Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en

Canadian Zinc Corp

Publié le 15 août 2014

Canadian Zinc Reports Financial Results for Second Quarter 2014

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Canada | Copper | Zinc |

Canadian Zinc Reports Financial Results for Second Quarter 2014

VANCOUVER, BRITISH COLUMBIA--(Marketwired - Aug 15, 2014) - Canadian Zinc Corporation (CZN.TO)(CZICF) ("the Company" or "Canadian Zinc") announces its financial results for the three and six month periods ended June 30, 2014.

Financial Results June 30, 2014

For the three and six month periods ended June 30, 2014, the Company reported a net loss and comprehensive loss of $3,071,000 and $5,098,000 compared to a net income and comprehensive income of $2,792,000 for the three month period ended June 30, 2013 and a net loss and comprehensive loss of $1,881,000 for the six month period ended June 30, 2013.

For the three and six month periods ended June 30, 2014, the Company expensed $1,455,000 and $2,694,000 respectively on its exploration and evaluation programs at Prairie Creek compared to $660,000 and $2,105,000 for the same periods ended June 30, 2013. The overall increase in expenditures at the Prairie Creek Mine site was due to the increased mine planning and feasibility studies costs of $2,064,000 in the first two quarters of 2014 compared to $1,076,000 for the comparative period in 2013.

At June 30, 2014, the Company had a positive working capital balance of $6,210,000 including cash and cash equivalents of $4,235,000, short term investments of $2,020,000 and marketable securities of $526,000 (for a total of $6,781,000). Subsequent to the end of the quarter the Company completed a bought deal public offering of units and flow-through shares and raised gross proceeds of $15,751,000.

Prairie Creek Optimization

Canadian Zinc is currently completing various optimization studies to further build on and refine its Preliminary Feasibility Study ("PFS"). The objective is to enhance overall mine economics by augmenting what has already been completed during and after the PFS and by exploring more efficient financial ways to reduce initial capital costs.

In January 2014, the Company engaged Tetra Tech WEI Inc. ("TT") to provide technical services for basic engineering and procurement services for the development of major equipment packages, facility rehabilitation and repair work, and capital items for the Prairie Creek Mine. Specifically these technical services will develop tender packages for further advancement of engineering designs, detailing and assessing what equipment can be utilized and better determining upgrade requirements. In preparation for putting the Prairie Creek Mine into production items being addressed include mine rehabilitation and development; mill completion; power generation and distribution; heat recovery systems; dense media separation plant; paste fill plant; water treatment plant; instrumentation and control systems; camp construction and winter road construction and maintenance.

A site visit was completed by TT personnel in January 2014 to further enable TT to detail the tender packages. A site visit for general contractors was completed in May 2014 and a site visit for mining contractors was held in June 2014. Canadian Zinc and TT have now issued a number of mine site equipment packages for competitive tender to qualified bidders, giving full recognition to opportunities for participation by local First Nations and adjacent communities. Bid Tender documents relating to various equipment packages needed to develop the mine have been distributed. Competitive tenders have been received for a number of equipment packages and are currently being evaluated in order to confirm the detailed plans and designs and actual costs for placing the mine into production.

A mining contract for the initial 2014/2015 underground exploration and development program has been tendered and the Company is expecting detailed bids to be returned later in August. A general contract is also being compiled and, once all equipment packages are determined, the general contract will be tendered for bid. Awarding of some contracts will begin later in August 2014.

Opening of the winter road into the mine site is planned to be completed in February 2015. The Company plans to transport key materials and supplies over the winter road in early 2015 to begin preliminary construction and rehabilitation of the mill and other site facilities in preparation for production, subject to obtaining the senior financing. A winter road contract to rehabilitate, construct and re-open the winter road was recently tendered and bid evaluation is now underway. A transportation services contract document is also being drafted for tender by TT which will help determine transport costs.

The contract tendering and procurement process, managed by TT, is an important phase of the Prairie Creek Project that will refine and augment the design work completed previously and will generate definitive estimates of the capital cost and schedules, and in turn reduce contingency factors, required to place the Prairie Creek Mine into operation.

Metallurgical studies are also being carried out to optimize the mill flow-sheet with the objective of reducing smelter penalty charges for deleterious elements such as mercury. These studies are on-going and include laboratory testing combined with evaluation of projected economics to better determine the optimum concentrate specifications. These metallurgical studies will be integrated in tandem with the Company's concentrate marketing studies.

Prairie Creek Permitting

In April 2014, the Company submitted applications to the Mackenzie Valley Land and Water Board and to Parks Canada for Land Use Permits to permit the possible future upgrade of the current winter access road to all-season use. The applications, as expected were referred to environmental assessment by the Mackenzie Valley Environmental Impact Review Board ("MVRB"). In June 2014, the Company presented a Developer's scoping document to local affected communities and organizations. On July 31, 2014 the MVRB issued draft Terms of Reference for comment by August 15 and it is expected these will be finalized in early September. Once the Terms of Reference are final, CZN will compile and submit a Developers Assessment Report. The Company anticipates the environmental assessment and permitting process for this application will take approximately two more years to complete.

Prairie Creek Project Activity

The Prairie Creek Mine Site re-opened in May 2014 and the normal care and maintenance programs were initiated. These programs included repair and recommissioning of the water treatment plant, mechanical repair of key pieces of equipment, yard cleanup and general building and site maintenance.

Pre-development site work programs are planned for later in the year including removal of obsolete equipment and material in the powerhouse, upgrading accommodations, geotechnical studies of water storage pond and waste rock pile facilities and further road work.

A helicopter supported field program was completed along the road corridor joining the mine with the existing Highway #7, in July to further assess and gather detailed data in support of the permit application for an all season road.

Newfoundland Exploration

In June 2014, the Company completed consolidation of its Buchans Junction Core Storage Facility and rehabilitation on its Pat's Pond Exploration Camp in the Tulks South area, to support an exploration program that commenced in July 2014.

The Company is undertaking geological field work and a planned 8,000 metre diamond drill program on its Tulks South property, focused on expanding the Boomerang-Domino deposit (4,000 metres), extending the Long Lake deposit (2,000 metres) and testing for mineralization in the Tulks East area (2,000 metres).

Drilling commenced at the Boomerang-Domino deposit on July 7, 2014. A total of 9 drillholes (3,030 metres) were completed by August 7, 2014. Six drillholes (1,750 metres) were aimed at expanding the Hurricane Prospect mineralization; a previously identified near surface lense of massive sulphides located approximately 300 metres along strike (northeast) and up-dip of the Boomerang-Domino deposit. Three drillholes (1,280 metres) targeted an untested area located between the Boomerang and Domino massive sulphide lenses. Analytical results for the drillholes are pending.

In order to continue evaluating the recently acquired Tulks South and Long Lake properties, the Company is compiling all available geological, geochemical and geophysical data for the property areas; reviewing historical drill core from key areas; and carrying out geological mapping, prospecting and lithogeochemical rock sampling at the priority target areas.

Bought Deal Financing

On July 31, 2014, the Company closed a bought deal public offering of units and flow-through shares through a syndicate of underwriters.

The Company issued 28,572,000 units at a price of $0.35 per unit for gross proceeds of $10,000,200, and 15,134,000 common shares, which qualify as "flow-through" shares ("FT Shares") at a price of $0.38 per FT Share for gross proceeds of $5,750,920, including 1,974,000 FT Shares issued upon the exercise by the underwriters of an over-allotment in respect of the FT Shares.

The net proceeds from the units will be used to advance the Prairie Creek Mine towards production by initiating an underground development program, opening the winter access road, completing the optimization studies already underway, posting reclamation security and undertaking engineering and preliminary procurement.

The net proceeds from the FT Shares will be used to incur eligible Canadian Exploration Expenses, as defined under the Tax Act, that will be renounced in favour of the purchasers with an effective date of no later than December 31, 2015. The funds are intended to be used to undertake exploration programs on the Prairie Creek Property with the goal of increasing mineral reserves and resources and to further explore the company's properties in central Newfoundland.

Outlook

Canadian Zinc's focus for the balance of 2014 and 2015 will be to advance the Prairie Creek Project towards production.

The Company plans to initiate the underground exploration and development program, open the winter access road, complete the optimization studies already underway and continue engineering and preliminary procurement.

The Company is currently undertaking a number of optimization studies as part of which TT has been engaged to provide technical services for basic engineering and procurement services for the development of major equipment packages, facility rehabilitation and repair work and capital items for the Prairie Creek Mine.

AMC Mining Consultants (Canada) Ltd. has been engaged to undertake an optimization study of the underground mine plan with a view to reducing the initial development, shorten the development schedule and optimize the underground mine operating costs. Geotechnical investigations to determine optimal mining methods were completed the first half of 2014.

Metallurgical concentrate studies, designed to optimize the mill flow-sheet with the objective of reducing smelter penalty charges, are also being carried out in 2014 and will be integrated with the Company's concentrate marketing plan.

These optimization studies are ongoing and are scheduled to be completed later this year.

Canadian Zinc expects to award a contract for opening of the winter road into the mine site, scheduled for completion in February 2015. The Company plans to transport key materials and supplies over the winter road in early 2015 to begin preliminary construction and rehabilitation of the mill and other site facilities in preparation for production.

On the back of the recent successful financing Canadian Zinc will continue to evaluate strategies for raising the senior financing necessary to complete the development and construction of the Prairie Creek Mine.

A new diamond drill program on the Tulks South property in central Newfoundland is currently underway and scheduled to be completed later in 2014. The Company will also be undertaking an exploration drill program at the Long Lake Property in Newfoundland in tandem with the Tulks South drilling. Further compilation and geochemical sampling will also be carried out in order to better focus on specific additional drill targets throughout the large land package.

At June 30, 2014, the Company had working capital of $6.21 million and subsequent to the end of the quarter completed a financing of $15,751,000. Accordingly, the Company expects it will be able to meet its current commitments, continue its planned 2014 programs and planned 2015 corporate activities.

About Canadian Zinc

Canadian Zinc is a TSX-listed exploration and development company trading under the symbol "CZN". The Company's key project is the 100%-owned Prairie Creek Project, a fully permitted, advanced-staged zinc-lead-silver property, located in the Northwest Territories.

Canadian Zinc also owns an extensive land package in central Newfoundland that it is exploring for copper-lead-zinc-silver-gold deposits. Key projects include the South Tally Pond project (Lemarchant deposit), the Tulks South project (Boomerang-Domino deposit) and Long Lake project (Long Lake deposit). The Company's strategy is to continue to build the zinc-copper-lead-silver-gold resources base with the aim of developing the deposits through a central milling facility.

Qualified Person

Alan Taylor, P.Geo., Vice President of Exploration, Chief Operating Officer and Director of the Company, who is a Non-Independent Qualified Person as defined in National Instrument 43-101 - Standards of Disclosure for Mineral Projects, has prepared, supervised the preparation of, or reviewed, parts of this press release that are of a scientific or technical nature.

Cautionary Statement - Forward-Looking Information

This press release contains certain forward-looking information, including, among other things, the expected completion of acquisitions and the advancement of mineral properties. This forward looking information includes, or may be based upon, estimates, forecasts, and statements as to management's expectations with respect to, among other things, the completion of transactions, the issue of permits, the size and quality of mineral resources, future trends for the company, progress in development of mineral properties, future production and sales volumes, capital costs, mine production costs, demand and market outlook for metals, future metal prices and treatment and refining charges, the outcome of legal proceedings, the timing of exploration, development and mining activities, acquisition of shares in other companies and the financial results of the company. There can be no assurances that such statements will prove to be accurate and actual results and future events could differ materially from those anticipated in such statements. Mineral resources that are not mineral reserves do not have demonstrated economic viability. Inferred mineral resources are considered too speculative geologically to have economic considerations applied to them that would enable them to be categorized as mineral reserves. There is no certainty that mineral resources will be converted into mineral reserves.

Cautionary Note to United States Investors

The United States Securities and Exchange Commission ("SEC") permits U.S. mining companies, in their filings with the SEC, to disclose only those mineral deposits that a company can economically and legally extract or produce. We use certain terms in this press release, such as "measured," "indicated," and "inferred" "resources," which the SEC guidelines prohibit U.S. registered companies from including in their filings with the SEC.

Lire la suite de l'article sur finance.yahoo.com
Données et statistiques pour les pays mentionnés : Canada | Tous
Cours de l'or et de l'argent pour les pays mentionnés : Canada | Tous

Canadian Zinc Corp

EN DÉVELOPPEMENT
CODE : CZN.TO
ISIN : CA1368021053
CUSIP : 136802-10-5
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Canadian Zinc est une société développant des projet miniers de zinc et d'argent basée au Canada.

Canadian Zinc est en développement de projets de zinc, d'argent et d'or au Fidji.

Son principal projet en développement est TUVATU au Fidji et son principal projet en exploration est PRAIRIE CREEK au Canada.

Canadian Zinc est cotée au Canada, aux Etats-Unis D'Amerique et en Allemagne. Sa capitalisation boursière aujourd'hui est 30,6 millions CA$ (23,2 millions US$, 20,1 millions €).

La valeur de son action a atteint son plus haut niveau récent le 20 février 2004 à 2,04 CA$, et son plus bas niveau récent le 04 décembre 2015 à 0,06 CA$.

Canadian Zinc possède 265 920 016 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Rapports annuels de Canadian Zinc Corp
2007 Annual Report
Financements de Canadian Zinc Corp
07/07/2016Announces Closing of $10,200,000 FInancing
01/08/2014CZN Closes $15.8 Million Bought Deal Financing
02/08/2013ANNOUNCES C$4 MILLION BOUGHT DEAL FLOW-THROUGH PRIVATE PLAC...
Nominations de Canadian Zinc Corp
13/06/2013Reports on Election of Directors at Annual General Meeting o...
Rapports Financiers de Canadian Zinc Corp
17/05/2016Reports Financial Results for Q1 2016 and Operations Update
31/03/2016CZN Reports Financial Results for 2015
13/11/2015Reports Results for Third Quarter 2015
14/08/2015Reports Financial Results for Second Quarter 2015
31/03/2015Reports Financial Results for Fiscal 2014
15/11/2013CZN Reports Financial Results for Third Quarter 2013
13/08/2013Reports Financial Results for Second Quarter 2013
13/05/2013Reports Financial Results for First Quarter 2013
20/03/2013REPORTS FINANCIAL RESULTS FOR FISCAL 2012
10/08/2012Reports Financial Results for Second Quarter 2012
16/03/2012Reports Financial Results for Fiscal 2011
17/03/2011Reports Financial Results for Fiscal 2010
17/11/20092009 Third Quarter Results
17/08/2009Reports Second Quarter 2009 Results
16/05/20092009 First Quarter Results
08/08/2008Reports Second Quarter 2008 Results
15/05/2008First Quarter Results
Projets de Canadian Zinc Corp
19/04/2017Drilling Extends Mineralization at Lemarchant, NFLD
15/09/2016CZN Modifies 2016 Preliminary Feasibility Study
21/01/2014Engineering and Procurement Contracts awarded for Prairie Cr...
12/12/2013Assay Results of 2013 Drill Program at South Tally Pond
09/12/2013(Prairie Creek)Assay Results of 2013 Drill Program at Prairie Creek
18/09/2013(Prairie Creek)Granted Water Licence for Prairie Creek Mine
21/06/2013(Prairie Creek)CZN RECEIVES PERMITS FOR OPERATION OF PRAIRIE CREEK MINE
25/03/2013(Prairie Creek)RECEIVES PROPOSED WATER QUALITY CONDITIONS IN DRAFT WATER LI...
18/03/2013(Prairie Creek)Receives Draft Water Licence and Permits for Operation of Pr...
15/01/2013to Drill South Tally Pond Project, Newfoundland
08/01/2013(Prairie Creek)oration: Permitting Progress for Prairie Creek Mine
28/08/2012(Prairie Creek)and Government of Northwest Territories Advance Co-operation...
14/06/2012(Prairie Creek)oration: Minister Confirms Environmental Impact Review Not R...
15/05/2012(Prairie Creek)oration: Additional Permits Approved for Prairie Creek Mine ...
03/10/2011(Prairie Creek)Reports Success With Prairie Creek Exploration Drilling
26/09/2011(Prairie Creek)oration: Environmental Assessment of Prairie Creek Mine Ente...
22/08/2011(Prairie Creek)and Government of the Northwest Territories Sign Socio-Econo...
19/06/2011(Prairie Creek)and Liidlii Kue First Nation Sign Impact and Benefits Agreem...
08/06/2011(Prairie Creek)oration: Exploration Drill Program Commences at Prairie Cree...
28/02/2011(Prairie Creek)oration: Prairie Creek Mine Feasibility Study Commissioned
02/02/2011(Prairie Creek)CZN Obtains Permit Extension
24/01/2011(Prairie Creek)CZN Signs Agreement with NDDB
21/01/2011(Prairie Creek)and Nahanni Butte Dene Band Sign Impact and Benefit Agreemen...
02/09/2009(Tuvatu)Diamond Drilling Commences at Tuvatu
21/07/2009(Prairie Creek)Federal Minister Visits Prairie Creek Mine
05/06/2009(Prairie Creek)Prairie Creek Metallurgical Results
20/05/2009(Tuvatu)Tuvatu gold project option
21/08/2008Permitting Update
22/07/2008(Prairie Creek)Prairie Creek Permitting Update
11/06/2008(Prairie Creek)Submits Permit Applications for Production at the Prairie Cr...
Communiqués de Presse de Canadian Zinc Corp
10/08/2017Reports Financial Results for Q2 and Provides Project Update...
15/07/2016DEH CHO DRUM - July 14, 2016 Public voices thoughts on road
07/07/2016JULY 7, 2016: CANADIAN ZINC ANNOUNCES CLOSING OF $10,200,000...
29/06/2016JUNE 29, 2016: CANADIAN ZINC ANNOUNCES FILING OF FINAL PROSP...
21/06/2016JUNE 21, 2016: CANADIAN ZINC REPORTS ON ANNUAL GENERAL MEETI...
16/06/2016JUNE 16, 2016: CANADIAN ZINC ANNOUNCES C$8.0 MILLION UNDERWR...
16/06/2016JUNE 16, 2016: CANADIAN ZINC PRICES $8-MILLION OVERNIGHT OFF...
15/06/2016JUNE 15, 2016: CANADIAN ZINC ANNOUNCES PUBLIC EQUITY OFFERIN...
30/05/2016Minco Press Release First Quarter 2016 Financial Results
27/05/20162016 First Quarter Managements Discussion and Analysis
24/05/2016MAY 24, 2016: CANADIAN ZINC ANNOUNCES NEW NOMINEES TO BOARD ...
25/01/2016JANUARY 25, 2016: UPDATE ON RESEARCH PROGRAM TO INVESTIGATE ...
25/01/2016Canadian Zinc provides update on research program to investi...
02/12/2015DECEMBER 2, 2015: RESEARCH FUNDING AWARDED TO CANADIAN ZINC ...
02/12/2015Research Funding awarded to Canadian Zinc to investigate cen...
24/10/2015Sandstorm Gold Provides Asset Updates
23/10/2015Sandstorm Gold Provides Asset Updates
17/09/2015SEPTEMBER 17, 2015: MINERAL RESOURCES INCREASE AT PRAIRIE CR...
17/09/2015Canadian Zinc Corporation : Mineral Resources Increase at Pr...
14/08/2015AUGUST 14, 2015: CANADIAN ZINC REPORTS FINANCIAL RESULTS FOR...
14/08/2015Canadian Zinc Reports Financial Results for Second Quarter 2...
11/08/2015AUGUST 11, 2015: UNDERGROUND DRILL PROGRAM AT PRAIRIE CREEK ...
11/08/2015Canadian Zinc Corporation: Underground Drill Program at Prai...
31/03/2015MARCH 31, 2015: CANADIAN ZINC REPORTS FINANCIAL RESULTS FOR ...
31/03/2015Canadian Zinc Reports Financial Results for Fiscal 2014
26/03/2015MARCH 26, 2015: NEW MINERAL RESOURCE UPDATE AT PRAIRIE CREEK...
26/03/2015(Prairie Creek)oration: New Mineral Resource Update at Prairie Creek Mine
29/01/20142014 Winter Drill Program Commences at South Tally Pond, NFL...
31/10/2013Drilling Extends Massive Sulphide Mineralization at Lemarcha...
31/10/2013oration: Drilling Extends Massive Sulphide Mineralization at...
16/09/2013Drill Program Underway for South Tally Pond, Newfoundland
12/09/2013and Messina Minerals Announce Agreement on Proposed Acquisit...
05/09/2013(Prairie Creek)CZN Receives Permits from Parks Canada for Prairie Creek Min...
04/09/2013(Prairie Creek)Commencing New Drill Program at Prairie Creek
20/08/2013Announces Closing of C$4 Million Bought Deal Flow-Through Pr...
01/08/2013announces C$4 million bought deal flow-through private place...
15/07/2013OtcbbJournal.com Sheds Light on Micro-Cap Companies Under th...
08/07/2013oration: Water Board Completes Regulatory Process; Water Lic...
31/05/2013Raises US$10.0 Million
10/05/2013oration: Annual General Meeting and Adoption of Advance Noti...
17/04/2013Completes Winter Drill Program at South Tally Pond
29/01/2013(Prairie Creek)First Operating Permit Received For Prairie Creek Mine:
25/01/2013CZN Submits Final Responses To Water Board Ahead Of Public H...
22/01/2013Submits Final Responses to Water Board Ahead of Public Heari...
15/01/2013to Drill Lemarchant Massive Sulphide Deposit at South Tally ...
31/10/2012Visit Canadian Zinc Booth # 418 Hard Assets San Francisco
24/09/2012Acquires Paragon Minerals Corporation
31/07/2012Announces Merger and Private Placement With Paragon Minerals...
27/06/2012(Prairie Creek)Reports Results of Prairie Creek Preliminary Feasibility Stu...
05/03/2012and Parks Canada Sign Renewed Memorandum of Understanding
29/02/2012Reports Significant Assay Results from Final Holes of 2011 D...
10/02/2012(Prairie Creek)Closes $4 Million Second Tranche of Zhongrun Private Placeme...
06/01/2012Announces the Closing of $5.1 Million Bought Deal Public Off...
30/12/2011Announces Closing of: $2.5 Million Private Placement of Flow...
09/12/2011Receives Environmental Approval
29/08/2011Federal Government Provides $3 Million Funding to Assist in ...
28/06/2011oration: Environmental Assessment Hearings Completed
26/03/2010Developers Assessment Report Filed
30/09/2009Vatukoula Finance - Operations Update
24/06/2009Gold Production Up at Vatukoula Mine
12/06/2009Vatukoula Approves Share Purchase
27/05/2009Normal Course Issuer Bid
24/02/20092009 Convention - Prospectors & Developers Association of Ca...
18/11/2008SULPHIDE VENT COMPLEX/FEEDER ZONE IDENTIFIED AT THE NORTH LE...
04/11/2008Memorandum of Understanding Signed With Nahanni Butte Dene B...
01/08/2008Memorandum Of Understanding Signed With Parks Canada
01/04/20082007 Year End Results
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TORONTO (CZN.TO)FRANKFURT (SRS.F)
0,115+4.55%0,017-5.56%
TORONTO
CA$ 0,115
10/09 16:58 0,010
4,55%
Cours préc. Ouverture
0,110 0,110
Bas haut
0,110 0,115
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
- -  0,115 -%
Volume var. 1 mois
122 370 -%
24hGold TrendPower© : 11
Produit
Développe Gold
Recherche Copper - Lead - Silver - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 18/10/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,75 AU$+0,52%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
10,89 US$-1,98%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,55 GBX+0,00%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$-8,33%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,39 CA$-3,24%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
15,32 CA$+0,43%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$-2,08%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,19 AU$+0,00%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,76 CA$-1,68%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
51,92 US$-1,23%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+0,00%Trend Power :