Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en
Bombore FS and Resource Update Will Include +400,000m of Drilling
Published : February 04, 2013

Progress continues on the full Feasibility Study for a CIL plant

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Burkina Faso | Nsa | Report |

OTTAWA, ONTARIO--(Marketwire - Feb. 4, 2013) - Orezone Gold Corporation (News - Market indicators) is pleased to announce additional positive results from an ongoing infill and expansion drill program at its wholly owned Bomboré Gold Project in Burkina Faso, West Africa. An additional 75,000 m of results have now been released since the August 2012 resource estimation.  The 100,000 m drill program continues to demonstrate the potential to upgrade and expand the resources, especially the softer near surface oxide resources.  The current resource is constrained within optimized open pit shells that span 11 km and includes 4.13 Moz of measured and indicated (125 Mt @ 1.03 g/t) and 1.03 Moz of inferred resources (35 Mt @ 1.00 g/t) with an average depth of drilling to only 120 meters.  The oxide portion of the resource occurs in the top 50 m and includes 1.76 Moz M&I and 0.26 Moz Inferred resources.  The Company has recently commissioned an interim/internal resource update using 63,500 m (771 holes) of the current program that will bring the total database to over 400,000 m (5,034 holes).  The update is expected to be completed in Q1 2013 and will be the basis for the reserves of the full Feasibility Study ("FS") to be released during the second half of 2013. 

"The additional drilling completed since the release of the 2012 Resource has been successful in infilling and expanding the known resources.  This is expected to have a positive impact on the Bomboré gold resource in terms of both size and the project economics," said Pascal Marquis, SVP Exploration for Orezone.

Results for this release include 9,509 m of reverse circulation (RC) drilling (170 holes) and 9,756 m of core (DD) drilling (73 holes) and are mostly from the northern area of the deposit.  The drilling in this location was designed to upgrade the largely inferred resources and test some new oxide targets.  Some of the holes were also part of a geotechnical drill program that was necessary to finalize the plant, tailings and infrastructure sites as part of the FS.

Feasibility Study Update:

Work continues on the FS with various trade-off studies to finalize the plant site location, optimal grinding circuit, water storage system, tailings design, geotechnical and environmental studies. All geotechnical drilling and work on the ground was completed prior to year end with the results and reports pending.  The Q1 resource update will include pit slopes derived from the geotechnical drilling and studies.  Although results from the 2012 detailed variability metallurgical tests should be released during Q1 2013, the Company continues to study both the soft and hard rock ores to further optimize the design of the grinding circuit so that the CIL plant can be built in two phases.  Preliminary results to date are positive and indicate that up to 60% of the near surface saprolite oxide resources (approximately 65% of the total oxide resource) does not require grinding and could report directly to the CIL leaching circuit.  This would allow for a small grinding circuit (ball mill) with lower power consumption. The Company's objective is to improve project returns by reducing both the initial capital expenditures and operating costs through the processing of only the softer surface ores for at least the first 5 to 6 years, with subsequent expansion of the grinding and leaching circuit funded from cash flows generated from the operation.  Results of the ongoing trade-off studies will be released as they are completed.

Table 1. Cumulative Results Excluded from the August 2012 Resource Reported to Date

Total Drilling to Date Grade g/t
Zone # of Holes Total m Uncut Cut(1)
KT - RC 23 1,172 1.28 1.23
CFU - RC 17 1,455 0.82 0.82
CFU - DD 16 2,517 2.69 1.08
Maga - RC 268 17,885 1.08 0.95
Maga - DD 60 12,874 1.36 1.10
P8P9 - RC 30 1,665 0.91 0.90
P8P9 - DD 43 8,320 1.01 0.98
P11 - RC 24 1,308 1.42 1.12
P11- DD 3 496 1.69 1.15
Siga E - RC 55 2,828 1.06 0.90
Siga E - DD 15 1,920 1.37 1.03
Siga W - RC 35 1,750 1.17 0.96
Siga W - DD 17 2,127 0.93 0.88
Siga S - RC 177 8,877 0.95 0.87
Siga S - DD 36 5,423 0.95 0.90
P16 - RC 12 607 1.03 1.03
P16 - DD 1 184 .91 .91
P17 N - RC 5 250 1.50 1.26
P17 S - DD 3 414 3.09 2.59
North - RC 338 22,177 1.07 0.96
North - DD 119 23,711 1.28 1.03
South - RC 291 14,763 1.01 0.90
South- DD 71 9,966 1.02 0.92
SE - RC 17 857 1.23 1.13
SE - DD 4 598 1.98 1.74
All - RC 646 37,797 1.05 0.94
All - DD 194 34,274 1.19 1.00
 
(1) Weighted average grade of individual assays, cut to 5 g/t. NSA: No Significant Assay.

Table 2. Breakdown of Drilling Meterage for this Release

Zone Core Drilling RC Drilling
# of holes Total m # of holes Total m
KT 0 0 16 822
Maga 15 3,010 93 6,618
CFU 16 2,517 4 293
P8P9 18 3,689    
P16 1 184 12 607
Geotechnical program 23 356 49 1,462
TOTAL 73 9,756 170 9,509

Table 3. Highlights of Diamond Drill Hole Results for this Release

      From To Length Uncut Grade(2) Cut Grade(3) Total
Zone Section Hole # (m) (m) (m) (g/t) (g/t) Assay(4)
CFU 3500 BBD0921 52.00 63.00 11.00 9.92 1.34  
CFU 3500 BBD0921 66.50 78.50 12.00 15.40 1.23  
CFU 2950 BBD0927 212.00 221.00 9.00 1.77 1.77  
CFU 2650 BBD0897 7.00 11.50 4.50 2.90 2.74  
CFU 2550 BBD0898 28.00 50.00 20.50 2.71 1.46  
CFU 2400 BBD0930 39.50 50.00 10.50 1.64 1.46  
Maga 4900 BBD0888 110.00 113.00 3.00 15.14 3.64  
Maga 4800 BBD0889 83.50 90.50 7.00 21.14 2.94  
Maga 3700 BBD0904 174.00 187.00 13.00 1.58 1.58  
Maga 3550 BBD0879 215.00 224.00 9.00 2.64 2.39  
Maga 3450 BBD0878 65.00 76.00 11.00 2.61 2.19  
Maga 3450 BBD0878 80.00 84.00 4.00 2.74 2.74  
Maga 3450 BBD0887 235.00 239.00 4.00 3.31 2.66  
Maga 3400 BBD0885 269.00 275.00 6.00 2.10 2.10  
Maga 2900 BBD0916 83.00 93.50 10.50 1.28 1.28  
Maga 2800 BBD0894 129.00 137.00 8.00 1.66 1.66  
P16 44200 BBD0971 85.00 95.00 10.00 1.26 1.26 Pending
P8P9 2100 BBD0933 111.00 120.00 9.00 3.91 2.81  
P8P9 1950 BBD0935 38.50 44.50 6.00 2.95 2.60  
P8P9 1950 BBD0935 71.50 82.00 10.50 1.67 1.66  
P8P9 1750 BBD0949 15.00 25.00 10.00 2.40 2.25 Pending
 
(2) Weighted average grade of uncut individual assays
(3) Weighted average grade of individual assays cut to 5 g/t
(4) Composite width and grade are preliminary where leach residue fire assay results are pending.

Table 4. Highlights of Reverse Circulation Results for this Release

      From To Length Uncut Grade(5) Cut Grade(6) Total
Zone Section Hole # (m) (m) (m) (g/t) (g/t) Assay(7)
KT 6750 BBC3839 8.00 12.00 4.00 3.71 3.10  
KT 6350 BBC3846 12.00 21.00 9.00 1.76 1.73  
KT 6300 BBC3847 42.00 50.00 8.00 2.44 2.27  
Maga 4950 BBC3857 6.00 13.00 7.00 1.55 1.55  
Maga 4950 BBC3876 26.00 37.00 11.00 3.01 1.82  
Maga 4850 BBC3859 47.00 56.00 9.00 4.86 2.02  
Maga 4850 BBC3862 18.00 32.00 14.00 1.69 1.69  
Maga 4850 BBC3878 28.00 39.00 11.00 1.59 1.59  
Maga 4800 BBC3690 53.00 64.00 11.00 2.05 2.05  
Maga 4800 BBC3880 22.00 29.00 7.00 3.16 2.04  
Maga 4750 BBC3868 21.00 28.00 7.00 1.47 1.47  
Maga 4200 BBC3824 19.00 25.00 6.00 8.96 2.20  
Maga 4150 BBC3717 5.00 20.00 15.00 0.78 0.78  
Maga 4100 BBC3829 50.00 64.00 14.00 1.36 1.36  
Maga 4050 BBC3723 8.00 13.00 5.00 2.14 2.14  
Maga 3950 BBC3738 13.00 21.00 8.00 1.33 1.33  
Maga 3650 BBC3743 45.00 51.00 6.00 3.65 2.44  
Maga 3050 BBC3771 33.00 42.00 9.00 1.26 1.26  
 
(5) Weighted average grade of uncut individual assays
(6) Weighted average grade of individual assays cut to 5 g/t
(7) Composite width and grade are preliminary where leach residue fire assay results are pending

The mineralized intervals are based on a lower cut-off grade of 0.5 g/t, a minimal width of 3 m and up to a maximum of two consecutive meters of dilution being included. The true width of the mineralization is approximately 85% of the drill length intervals in KT, CFU, Maga, P16, P17 and P8P9 areas, and 95% of the drill length intervals in the Siga area.

The half-core samples were collected by Orezone employees using a diamond saw. The core samples were prepared by SGS Burkina Faso s.a.r.l. at the Bomboré site facility and then split by Orezone to 1 kg using Rotary Sample Dividers (RSDs). A 1 kg aliquot was analyzed for leachable gold at BIGS Global Burkina s.a.r.l in Ouagadougou, by bottle-roll cyanidation using a LeachWell™ catalyst.

The RC drilling samples were divided by Orezone employees using Rotary Sample Dividers (RSDs). A 2 kg split was prepared by SGS Burkina Faso s.a.r.l. at the Bomboré site facility and then split by Orezone to 1 kg using Rotary Sample Dividers (RSDs). A 1 kg aliquot was analyzed for leachable gold at BIGS Global Burkina s.a.r.l in Ouagadougou, by bottle-roll cyanidation using a LeachWell™ catalyst.

The leach residues from all samples with a leach grade in excess of 0.2 g/t were prepared by BIGS Global Burkina s.a.r.l. and then split by Orezone to 50 g using Rotary Sample Dividers (RSDs). A 50 g aliquot was analyzed by fire assay at SGS Burkina Faso s.a.r.l.

Orezone employs a rigorous Quality Control Program (QCP) including a minimum of 10% standards, blanks and duplicates. This program was executed under the supervision of Pascal Marquis, SVP Exploration for Orezone, who is a Qualified Person under National Instrument 43-101 and approved the technical information in this release. A complete table of results and the NI 43-101 Bomboré Resource Report that describes the Bomboré resource model can be found at www.orezone.com.

About Orezone Gold Corporation

Orezone is a Canadian company with a gold discovery track record of +12 Moz and recent mine development experience in Burkina Faso, West Africa.  The company owns a 100% interest in Bomboré which is situated 85 km east of the capital city, adjacent to an international highway. Mineral resources are constrained within optimized open pit shells that span 11 km, and include 4.13 Moz of measured and indicated (125 Mt @ 1.03 g/t) and 1.03 Moz of inferred resources (35 Mt @ 1.00 g/t) with an average depth of drilling to only 120 meters.  The Company is working to further expand the resources at Bomboré while it completes a FS for a phase one oxide-only CIL plant in 2H 2013 and becomes a mid-tier gold producer by 2015.

FORWARD-LOOKING STATEMENTS AND FORWARD-LOOKING INFORMATION: This news release contains certain "forward-looking statements" within the meaning of applicable Canadian securities laws. Forward-looking statements and forward-looking information are frequently characterized by words such as "plan," "expect," "project," "intend," "believe," "anticipate", "estimate" and other similar words, or statements that certain events or conditions "may" or "will" occur. Forward-looking statements in this release include statements regarding, among others; capital and operating cost estimates; gold production for the project; completion of a FS in 2H 2013;  completion of an internal resource update in Q1 2013; commencement of production at the Bomboré Project in 2015.

FORWARD-LOOKING STATEMENTS are based on certain assumptions, the opinions and estimates of management at the date the statements are made, and are subject to a variety of risks and uncertainties and other factors that could cause actual events or results to differ materially from those projected in the forward-looking statements. These factors include the inherent risks involved in the exploration and development of mineral properties, the uncertainties involved in interpreting drilling results and other geological data, fluctuating metal prices, the possibility of project cost overruns or unanticipated costs and expenses, the ability of contracted parties (including laboratories and drill companies to provide services as contracted); uncertainties relating to the availability and costs of financing needed in the future and other factors. The Company undertakes no obligation to update forward-looking statements if circumstances or management's estimates or opinions should change. The reader is cautioned not to place undue reliance on forward-looking statements. Comparisons between any resource model or estimates with the subsequent drill results are preliminary in nature and should not be relied upon as potential qualified changes to any future resource updates or estimates.

Readers are advised that National Instrument 43-101 of the Canadian Securities Administrators requires that each category of mineral reserves and mineral resources be reported separately. Readers should refer to the annual information form of Orezone for the year ended December 31, 2011 and other continuous disclosure documents filed by Orezone since January 1, 2012 available at www.sedar.com, for this detailed information, which is subject to the qualifications and notes set forth therein.



Orezone
Ron Little
CEO
(613) 241-3699 or Toll Free: (888) 673-0663
rlittle@orezone.com
or
Orezone
Pascal Marquis
SVP Exploration
(613) 241-3699 or Toll Free: (888) 673-0663
pmarquis@orezone.com
Données et statistiques pour les pays mentionnés : Burkina Faso | Tous
Cours de l'or et de l'argent pour les pays mentionnés : Burkina Faso | Tous

Orezone Gold Corp.

EXPLORATEUR
CODE : ORE.TO
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Orezone Gold est une société d’exploration minière d'or basée au Canada.

Ses principaux projets en exploration sont ZELINE 1 & ZELINE 4 et KOSSA au Niger et BOMBORE, SEGA et BONDI au Burkina Faso.

Orezone Gold est cotée au Canada. Sa capitalisation boursière aujourd'hui est 95,1 millions CA$ (69,1 millions US$, 64,9 millions €).

La valeur de son action a atteint son plus haut niveau récent le 08 avril 2011 à 5,26 CA$, et son plus bas niveau récent le 27 novembre 2015 à 0,22 CA$.

Orezone Gold possède 117 350 000 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Rapports annuels de Orezone Gold Corp.
2009 Annual Report
2008 Annual Report
Annual report 2006
Financements de Orezone Gold Corp.
13/11/2013Closes C$5M Non-Brokered Private Placement
30/10/2013Arranges C$5M Non-Brokered Private Placement
23/06/2010Arranges C$5M Private Placement for Brighton Energy
02/01/2009 Closes Private Placement, Updates Timing of Transaction wit...
Rapports Financiers de Orezone Gold Corp.
15/11/2008 Third Quarter Update
Projets de Orezone Gold Corp.
27/03/2013(Bombore)Positive Progress Report for Bombore Feasibility Study and R...
13/11/2012(Bombore)Positive Drill Results Support Further Growth at Bombore
04/09/2012(Bombore)35,000 m of Positive Drill Results Support Further Growth at...
27/08/2012(Bombore)Bombore Gold Project Reaches World Class Size
22/02/2012(Bombore)Provides Positive Update on its Bombore Gold Project
03/02/2012(Sega)Sells Sega Project to Cluff Gold for $29.6M
10/01/2012(Bombore)Reports Continued Positive Results at Bombore Gold Project
28/11/2011Brighton Expands Niger Uranium Discovery to 14 km2 of Minera...
18/08/2011Orezone Confirms Heap Leach Potential of Sulphide Resources ...
18/08/2011(Sega)Confirms Heap Leach Potential of Sulphide Resources at Sega
08/08/2011Orezone Expands Bombor\303\251 Gold Project ...
08/08/2011(Bombore)Expands Bombore Gold Project Area 60% With New Permit
26/07/2011(Bombore)Reports Higher Gold Grades and Improved Continuity at Bombor...
21/06/2011(Bombore)Bombor=E9 Gold Project Has PositivePreliminary Economic Asse...
20/06/2011Orezone Bombor\303\251 Gold Project ...
11/04/2011(Sega)Confirms Positive Metallurgical Results for Sega Gold Deposi...
24/03/2011(Bombore)Positive Drill Results at Bombore Continue to Confirm Model
23/03/2011(Bombore)Positive Drill Results at Bombore Continue to Confirm Model
24/02/2011(Zeline 1 & Zeline 4)/Brighton Makes Significant New Uranium Discovery in Niger: ...
06/07/2010(Bombore)Fourth Round of Positive Drill Results at Bombore
16/06/2010(Bombore)Positive Results Continue From Bombore Infill and Expansion ...
13/05/2010Additional PositiveInfill and Expansion Drilling Results at ...
25/03/2010(Bombore)Bombore Auger Drilling Results Indicate Possible 2.5km of Ex...
28/01/2010(Bombore)Commences $2 Million Drill Program at Bombore
05/01/2010(Sega)Increases Sega Project Gold Resources
08/12/2009(Bombore)Improves on Final Bombore Metallurgical Results
14/10/2009(Bombore)Confirms Bombore Gold Deposit is Amenable to Heap Leaching
29/07/2009(Bombore)Completes Drilling Below Surface Resources at Bombore
24/06/2009(Bombore)Orezone Confirms Mineralization at Bombore Below Surface Res...
10/11/2008(Bombore)Almost Triples Gold Resource at Bombore Project
30/06/2008(Essakane)2008 Technical report
Communiqués de Presse de Orezone Gold Corp.
04/12/2015Orezone Approved to Move from TSX to TSX-V
16/09/2015Orezone Provides Update on Bomboré Permitting and Bondi Proj...
16/09/2015Orezone Provides Update on Bombore Permitting and Bondi Proj...
21/07/2015Orezone Closes C$6.5M Investment
06/07/2015Orezone Arranges C$6.5M Investment that Includes Ross Beaty
27/01/2015Sandstorm Gold Announces 10 Royalty Agreements
27/01/2015Orezone Closes US$3 Million Financing and Secures an Additio...
27/01/2015Sandstorm Gold Announces 10 Royalty Agreements
27/01/2015Orezone Closes US$3Million Financing
24/11/2014Bombore Gold Project Feasibility Study Update
10/11/2014Orezone update on Operations in Burkina Faso
10/11/2014Orezone Update on Operations in Burkina Faso
03/11/2014Orezone update on Bomboré and Burkina Faso
03/11/2014Orezone Update on Bombore and Burkina Faso
14/10/2014Bombore Gold Project Feasibility Study Update
08/09/2014Bombore Gold Project Feasibility Study Update
10/07/2014Positive Metallurgical and Drilling Results at Bombore
04/06/2014Positive Metallurgical Test Results at Bombore
23/05/2014Orezone Gold Corporation: Results of Annual General Meeting
21/05/2014Orezone Appoints Chief Operating Officer
20/06/2013News Release
20/06/2013(Bombore)Shifts Focus of Bombore Study to Heap Leach Scenario
04/06/2013(Bondi)Positive Metallurgical and Drill Results from the Bondi Proj...
24/05/2013Results of Annual General Meeting
24/05/2013Results of Annual General Meeting
29/04/2013(Bombore)Increases and Upgrades the Bombore Gold Project Resource
04/02/2013(Bombore)Bombore FS and Resource Update Will Include +400,000m of Dri...
31/05/2012(Bombore)Bombore Drill Program Continues with Positive Results
23/05/2012(Sega)Completes the Sale of Sega to Cluff Gold for $26.5M
30/03/2012(Bombore)Completes 215,000 Drill Program at Bombore
07/02/2012to Consolidate Brighton Energy Corporation
07/12/2011Brighton Energy Makes Another Near-Surface Uranium Discovery...
12/09/2011(Bombore)Positive Results Continue at Bombore With Seven Drills Opera...
26/05/2011(Bombore)Reports Additional Positive Drill Results at Bombore Gold Pr...
16/05/2011.: Brighton Energy Discovers Additional Uranium Mineralizati...
06/04/2011Expands Board and Management Team
07/03/2011Burkina Faso is Ra
17/02/2010Brighton Energy Limited Receives Niger Uranium Permit Approv...
08/07/2009Ron Little named Ernst & Young Entrepreneur of the Year Fina...
25/02/2009IAMGOLD Completes Acquisition of Orezone
20/02/2009Obtains Final Court Approval for IAMGOLD Transaction
19/02/2009Shareholders Approve Arrangement with IAMGOLD
13/02/2009 Updates Status of Shareholder Vote
29/09/2005An emerging producer in Burkina Faso, West Africa
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TORONTO (ORE.TO)
0,810-3.57%
TORONTO
CA$ 0,810
19/04 17:00 -0,030
-3,57%
Cours préc. Ouverture
0,840 0,830
Bas haut
0,800 0,840
Année b/h Var. YTD
0,690 -  0,900 -4,71%
52 sem. b/h var. 52 sem.
0,690 -  1,61 -48,08%
Volume var. 1 mois
226 895 -%
24hGold TrendPower© : -19
Produit
Développe
Recherche Copper - Gold - Molybdenum - Uranium
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 10/02/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
2024-18,18%
2023-21,43%1,650,82
20222,44%1,811,08
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,82 AU$+1,69%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
11,22 US$+1,63%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,55 GBX+2,59%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,48 CA$-1,59%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
15,84 CA$-1,31%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+0,00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,19 AU$-7,32%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,85 CA$-2,63%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
51,83 US$+0,78%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,03 AU$+0,00%Trend Power :