03/03/2011Belo Sun Announces $45 Million Equity Offering
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TSX-V (BSX.V)OTHER OTC (VNNHF)
1,05+3.96%0,390+1.30%
TSX-V
CA$ 1,05
15/02 17:23 0,040
3,96%
Cours préc. Ouverture
1,01 1,01
Bas haut
1,00 1,06
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
- -  1,05 -%
Volume var. 1 mois
1 566 389 -%
24hGold TrendPower© : -35
Produit
Développe
Recherche Gold
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 20/11/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,66 AU$-0,78%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
12,22 US$-0,33%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,52 GBX-0,76%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,64 CA$+0,00%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
16,48 CA$+1,54%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,26 CA$+4,08%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,23 AU$+9,52%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,90 CA$+1,06%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
53,08 US$+0,70%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+5,56%Trend Power :