Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en

Canadian Zinc Corp

Publié le 21 mars 2014

Canadian Zinc Reports Financial Results for Fiscal 2013

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Canada | Copper | Precious Metals | Zinc |

Canadian Zinc Reports Financial Results for Fiscal 2013

VANCOUVER, BRITISH COLUMBIA--(Marketwired - May 16, 2014) -

  • Prairie Creek Mine Undergoing Optimization to Enhance Efficiencies, Lower Costs and Shorten Development Time Line
  • Encouraging Drill Results at South Tally Pond - Additional Drilling Planned for Newfoundland Projects

Canadian Zinc Corporation (CZN.TO)(CZICF) ("the Company" or "Canadian Zinc") reports its financial and operating results for the quarter ended March 31, 2014 and provides outlook on 2014 activities.

This press release should be read in conjunction with the unaudited consolidated financial statements and notes thereto for the quarter ended March 31, 2014, and management's discussion and analysis ("MD&A") for the quarter ended March 31, 2014, both available on SEDAR at www.sedar.com.

Financial Results for First Quarter 2014

For the three month period ended March 31, 2014, the Company reported a net loss and comprehensive loss of $2,027,000 compared to a net loss and comprehensive loss of $4,673,000 for the three month period ended March 31, 2013. The net loss in the three month period ended March 31, 2014 included a gain of $120,000 on the Company's marketable securities compared to loss of $2,319,000 for the comparative period.

At March 31, 2014, the Company had a positive working capital balance of $9,235,000 including cash and cash equivalents of $5,775,000, short term investments of $2,011,000 and marketable securities of $1,448,000 (for a total of $9,234,000). At December 31, 2013, the Company had cash and cash equivalents of $8,376,000, short term investments of $2,005,000, marketable securities of $1,328,000, and a positive working capital balance of $10,617,000.

Prairie Creek Mine

The primary objective of the Company is to bring the Prairie Creek zinc/lead/silver mine into production at the earliest opportunity and in pursuit of that objective secure the necessary capital funding to rehabilitate, upgrade and develop the Mine, inclusive of the processing plant and related site infrastructure.

To further build on and refine the Pre-Feasibility Study ("PFS") completed by SNC-Lavalin Inc. in 2012 CZN has engaged in an Optimization Study with a view to augmenting what has already been completed during and after the PFS. Further advancement of engineering designs, detailing and assessing what existing equipment can be utilized, determining upgrade requirements, exploring more efficient financial ways to reduce initial capital costs. A number of bid tender documents relating to various work packages needed to develop the mine have been distributed in order to confirm the detailed plans and design and actual costs for developing the mine into production.

As a lead up to the Optimization Study, in November 2013, Canadian Zinc engaged AMC to undertake an underground optimization study of the mine plan with a view to reducing the initial development, shorten the development schedule and minimize mine operating costs.

In January 2014, the Company engaged Tetra Tech ("TT") to provide technical services for basic engineering and procurement services for the development of major equipment packages, facility rehabilitation and repair work and capital items for the Prairie Creek Mine. Specifically these technical services will develop tender packages for mine rehabilitation and development; mill completion, power generation and distribution; heat recovery systems; a dense media separation plant; a paste fill plant; a water treatment plant; instrumentation and control systems; camp construction and winter road construction and maintenance needed to put the Prairie Creek Mine into production.

Canadian Zinc and TT have now issued a number of mine site packages for competitive tender to qualified bidders, giving full recognition to opportunities for participation by local First Nations and adjacent communities.

The tendering and procurement process, managed by TT, is an important phase of the Prairie Creek project that will refine and augment the design work completed previously and will generate definitive estimates of the capital cost and schedules, and in turn reduce contingency factors, required to place the Prairie Creek Mine into operation.

The Prairie Creek Mine site is scheduled to be re-opened at the end of May 2014 in order for ongoing care and maintenance programs to be conducted along with some pre-development and road work programs that can be completed during the summer season.

Newfoundland Properties

A winter diamond drill program on the South Tally Pond property was completed in March 2014 on the South Tally Pond copper-lead-zinc-silver-gold project in central Newfoundland. The South Tally Pond project is located adjacent to and in the same volcanic belt as the Duck Pond copper and zinc mine and mill complex operated by Teck Resources.

Six drillholes, totaling 2,350 metres were completed at the Northwest mineralized zone located 250 metres northwest of the drill-defined Lemarchant Deposit. The 2014 winter drilling program successfully extended the Northwest zone mineralization which remains open for further expansion. Highlights of the 2014 winter drilling program include:

  • Drillhole LM14-95 (Section 106+50N), located 30 metres up-dip of drillhole LM13-94, intersected two semi-massive sulphide intervals between 315 and 400 metres downhole. Significant assays included 4.8% zinc, 0.3% lead, 0.5% copper, 24.3 g/t silver and 0.9 g/t gold over 2.5 metres.
  • Drillhole LM14-96 (Section 106+50N), located 30 metres up-dip of drillhole LM14-95, intersected semi-massive to massive sulphides with massive barite (14 metres) between 303 and 321 metres downhole Significant assays include 7.0% zinc, 4.3% lead, 0.4% copper, 62.1 g/t silver and 0.7 g/t gold over 1.5 metres.
  • Drillhole LM14-97 (Section 105+50N) located 35 metres down-dip of LM13-82, intersected a mineralized massive barite interval between 357 and 361 metres downhole. Significant assays include 90.5 g/t silver and 1.4 g/t gold over 3.5 metres.
  • Drillhole LM14-99 (Section 106+50N), located 40 metres up-dip of LM14-96 intersected a thick sequence of iron-rich mudstones and felsic volcanic rocks with anomalous base and precious metals between 224 and 249 metres downhole.
  • Drillhole LM14-100 (Section 107+00N), located 50 metres north of LM13-94, intersected disseminated to semi-massive stringer pyrite mineralization between 314 and 364 metres downhole with anomalous base and precious metals over two, 13 metre intervals.

The sulphide mineralization and barite intervals in the Northwest zone are commonly underlain by a moderate to intensely altered felsic volcanic footwall stratigraphy, typical of volcanogenic massive sulphide deposits. These are excellent indications of a well-developed hydrothermal system that provide vectors to potential deposits.

The Company is planning a detailed review, structural analysis and remodeling of the Lemarchant deposit to take into account the results of the Northwest zone drilling.

Outlook

Canadian Zinc's focus for 2014 will be to advance the Prairie Creek Project towards production.

The Company is currently undertaking an Optimization Study as part of which Tetra Tech has been engaged to provide technical services for basic engineering and procurement services for the development of major equipment packages, facility rehabilitation and repair work and capital items for the Prairie Creek Mine. AMC has been engaged to undertake an optimization study of the underground mine plan with a view to reducing the initial development, shorten the development schedule and optimize the underground mine operating costs.

Geotechnical investigations to determine optimal mining methods will be completed the first half of 2014. Metallurgical studies, designed to enhance concentrate production and quality are also being carried out in 2014 and are part of the Company's concentrate marketing plan.

The current Optimization Study is scheduled to be completed by mid-2014 and, dependent on the progress of financing strategies concurrently being executed, the Company will begin procurement of long lead time items; construction of the access road; site preparation and other startup activities on site. The Company is evaluating strategies for raising the financing necessary to complete the development and construction of the Prairie Creek Mine.

A new diamond drill program on the Tulks South property in central Newfoundland targeting the exploration of the Boomerang deposit is scheduled to be completed later in 2014. The Boomerang has NI43-101 compliant indicated resources of 1.36 million tonnes averaging 0.51% copper, 7.07% zinc, 3.00% lead 110.2 g/t Silver and 1.66 g/t gold and inferred resources of 0.44% copper, 6.72% zinc, 2.88% lead, 96.5 g/t silver and 1/29 g/t gold. The Company is also undertaking an ongoing exploration drill program at the South Tally Pond property in Newfoundland targeting the expansion of the Lemarchant deposit and further exploring the new zone of mineralization discovered northwest of Lemarchant.

At March 31, 2014, the Company had working capital of $9.24 million and expects it will be able to meet current commitments, continue its planned 2014 programs and subject to adequate financing, continue planned 2015 corporate activities.

About Canadian Zinc

Canadian Zinc is a TSX-listed exploration and development company trading under the symbol "CZN". The Company's key project is the 100%-owned Prairie Creek Project, a fully permitted, advanced-staged zinc-lead-silver property, located in the Northwest Territories.

The Prairie Creek Project contains a Mineral Reserve of 5.2 million tonnes averaging 9.4% zinc, 9.5% lead and 151 g/t silver. In addition, Prairie Creek hosts an Inferred Resource of 6.2 million tonnes averaging 14.5% zinc, 11.5% lead, 0.57% copper and 229 g/t silver. (AMC Mining Consultants (Canada) Ltd. J M Shannon and D Nussipakynova, Qualified Persons, June 2012). A Preliminary Feasibility Study was completed by SNC-Lavalin in July 2012. Prairie Creek is an underground operation that will utilize multiple mining methods to access readily available ore. Canadian Zinc has the majority of infrastructure in place including a 1,000 tonne per day mill, five kilometres of underground workings and related equipment, a heavy duty and light duty surface fleet, three exploration diamond drills and a 1,000 m airstrip.

Canadian Zinc also owns an extensive land package in central Newfoundland that includes the South Tally Pond project, which hosts the Lemarchant deposit, the Tulks South project and the Long Lake project. A detailed and updated database is now being assembled from which exploration programs will be planned on key central Newfoundland properties during 2014.

Qualified Person

Alan Taylor, P.Geo., Vice President of Exploration, Chief Operating Officer and Director of the Company, who is a Non-Independent Qualified Person as defined in National Instrument 43-101 - Standards of Disclosure for Mineral Projects, has prepared, supervised the preparation of or reviewed, the parts of this MD&A that are of a scientific or technical nature.

Cautionary Statement - Forward-Looking Information

This press release contains certain forward-looking information, including, among other things, the expected completion of acquisitions and the advancement of mineral properties. This forward looking information includes, or may be based upon, estimates, forecasts, and statements as to management's expectations with respect to, among other things, the completion of transactions, the issue of permits, the size and quality of mineral resources, future trends for the company, progress in development of mineral properties, future production and sales volumes, capital costs, mine production costs, demand and market outlook for metals, future metal prices and treatment and refining charges, the outcome of legal proceedings, the timing of exploration, development and mining activities, acquisition of shares in other companies and the financial results of the company. There can be no assurances that such statements will prove to be accurate and actual results and future events could differ materially from those anticipated in such statements. Mineral resources that are not mineral reserves do not have demonstrated economic viability. Inferred mineral resources are considered too speculative geologically to have economic considerations applied to them that would enable them to be categorized as mineral reserves. There is no certainty that mineral resources will be converted into mineral reserves.

Cautionary Note to United States Investors

The United States Securities and Exchange Commission ("SEC") permits U.S. mining companies, in their filings with the SEC, to disclose only those mineral deposits that a company can economically and legally extract or produce. We use certain terms in this press release, such as "measured," "indicated," and "inferred" "resources," which the SEC guidelines prohibit U.S. registered companies from including in their filings with the SEC.

Lire la suite de l'article sur finance.yahoo.com
Données et statistiques pour les pays mentionnés : Canada | Tous
Cours de l'or et de l'argent pour les pays mentionnés : Canada | Tous

Canadian Zinc Corp

EN DÉVELOPPEMENT
CODE : CZN.TO
ISIN : CA1368021053
CUSIP : 136802-10-5
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Canadian Zinc est une société développant des projet miniers de zinc et d'argent basée au Canada.

Canadian Zinc est en développement de projets de zinc, d'argent et d'or au Fidji.

Son principal projet en développement est TUVATU au Fidji et son principal projet en exploration est PRAIRIE CREEK au Canada.

Canadian Zinc est cotée au Canada, aux Etats-Unis D'Amerique et en Allemagne. Sa capitalisation boursière aujourd'hui est 30,6 millions CA$ (23,2 millions US$, 20,1 millions €).

La valeur de son action a atteint son plus haut niveau récent le 20 février 2004 à 2,04 CA$, et son plus bas niveau récent le 04 décembre 2015 à 0,06 CA$.

Canadian Zinc possède 265 920 016 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Rapports annuels de Canadian Zinc Corp
2007 Annual Report
Financements de Canadian Zinc Corp
07/07/2016Announces Closing of $10,200,000 FInancing
01/08/2014CZN Closes $15.8 Million Bought Deal Financing
02/08/2013ANNOUNCES C$4 MILLION BOUGHT DEAL FLOW-THROUGH PRIVATE PLAC...
Nominations de Canadian Zinc Corp
13/06/2013Reports on Election of Directors at Annual General Meeting o...
Rapports Financiers de Canadian Zinc Corp
17/05/2016Reports Financial Results for Q1 2016 and Operations Update
31/03/2016CZN Reports Financial Results for 2015
13/11/2015Reports Results for Third Quarter 2015
14/08/2015Reports Financial Results for Second Quarter 2015
31/03/2015Reports Financial Results for Fiscal 2014
15/11/2013CZN Reports Financial Results for Third Quarter 2013
13/08/2013Reports Financial Results for Second Quarter 2013
13/05/2013Reports Financial Results for First Quarter 2013
20/03/2013REPORTS FINANCIAL RESULTS FOR FISCAL 2012
10/08/2012Reports Financial Results for Second Quarter 2012
16/03/2012Reports Financial Results for Fiscal 2011
17/03/2011Reports Financial Results for Fiscal 2010
17/11/20092009 Third Quarter Results
17/08/2009Reports Second Quarter 2009 Results
16/05/20092009 First Quarter Results
08/08/2008Reports Second Quarter 2008 Results
15/05/2008First Quarter Results
Projets de Canadian Zinc Corp
19/04/2017Drilling Extends Mineralization at Lemarchant, NFLD
15/09/2016CZN Modifies 2016 Preliminary Feasibility Study
21/01/2014Engineering and Procurement Contracts awarded for Prairie Cr...
12/12/2013Assay Results of 2013 Drill Program at South Tally Pond
09/12/2013(Prairie Creek)Assay Results of 2013 Drill Program at Prairie Creek
18/09/2013(Prairie Creek)Granted Water Licence for Prairie Creek Mine
21/06/2013(Prairie Creek)CZN RECEIVES PERMITS FOR OPERATION OF PRAIRIE CREEK MINE
25/03/2013(Prairie Creek)RECEIVES PROPOSED WATER QUALITY CONDITIONS IN DRAFT WATER LI...
18/03/2013(Prairie Creek)Receives Draft Water Licence and Permits for Operation of Pr...
15/01/2013to Drill South Tally Pond Project, Newfoundland
08/01/2013(Prairie Creek)oration: Permitting Progress for Prairie Creek Mine
28/08/2012(Prairie Creek)and Government of Northwest Territories Advance Co-operation...
14/06/2012(Prairie Creek)oration: Minister Confirms Environmental Impact Review Not R...
15/05/2012(Prairie Creek)oration: Additional Permits Approved for Prairie Creek Mine ...
03/10/2011(Prairie Creek)Reports Success With Prairie Creek Exploration Drilling
26/09/2011(Prairie Creek)oration: Environmental Assessment of Prairie Creek Mine Ente...
22/08/2011(Prairie Creek)and Government of the Northwest Territories Sign Socio-Econo...
19/06/2011(Prairie Creek)and Liidlii Kue First Nation Sign Impact and Benefits Agreem...
08/06/2011(Prairie Creek)oration: Exploration Drill Program Commences at Prairie Cree...
28/02/2011(Prairie Creek)oration: Prairie Creek Mine Feasibility Study Commissioned
02/02/2011(Prairie Creek)CZN Obtains Permit Extension
24/01/2011(Prairie Creek)CZN Signs Agreement with NDDB
21/01/2011(Prairie Creek)and Nahanni Butte Dene Band Sign Impact and Benefit Agreemen...
02/09/2009(Tuvatu)Diamond Drilling Commences at Tuvatu
21/07/2009(Prairie Creek)Federal Minister Visits Prairie Creek Mine
05/06/2009(Prairie Creek)Prairie Creek Metallurgical Results
20/05/2009(Tuvatu)Tuvatu gold project option
21/08/2008Permitting Update
22/07/2008(Prairie Creek)Prairie Creek Permitting Update
11/06/2008(Prairie Creek)Submits Permit Applications for Production at the Prairie Cr...
Communiqués de Presse de Canadian Zinc Corp
10/08/2017Reports Financial Results for Q2 and Provides Project Update...
15/07/2016DEH CHO DRUM - July 14, 2016 Public voices thoughts on road
07/07/2016JULY 7, 2016: CANADIAN ZINC ANNOUNCES CLOSING OF $10,200,000...
29/06/2016JUNE 29, 2016: CANADIAN ZINC ANNOUNCES FILING OF FINAL PROSP...
21/06/2016JUNE 21, 2016: CANADIAN ZINC REPORTS ON ANNUAL GENERAL MEETI...
16/06/2016JUNE 16, 2016: CANADIAN ZINC ANNOUNCES C$8.0 MILLION UNDERWR...
16/06/2016JUNE 16, 2016: CANADIAN ZINC PRICES $8-MILLION OVERNIGHT OFF...
15/06/2016JUNE 15, 2016: CANADIAN ZINC ANNOUNCES PUBLIC EQUITY OFFERIN...
30/05/2016Minco Press Release First Quarter 2016 Financial Results
27/05/20162016 First Quarter Managements Discussion and Analysis
24/05/2016MAY 24, 2016: CANADIAN ZINC ANNOUNCES NEW NOMINEES TO BOARD ...
25/01/2016JANUARY 25, 2016: UPDATE ON RESEARCH PROGRAM TO INVESTIGATE ...
25/01/2016Canadian Zinc provides update on research program to investi...
02/12/2015DECEMBER 2, 2015: RESEARCH FUNDING AWARDED TO CANADIAN ZINC ...
02/12/2015Research Funding awarded to Canadian Zinc to investigate cen...
24/10/2015Sandstorm Gold Provides Asset Updates
23/10/2015Sandstorm Gold Provides Asset Updates
17/09/2015SEPTEMBER 17, 2015: MINERAL RESOURCES INCREASE AT PRAIRIE CR...
17/09/2015Canadian Zinc Corporation : Mineral Resources Increase at Pr...
14/08/2015AUGUST 14, 2015: CANADIAN ZINC REPORTS FINANCIAL RESULTS FOR...
14/08/2015Canadian Zinc Reports Financial Results for Second Quarter 2...
11/08/2015AUGUST 11, 2015: UNDERGROUND DRILL PROGRAM AT PRAIRIE CREEK ...
11/08/2015Canadian Zinc Corporation: Underground Drill Program at Prai...
31/03/2015MARCH 31, 2015: CANADIAN ZINC REPORTS FINANCIAL RESULTS FOR ...
31/03/2015Canadian Zinc Reports Financial Results for Fiscal 2014
26/03/2015MARCH 26, 2015: NEW MINERAL RESOURCE UPDATE AT PRAIRIE CREEK...
26/03/2015(Prairie Creek)oration: New Mineral Resource Update at Prairie Creek Mine
29/01/20142014 Winter Drill Program Commences at South Tally Pond, NFL...
31/10/2013Drilling Extends Massive Sulphide Mineralization at Lemarcha...
31/10/2013oration: Drilling Extends Massive Sulphide Mineralization at...
16/09/2013Drill Program Underway for South Tally Pond, Newfoundland
12/09/2013and Messina Minerals Announce Agreement on Proposed Acquisit...
05/09/2013(Prairie Creek)CZN Receives Permits from Parks Canada for Prairie Creek Min...
04/09/2013(Prairie Creek)Commencing New Drill Program at Prairie Creek
20/08/2013Announces Closing of C$4 Million Bought Deal Flow-Through Pr...
01/08/2013announces C$4 million bought deal flow-through private place...
15/07/2013OtcbbJournal.com Sheds Light on Micro-Cap Companies Under th...
08/07/2013oration: Water Board Completes Regulatory Process; Water Lic...
31/05/2013Raises US$10.0 Million
10/05/2013oration: Annual General Meeting and Adoption of Advance Noti...
17/04/2013Completes Winter Drill Program at South Tally Pond
29/01/2013(Prairie Creek)First Operating Permit Received For Prairie Creek Mine:
25/01/2013CZN Submits Final Responses To Water Board Ahead Of Public H...
22/01/2013Submits Final Responses to Water Board Ahead of Public Heari...
15/01/2013to Drill Lemarchant Massive Sulphide Deposit at South Tally ...
31/10/2012Visit Canadian Zinc Booth # 418 Hard Assets San Francisco
24/09/2012Acquires Paragon Minerals Corporation
31/07/2012Announces Merger and Private Placement With Paragon Minerals...
27/06/2012(Prairie Creek)Reports Results of Prairie Creek Preliminary Feasibility Stu...
05/03/2012and Parks Canada Sign Renewed Memorandum of Understanding
29/02/2012Reports Significant Assay Results from Final Holes of 2011 D...
10/02/2012(Prairie Creek)Closes $4 Million Second Tranche of Zhongrun Private Placeme...
06/01/2012Announces the Closing of $5.1 Million Bought Deal Public Off...
30/12/2011Announces Closing of: $2.5 Million Private Placement of Flow...
09/12/2011Receives Environmental Approval
29/08/2011Federal Government Provides $3 Million Funding to Assist in ...
28/06/2011oration: Environmental Assessment Hearings Completed
26/03/2010Developers Assessment Report Filed
30/09/2009Vatukoula Finance - Operations Update
24/06/2009Gold Production Up at Vatukoula Mine
12/06/2009Vatukoula Approves Share Purchase
27/05/2009Normal Course Issuer Bid
24/02/20092009 Convention - Prospectors & Developers Association of Ca...
18/11/2008SULPHIDE VENT COMPLEX/FEEDER ZONE IDENTIFIED AT THE NORTH LE...
04/11/2008Memorandum of Understanding Signed With Nahanni Butte Dene B...
01/08/2008Memorandum Of Understanding Signed With Parks Canada
01/04/20082007 Year End Results
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TORONTO (CZN.TO)FRANKFURT (SRS.F)
0,115+4.55%0,017-5.56%
TORONTO
CA$ 0,115
10/09 16:58 0,010
4,55%
Cours préc. Ouverture
0,110 0,110
Bas haut
0,110 0,115
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
- -  0,115 -%
Volume var. 1 mois
122 370 -%
24hGold TrendPower© : 11
Produit
Développe Gold
Recherche Copper - Lead - Silver - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 18/10/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,70 AU$-0,65%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
12,26 US$+2,68%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,53 GBX-1,87%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,64 CA$-1,86%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
16,23 CA$+4,04%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+4,26%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,20 AU$+2,63%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,88 CA$+0,53%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
52,71 US$+0,19%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+5,56%Trend Power :