Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en

International Enexco Limited

Publié le 27 janvier 2014

Commences $2.9 Million Drill Program on the Man Lake Uranium Project, Athabasca SK

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Canada | Copper | Uranium |
 


International Enexco Commences $2.9 Million Drill Program on the Man Lake Uranium Project, Athabasca SK


 

  • 13,000 Metre Diamond Drill Program Underway

  • 3 Drill Rigs

  • 18 Drill Holes

  • Partnered with Cameco and AREVA

Vancouver, Canada - January 27, 2014 - International Enexco Limited. (TSX-V: IEC; OTCQX: IEXCF; Frankfurt: I6E) (the "Company" or "Enexco") is pleased to announce that the proposed 13,000 metre (42,650 feet) diamond drill program on the Mann Lake Uranium project has commenced under the direction of project operator, Cameco Corporation("Cameco"). The budget for the 2014 program is CDN$2,900,000 with Enexco's portion being CDN$870,000.

The 2014 winter drill program will include up to 18 diamond drill holes evaluating three types of targets; a preliminary evaluation of the area footwall to the western axis of the C trend, the initial evaluation of the conductive features near the western margin of the Wollaston sedimentary corridor and the completion of the systematic evaluation of the remaining targets along the main C trend. The drill program will be carried out in coordination with Cameco's drill programs planned on adjacent projects.

The Mann Lake project is located in the heart of what is undisputedly the most prolific and highest grade uranium region in the world, the Athabasca Basin in Saskatchewan. Mann Lake is 25 km southwest of Cameco's McArthur River Mine and is 20 km northeast of Cameco's Millennium deposit. High-grade basement-hosted uranium mineralization was discovered at Mann Lake during a 2006 drill program. The two highest grade intervals are 7.12% U308 over 0.25m and 5.53% U308 over 0.4m at depths of just over 500m.

Qualified Person
William Willoughby, Ph.D., P.E. is the Company's Qualified Person for the purposes of National Instrument 43-101 and has prepared or supervised the preparation of the disclosure of any scientific and technical information contained in this news release.


About International Enexco, Limited
International Enexco, Limited is a North American exploration and development company focused on the feasibility stage, 100% owned, Contact Copper project in northern Nevada and the Mann Lake and Bachman Lake uranium projects located in Saskatchewan's prolific Athabasca Basin. The Mann Lake project is a joint venture with Cameco (52.5%) as operator, Enexco (30%) and AREVA (17.5%) - two of the world's largest uranium companies. The Bachman Lake project is a joint venture with Denison (80%) as operator and Enexco (20%).

On behalf of our Board of Directors.

"G. Arnold Armstrong"
President & CEO

 

 

 

 

 

 

 

 

 

 

 

Certain information regarding the Company including management's assessment of future plans and operations, may constitute forward-looking statements under applicable securities laws and necessarily involve risks associated with mining exploration and development, volatility of prices, currency fluctuations, imprecision of resource estimates, environmental and permitting risks, access to labour and services, competition from other companies and ability to access sufficient capital. As a consequence, actual results may differ materially from those anticipated in the forward-looking statements. A feasibility study has not been completed and there is no certainty the disclosed targets will be reached nor that the proposed operations will be economically viable. Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. We seek safe harbour.


LATEST NEWS


  05 Dec. International Enexco Closes Flow-Through Private Placement with Proceeds of $750,000

 

  02 Dec. International Enexco Announces Non-Brokered Flow-Through Private Placement

 

  13 Nov. International Enexco Announces $2.9 Million Drill Program, on the Mann Lake Uranium Project, Athabasca Basin, SK

 

  04 Nov. International Enexco Announces Drill Results From the Bachman Lake Uranium Project, Athabasca Basin, SK

 

  01 Oct. International Enexco Announces Positive Pre-Feasibility Study for Contact Copper Project

 

  09 Sep. International Enexco Reports On the Mann Lake Uranium Project, Athabasca SK

 

  6 Aug. International Enexco and Denison Mines Commence Drill Program on the Bachman Lake Uranium Project, Athabasca SK

 

  25 Jun. International Enexco Announces Joint Venture with Denison Mines on Bachman Lake Uranium Project, Athabasca SK

 

  06 Jun. International Enexco Announces Adoption of Advance Notice Policy

 

 
 

 

RECENT ARTICLES


Données et statistiques pour les pays mentionnés : Canada | Tous
Cours de l'or et de l'argent pour les pays mentionnés : Canada | Tous

International Enexco Limited

EXPLORATEUR
CODE : IEC.V
ISIN : CA45945G1072
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

International Enexco est une société développant des projet miniers de cuivre et d'uranium basée au Canada.

International Enexco détient divers projets d'exploration au Canada.

Ses principaux projets en exploration sont LOOMIS, HOT POT PROJECT, MANN LAKE, CONTACT COPPER et MANN LAKE (JV) au Canada.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Financements de International Enexco Limited
14/02/2014Announces Non-Brokered Private Placement
Nominations de International Enexco Limited
13/07/2011Appoints Spiros Cacos
24/06/2008Appoints Two New Directors
Projets de International Enexco Limited
27/01/2014Commences $2.9 Million Drill Program on the Man Lake Uranium...
10/12/2013International Enexco Gives a Base Metal (and Uranium) Balanc...
13/11/2013(Mann Lake)Announces $2.9 Million Drill Program, on the Mann Lake Urani...
10/10/2013(Contact Copper)Files Pre-Feasibility Study for Contact Copper Project, Neva...
01/10/2013(Contact Copper)Announces Positive Pre-Feasibility Study for Contact Copper ...
25/06/2013Announces Joint Venture with Denison Mines on Bachman Lake U...
27/03/2013(Mann Lake)Reports On the Mann Lake Uranium Project, Athabasca SK
19/02/2013(Mann Lake)JV Partner Cameco Adds Third Drill Rig On the Mann Lake Uran...
08/02/2013(Mann Lake)Minesite.com Article: International Enexco Sets The Drills T...
24/01/2013INTERNATIONAL ENEXCO (TSX-V: IEC) COMMENCES $6 MILLION, THRE...
21/01/2013International Enexco Commences $6 Million, Three Rig Drill P...
21/01/2013(Mann Lake)Commences $6 Million, Three Rig Drill Program, On the Mann L...
18/09/2012International Enexco Announces Positive Metallurgical Result...
18/09/2012(Contact Copper)Announces Positive Metallurgical Results from Contact Copper...
10/09/2012(Contact Copper)Completes Drill Program at Contact Copper Project and Report...
19/03/2012International Enexco Announces Additional Drill Results from...
24/02/2012International Enexco's Shares Power Ahead, As The Contact Co...
23/02/2012(Contact Copper)MINESITE.COM: International Enexco's Shares Power Ahead, As ...
16/01/2012(Contact Copper)Drill Program Update for Contact Copper Project, Nevada
28/11/2011(Contact Copper)Commences Drilling Contact Copper Project, Nevada
27/07/2011(Contact Copper)to Acquire Properties of Allied Nevada at Contact, Nevada
09/02/2011(Contact Copper)Rising Copper Prices Favor International Enexco
17/08/2009Positive Copper Pre-Feasibility Study Received
09/02/2009(Mann Lake)Drilling at Mann Lake Underway with Cameco as Operator
07/01/2009(Mann Lake)Cameco to Commence 3rd Enexco Drill Program at Mann Lake
29/09/2008(Contact Copper)Prepares to Drill Newly Optioned Boston Claim Group
21/08/2008(Contact Copper)Pre-Feas Study to Commence at Contact - New Resource Calcula...
Communiqués de Presse de International Enexco Limited
04/11/2013Announces Drill Results From the Bachman Lake Uranium Projec...
10/10/2013Mid=2DDay Breaking News From Zenyatta and International Enex...
09/09/2013Mid=2DDay Breaking News From International Enexco=2C Miracul...
26/08/2013Mid=2DDay Breaking News From Rango Energy and International ...
26/08/2013and Denison Mines Commence Drill Program on the Bachman Lake...
10/10/2012Mid-Day Breaking News From International Enexco, Gold Reach,...
10/10/2012(Contact Copper)Announces an Increase of 49% to 1.06 Billion Pounds of Coppe...
10/10/2012Announces an Increase of 49% to 1.06 Billion Pounds of Coppe...
27/08/2012Mid-Day Breaking News From Pelangio, International Enexco, S...
27/08/2012(Contact Copper)Confirms New Copper Target at Contact Copper Project (Nevada...
20/06/2012Todd Hilditch Joins International Enexco as Director
08/06/2012RESOURCE WORLD: INTERNATIONAL ENEXCO EXPANDING PROPERTY AND ...
23/05/2012Mid-Day Breaking News From International Enexco, CardioComm,...
23/05/2012(Contact Copper)Additional Drill Results from Contact Copper Project, Nevada
10/05/2012JOIN INTERNATIONAL ENEXCO LTD. AT THE 2012 NEW YORK HARD ASS...
26/04/2012Mid-Day Breaking News From International Enexco and Canada R...
19/03/2012(Contact Copper)Announces Additional Drill Results From Contact Copper Proje...
01/03/2012Mid-Day Breaking News From Mirasol, Novadx, Zimtu, Internati...
01/03/2012(Mann Lake)Announces Winter Geophysical Survey Planned at Mann Lake, Sa...
16/01/2012Mid-Day Breaking News From El Ni=F1o Ventures and Internatio...
28/11/2011Mid-Day Breaking News From El Nino, Millrock, Golden Touch, ...
11/07/2011Former Nevada Governor Jim Gibbons Joins International Enex...
01/12/2010President's Letter International Enexco
02/06/2010REPORTS 161% INCREASE IN MINEABLE COPPER AND 20.2% IRR, IN U...
11/08/2009S SHAREHOLDERS ON MULTIPLE DRILL PROGRAMS
09/06/2009signs JV with Nevada Exploration Inc.
02/06/2009has entered into an option agreement with Fronteer Developme...
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TSX-V (IEC.V)Other OTC (IEXCF)
0,410+0.00%0,3700
TSX-V
CA$ 0,410
10/06 15:54 -
0%
Cours préc. Ouverture
0,410 0,440
Bas haut
0,410 0,440
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
- -  0,410 -%
Volume var. 1 mois
33 100 -%
24hGold TrendPower© : 2
Produit
Développe
Recherche Copper - Gold - Uranium
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 18/12/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,84 AU$+1,75%Trend Power :
OceanaGold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
10,28 US$-0,39%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,71 GBX+4,41%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,62 CA$-1,13%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
16,06 CA$+0,75%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+2,13%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,22 AU$+7,50%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,89 CA$-5,03%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
50,12 US$-1,44%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$-5,26%Trend Power :