Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en
Dans la même rubrique

El Nino Ventures Ltd

Publié le 02 décembre 2009

Closes $1.5 Million Non-Brokered Private Placement; Update on the Kasala Copper Project in the DRC

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Canada | Cobalt | Copper | Nickel | Zinc |

 

 
NEWS RELEASE

www.elninoventures.com


El Ni�o Closes $1.5 Million Non-Brokered Private Placement
Update on the Kasala Copper Project in the DRC


December 2, 2009 Vancouver, BC -- El Ni�o Ventures Inc. ("ELN" and the "Company") (TSX.V: ELN; Frankfurt: E7Q) is pleased to announce that further to its news release of October 16, 2009, the Company has closed its non-brokered private placement. Proceeds from the financing will be used in part to advance the Company's properties in the Democratic Republic of Congo ("DRC") where the Company announced January 12, 2009 and February 25, 2009, a significant Copper discovery in the DRC. 

  Highlights
  • Geochem program in progress on the Kasala Copper project 
  • Follow up on high grade copper mineralization
  • Drill program slated early 2010
  • Excellent infrastructure in place


Kasala Copper Project


One of the newest copper discoveries in the Central African Copperbelt, El Ni�o Ventures' Kasala prospect is located approximately 70 kilometers northwest of Lubumbashi, Democratic Republic of Congo's second largest city and the center of the country's massive copper/cobalt mining industry. The Central African Copperbelt contains over 10% of the worlds copper and 34% of the world's cobalt. The Kasala project permits are located adjacent to Anvil Mining's Kinsevere Mine, which is expected to produce 24,000 tonnes (52 million pounds) of copper annually for the next 20 years. 

The Kasala project is one of the first new Greenfields copper discovery in the last 10 years in the central African Copper belt.


It is also located approximately 10km east of Tiger Resources' Kipoi deposit. Other prominent companies active within this region are; Freeport-McMoran, Lundin Mining Corp, First Quantum Minerals, Katanga Mining Limited, Ivanhoe Nickel & Platinum Ltd. and Konkola Copper Mines.

The Kasala project has an excellent infrastructure and is ideally situated within 20 km of the national highway (a hard-surfaced all-weather road) and is also within 30 km of a rail line linking the mining centers of the Copperbelt. A high-tension electrical transmission line is located 12 km west of the projects' boundaries.


Highlights of the Drilling and Exploration to date:


The recent drill program identified consistent mineralization over large widths, from 50m to 91m. Highlights included high-grade intercepts:
  • 22 m @ 3.28% Cu
  • 29 m @ 2.82% Cu
  • 31 m @ 2.19% Cu
  • 11 m @ 3.68% Cu
These results confirm the presence of significant mineralization within the Kasala Main Zone with the potential for expansion based on the results from an IP Survey completed in early 2009.

The 2008 drill campaign on the project was undertaken to test a number of priority targets identified from the interpretation of airborne geophysical data from a survey commissioned by the Company in late 2007. 

The 50 drill hole, 5,920 metre 2008 drill program consisted of 35 Reverse Circulation ("RC") drill holes totaling 3,336 meters and 15 diamond drill ("DD") holes totaling 2,584 meters.

Since then, the Company has completed a soil geochemistry sampling program and an Induced Polarization ("IP") survey across the Kasala site and has found good correlation between mineralization identified in the drilling, soil anomalies identified from the geochemical sampling program and both the ground and airborne geophysical surveys.

Figure 1: Kasala "Blocks" with Copper soil geochemistry values

The Company's technical team has compiled all of the available data (including drilling results, geophysical and geochemical data) into a geological model of the site, which has led to new interpretations of the geology. 

Previously, the Company had reported (press release of February 25, 2009) that a parallel zone had been identified east of "Kasala Main Zone" and was being referred to as "Kasala East". Further interpretation of the "Kasala East" zone has now found that this block is not one structure but is actually two discreet blocks. For this reason, and the possibility of discovery of additional blocks, "Kasala Main Zone" is now being referenced as Kasala Block "A", while what was previously referred to as "Kasala East" has been divided into Kasala Block "B" and Kasala Block "C" (Figure 1).

The recent drill program focused exclusively on Kasala Block "A" -- Blocks "B" and "C" are yet to be drill tested, but are considered as priority drill targets due to the strong copper-in-soil values identified over large areas on these blocks. 

Block "C" in particular has numerous multi-point anomalies of greater than 300 parts per million copper-in-soil and has an anomalous area of approximately 1,500 meters long by 1,500 meters wide -- it represents a high priority for drilling.

All samples from the drilling program were collected following strict quality controls and were then dispatched to ALS Chemex Laboratories in Johannesburg, South Africa for assay.

Across Kasala Block "A" copper mineralization is found close to surface (some intercepts less than 10 meters from surface) and both oxide (malachite) and sulphide (chalcopyrite) copper mineralization have been identified.

Currently, the mineralized strike length of Kasala Block "A" stands at just over 750 meters with a width of as much as 250 meters. The thickness of mineralization has been found to be as great as 90 meters, but the mineralization is open in all directions, including at depth. 

2010 Exploration Program

An infill diamond drilling program of at least 5,000 meters is planned to commence on Kasala Block "A" in late April, 2010, to determine the complete extent of the mineralization and to allow an NI 43-101 compliant resource estimate to be completed on Kasala Block "A" by the end of summer, 2011. 

In advance of any additional drilling the Company has determined to undertake additional soil sampling, both across Kasala Blocks "A", "B" and "C" and regionally, to provide enhanced geochemical detail while selecting drill targets

  • Phase 1 objective -- To define a inferred resource on block A with 5000 meters of diamond drilling

  • Phase 2 objective -- Step out and test geochemical and geophysical anomalies on block B and block C with 5000 meters of diamond drilling

  • Phase 3 objective -- Continue to develop inferred resource on blocks A, B and C

This Enhanced Soil Geochemistry Survey is planned to decrease sample spacing from the current 100 m x 100 m coverage over Kasala Blocks "A" "B" and "C" to 100 m x 50 m spacing regionally and 50 m x 50 m spacing over priority target areas. The Enhanced Soil Survey will be started within the next week and will entail the collection of some 6,000 samples. All results are expected to be received within 8 weeks of commencing the program.

The high degree of correlation between the soil geochemistry and drill results on Block "A" indicates that detailed soil geochemistry will provide reliable information when targeting drill holes. The objective of the continuing exploration programs on Kasala Blocks "A", "B" and "C" is to define an aggregate minimum of 1 million tonnes of contained copper metal.

Terms and Condition of Private Placement

Further to its news release of October 16, 2009, the Company has closed its non-brokered private placement and issued a total of 21,428,571 units at a purchase price of $0.07 per unit for gross proceeds of $1,500,000.

Each unit consisted of one common share and one common share purchase warrant. Each warrant entitles the holder to purchase an additional common share at a price of $0.15 per share for a period of 18 months, subject to accelerated expiry, such expiry being accelerated to 30 days in the event the Company's shares have closed at or above a price of $0.25 per share for ten consecutive trading days. 

In connection with the closing of this financing, the Company has paid a finder's fee consisting of an aggregate of $49,986.65 in cash. 

In compliance with Canadian securities laws, all of the securities issued in connection with this closing are subject to a hold period expiring on March 21, 2010.

Proceeds from the financing will be used in part to advance the Company's properties in the Democratic Republic of Congo ("DRC") where the Company made a significant Copper discovery, and in particular the Kasala Project. The Kasala Project has several intercepts of ore grade material with thickness varying from 50 to 90 meters.

This placement allowed the Company to position several strategic financial and recognized technical experts which will continue to allow the Company to complete its objectives in both Africa and its projects in Canada.

About El Ni�o Ventures Inc.

El Ni�o Ventures is an exploration company, focused on exploring for Copper/Cobalt in the DRC, that is aggressively negotiating to acquire other projects throughout Africa that are in line with the Company's corporate objectives. In Canada, in the Bathurst Mining District, the Company holds a 50% interest in an extensive base metal project located within the Bathurst mining camp, New Brunswick. El Ni�o recently entered into an option agreement with Votorantim Metals Canada Inc. and Xstrata Zinc whereby Votorantim may earn a 50% interest in El Ni�o's landholdings by expending $10 million over 5 years and may further increase its interest in El Ni�o's landholdings to 70% by expending an additional $10 million over a further two years. (Please refer to ELN's August 6, 2009 news release).

Allan Lines (P.Geo.) is the Qualified Person responsible for reviewing the technical results in this release.


On Behalf of the Board of Directors,

"Harry Barr"

Harry Barr, Chairman and CEO

Further information: 
Contact: Fern Turner at
Toll free 1.877.895.6466 or Telephone: +1.604.683.4886
Email: info@elninoventures.com  Fax
604.683.4887, or visit www.elninoventures.com
2303 West 41st Avenue, Vancouver, B.C. Canada V6M 2A3


Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release CUSIP# 28335E-10-6

Note: this release contains forward-looking statements that involve risks and uncertainties. These statements may differ materially from actual future events or results and are based on current expectations or beliefs. For this purpose, statements of historical fact may be deemed to be forward-looking statements. In addition, forward-looking statements include statements in which the Company uses words such as "continue", "efforts", "expect", "believe", "anticipate", "confident", "intend", "strategy", "plan", "will", "estimate", "project", "goal", "target", "prospects", "optimistic" or similar expressions. These statements by their nature involve risks and uncertainties, and actual results may differ materially depending on a variety of important factors, including, among others, the Company's ability and continuation of efforts to timely and completely make available adequate current public information, additional or different regulatory and legal requirements and restrictions that may be imposed, and other factors as may be discussed in the documents filed by the Company on SEDAR (www.sedar.com), including the most recent reports that identify important risk factors that could cause actual results to differ from those contained in the forward-looking statements. The Company does not undertake any obligation to review or confirm analysts' expectations or estimates or to release publicly any revisions to any forward-looking statements to reflect events or circumstances after the date hereof or to reflect the occurrence of unanticipated events. Investors should not place undue reliance on forward-looking statements.


This email should not be construed as an offer to buy or sell securities of El Ni�o Ventures Inc.

Données et statistiques pour les pays mentionnés : Canada | Tous
Cours de l'or et de l'argent pour les pays mentionnés : Canada | Tous

El Nino Ventures Ltd

EXPLORATEUR
CODE : ELN.V
ISIN : CA28335E3041
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

El Nino Ventures est une société d’exploration minière d'argent et d'or basée au Canada.

El Nino Ventures détient divers projets d'exploration au Canada.

Ses principaux projets en exploration sont KASALA en Republique Democratique Du Congo et BATHURST et BANCROFT au Canada.

El Nino Ventures est cotée au Canada et en Allemagne. Sa capitalisation boursière aujourd'hui est 3,1 millions CA$ (2,5 millions US$, 2,2 millions €).

La valeur de son action a atteint son plus haut niveau récent le 15 août 1997 à 9,90 CA$, et son plus bas niveau récent le 24 mars 2016 à 0,01 CA$.

El Nino Ventures possède 61 610 000 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Financements de El Nino Ventures Ltd
04/10/2013Niño Ventures Inc. Announces Closing of Private Placement an...
11/09/2013and Private Placement - El Nino Ventures
08/04/2011Closes Non Brokered Private Placement
02/12/2009Closes $1.5 Million Non-Brokered Private Placement; Update o...
26/08/2009First Tranche Closing Non-brokered Private Placement
27/07/2009Ammends Terms of Non-Brokered Private Placement
Nominations de El Nino Ventures Ltd
25/09/2009Appoints Mr. Harry Barr as Chairman and Acting CEO
27/03/2008appoints senior geologist to head its exploration program in...
12/10/2007Announces Appointment of New Directors and Chief Executive O...
Projets de El Nino Ventures Ltd
25/02/2014(Bathurst)Exploration Update on the Bathurst Option Joint Venture Zinc...
10/09/2013(Bathurst)$2 Million Exploration Program Approved for Bathurst Option ...
02/05/2013(Bathurst)Development Update on the Murray Brook Zn-Cu-Pb-Ag Deposit, ...
16/01/2013(Bathurst)Releases Phase 1 Metallurgical Results for the Murray Brook ...
23/10/2012(Bathurst)Exploration Update on the Bathurst Option JV Base Metals Pro...
18/09/2012EXPANDS ITS PROJECT INTEREST WITH BRAZIL'S SECOND LARGEST MI...
07/09/2012Announces completion of its 35% Earn-In, Receives Notice of ...
28/08/2012announces a 122 metre thick mineralized interval of massive ...
17/07/2012(Bathurst)Drills 9.23 % Zinc, 108.7 gpt Silver, 0.18 % Copper, 0.336 g...
24/04/2012(Bathurst)Exploration Update on the Bathurst Mining Camp (BMC) Base Me...
27/03/20122012 Exploration Program on the Murray Brook Polymetallic Ba...
04/03/2012Northern Miner article: El Nino Ventures posts new resource ...
23/02/2011(Bathurst)2011 Exploration Program on the Bathurst Mining Camp, New Br...
11/03/2010(Kasala)Reports Soil Geochemistry Sampling Results on the Kasala Cop...
24/07/2009(Bathurst)Options Bathurst Project to VotorantimMetals Canada Inc.
25/02/2009(Kasala)Identifies Additional Targets On The Company's Kasala Projec...
01/02/2008intersects 10 meters of 3.50% Cu and 5 meters of 1.90% Cu, i...
17/10/2007Acquires Significant Land Position in Ireland
Communiqués de Presse de El Nino Ventures Ltd
20/06/2016EL NINO CLOSES PRIVATE PLACEMENT AND ISSUES EARLY WARNING RE...
20/06/2016Early Warning Report
16/06/2016El Nino announces extension of private placement and issues ...
22/04/2016El Nino Announces Private Placement of up to $500,000; Negot...
10/07/2015Democratic Republic of the Congo (DRC) Corporate Update
09/04/2015MMG Limited Terminates Option Agreement with El Nino
27/10/2014El Nino Receives DRC Supreme Court Approval for All Arbitrat...
27/10/2014El Nino Receives DRC Supreme Court Approval for All Arbitrat...
23/09/2014El Nino Seeks Joint Venture Partner for Zinc-Lead Exploratio...
20/05/2014El Nino Options the Kasala Project to MMG Limited
02/04/2014El Nino Ventures Wins Final Award on all Costs of the Intern...
20/03/2014El Nino Ventures Inc. Grants Options
06/01/2014Wins International Commercial Arbitration Against George Kav...
23/07/2013(Bathurst)Positive Preliminary Economic Assessment for Murray Brook Zn...
05/06/2013(Bathurst)Positive Preliminary Economic Assessment for Murray Brook Zn...
13/11/2012Update from the Chairman
31/10/2012(Bathurst)Developing Bathurst's Largest NI 43-101 Polymetallic Deposit
02/10/2012Ni=F1o Ventures Inc. announces a 45.4 metre drill intersecti...
26/09/2012Niño Ventures retains Renmark Financial Communications
14/08/2012announces a 4.3% Zinc, 1.4% Lead and 54 g/t Silver over 81 M...
30/07/2012announces a 10.34 % Zinc, 126.0 gpt Silver, 0.29 % Copper, 1...
27/06/2012(Bathurst)continues to intersect High Grade Zinc, Gold and Silver Over...
05/06/2012(Bathurst)Announces High Grade Zinc, Gold and Silver intersections ove...
17/05/2012(Bathurst)Announces High Grade Zinc, Lead and Silver on Phase II 18,00...
11/05/2012(Bathurst)Ni=F1o Announces Initial 50% Earn-In for Murray Brook Projec...
17/04/2012Ni=F1o Ventures Inc. Announces SEDAR Filing of NI 43-101 Min...
28/02/2012(Bathurst)Announces an Initial NI 43-101 Mineral Resource Estimate for...
23/01/2012(Bathurst)Announces Additional High Grade Zinc, Lead and Silver Over B...
16/01/2012(Bathurst)Continues to Intersect High Grade Zinc, Lead and Silver Over...
28/11/2011(Bathurst)Reports High Grade Zinc, Lead and Silver over Broad intercep...
16/09/2011Joins OTCQX -- "ELNOF"
30/08/2011(Bathurst)Significant drill results continue to be intersected in the ...
12/07/2011Ni=F1o Ventures Announces $1=2C000=2C000=2C 6650 MeterDrill ...
24/05/2011amends press release of April 26, 2011
11/05/2011Up to 27 Metres (88.6 ft) of 9.56% Zinc; 122.1 g/t (3.56 opt...
25/04/2011An Interview of Harry Barr, Chairman and Acting CEO of El Ni...
11/04/2011DEMOCRATIC REPUBLIC OF CONGO (DRC) COURT RULES IN FAVOUR OF ...
07/03/2011Increases Private Placement to $2,000,000
04/03/2011Ni=F1o Ventures Appoints Colin Bird to Advisory Board
05/01/2011Hearing Update Regarding Claims Against George Kavvadias and...
24/06/2010Litigation in the DRC Dismissed; El Nino Files $850,000 Coun...
04/05/2010Votorantim Metals Canada Inc. finalizes Option/Joint Venture...
10/12/2009joins Agoracom and launches Online IR and Marketing Program
18/02/2009Joins the "Agoracom 100" and Launches Online IR and Marketin...
16/12/2008Completes Acquisition in the DRC
03/09/2008 at the Las Vegas Hard Assets Investment Conference
21/07/2008makes new Acquisition in the DRC
26/06/2008DRC Exploration Program Review and Update
13/05/2008DRC Exploration Program Update
05/05/2008Commences Irish Drill Program
14/04/200825,000 meter drill program underway in the Democratic Republ...
21/02/2008Update on Democratic Republic of Congo Projects
11/02/2008to Drill Irish Licences
04/02/2008acquires new Copper Project in the Democratic Republic of Co...
21/01/2008Update on Exploration Program in the Democratic Republic of ...
10/12/2007Update on Exploration program Project in the Democratic Repu...
28/11/2007 Completes 7,000 Meter Drill Program on Copper Project in th...
13/11/2007update on their drill program in the Democratic Republic of ...
06/11/2007New Office
25/10/2007expands drill program to 7,000 meters using a second drill r...
09/10/2007 5,000 meter drilling program in the Democratic Republic of ...
20/09/2007Identifies New Copper Mineralized Zone on Properties in the ...
20/08/2007to start 5,000 Meter Drill Program on their Democratic Repub...
02/08/2007to Commence Airborne Geophysics, Followed by Initial Drill P...
25/06/2007& Xstrata Zinc to Commence 25,000 m Drill Program on Bathurs...
22/06/2007Mining expertise helps El Nino Ventures find success
14/06/2007Begins Work on Copper Mountain Project in Democratic Republi...
11/06/2007Starts Operations in the (DRC) Congo and the Government of N...
20/04/2007Outlook for 2007 -2008 Work Program and Report on the Bathur...
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TSX-V (ELN.V)FRANKFURT (E7Q.F)
0,050+150.00%0,027+0.00%
TSX-V
CA$ 0,050
30/12 09:30 0,030
150%
Cours préc. Ouverture
0,020 0,050
Bas haut
0,050 0,050
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
- -  0,050 -%
Volume var. 1 mois
0 -%
24hGold TrendPower© : -25
Produit
Développe
Recherche Zinc
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 23/04/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
2022100,00%0,050,02
2021-44,44%0,060,03
202080,00%0,070,02
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,68 AU$-0,52%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
10,89 US$-1,36%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,55 GBX-0,72%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,36 CA$-3,28%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
15,64 CA$+2,69%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+2,17%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,20 AU$+7,89%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,87 CA$+6,25%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
51,67 US$-0,98%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,03 AU$-2,94%Trend Power :