Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en

Tasman Resources NL

Publié le 15 juin 2013

Clarifies Technical Disclosure

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Europe | Report |

Re:       News Release - Friday, June 14, 2013
Title:     Tasman Clarifies Technical Disclosure

Vancouver, Canada

As a result of a review by the British Columbia Securities Commission (the "BCSC"), Tasman Metals Ltd. ("Tasman" or the "Company") (TSXV:TSM; Frankfurt: T61; NYSE-MKT: TAS) is issuing the following news release to clarify certain aspects of its technical disclosure.

The BCSC has identified certain issues with the disclosure in the Company's current technical reports and with certain of the Company's other technical disclosure, as set out below.

A. TECHNICAL REPORTS

The Company advises that, as set forth below under items 1 and 2, the following technical reports are not compliant with National Instrument 43-101 -- Standards of Disclosure for Mineral Projects ("NI 43-101"):

  • "Preliminary Economic Assessment - NI 43-101 Technical Report for the Norra K�rr (REE-Y-Z) Deposit - Gr�nna, Sweden" dated May 11, 2012 in support of the first time disclosure of a preliminary economic assessment on the Company's Norra K�rr project (the "Norra K�rr Report"); and
  • "Technical Report for Olserum REE Deposit, Southern Sweden" dated April 2, 2013 in support of the first time disclosure of a mineral resource estimate on the Olserum REE deposit (the "Olserum Report" and together with the Norra K�rr Report, the "Technical Reports").

1. Norra K�rr Report

The BCSC's review identified the following examples where the Norra K�rr Report does not comply with the requirements of NI 43-101:

  1. The economic analysis in section 22 of the Norra K�rr Report fails to include a summary of taxes applicable to the Norra K�rr property or to production, and to revenue or income from the project, as required by Item 22(d) of Form 43-101F1;
  2. The authors of the Norra K�rr Report disclose the quantity and grade of the deposit as a "Block Model Inventory" without using the required categories of inferred, indicated or measured mineral resources contrary to section 2.1(a) of NI 43-101 and state that such disclosure is NI 43-101 compliant which is not accurate;
  3. The Norra K�rr Report contains references to NI 43-101 compliance in the context of exploration information, such as data, drilling, probing, sampling, and resources which is inconsistent with the stated application and requirements of NI 43-101. NI 43-101 establishes rules for how issuers disclose scientific and technical information but does not provide rules for the collection of exploration information or the estimation of mineral resources;
  4. The Norra K�rr Report uses the term "ore" to describe mineral resource quantities which implies economic viability and is, therefore, not appropriate before the completion of a positive pre-feasibility study or feasibility study;
  5. Although the Norra K�rr Report recommends a work program on the Norra K�rr property, it fails to provide particulars and a breakdown of costs as required by item 26 of Form 43-101F1; and
  6. the Consents of Qualified Person filed with the Norra K�rr Report do not comply with section 8.3(1)(d) of NI 43-101.

2. Olserum Report

The BCSC's review identified the following examples where the Olserum Report does not comply with the requirements of NI 43-101:

  1. The Olserum Report did not apply a cut-off grade and failed to apply metallurgical assumptions, assumptions of mining methods or metal prices in the mineral resource estimation. Such key assumptions and parameters are relevant and should have been included in the Olserum Report in order to ensure that the Olserum mineral resource estimate meets the resource definition in NI 43-101. Accordingly, the Olserum mineral resource estimate should not be relied on until the amended Olserum Technical Report referred to below is filed;
  2. The authors of the Olserum Report appear to disclaim responsibility for scientific and technical information contained in the Olserum Report contrary to section 6.4 of NI 43-101;
  3. The Olserum Report contains references to NI 43-101 compliance in the context of exploration information, such as data, drilling, probing, sampling, and resources which is inconsistent with the stated application and requirements of NI 43-101 as noted above in item (iii) under the heading Norra K�rr Report;
  4. The exploration disclosure in section 9 of the Olserum Report fails to include all the information required by item 9 of Form 43-101F1. In addition, the section includes an historical estimate for the project without also providing the information required by section 2.4 of NI 43-101 which governs the disclosure of historical estimates;
  5. The Olserum Report recommends infill and extension drilling work to increase the confidence of the resource category from indicated to measured. However, the report fails to take into consideration other work necessary, such as metallurgical and geotechnical studies, to achieve the level of confidence required for such classification;
  6. The Olserum Report does not comply with the requirements of NI 43-101 and Form 43-101F1 which came into force on June 30, 2011; and
  7. the Consents of Qualified Persons filed with the Olserum Report do not comply with section 8.3(1)(d) of NI 43-101.

The Company has instructed the respective authors of the Technical Reports to make the revisions required to address the above comments of the BCSC and will file amended Technical Reports, when completed.

B. TECHNICAL DISCLOSURE

The BCSC identified the following issues with the Company's other technical disclosure:

  1. The disclosure of the economic analysis with respect to the Norra K�rr project extracted from the Norra K�rr Report in the Company's (i) annual information form for the year ended August 31, 2012 (the "AIF"); (ii) management discussion & analysis for the six months ended February 28, 2013 (the "MD&A"); (iii) March 21, 2012 news release (the "March News Release"); (iv) fact sheet previously posted on the Company's website (the "Fact Sheet"); and (v) May 2013 corporate presentation previously posted on the Company's website (the "May 2013 Presentation"); includes only the pre-tax economics, net present value and internal rate of return without disclosing the comparative post-tax values, which could potentially overstate the value of the Norra K�rr project. Additionally, such disclosure does not include the proximate cautionary language in relation to a preliminary economic assessment (a "PEA") nor details required by section 2.3(3) of NI 43-101.

    To address the above noted issues, the Company has removed the Fact Sheet and May 2013 Presentation from its web site and has requested that the authors of the Norra K�rr Report revise the report to include the comparative post-tax values in the Norra K�rr economic analysis.
  2. The March News Release and Fact Sheet contain the following statements: "the PEA clearly demonstrates the strong economics of the project" and "Norra K�rr is one of the most economically robust projects amongst its peers". The BCSC has raised concerns that these statements could potentially be confusing as they contradict the definition of a PEA and the cautionary language required by section 2.3 (3)(a) and section 3.4(e) of NI 43-101.

    The statements referenced above should not be relied upon and the Company wishes to retract such statements. As the AIF, MD&A and March News Release cannot be withdrawn from circulation, the Company wishes to correct this disclosure and cautions that a PEA is preliminary in nature and includes inferred mineral resources which are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as mineral reserves, and there is no certainty that the PEA will be realized. In addition, mineral resources are not mineral reserves and do not have demonstrated economic viability.
  3. The March News Release, the May 2013 Presentation, the Fact Sheet and statements on the Company's website, disclose mineral resources that are contrary to section 2.3 and section 3.4 of NI 43-101 in that:

    • On its Fact Sheet and slides 20 and 31 of the May 2013 Presentation, the Company disclosed a mineral resource without: (a) providing the effective date of each mineral resource; (b) disclosing the key assumptions, parameters, and methods used to estimate the mineral resource; (c) identifying any known legal, political, environmental or other risks that could materially affect the potential development of the mineral resource; and (d) providing the required cautionary language; all contrary to sections 3.4 (a), (c), (d) and (e) of NI 43-101; and
    • In the March New Release and on slide 20 of the May 2013 Presentation the Company disclosed the quantity and grade of the Norra K�rr project as a "Block Model Inventory" or a "Mineral Inventory" which, as noted above in item (ii) under the heading Norra K�rr Report, is contrary to section 2.3 (1)(a) of NI 43-101.
    The Company has removed the Fact Sheet, the May 2013 Presentation and the non-NI 43-101 compliant statements from its website. The Company wishes to retract the disclosure relating to the "Block Model Inventory" and "Mineral Inventory" from the March News Release and cautions that the potential quantity and grade is conceptual in nature, there has been insufficient exploration to define a mineral resource and that it is uncertain if further exploration will result in the target being delineated as a mineral resource.
  4. On slide 29 of the May 2013 Presentation, the Company disclosed historical estimates for the Olserum project without also providing the necessary information required by section 2.4 of NI 43-101.

    The Company has removed the May 2013 Presentation from its website and the referenced disclosure should not be relied upon.
  5. The Company's March News Release, February 27, 2013 news release (the "February News Release"), the Fact Sheet and project pages of its website state that the "mineral resource estimates are NI 43-101 compliant" and that they are the "only NI 43-101 resource of REE's in mainland Europe". The BCSC has raised concerns that such statements may be confusing because they are inconsistent with the stated application and requirements of NI 43-101. In particular, NI 43-101 establishes rules on how issuers disclose mineral resource/reserve estimates and other scientific and technical information and does not provide rules for the collection of exploration information or the estimation of mineral resources.

    The Company has removed the Fact Sheet from its website and has removed the above-noted statements from the project pages of its website. The Company wishes to retract the above-noted statements from its March News Release and February News Release.
  6. In the May 2013 Presentation, the Company failed to identify and disclose the relationship to the Company of the qualified person who prepared or supervised the preparation of the technical information it is disclosing, as required by NI 43-101.

    The Company has removed the May 2013 Presentation from its website.

On behalf of the Board,

"Mark Saxon"        
Mark Saxon, President & CEO

Investor Information
www.tasmanmetals.com

1305 -- 1090 West Georgia St., Vancouver, BC, V6E 3V7
Company Contact: Jim Powell, V.P. - Corporate Development
+ 1 (647) 478 8952 Email: jpowell@tasmanmetals.com
or Mariana Bermudez +1 (604) 685 9316
Email: info@tasmanmetals.com

The qualified person for the Company's exploration projects, Mark Saxon, President and Chief Executive Officer of Tasman and a Fellow of the Australasian Institute of Mining and Metallurgy and Member of the Australian Institute of Geoscientists, has reviewed and verified the contents of this release.

The TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange), the NYSE - MKT nor the Frankfurt Stock Exchange accepts responsibility for the adequacy or accuracy of this news release.

Cautionary Note to U.S. Investors Concerning Mineral Resources and Reserves. In this news release, the definition of "mineral resources" is that used by the Canadian securities administrators and conforms to the definition utilized by CIM in the "CIM Standards on Mineral Resources and Reserves -- Definitions and Guidelines" adopted on August 20, 2000 and amended December 11, 2005.

The standards employed in estimating the mineral resources referenced in this news release differ significantly from the requirements of the United States Securities and Exchange Commission (the "SEC") and the resource information reported may not be comparable to similar information reported by United States companies. The term "resources" does not equate to "reserves" and normally may not be included in documents filed with the SEC. "Resources" are sometimes referred to as "mineralization" or "mineral deposits". While the terms "mineral resource", "measured mineral resource", "indicated mineral resource" and "inferred mineral resource" are recognized and required by Canadian regulations, they are not defined terms under standards in the United States and normally are not permitted to be used in reports and registration statements filed with the SEC. The terms "mineral reserve", "proven mineral reserve" and "probable mineral reserve" are Canadian mining terms as defined in accordance with National Instrument 43-101 -- Standards of Disclosure for Mineral Projects ("NI 43-101") and the CIM - CIM Definition Standards on Mineral Resources and Mineral Reserves, adopted by the CIM Council, as may be amended from time to time by the CIM. These definitions differ from the definitions in the United States Securities and Exchange Commission Industry Guide 7 ("SEC Industry Guide 7") under the Securities Act of 1933. Under Canadian rules, estimates of inferred mineral resources may not form the basis of feasibility or prefeasibility studies, except in rare cases. Disclosure of "contained ounces" in a resource is permitted disclosure under Canadian regulations; however, the SEC normally only permits issuers to report mineralization that does not constitute "reserves" by SEC standards as in place tonnage and grade without reference to unit measures.

The estimation of measured, indicated and inferred mineral resources involves greater uncertainty as to their existence and economic feasibility than the estimation of proven and probable reserves. U.S. investors are cautioned (i) not to assume that measured or indicated resources will be converted into reserves and (ii) not to assume that estimates of inferred mineral resources exist, are economically or legally minable, or will be upgraded into measured or indicated mineral resources. It cannot be assumed that the Company will identify any viable mineral resources on its properties or that any mineral reserves, if any, can be recovered profitably, if at all. As such, information contained in this news release and the documents incorporated by reference herein concerning descriptions of mineralization and resources under Canadian standards may not be comparable to similar information made public by United States companies in SEC filings.

Cautionary Statements. Certain statements found in this release may constitute forward-looking statements as defined in the U.S. Private Securities Litigation Reform Act of 1995. Forward-looking statements reflect the speaker's current views with respect to future events and financial performance and include any statement that does not directly relate to a current or historical fact. Such statements reflect the current risks, uncertainties and assumptions related to certain factors including, without limitations, competitive factors, general economic conditions, customer relations, uncertainties related to the availability and costs of financing, unexpected geological conditions, success of future development initiatives, imprecision in resource estimates, ability to obtain necessary permits and approvals, relationships with vendors and strategic partners, the interest rate environment, governmental regulation and supervision, seasonality, technological change, changes in industry practices, changes in world metal markets, changes in equity markets, environmental and safety risks, and one-time events. Should any one or more of these risks or uncertainties materialize, or should any underlying assumptions prove incorrect, actual results may vary materially from those described herein. Forward-looking statements cannot be guaranteed and actual results may vary materially due to the uncertainties and risks, known and unknown, associated with such statements. Shareholders and other readers should not place undue reliance on "forward-looking statements," as such statements speak only as of the date of this release.



Copyright � 2013 TASMAN METALS LTD. (TSM) All rights reserved. For more information visit our website at http://www.tasmanmetals.com/ or send email to info@tasmanmetals.com ..

Tasman Resources NL

EXPLORATEUR
CODE : TAS.AX
ISIN : AU000000TAS5
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Tasman est une société d’exploration minière d'argent et d'or basée en Australie.

Tasman détient divers projets d'exploration en Australie et en Finlande.

Ses principaux projets en exploration sont PARKINSON DAM et WYNBRING EL3306 (CENTRAL GRAWLER) en Australie et OTANMAKI en Finlande.

Tasman est cotée en Australie et en Allemagne. Sa capitalisation boursière aujourd'hui est 1,9 millions AU$ (1,2 millions US$, 1,2 millions €).

La valeur de son action a atteint son plus haut niveau récent le 24 février 2017 à 0,30 AU$, et son plus bas niveau récent le 24 avril 2024 à 0,01 AU$.

Tasman possède 382 740 000 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Dans les médias de Tasman Resources NL
21/12/2018Tasman Mining to bring historic New Zealand mine back into p...
Rapports annuels de Tasman Resources NL
Annual Report to shareholders
Financements de Tasman Resources NL
11/02/2014Announces First Tranche Private Placement Closing and Oversu...
Projets de Tasman Resources NL
20/01/2014Provides Update On Mining Lease For Norra Karr Heavy Rare Ea...
10/10/2013Expands Critical Metal Portfolio With Acquisition Of Tungste...
25/07/2013Receives Bulk Surface Sample Permit For The Norra Karr Heavy...
23/07/2013Submits Mining Lease Application Over Olserum Heavy Rare Ear...
21/05/2013Granted Mining Lease For Norra Karr Heavy Ree Project
19/02/2013Drills Thick Intervals of Heavy REE Mineralization at Olseru...
03/10/2012Completes Summer Drilling Program at Norra Karr Heavy Rare E...
11/07/2012Submits Mining Lease Application Over Norra Karr Heavy Rare ...
11/06/2012Expands Rare Earth Element Project Portfolio in Finland
09/03/2012New York report values Tasman Resources at between 15 and 71...
13/01/2012Commences Phase 4 Drilling Program at Norra Karr Heavy Rare ...
15/12/2011Board Approves Phase 4 Drilling Program at Norra Karr Heavy ...
08/12/2011Reports on 2011 Drilling and Exploration Results at Norra Ka...
13/10/2011Acquires Olserum Heavy Rare Earth Project in Sweden
09/09/2011secures native title agreement on key IOCGU target near Olym...
31/08/2011Resource Generation ASX Announcements: Sale of Tasmanian ass...
09/08/2011Retains Pincock Allen & Holt For Preliminary Economic Assess...
06/07/2011Norra Karr Heavy Rare Earth Element Project Declared Project...
29/06/2011Government grants Mining Lease to new Tasmanian project, nea...
08/06/2011Mining lease for new Tasmanian mine near Launceston
02/05/2011Further Expands Thickness of Drilled Mineralization at Norra...
28/04/2011Board Approves Expansion of Phase 3 Drilling Program at Norr...
13/04/2011(Otanmaki)Begins Drilling Otanmaki Rare Earth Element Project, Finland
19/06/2007(Parkinson Dam)High grade silver at Tasman's SA gold project
Communiqués de Presse de Tasman Resources NL
02/08/2016Appendix 3B
23/06/2016Cleansing Notice
21/01/2016Appendix 3B
02/11/2015Notice of Annual General Meeting/Proxy Form
02/11/2015First Quarter Cashflow Report
06/10/2015Non Renounceable Rights Issue Prospectus
29/09/2015Annual Report to shareholders
07/08/2015Results of Meeting
30/07/2015Cleansing Notice
29/07/2015Fourth Quarter Activities and Cashflow Reports
15/07/2015Notice of General Meeting/Proxy Form
08/04/2015Corrie Dam Drilling Results
13/03/2015Half Year Accounts
12/01/2015Issue of ESOP Options
11/11/2014Exploration Update
12/12/2013and Flinders Announce Merger Negotiations to Create a Divers...
17/07/2013Receives European Commission Funding for Processing Research...
15/06/2013Clarifies Technical Disclosure
15/03/2013Announces Results of AGM
08/11/2012Advances Mineral Processing At Norra Karr, Sweden
18/07/2012Announces New Managing Director in Sweden and Appointments t...
01/05/2012Rio and Tasman execute conditional agreement over SA acreage
20/12/2011Proto Tasmanian pilot on track for January 2012
30/11/2011Lists on the NYSE-AMEX Under the Symbol "TAS"
17/06/2011Completes Spring Drilling and Begins Updated Resource Calcul...
26/05/2011Announces Registration of Form 40-F with US Securities and E...
27/04/2011Drills Thickest Interval of Heavy Rare Earth Elements and Zi...
29/03/2011Files Form 40-F with U.S. Securities and Exchange Commission
23/07/2010in 3rd drill push in a year on IOCGU discovery near Olympic ...
09/06/2010ASX Announcement
20/05/2010Release - Tasman looks east after 'stronger' IOCGU hole near...
19/05/2010Release - Strong nickel-cobalt hits lift Proto's progress in...
11/05/2010Tasmanian nickel project receives thumbs-up from broker
12/04/2010Tasman raising to fund SA IOCGU drilling
29/03/2010clears path for IOCGU drilling near Olympic Dam
27/10/2009Begins drilling at priority Vulcan target near Olympic Dam
29/09/2009Perth's Tasman drill start on key target near Olympic Dam in...
20/06/2008Completion of Due Diligence on Tasmanian Coal Acquisition
05/07/2007Drill start adjacent Olympic Dam for copper gold uranium JV
07/05/2007Geothermal Energy Tasmania
30/04/2007diamond JV across SA
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
AUSTRALIA (TAS.AX)BERLIN (S9U.BE)
0,005-16.67%0,021+5.00%
AUSTRALIA
AU$ 0,005
24/04 11:00 -
-16,67%
Cours préc. Ouverture
0,006 0,005
Bas haut
0,005 0,005
Année b/h Var. YTD
- -  0,006 -
52 sem. b/h var. 52 sem.
- -  0,010 -28,57%
Volume var. 1 mois
55 000 -
24hGold TrendPower© : 44
Produit
Développe
Recherche Uranium
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
2024-16,67%
2023-40,00%0,010,01
2022-60,00%0,030,01
2021-37,50%0,130,02
20200,00%0,060,02
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,70 AU$-0,65%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
12,26 US$+2,68%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,53 GBX-1,87%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,64 CA$-1,86%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
16,23 CA$+4,04%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+4,26%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,20 AU$+2,63%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,88 CA$+0,53%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
52,71 US$+0,19%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+5,56%Trend Power :