Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en
Dans la même rubrique

Capstone Mining Corp.

Publié le 08 novembre 2012

Capstone Reports 2012 Third Quarter Financial Results; Cash Flow from

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Canada | Capstone | Copper | G Mexico | K Street | Zinc |

Capstone Mining Corp. TSX:CS
Suite 900 - 999 West Hastings Street
Vancouver, B.C. V6C 2W2
Tel: (604) 684-8894
Fax: (604) 688-2180



Capstone Reports 2012 Third Quarter Financial Results; Cash Flow from Operations Remains Strong


Cash Flow from Operating Activities of $25.8 million, Net Earnings of $12.8 million or $0.03 per share
(All amounts in US$ unless otherwise specified)

VANCOUVER, Nov. 7, 2012 /CNW/ - Capstone Mining Corp. ("Capstone") (TSX: CS) today announced its financial results for the three and nine months ended September 30, 2012. Net earnings for the quarter were $12.8 million and cash flow from operating activities was $25.8 million. Capstone ended the quarter with cash on hand of $509.4 million and a $200 million credit facility. Copper production for the quarter at Capstone's two operating mines, Cozamin and Minto, totalled 22.6 million pounds in concentrates at a total cash cost(1) of $1.50 per payable pound.

Capstone will hold a conference call and webcast on Thursday, November 8, 2012 at 11:30 am Eastern time (8:30 am Pacific time) to discuss these results; call-in details are provided at the end of this release. This release should be read in conjunction with Capstone's unaudited condensed interim consolidated financial statements and management's discussion and analysis ("MD&A") for the three and nine months ended September 30, 2012, which are available on Capstone's website at: http://capstonemining.com/s/Financial_Statements.asp and on SEDAR. An updated corporate presentation, including results to September 30, 2012, will also be available at http://capstonemining.com/s/Presentation.asp.

Overview

    Three months
  ended
  Sept. 30, 2012
Three months
ended
Sept. 30, 2011
Nine months
ended
Sept. 30, 2012
Nine months
ended
Sept. 30, 2011
Gross sales revenue ($ millions) 99.7 97.9 250.0 287.0
         
Copper in concentrates produced (million lbs) 22.6 20.6 63.1 58.5
         
Payable copper produced (million lbs) 21.8 19.9 60.8 56.5
Total cash cost per payable pound of copper produced (1) ($) 1.50 1.39 1.44 1.42
         
Copper sold (million lbs) 23.4 23.3 59.6 62.6
Recognized copper price per pound ($) 3.84 3.66 3.72 4.03
         
Net earnings ($ millions) 12.8 21.1 41.1 55.5
Earnings per common share ($) 0.03 0.06 0.11 0.21
         
Adjusted net earnings(1) ($ millions) 21.6 13.4 58.6 47.9
Adjusted net earnings(1) per common share ($) 0.06 0.04 0.15 0.18
         
Cash flow from operating activities ($ millions) 25.8 38.9 72.2 75.4
Cash flow from operating activities per common share(1) ($) 0.07 0.10 0.19 0.28
         
Cash and cash equivalents ($ millions)     509.4 484.2

"Both mines continued to run well, generating solid cash flow from operating activities of $72.2 million over the first nine months of the year," said Darren Pylot, President and CEO of Capstone. "On the project development side, we have chosen to align our Santo Domingo project timeline to more closely coincide with the expected availability of low cost power in the area of our project in Chile, rather than fast track the timeline. This revised timeline will allow us an opportunity to optimize the project and we will take full advantage of the slowdown to perform optimization and trade-off studies to ensure the lowest capital and operating costs are achieved at the feasibility study stage."

"We remain fully committed to the project and will explore all opportunities to advance it as quickly as possible, but only on a timeline that maximizes returns. Our cash balance, credit facility, access to credit and the Korea Resources Corporation strategic partnership and financing agreement for the Santo Domingo project, combined with on-going cash flow from operations, give us considerable financial flexibility to opportunistically redeploy our capital in the short term, while at all times maintaining a balance sheet that allows us to advance Santo Domingo," continued Mr. Pylot.

Financial and Production Highlights for the Three Months Ended September 30, 2012

  • Recorded net earnings of $12.8 million or $0.03 per common share which included:
    • Earnings from mining operations of $21.2 million,
      • Recognized copper price of $3.84 per pound.
    • Cost of sales included a $5.7 million non-cash charge related to the write-down of ore stockpile inventory at the Minto Mine,
    • $5.5 million in current and deferred tax expenses.
  • Adjusted net earnings(1) of $21.6 million or $0.06 per common share after making adjustments for certain non-cash and non-recurring items.
  • Generated cash flow from operating activities of $25.8 million or $0.07 per common share.
  • Working capital increased to $567.8 million at September 30, 2012 (which included $509.4 million of cash and cash equivalents) from $533.1 million at December 31, 2011.
  • Produced a total of 21.8 million pounds of payable copper at an estimated total cash cost(1) of $1.50 per pound of payable copper produced.
  • Recorded gross sales revenue of $99.7 million on the sale of 23.4 million pounds of copper, 2.5 million pounds of zinc, 0.6 million pounds of lead, 6,880 ounces of gold and 351,366 ounces of silver.

Financial and Production Highlights for the Nine Months Ended September 30, 2012

  • Recorded net earnings of $41.1 million or $0.11 per common share which included:
    • Earnings from mining operations of $64.1 million,
      • Recognized copper price of $3.72 per pound.
    • Cost of sales included a $5.7 million non-cash charge related to the write-down of ore stockpile inventory at the Minto Mine,
    • $22.0 million in current and deferred tax expenses.
  • Adjusted net earnings(1) of $58.6 million or $0.15 per common share after making adjustments for certain non-cash and non-recurring items.
  • Generated cash flow from operating activities of $72.2 million or $0.19 per common share.
  • Produced a total of 60.8 million pounds of payable copper at an estimated total cash cost(1) of $1.44 per pound of payable copper produced.
  • Recorded gross sales revenue of $250.0 million on the sale of 59.6 million pounds of copper, 9.3 million pounds of zinc, 2.2 million pounds of lead, 12,864 ounces of gold and 1,176,401 ounces of silver.

Operational Highlights for the Three Months Ended September 30, 2012

Cozamin Mine, Mexico:

  • Achieved copper production of 11.0 million pounds.
  • Recorded cash costs(1) of $1.12 per pound of payable copper produced.
  • Continued the 32,000 metre 2012 exploration program.  Work in the quarter focused on the Mala Noche Footwall Zone, drilling 8,565 metres during the quarter, bringing the year-to-date total to 27,546 metres.
  • Continued development of the MNFWZ reserves.

Minto Mine, Yukon:

  • Achieved copper production of 11.6 million pounds.
  • Recorded cash costs(1) of $1.86 per pound of payable copper produced.
  • Recorded a $5.7 million non-cash charge related to the write-down of its ore stockpile inventory.
  • Completed new mineral resource estimates for the Fireweed and Inferno North deposits, resulting in a resource estimate of 101 million pounds of copper in the indicated category and 86 million pounds in the inferred category, at a 1.2% copper cut-off grade.
  • Commenced underground development with the initial excavation of the portal.
  • Subsequent to quarter end, the amendment to Minto's Water Use License was approved, allowing placement of tailings into the mined out Main Pit. Tailings have been deposited in the Main Pit since the beginning of November, resulting in an estimated cost savings of C$5.00 per tonne of ore milled.

Santo Domingo Project, Chile:

  • A Project Director with over 25 years of project, construction and engineering management experience, including extensive Owner and EPCM project management experience, has been hired to be based in Santiago to lead the Owner's team.
  • The bid process for power supply was completed with only one compliant proposal ultimately received.  The proponent's power project related to that proposal has subsequently met with substantial delays as a result of a recent court decision in Chile and the proposal was withdrawn. As a result, the bid process was closed without advancing a power purchase agreement. Discussions continue with a number of power suppliers to determine the best course of action.
  • The Bankable Feasibility Study was originally targeted for completion in the first quarter of 2013.  However, given the current state of the electricity market in Chile, reasonable rates for electric power are not expected to be available until 2017-2018, so Capstone has chosen to slow the project timeline to more closely align with power availability. The revised date for completion of the study will be the first quarter of 2014 and will incorporate a number of optimizations and trade-off studies. At the same time, indications are that the build time for the project will be 24 months. As a result, the targeted start up for the project is now mid-2017 at the earliest, but will be continually evaluated to align with any developments in the Chilean power supply.
  • The environmental impact study is expected to be completed as planned, however starting the formal assessment may be delayed to allow incorporation of project improvements.

Kutcho Project, British Columbia:

  • The Kutcho Project is in the pre-application stage of the environmental assessment process and work continued with the provincial and federal agencies to towards finalizing the draft Application Information Requirements.
  • Continued the First Nations consultation program, including negotiations around agreements leading to Impact Benefit Agreements.
  • Advanced basic engineering which has been allocated into three control work packages: the access road, surface infrastructure and mine development.

Production Outlook

Capstone's 2012 guidance of 80 million pounds (� 5%) of copper contained in concentrates at a total cash cost(1) of $1.55 to $1.65 per pound of payable copper, net of by-product credits and selling costs, remains unchanged. With copper production of 63.1 million pounds at a total cash cost per payable pound of copper produced of $1.44 for the first nine months of the year, we are on target to meet our original guidance for the year.

Conference Call and Webcast Details

Capstone will host a conference call and webcast on Thursday, November 8, 2012 at 11:30 am Eastern time (8:30 am Pacific time).

Date:   Thursday, November 8, 2012
Time:    11:30 am Eastern Time (8:30 am Pacific Time)
Dial in:    North America: 1-888-231-8191, International: 1-647-427-7450
Webcast:    http://www.newswire.ca/en/webcast/detail/1047205/1137953
Replay:    North America: 1-855-859-2056, International: 1-416-849-0833
Replay Passcode:  38430666

The conference call replay will be available until November 22, 2012. The conference call audio and transcript will be available on Capstone's website within approximately 24 hours of the call at http://capstonemining.com/s/Conference_Calls.asp.

About Capstone Mining Corp.

Capstone Mining Corp. is a Canadian base metals mining company with two producing copper mines, the Cozamin copper-silver-zinc-lead mine located in Zacatecas State, Mexico and the Minto copper-gold-silver mine in Yukon, Canada. In addition, Capstone has two development projects, the large scale 70% owned Santo Domingo copper-iron-gold project in Chile in partnership with Korea Resources Corporation and the 100% owned Kutcho copper-zinc-gold-silver project in British Columbia, as well as exploration at properties in Australia, Canada, Chile and Mexico. Using its cash flow and strong balance sheet as a springboard, Capstone aims to grow organically through continued mineral resource and reserve expansions and through acquisitions in politically stable, mining-friendly regions. Additional information is available at www.capstonemining.com.

Cautionary Note Regarding Forward-Looking Information

This document may contain "forward-looking information" within the meaning of Canadian securities legislation and "forward-looking statements" within the meaning of the United States Private Securities Litigation Reform Act of 1995 (collectively, "forward-looking statements"). These forward-looking statements are made as of the date of this document and Capstone Mining Corp. (the "Company") does not intend, and does not assume any obligation, to update these forward-looking statements, except as required under applicable securities legislation.

Forward-looking statements relate to future events or future performance and reflect Company management's expectations or beliefs regarding future events and include, but are not limited to, statements with respect to the estimation of mineral reserves and mineral resources, the realization of mineral reserve estimates, the timing and amount of estimated future production, costs of production, capital expenditures, success of mining operations, environmental risks, unanticipated reclamation expenses, title disputes or claims and limitations on insurance coverage. In certain cases, forward-looking statements can be identified by the use of words such as "plans", "expects" or "does not expect", "is expected", "outlook", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates" or "does not anticipate", or "believes", or variations of such words and phrases or statements that certain actions, events or results "may", "could", "would", "might" or "will be taken", "occur" or "be achieved" or the negative of these terms or comparable terminology. In this document certain forward-looking statements are identified by words including "scheduled", "guidance", "plan", "planned", "estimated", "projections", "projected" and "expected". By their very nature forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Company to be materially different from any future results, performance or achievements expressed or implied by the forward-looking statements. Such factors include, among others, risks related to actual results of current exploration activities; changes in project parameters as plans continue to be refined; future prices of mineral resources; possible variations in ore reserves, grade or recovery rates; accidents, dependence on key personnel, labour pool constraints, labour disputes; delays in obtaining governmental approvals or financing or in the completion of development or construction activities; and other risks of the mining industry as well as those factors detailed from time to time in the Company's interim and annual financial statements and management's discussion and analysis of those statements, all of which are filed and available for review on SEDAR at www.sedar.com. Although the Company has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking statements, there may be other factors that cause actions, events or results not to be as anticipated, estimated or intended. There can be no assurance that forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements.  Accordingly, readers should not place undue reliance on forward looking statements.

National Instrument 43-101 Compliance

Unless otherwise indicated, Capstone has prepared the technical information in this news release ("Technical Information") based on information contained in the technical reports, news releases and MD&A's (collectively the "Disclosure Documents") available under Capstone Mining Corp.'s company profile on SEDAR at www.sedar.com. Each Disclosure Document was prepared by, or under the supervision of, a qualified person (a "Qualified Person") as defined in National Instrument 43-101 Standards of Disclosure for Mineral Projects of the Canadian Securities Administrators ("NI 43-101").  Readers are encouraged to review the full text of the Disclosure Documents which qualifies the Technical Information.  Readers are advised that mineral resources that are not mineral reserves do not have demonstrated economic viability. The Disclosure Documents are each intended to be read as a whole, and sections should not be read or relied upon out of context. The Technical Information is subject to the assumptions and qualifications contained in the Disclosure Documents.

The disclosure of the Technical Information contained in this news release has been reviewed and approved by John Sagman, P. Eng., Capstone's Vice President, Technical Services (Technical Information related to mining and production) and Brad Mercer, P. Geol., Capstone's Vice President, Exploration (Technical Information related to mineral exploration activities), both Qualified Persons under NI 43-101. In addition, Gregg Bush, Senior Vice President and Chief Operating Officer for Capstone reviewed all Technical Information in this news release.

Alternative Performance Measures

The items marked with a "(1)" are alternative performance measures and readers should refer to Alternative Performance Measures in the Company's Interim Management's Discussion and Analysis for the three and nine months ended September 30, 2012 as filed on SEDAR and as available on the Company's website for further details.

Cautionary Note to United States Investors

This press release contains disclosure that has been prepared in accordance with the requirements of Canadian securities laws, which differ from the requirements of U.S. securities laws. Without limiting the foregoing, this press release uses the terms "indicated" and "inferred" resources. U.S. investors are cautioned that, while such terms are recognized and required by Canadian securities laws, the SEC does not recognize them. Under U.S. standards, mineralization may not be classified as a "reserve" unless the determination has been made that the mineralization could be economically and legally produced or extracted at the time the reserve determination is made. U.S. investors are cautioned not to assume that all or any part of indicated resources will ever be converted into reserves. U.S. investors should also understand that "inferred resources" have a great amount of uncertainty as to their existence and as to whether they can be mined legally or economically. It cannot be assumed that all or any part of "inferred resources" will ever be upgraded to a higher category. Therefore, U.S. investors are also cautioned not to assume that all or any part of inferred resources exist, or that they can be mined legally or economically. Accordingly, information concerning descriptions of mineralization and resources contained in this press release may not be comparable to information made public by U.S. companies subject to the reporting and disclosure requirements of the SEC.

(1) The items marked with a "1" are alternative performance measures; please see "Alternative Performance Measures" at the end of this release.

 

SOURCE: Capstone Mining Corp.

For further information:

Cindy Burnett, VP, Investor Relations and Communications
604-637-8157
cburnett@capstonemining.com

.
Données et statistiques pour les pays mentionnés : Canada | Tous
Cours de l'or et de l'argent pour les pays mentionnés : Canada | Tous

Capstone Mining Corp.

PRODUCTEUR
CODE : CS.TO
ISIN : CA14068G1046
CUSIP : 14067U104
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Capstone Mining est une société de production minière de cuivre basée au Canada.

Capstone Mining est productrice de cuivre, d'argent, d'or, de plomb et de zinc au Canada et au Mexique, en développement de projets d'argent, de cuivre, d'or et de zinc au Canada.

Ses principaux projets en production sont MINTO MINE au Canada et COZAMIN BACIS au Mexique et son principal projet en développement est KUTCHO au Canada.

Capstone Mining est cotée au Canada, aux Etats-Unis D'Amerique et en Allemagne. Sa capitalisation boursière aujourd'hui est 3,8 milliards CA$ (2,8 milliards US$, 2,6 milliards €).

La valeur de son action a atteint son plus bas niveau récent le 06 décembre 2002 à 0,11 CA$, et son plus haut niveau récent le 25 avril 2024 à 9,62 CA$.

Capstone Mining possède 390 500 000 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Présentations des Compagnies de Capstone Mining Corp.
31/12/2007Corporate Presentation
Dans les médias de Capstone Mining Corp.
26/11/2018Capstone Mining mulls selling stake in Chile-based copper-ir...
Rapports annuels de Capstone Mining Corp.
2007 Annual Report
Nominations de Capstone Mining Corp.
14/05/2013Capstone Appoints D. James Slattery as Chief Financial Offic...
04/06/2012Capstone Mining Appoints Director
14/09/2011Capstone Appoints Santo Domingo General Manager and Awards E...
14/04/2011Reports Change to its Board
Rapports Financiers de Capstone Mining Corp.
28/07/2015Second Quarter 2015 Financial Results
21/02/2014Capstone Mining Reports Financial Results
21/02/2014Reports Financial Results for Pivotal Year
13/01/2014Capstone Mining 2013 Fourth Quarter and Full
30/10/2013Capstone Mining 2013 Third Quarter Continues
10/10/2013Capstone Mining 2013 Third Quarter
11/07/2013Capstone Mining 2013 Second Quarter
08/05/2013Capstone Mining 2013 First Quarter Financial
11/04/2013Capstone Mining 2013 First Quarter
08/11/2012Capstone Reports 2012 Third Quarter Financial Results; Cash ...
15/08/2012Capstone Reports 2012 Second Quarter
10/05/2012Capstone Reports Solid 2012 First Quarter
15/08/2011Capstone Reports Second Quarter 2011
25/05/2011Capstone Reports First Quarter 2011 Financial Results
07/11/2008Reports Financial Results For The Third Quarter
23/07/2008To Release Second Quarter Results
09/07/2008Announces Production and Sales for the Second Quarter of 200...
30/04/2008 Reports Record Operating Profit Of $15.9 Million For The Fi...
23/04/2008To Release First Quarter Results On Tuesday April 29, 2008
16/04/2008 Announces Production And Sales For The First Quarter Of 200...
15/11/2007Year-End and Fourth Quarter Results
Projets de Capstone Mining Corp.
22/09/2014(Minto Mine)Receives Quartz Mining License Amendment for Minto Mine
03/12/2013Capstone Mining Provides Pinto Valley Production Update
11/10/2013Capstone Mining Completes Acquisition of
08/08/2013Capstone Mining Acquires Option on 350,000 Hectare Explorati...
11/06/2013Capstone Mining Provides Update on Pinto Valley Acquisition
25/10/2012Capstone adds 101 Million Pounds of Copper in Indicated Mine...
18/06/2012Capstone Completes Minto Mine Phase VI
08/02/2012Capstone Updates Mineral Resource Estimate for Footwall Zone...
02/02/2012Capstone Completes Another Successful Drill Season at Minto ...
20/06/2011Capstone Announces Initial Mineral Resource
17/06/2011Capstone Completes Acquisition of Far West Mining and Transa...
14/06/2011Capstone Mining and Far West Mining Approve Acquisition and ...
30/05/2011Capstone Adds 219 Million Pounds of Copper in M&I Mineral Re...
02/05/2011Capstone Reports Additional High Grade
14/04/2011Capstone Reports High Grade Intercepts at
14/03/2011Capstone Completes Prefeasibility Study on Phase V Expansion...
24/02/2011(Kutcho)Reports 2011 Prefeasibility Study for Kutcho Copper-Zinc Pro...
24/02/2011Capstone Reports 2011 Prefeasibility Study
17/02/2009(Minto)Reports 5th New High Grade Copper-Gold Discovery at Minto Mi...
09/02/2009Announces Robust Mineral Resource Update for High Grade Kutc...
04/02/2009(Cozamin Bacis)Reports Record Copper Production for 2008 and Increases Fore...
10/01/2008(Cozamin Bacis)Highlights Production and Sales for the Four Months Ended De...
16/10/2007(Cozamin Bacis)Capstone Increases Resources to 8.6 Million Tonnes at the Co...
11/10/2007(Cozamin Bacis) Declares Expanded Commercial Production at Cozamin and High...
Communiqués de Presse de Capstone Mining Corp.
26/07/2016Capstone reports 2Q loss
26/04/2016Capstone reports 1Q loss
19/01/2016Capstone Mining to Attend Upcoming Investor Conferences
18/01/2016Capstone Mining 2016 Operating and Capital Guidance
18/01/2016Capstone Extends Pinto Valley Mine Life to 2039
06/01/2016Edited Transcript of CS.TO earnings conference call or prese...
25/11/2015Capstone Mining to Attend Upcoming Investor Conferences
27/10/2015Capstone reports 3Q loss
13/10/2015Capstone Mining 2015 Third Quarter Production Results
09/09/2015Capstone Mining Announces Spending Cuts in Response to Marke...
08/09/2015Capstone Mining to Attend Upcoming Investor Conference
27/08/2015Edited Transcript of CS.TO earnings conference call or prese...
05/08/2015Capstone Mining Receives Water Use Licence for Minto Mine
03/08/2015Zacks Investment Ideas feature highlights: Avino Silver and ...
28/07/2015Capstone Mining Second Quarter 2015 Financial Results
13/07/2015Capstone Mining 2015 Second Quarter Production Results
08/07/2015Capstone Mining Receives Approval of Environmental Impact As...
13/04/2015Capstone Mining 2014 First Quarter Production Results
01/04/2015Capstone Mining Publishes Inaugural Sustainability Report
01/04/2015Publishes Inaugural Sustainability Report
19/02/2015to Attend Upcoming Investor Conferences
01/12/2014to Attend Upcoming Investor Conferences
29/10/2014Capstone Mining Reports Another Quarter of Record Cash Flow
14/10/2014Capstone Mining to Attend Upcoming Investor Conference
12/09/2014Discontinues Planned Offering of $300 million Senior Notes
05/09/2014Announces Launch of $300 million Senior Notes Offering
07/05/2014Reports Operating Cash Flow Increases 134% to $47.1 Million
10/04/2014Record 2014 First Quarter Production Results
26/03/2014Extends Pinto Valley Mine Life to 2026
20/01/2014Capstone Mining to Attend Upcoming Investor Conferences
20/01/2014to Attend Upcoming Investor Conferences
20/01/2014to Attend Upcoming Investor Conferences
13/01/20142013 Fourth Quarter and Full Year Production Results
11/12/2013Capstone Mining Files Updated Technical Report for Pinto Val...
11/12/2013Files Updated Technical Report for Pinto Valley
14/11/2013Capstone Mining to Attend Upcoming Investor Conferences
14/11/2013to Attend Upcoming Investor Conferences
07/10/2013Capstone Mining Provides Update on Pinto
07/10/2013Provides Update on Pinto Valley Acquisition
31/07/2013Capstone Mining Delivers Consistent 2013
11/07/20132013 Second Quarter Production Results
13/06/2013Capstone Mining Files Pinto Valley 43-101 Mineral Resource E...
11/06/2013Provides Update on Pinto Valley Acquisition
30/05/2013Capstone Mining to Attend Upcoming Investor Conferences
10/05/2013Capstone Mining Reports Annual General Meeting Voting Result...
29/04/2013Capstone Mining to Purchase Pinto Valley
28/04/2013to Purchase Pinto Valley Copper Mine
13/03/2013Capstone Mining Reports 2012 Year End
18/02/2013to Present at Upcoming Investor Conferences
10/01/2013Capstone 2012 Fourth Quarter and Full Year Production Result...
10/01/20132012 Fourth Quarter and Full Year Production Results Meet Gu...
31/10/2012Capstone Reports Senior Management Change
31/10/2012Reports Senior Management Change
23/10/2012Capstone Reports Board Change
23/10/2012Reports Board Change
11/10/2012Capstone 2012 Third Quarter Production Results on Track
12/07/2012Capstone 2012 Second Quarter Production Results On Target
14/05/2012Capstone Reports Board Change
13/04/2012Capstone Mining Announces New $200 Million
12/04/2012Capstone 2012 First Quarter Production
14/03/2012Capstone Reports Strong 2011 Results
10/02/2012Capstone Mining Reports Board Change
26/01/2012Capstone 2012 Operating and Capital Guidance
17/01/2012Capstone Fourth Quarter and Full Year 2011 Production Result...
16/01/2012Capstone Awards Contract for Santo Domingo
06/10/2011Capstone Third Quarter Production Results
15/08/2011Capstone Reports Pre-Feasibility Study
10/08/2011to Hold Second Quarter and Santo Domingo PFS Conference Call...
06/07/2011Capstone Second Quarter Production Results
20/06/2011Capstone Mining Board of Director Changes
14/06/2011and Far West Mining Approve Acquisition and KORES Agreement
02/06/2011Independent Proxy Firms Recommend Capstone Shareholders Vote...
23/05/2011Mails Information Circular with Respect to Acquisition of Fa...
20/05/2011Capstone Mining Mails Information Circular
10/05/2011to Hold First Quarter Conference Call May 25, 2011
26/04/2011Capstone Reports First Quarter Production
17/04/2011Capstone Mining to Acquire Far West Mining
14/04/2011Capstone Reports Change to its Board
15/03/2011Capstone Reports Record Revenue and Strong
26/01/2009Commences US$ 3 Million Resource Expansion Drill Program at ...
22/01/2009Reports Debt Repayments, Funding of Debenture Repurchase and...
10/12/2008Reports Final Drill Intercepts of Near Surface Copper-Gold a...
25/11/2008Reports Minto Mine Connected to Yukon Electrical Grid
24/11/2008Sherwood and Capstone Announce Closing of Business Combinati...
14/11/2008Shareholders Overwhelmingly Approve Business Combination wit...
08/09/2008Announce Combination to Create Intermediate Copper Producer
29/07/2008Reports Record Revenues of $35.3 Million and Record Operatin...
15/07/2008Announces Normal Course Issuer Bid
28/02/2008December 31, 2007 Four Month Stub Period Results
21/02/2008to Release 4 Months Ended December 31, 2007 Results on Thurs...
17/01/2008Provides 2008 Expansion And Exploration Plans And Increases ...
08/11/2007 To Release 2007 Year End Results On Wednesday November 14,...
19/07/2007Provides Cozamin Mine Expansion Update
28/06/2007Reports Q3 Results: Operating Profit of $7.8 Million, $0.09 ...
05/04/2007Closes Previously Announced Agreement to Sell Cozamin Silver...
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TORONTO (CS.TO)FRANKFURT (OUW.F)
9,62+6.42%5,45-2.68%
TORONTO
CA$ 9,62
25/04 17:00 0,580
6,42%
Cours préc. Ouverture
9,04 9,09
Bas haut
9,09 9,69
Année b/h Var. YTD
6,02 -  9,65 49,61%
52 sem. b/h var. 52 sem.
4,49 -  9,65 53,18%
Volume var. 1 mois
2 525 968 20,70%
24hGold TrendPower© : 40
Produit Copper - Gold - Silver
Développe Copper - Gold - Silver - Zinc
Recherche
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 05/11/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
202458,22%
202323,08%7,254,90
2022-8,52%7,792,25
2021126,89%6,642,41
2020226,03%2,490,33
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,75 AU$+0,52%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
11,94 US$+9,34%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,54 GBX-2,55%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,69 CA$+13,03%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
15,60 CA$+1,83%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+0,00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,19 AU$+0,00%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,87 CA$+5,65%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
52,62 US$+1,00%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+0,00%Trend Power :