Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en

Yamana Gold Inc.

Publié le 13 août 2015

Brio Gold, a Subsidiary of Yamana Gold, Provides Update on C1 Santa Luz

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Canada | Copper | Dollar | G Mexico | Zinc |

Brio Gold, a Subsidiary of Yamana Gold, Provides Update on C1 Santa Luz

08/13/2015

TORONTO, ONTARIO--(Marketwired - Aug. 13, 2015) - BRIO GOLD INC. ("Brio Gold"), a subsidiary of Yamana Gold Inc. (TSX:YRI)(NYSE:AUY) ("Yamana" or "the Company"), is hereby announcing the modified process flow sheet and results from the recently completed metallurgical testwork at the C1 Santa Luz project ("C1 Santa Luz"), located in the Bahia State of Brazil. The results of the work to date have been incorporated into a Preliminary Economic Assessment Report ("PEA") in accordance with National Instrument 43-101, which includes an updated mine design and production schedule based on a new mineral resource in connection with the current operating cost estimates and recovery parameters. The PEA is being completed by Roscoe Postle Associates Inc ("RPA").

"We have reached a major milestone toward the restart of C1 Santa Luz," said Gil Clausen, Brio Gold's President and Chief Executive Officer. "The modified plant flowsheet is expected to achieve average recoveries of about 83% with the mine plan designed to separate the carbonaceous minerals from the clean dacite minerals. Given the results of this metallurgical testwork and pilot plant success, we are moving onto the next stage of analysis in our re-commissioning plan. C1 Santa Luz is expected to contribute approximately 100,000 ounces per year when in full production and will bring our annual production profile to over 230,000 ounces of gold per year. This combined with the operational turnaround at Pilar and the recent exploration success at Fazenda Brasileiro point to a very robust production and cost profile in the future."

PEA Results Highlights

  • After-tax net present value ("NPV")(1) at a 5% discount rate of $199 million and an after-tax internal rate of return ("IRR") of 56%, based on the open pit mineral resource only.
  • Average annual gold production of approximately 100,000 ounces over a ten year mine life, for total open pit life of mine ("LOM") gold production of 1.03 million ounces of gold.
  • Total average LOM recoveries of 83.7%.
  • Average LOM all-in sustaining costs(1,2,3) ("AISC") of $898 per ounce.
  • Initial plant capital cost(1) of $27.7 million, plus a $4.9 million contingency.
  • Total initial capital cost(1), including initial plant capital cost, of $47.9 million, including tailings dam lifts and liner, and community related costs.
  • Open pit indicated mineral resource of 28.2 million tonnes at an average grade of 1.61 grams per tonne ("g/t") gold for a total of 1.46 million contained gold ounces and an open pit inferred mineral resource of 1.5 million tonnes at an average grade of 1.62 g/t gold for a total of 79,000 contained gold ounces.
  • Underground indicated mineral resource of 2.0 million tonnes at an average grade of 2.25 g/t gold for a total of 144,000 contained gold ounces and an underground inferred mineral resource of 10.8 million tonnes at an average grade of 2.5 g/t gold for a total of 865,000 contained gold ounces.
(All amounts are expressed in United States dollars unless otherwise indicated.)
1. Based on a long-term Brazilian Real to U.S. Dollar exchange rate of 3.40 and a flat gold price of $1,250 per ounce.
2. Refers to a non-GAAP measure. Reconciliation of non-GAAP measures are available at www.yamana.com/Q22015.
3. Includes cash costs, sustaining capital and exploration expense.

The C1 Santa Luz PEA is preliminary in nature and includes inferred mineral resources that are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as mineral reserves. Therefore, there is no certainty that the C1 Santa Luz PEA will be realized. As a result of the PEA, there are no mineral reserves reported in connection with C1 Santa Luz at this stage. Mineral resources that are not mineral reserves do not have demonstrated economic viability.

MINERAL RESOURCE

The mineral resource estimate for C1 Santa Luz is provided below. The PEA LOM plan is based on the open pit mineral resource only and does not include the underground mineral resource. Brio Gold intends to study the underground potential at a later date. The C1 Santa Luz mineral resource is effective March 31, 2015 and includes drill holes to the end of the most recent drilling campaign which occurred in 2012 through to 2013.

Category of Mineral Resource Tonnes
(kt)
Gold Grade
(g/t)
Contained Gold
(koz)
Indicated - Open pit 28,239 1.61 1,461
Inferred - Open Pit 1,511 1.6 79
Indicated - Stockpile 1,577 1.02 52
Indicated - Underground 1,993 2.25 144
Inferred - Undergound 10,818 2.5 865
Total Indicated 31,809 1.62 1,605
Total Inferred 12,328 2.4 943
  • CIM definitions were followed for Mineral Resources.
  • Underground Mineral Resources are reported at a cut-off grade of 1.5 g/t Au.
  • Open Pit Mineral Resources are reported at a cut-off grade of 0.50 g/t Au.
  • Mineral Resources are estimated using a gold price of $1,500 per ounce and constrained by a pit shell.
  • Numbers may not add due to rounding.

The mineral resources for the LOM plan, which may potentially be mined by open pit methods, are provided below.

Category of Mineral Resource Tonnes
(kt)
Gold Grade
(g/t)
Contained Gold
(koz)
Indicated - Open Pit 23,262 1.51 1,129
Indicated - Stockpile 1,577 1.02 52
Total Indicated 24,838 1.47 1,174
Inferred 1,097 1.6 58
  • CIM definitions were followed for Mineral Resources that may potentially be mined by open pit methods.
  • Excludes any Underground Mineral Resources.
  • Open Pit Mineral Resources are reported at a cut-off grade of 0.50 g/t Au.
  • Mineral Resources are estimated using a gold price of $1,250 per ounce.
  • Numbers may not add due to rounding.
  • 5% mining dilution was added to all ore tonnes.

METALLURGICAL TESTWORK

Brio Gold, in cooperation with Yamana management, completed a five month metallurgical testwork program to develop an updated flowsheet for the processing of carbonaceous minerals at C1 Santa Luz. Three metallurgical composite samples, totaling 17 tonnes and representing the carbonaceous high to low sulphur minerals, were used for the testing program.

The testwork was performed in Australia by Gekko Systems Pty Ltd ("Gekko"), in Brazil by Yamana and Brio Gold, and in the USA by Hazen Research Inc ("Hazen"), utilizing batch scale and pilot plant testing methods. Both Gekko and Hazen are independent firms from Yamana and Brio Gold. The resulting flowsheet (see Appendix 1) was designed in collaboration with Gekko and Ausenco Limited ("Ausenco") and demonstrated that it is potentially viable to process the carbonaceous minerals. The new flowsheet eliminates the flotation circuit and the leaching of sulphide concentrate, and is now a "whole ore leach" of the total plant feed of carbonaceous and non-carbonaceous mineral types. This accommodates the variability in the "preg-robbing" organic carbon and sulphur concentrations in the plant feed.

The new processing route implements a kerosene soak and removal step ahead of the leaching circuit, in order to blank naturally occurring "preg-robbing" carbon before the gold mineral is leached in cyanide and absorbed onto activated carbon in a Carbon-in-Leach ("CIL") circuit. The design allows for various addition points and dosages of kerosene and cyanide in the circuit, in order to accommodate varying concentrations of organic carbon.

The expected average recoveries for the different mineral types, based on the testwork available, are as follows:

  • Non-carbonaceous dacitic mineral - 90.0%
  • Carbonaceous low to high sulphur minerals - 74.0%
  • Weighted average overall recovery - 83.7%

The expected plant modifications to the existing circuit require the installation of a pre-leach thickener, kerosene blanking and soak tanks, additional carbon regeneration capacity, six leaching tanks and one additional elution column. A Knelson concentrator will be installed in the grinding circuit, once dacitic mineral processing starts. Further, additional lifts on the two existing tailings dams as well as a geo-membrane lining on the larger tailings dam will be required to be constructed.

MINING

C1 Santa Luz is a past operating open pit mine, currently on care and maintenance, with a plant capacity of approximately 6,800 tonne per day ("tpd"). Based on the updated mine design and production schedule, which is modelled on a new mineral resource constrained by current operating cost estimates and recovery parameters, C1 Santa Luz is expected to produce approximately 100,000 ounces of gold per year over a ten year mine life for a total of 1.03 million ounces of gold. A summary of production metrics is provided below and a detailed LOM production schedule is available in Appendix 2 at the end of this press release.

Production Metrics:

Total material mined (million tonnes) 24.4
Stockpiled material (million tonnes) 1.6
Total waste (million tonnes) 198.9
Stripping ratio 8.2:1
Total tonnes processed (million tonnes) 25.9
Average annual production (koz) 100
Total gold production (koz) 1,034
Mine life (years) 10
Average gold grade (g/t) 1.48

CAPITAL AND OPERATING COSTS

The capital cost estimate for the planned plant modifications is $27.7 million, plus a $4.9 million contingency. The total capital cost for the re-commissioning of C1 Santa Luz is expected to be $47.9 million. A detailed capital breakdown is provided below:

Capital Expenditures (In millions)
Plant capital expenditures
Plant $27.7
Contingency $4.9
Sub-total $32.6
Other capital expenditures
Owner's cost $1.8
Tailings dam $5.4
Pit re-start $0.5
Pre-feasibility and optimization studies $1.3
Sub-total $8.9
Community related costs $6.3
Total other capital cost $15.2
Total capital cost $47.9

Average LOM cash costs and average AISC, inclusive of royalties, for C1 Santa Luz is estimated at $841 and $898 per ounce of gold, respectively. Total operating costs are estimated at $31.59 per tonne milled, which includes mining, processing and direct general and administration costs. A breakdown of operating costs is provided below.

Operating unit costs (1)
Mining $1.80/tonne moved
Processing - Dacite $13.19/tonne milled
Processing - Carbonaceous $16.43/tonne milled
General & Administrative expenses $1.56/tonne milled
(1) Based on a long-term Brazilian Real to U.S. Dollar exchange rate of 3.40.

PROJECT ECONOMICS

Based on a long-term Brazilian Real to U.S. Dollar exchange rate of 3.40 and a gold price of $1,250 per ounce, the after-tax NPV (5%) for C1 Santa Luz is $199 million and the after-tax IRR is 56%. A sensitivity analysis on varying gold prices and Brazilian Real to U.S. Dollar exchange rates was completed on the NPV. The results are summarized below.

Gold Price Sensitivity (per ounce)(at long-term Brazilian Real to U.S. Dollar exchange rate of 3.4) $1,125
(-10%)
$1,250
(Long-term Base)
$1,375
(+10%)
After-tax NPV (0%) (in millions) $169.6 $285.5 $396.4
After-tax NPV (5%)( in millions) $113.0 $199.4 $282.2
After-tax NPV (8%) (in millions) $88.5 $162.2 $232.7
Brazilian Real Sensitivity (Brazilian Real to U.S. Dollar) (at a $1,250 per ounce gold price) 3.06
(-10%)
3.4
(Long-term Base)
3.74
(+10%)
After-tax NPV (0%) (in millions) $210.3 $285.5 $344.9
After-tax NPV (5%) (in millions) $142.4 $199.4 $244.5
After-tax NPV (8%) (in millions) $113.0 $162.2 $201.1

Qualified Persons

The mineral resource estimate was prepared by RPA in accordance with standards as defined by the Canadian Institute of Mining, Metallurgy and Petroleum ("CIM") "CIM Definition Standards-For Mineral Resources and Mineral Reserves", adopted by CIM Council on May 10, 2014. Messrs. Hugo Miranda, P.C., Chester M. Moore, P. Eng., and Andrew P. Hampton, P. Eng., serve as the Qualified Persons for the PEA. Mr. Moore is the Qualified Person for this Mineral Resource Estimate. Messrs. Miranda, Moore and Hampton, who are independent of the Company, have approved the contents of this news release.

About Brio Gold

Brio Gold, a subsidiary of Yamana Gold, holds the Fazenda Brasileiro and Pilar mines and the C1 Santa Luz project. The Company expects to produce 130,000 ounces of gold in 2015, increasing to an average run-rate of over 230,000 ounces in 2017 with the re-start of C1 Santa Luz.

About Yamana

Yamana is a Canadian-based gold producer with significant gold production, gold development stage properties, exploration properties, and land positions throughout the Americas including Brazil, Argentina, Chile, Mexico and Canada. Yamana plans to continue to build on this base through existing operating mine expansions, throughput increases, development of new mines, the advancement of its exploration properties and by targeting other gold consolidation opportunities with a primary focus in the Americas.

APPENDIX 1

To view Appendix 1, please visit the following link: http://media3.marketwire.com/docs/1021178_appendix1.pdf

APPENDIX 2 - LIFE OF MINE PRODUCTION SCHEDULE

2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 LOM
Mineral Mined - Dacite kt - 1,084 1,543 1,215 1,403 1,692 1,941 1,743 2,497 2,305 646 16,069
Mineral Mined - Carbonaceous kt - 1,093 1,280 1,303 1,195 956 844 665 549 213 192 8,289
Total Mineral Mined kt - 2,177 2,822 2,517 2,598 2,648 2,786 2,408 3,047 2,518 838 24,359
Stockpile kt 1,200 377 - - - - - - - - - 1,577
Waste kt 2,521 16,052 21,693 21,848 23,721 18,865 22,193 31,210 20,569 11,825 8,392 198,889
Mineral Processed - Dacite kt - 1,105 1,255 1,244 1,349 1,535 1,727 1,819 2,098 2,288 1,688 16,106
Mineral Processed - Carbonaceous kt 1,200 1,395 1,245 1,256 1,151 965 773 681 402 212 548 9,829
Total Mineral Processed kt 1,200 2,500 2,500 2,500 2,500 2,500 2,500 2,500 2,500 2,500 2,235 25,935
Processed Grade - Dacite g/t Au - 1.67 1.83 1.53 1.33 1.37 1.50 1.29 1.53 1.47 1.06 1.44
Processed Grade - Carbonaceous g/t Au 1.00 1.55 1.72 1.55 1.78 1.66 1.84 1.59 1.73 1.45 1.02 1.54
Total Average Grade g/t Au 1.00 1.60 1.77 1.54 1.54 1.48 1.61 1.38 1.56 1.47 1.05 1.48
Recovery - Dacite % 87% 90% 90% 90% 90% 90% 90% 90% 90% 90% 90% 90.0%
Recovery - Carbonaceous % 74% 74% 74% 74% 74% 74% 74% 74% 74% 74% 74% 74.0%
Total Average Recovery % 74% 81% 82% 82% 81% 83% 84% 85% 87% 89% 86% 83.7%
Recovered Gold - Dacite koz - 53 66 55 52 61 75 68 93 97 52 673
Recovered Gold - Carbonaceous koz 29 52 51 46 49 38 34 26 17 7 13 361
Total Recovered Gold koz 29 105 117 101 101 99 109 94 109 105 65 1,034

CAUTIONARY NOTE REGARDING FORWARD-LOOKING STATEMENTS: This news release contains "forward-looking statements" within the meaning of the United States Private Securities Litigation Reform Act of 1995 and applicable Canadian securities legislation. Except for statements of historical fact relating to the Company, information contained herein constitutes forward-looking statements, including any information as to the Company's strategy, plans or future financial or operating performance, the outcome of the legal matters involving the damages assessment and any related enforcement proceedings. Forward-looking statements are characterized by words such as "plan," "expect", "budget", "target", "project", "intend," "believe", "anticipate", "estimate" and other similar words, or statements that certain events or conditions "may" or "will" occur. Forward-looking statements are based on the opinions, assumptions and estimates of management considered reasonable at the date the statements are made, and are inherently subject to a variety of risks and uncertainties and other known and unknown factors that could cause actual events or results to differ materially from those projected in the forward-looking statements. These factors include the Company's expectations in connection with the expected production and exploration, development and expansion plans at the Company's projects discussed herein being met, the impact of proposed optimizations at the Company's projects, the impact of the proposed new mining law in Brazil and the impact of general business and economic conditions, global liquidity and credit availability on the timing of cash flows and the values of assets and liabilities based on projected future conditions, fluctuating metal prices (such as gold, copper, silver and zinc), currency exchange rates (such as the Brazilian Real, the Chilean Peso, the Argentine Peso, and the Mexican Peso versus the United States Dollar), the impact of inflation, possible variations in ore grade or recovery rates, changes in the Company's hedging program, changes in accounting policies, changes in mineral resources and mineral reserves, risk related to non-core mine dispositions, risks related to acquisitions, changes in project parameters as plans continue to be refined, changes in project development, construction, production and commissioning time frames, risk related to joint venture operations, the possibility of project cost overruns or unanticipated costs and expenses, higher prices for fuel, steel, power, labour and other consumables contributing to higher costs and
general risks of the mining industry, failure of plant, equipment or processes to operate as anticipated, unexpected changes in mine life, final pricing for concentrate sales, unanticipated results of future studies, seasonality and unanticipated weather changes, costs and timing of the development of new deposits, success of exploration activities, permitting time lines, government regulation and the risk of government expropriation or nationalization of mining operations, environmental risks, unanticipated reclamation expenses, title disputes or claims, limitations on insurance coverage and timing and possible outcome of pending litigation and labour disputes, as well as those risk factors discussed or referred to in the Company's current and annual Management's Discussion and Analysis and the Annual Information Form filed with the securities regulatory authorities in all provinces of Canada and available at www.sedar.com, and the Company's Annual Report on Form 40-F filed with the United States Securities and Exchange Commission. Although the Company has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking statements, there may be other factors that cause actions, events or results not to be anticipated, estimated or intended. There can be no assurance that forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. The Company undertakes no obligation to update forward-looking statements if circumstances or management's estimates, assumptions or opinions should change, except as required by applicable law. The reader is cautioned not to place undue reliance on forward-looking statements. The forward-looking information contained herein is presented for the purpose of assisting investors in understanding the Company's expected financial and operational performance and results as at and for the periods ended on the dates presented in the Company's plans and objectives and may not be appropriate for other purposes.

CAUTIONARY NOTE TO UNITED STATES INVESTORS CONCERNING ESTIMATES OF MEASURED, INDICATED AND INFERRED MINERAL RESOURCES

This news release uses the terms "mineral resource", "measured mineral resource", "indicated mineral resource" and "inferred mineral resource" are defined in and required to be disclosed by NI 43-101. However, these terms are not defined terms under Industry Guide 7 and are not permitted to be used in reports and registration statements of United States companies filed with the Commission. Investors are cautioned not to assume that any part or all of the mineral deposits in these categories will ever be converted into mineral reserves. "Inferred mineral resources" have a great amount of uncertainty as to their existence, and great uncertainty as to their economic and legal feasibility. It cannot be assumed that all or any part of an inferred mineral resource will ever be upgraded to a higher category. Under Canadian rules, estimates of inferred mineral resources may not form the basis of feasibility or pre-feasibility studies, except in rare cases. Investors are cautioned not to assume that all or any part of an inferred mineral resource exists or is economically or legally mineable. Disclosure of "contained ounces" in a mineral resource is permitted disclosure under Canadian regulations. In contrast, the Commission only permits U.S. companies to report mineralization that does not constitute "mineral reserves" by Commission standards as in place tonnage and grade without reference to unit measures. Accordingly, information contained in this news release may not be comparable to similar information made public by U.S. companies subject to the reporting and disclosure requirements under the United States federal securities laws and the rules and regulations of the Commission thereunder.

Lire la suite de l'article sur www.noodls.com
Données et statistiques pour les pays mentionnés : Canada | Tous
Cours de l'or et de l'argent pour les pays mentionnés : Canada | Tous

Yamana Gold Inc.

PRODUCTEUR
CODE : YRI.TO
ISIN : CA98462Y1007
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Yamana Gold est une société de production minière d'or basée au Canada.

Yamana Gold est productrice d'or, d'argent, de cuivre, de molybdène et de zinc au Bresil, au Chili et en Argentine, en développement de projets d'argent, de cuivre, de molybdène, d'or, de plomb et de zinc au Mexique et en Argentine, et détient divers projets d'exploration au Bresil.

Ses principaux projets en production sont ALUMBRERA et GUALCAMAYO en Argentine, MINERA FLORIDA et EL PEÑON au Chili et FAZENDA BRASILEIRO, JACOBINA, CHAPADA MINE, SÃO VICENTE, FAZENDA NOVA et SÃO FRANCISCO au Bresil, ses principaux projets en développement sont AGUA RICA en Argentine et MERCEDES au Mexique et ses principaux projets en exploration sont MILLO au Perou, FERGUSSON ISLAND en Papouasie-Nouvelle-Guinee, PICACHO au Mexique, CAIAMAR, PILAR, PAU A PIQUE, C1 SANTA LUZ et ERNESTO au Bresil et AMANCAYA et JERONIMO au Chili.

Yamana Gold est cotée au Canada, au Royaume-Uni, aux Etats-Unis D'Amerique et en Allemagne. Sa capitalisation boursière aujourd'hui est 7,5 milliards CA$ (6,0 milliards US$, 5,2 milliards €).

La valeur de son action a atteint son plus haut niveau récent le 06 décembre 1996 à 98,91 CA$, et son plus bas niveau récent le 22 août 2003 à 1,20 CA$.

Yamana Gold possède 948 040 000 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Attributions d'options de Yamana Gold Inc.
21/02/2013Yamana Gold Declares Quarterly Dividend
29/10/2012Yamana Gold Declares Quarterly Dividend
23/02/2012Yamana Gold Increases Dividend by 10%
Rapports Financiers de Yamana Gold Inc.
30/03/2015Provides Notice of First Quarter 2015 Financial Results Rele...
19/02/2014Yamana Gold Announces Fourth Quarter and Year End 2013 Resul...
29/10/2013Yamana Gold Announces Third Quarter 2013 Results
09/10/2013Yamana Gold Provides Notice of Third Quarter 2013 Financial ...
01/08/2013Yamana Gold Announces Second Quarter 2013 Results
03/07/2013Yamana Gold Provides Notice of Second Quarter 2013 Financial...
30/04/2013Yamana Gold Announces First Quarter 2013 Results
10/04/2013Provides Notice of First Quarter 2013 Financial Results Rele...
20/02/2013Yamana Gold Announces Fourth Quarter & Year End 2012 Results
16/01/2013Yamana Gold Provides Notice of Fourth Quarter 2012 Financial...
09/01/2013Provides Preliminary 2012 Operating Results, Outlook for 201...
29/10/2012Yamana Gold Announces Results for the Third Quarter 2012
02/10/2012Yamana Gold Provides Notice of Third Quarter 2012 Financial ...
08/08/2012Yamana Gold Announces Second Quarter Results
10/07/2012Provides Notice of Second Quarter 2012 Financial Results
02/05/2012Yamana Gold Announces First Quarter Results
02/05/2012Yamana Gold Declares Quarterly Dividend
10/04/2012Provides Notice of First Quarter 2012 Financial Results and ...
23/02/2012Yamana Gold Announces Record Fourth Quarter & Year End 2011 ...
04/10/2011provides notice of third quarter financial results
05/08/2011Yamana Gold Declares Quarterly Dividend
05/08/2011Yamana Gold Declares Quarterly Dividend
03/08/2011Yamana Gold Announces Second Quarter 2011 Results - Records ...
12/07/2011Provides Notice of Second Quarter Financial Results
04/05/2011Declares Quarterly Dividend
04/05/2011Announces First Quarter 2011 Results
07/04/2011PROVIDES NOTICE OF FIRST QUARTER FINANCIAL RESULTS AND ANNUA...
24/02/2011YAMANA INCREASES MINERAL RESERVES BY 26%
24/02/2011Q4 and 2010 : RECORD REVENUE, RECORD EARNINGS, RECORD CASH F...
12/01/2011OPERATING RESULTS, OUTLOOK FOR 2011
01/07/2010Second Quarter Financial Results Release Notification & Conf...
03/05/2010First Quarter 2010 Results
09/04/2010First Quarter Results & Conference Call Date Change
05/04/2010Provides Notice of st Quarter Financial Results & AGM
03/11/2009Third Quarter 2009 Results
15/10/2009 Third Quarter Financial Results
04/08/2009Reports second quarter 2009 results
07/07/2009Second quarter financial results release notification
Projets de Yamana Gold Inc.
12/02/2015Yamana Gold reports loss on Brazil, Chile mine charges
11/02/2015Yamana Gold to build gold-silver mine in Argentina
01/08/2013Yamana Gold Outlines Successes of Cost Containment Initiativ...
31/07/2013Yamana Gold Provides 2013 Exploration Update
22/08/2012Yamana Gold Provides Update on Exploration at Chapada
22/08/2012Yamana Gold Completes Acquisition of Extorre Gold
05/06/2012Yamana Gold Provides 2012 Exploration Update
24/05/2012Premier Royalty Agrees to Acquire Golden Arrow's 1% NSR on Y...
08/03/2011(Alumbrera)ADVANCES AGUA RICA STRATEGY THROUGH AGREEMENT WITH XSTRATA A...
12/01/2011(Chapada Mine)UPDATE ON CHAPADA PRODUCTION PLAN
04/08/2010(Gualcamayo)Provides Update & Makes Construction Decision For QDD Lower ...
26/01/2010(Agua Rica)Provides Update on Agua Rica & Construction at Pau a Pique
23/07/2009(Gualcamayo)Declares commercial production at Gualcamayo
Communiqués de Presse de Yamana Gold Inc.
29/07/2016Amazon, Alphabet & Other Companies Are in Spotlight as Inves...
29/07/2016Yamana Gold misses 2Q profit forecasts
29/07/2016Yamana Gold Announces Second Quarter 2016 Results
29/07/2016Yamana Gold Announces Sale of its Mercedes Mine in Mexico
28/07/2016Yamana Gold Declares Third Quarter Dividend
28/07/2016Yamana Gold Makes Decision to Move Forward With C1 Santa Luz...
21/06/2016Yamana Provides Notice of Second Quarter 2016 Financial Resu...
05/05/2016Yamana Gold Announces Voting Results from Annual Meeting of ...
04/05/2016Yamana Gold beats 1Q profit forecasts
04/05/2016Yamana Gold Declares Second Quarter Dividend
04/05/2016Yamana Gold Announces First Quarter 2016 Results
11/04/2016Yamana Provides Preliminary First Quarter Operational Result...
08/04/2016Yamana Provides Notice of First Quarter 2016 Financial Resul...
31/03/2016Yamana Announces Copper Purchase Agreement in Relation to Fu...
01/02/2016Notable option activity in equity names
14/01/2016Here’s Why These 4 Stocks Made Big Moves Thursday
14/01/2016Yamana Gold Provides Preliminary 2015 Operational Results an...
06/01/2016Why Are These Five Stocks Rallying on Wednesday?
28/12/2015Why You Should Look Out for Gold Miners’ Commodity Exposure
21/12/2015Yamana Gold Provides Update on Brio Gold Operations and Susp...
11/12/2015S&P Dow Jones Indices Announces Changes to the S&P/TSX Canad...
22/11/2015Is Yamana Gold Inc. (USA) (AUY) A Gold Producer Worth Invest...
28/10/2015Will Yamana Gold (AUY) Surprise This Earnings Season?
27/10/2015Yamana Gold raises $152 mln to pay off credit facility
27/10/2015Yamana Announces Metal Purchase Agreements With Sandstorm an...
06/10/2015Comp: Analyzing Gold Miners’ Reserve Replacement
05/10/2015Comp: What Do Analysts Think About the Gold Miners?
30/09/2015Comp: Is Barrick Gold’s High Debt a Cause for Concern?
29/09/2015Comp: Which Gold Miners Expect Production Growth Going Forwa...
29/09/2015Yamana Provides Notice of Third Quarter 2015 Financial Resul...
04/09/2015Callinex Mines' President and CEO Max Porterfield Interviewe...
13/08/2015Brio Gold, a Subsidiary of Yamana Gold, Provides Update on C...
01/08/2015Edited Transcript of YRI.TO earnings conference call or pres...
30/07/2015Yamana Gold Provides Brazilian Exploration Update
30/07/2015Yamana Gold Announces Second Quarter 2015 Results
30/07/2015Yamana Gold Declares Third Quarter Dividend
28/07/2015Will Yamana Gold (AUY) Surprise This Earnings Season? - Anal...
16/07/2015Brio Gold, a Subsidiary of Yamana Gold, Provides Second Quar...
24/04/2015Lower Profits, Output on Tap for Barrick, Goldcorp -- Earnin...
14/04/2015UPDATE 3-Canada's Alamos Gold, AuRico merger may spark rival...
13/04/2015Canada's Alamos Gold, AuRico merger may spark rival bids
08/04/2015Yamana Gold plans to list shares of Brio unit in third quart...
08/04/2015Yamana Gold Provides Update on Brio Gold
08/04/2015Yamana plans to publicly list Brio unit in third quarter
08/04/2015Provides Update on Brio Gold
30/03/2015Yamana Provides Notice of First Quarter 2015 Financial Resul...
24/03/2015Candente Gold Appoints Paul H. Barry as Chairman
23/03/2015Golden Valley Mines Provides Update on Its 56%-Owned Subsidi...
12/03/2015Yamana Gold Announces Signing of Definitive Agreement With G...
12/03/2015Yamana Gold Announces Signing of Definitive Agreement With G...
09/03/2015Yamana Gold Announces Annulment of Award Assessment in Argen...
03/03/2015Yamana Gold Announces Annulment of Award Assessment in Argen...
03/03/2015Announces Annulment of Award Assessment in Argentine Legal D...
18/02/2015Yamana Gold Introduces Dividend Reinvestment Plan
18/02/2015Yamana Gold Announces Fourth Quarter and Year End 2014 Resul...
18/02/2015Yamana Gold Introduces Dividend Reinvestment Plan
11/02/2015Yamana Gold reports fourth-quarter loss on impairment charge...
11/02/2015Yamana Gold Announces Fourth Quarter and Year End 2014 Resul...
11/02/2015Yamana Announces Growth in Mineral Reserves and Mineral Reso...
11/02/2015Yamana Gold Announces Formal Decision to Proceed With Cerro ...
11/02/2015Yamana Gold Announces Formal Decision to Proceed With Cerro ...
11/02/2015Yamana Gold Declares First Quarter Dividend
11/02/2015Yamana Gold Declares First Quarter Dividend
03/02/2015Yamana Announces Closing of C$299.3 Million Equity Financing...
23/01/2015Yamana Provides Notice of Fourth Quarter 2014 Financial Resu...
20/01/2015Yamana Provides Notice of Fourth Quarter 2014 Financial Resu...
16/01/2015Yamana Advises of the Filing of Preliminary Prospectus
16/01/2015Advises of the Filing of Preliminary Prospectus
19/02/2014Yamana Gold Declares First Quarter Dividend
29/10/2013Yamana Gold Declares Fourth Quarter Dividend
31/07/2013Yamana Gold Declares Third Quarter Dividend
13/02/2013Announces 44% Increase to Mineral Resources at Cerro Moro
08/08/2012Could Potentially Reach $1,900/oz According to HSBC Analysts
18/06/2012Builds on Its Development Pipeline With Acquisition of Extor...
10/01/2012Fourth Quarter 2011 Financial Results Release Notification a...
23/03/2011Yamana ACQUIRES SHARES OF AURA MINERALS
04/08/2010Reports 2nd Quarter 2010 Results & Increases Dividend
15/05/2010Receives Shares of Aura Minerals
05/05/201050% Increase in Dividend
01/04/2010Reaffirms Annual 2010 Guidance
04/03/20102009 Results & Mineral Reserves & Resources
12/01/2010Provides 2010 & 2011 Operating Outlook
06/11/2009Delclares Quarterly Dividend
06/10/2009Hosts Annual Analyst And Investor Day
30/09/2009Hosts Official Inauguration Ceremony For The Gualcamayo Mine...
01/09/2009Declares Quaterly Dividend
31/08/2009 Board of Directors and management update
22/06/2009Added to FTSE Gold Mines Index
19/06/2009 Declares quarterly dividend
17/06/2009Development and near development stage projects update
10/06/2009Rlease
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TORONTO (YRI.TO)NYSE (AUY)
7,89+0.13%5,85-0.68%
TORONTO
CA$ 7,89
03/04 17:00 0,010
0,13%
Cours préc. Ouverture
7,88 7,89
Bas haut
7,83 8,08
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
- -  7,89 -%
Volume var. 1 mois
23 616 143 -%
24hGold TrendPower© : -3
Produit Copper - Gold - Silver - Zinc
Développe Copper - Gold - Molybdenum - Silver
Recherche Gold - Silver
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 27/04/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
20240,00%
20234,92%8,236,85
202242,42%8,054,87
2021-27,37%7,854,78
202043,96%9,293,11
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,70 AU$-0,19%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
10,89 US$-1,36%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,55 GBX-0,72%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,36 CA$-3,28%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
15,64 CA$+2,69%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+2,17%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,20 AU$+2,63%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,87 CA$+6,25%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
51,67 US$-0,98%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,03 AU$-2,94%Trend Power :